Abstract

This document sets general requirements for the treatment of waste electrical and electronic equipment (WEEE) except for preparing for re-use. The requirements for the treatment process preparing for re-use are described in EN 50614. This document is supplemented, for example by standards covering specific equipment.
NOTE 1   This document is intended to cover WEEE arising from electrical and electronic equipment as listed under Annex III of Directive 2012/19/EU.
NOTE 2   For the purposes of this document, treatment includes recovery or disposal operations, including preparation prior to recovery or disposal.
This document addresses all operators involved in the treatment including related handling, sorting, and storage of WEEE.
This document applies to operators processing WEEE and non-WEEE at the same facility and in the same process, regardless the size of the WEEE-related activities.

Status
Not Published
Public Enquiry End Date
31-Dec-2025
Current Stage
5020 - Formal vote (FV) (Adopted Project)
Start Date
12-Oct-2026
Due Date
30-Nov-2026
Completion Date
20-Oct-2026

Buy Documents

Draft

oSIST prEN 50625-1:2025

English language (39 pages)
Preview
Preview
e-Library read for
×1 day

kSIST FprEN 50625-1:2026 is the SIST publication of a draft European standard for the treatment of waste electrical and electronic equipment (WEEE). It sets general treatment requirements for WEEE, except for preparing for re-use, and it is written for operators who handle, sort, store, and treat WEEE. In practice, it tells a treatment facility what to control, document, monitor, and remove so that downstream recycling, recovery, or disposal can be tracked and managed.

What does kSIST FprEN 50625-1:2026 specify?

kSIST FprEN 50625-1:2026 specifies general treatment requirements for WEEE and the related handling, storage, de-pollution, monitoring, and documentation duties. It also applies when WEEE and non-WEEE are processed at the same facility and in the same process, regardless of the size of the WEEE activity.

The document is intended to cover WEEE arising from electrical and electronic equipment listed under Annex III of Directive 2012/19/EU. It also treats “treatment” broadly, as recovery or disposal operations, including preparation before recovery or disposal, but not preparing for re-use.

The document is organized into clauses 1 to 6 and Annexes A to G.

AnnexWhat it covers
ADe-pollution
BDe-pollution monitoring
CDetermination of recycling and recovery rates
DRequirements concerning batch tests
EVoid
FMaterials and components of WEEE requiring selective treatment
GDocumentation for downstream monitoring and establishment of recycling and recovery rates

What are the key requirements of kSIST FprEN 50625-1:2026?

kSIST FprEN 50625-1:2026 focuses on management control, safe handling, selective removal of hazardous or problematic items, and traceable reporting of what happens to each output fraction.

Management, site control, and training

Clause 4 requires the treatment operator to have a management system covering health, safety, environment, and quality, and to run a review and improvement process. The operator must also identify the legal requirements that apply to the site and keep infrastructure, fire safety, and operating conditions suitable for the work performed.

Clause 4 also requires training for everyone at the facility, including contractors. That matters because the document expects staff to know the site’s environmental, health, safety, and fire-prevention policy, and to be trained for the tasks they actually perform.

Receiving, handling, and storage

Clause 5 requires each delivery to be weighed and recorded, with WEEE separated from non-WEEE. WEEE must then be handled with suitable tools, containers, and fixings so it is not damaged and hazardous substances are not released.

Storage before treatment is limited to the amount that can be treated within 12 months, and storage areas need impermeable surfaces, spillage measures, and weatherproof covering where relevant. This is important because the standard ties storage practice to pollution prevention and to the later treatment process.

De-pollution and selective treatment

Clause 5.5 requires procedures to identify WEEE that contains the substances, mixtures, and components listed in Annex F, and to remove them in line with Annex A. If there is uncertainty, WEEE must be treated as if those materials are present.

The operator must keep removed materials separate, label them clearly, and avoid dilution or mixing just to reduce concentrations. In practice, this means the facility needs a controlled selective-treatment route, not just general dismantling.

Monitoring and downstream traceability

Clause 4.4 and Clause 5.6 require monitoring of where WEEE comes from and what happens downstream. The operator must record the origin of each consignment, track downstream treatment until end-of-waste status or final recovery/disposal, and keep the relevant acceptor details.

For output fractions, the document distinguishes between fractions that have reached end-of-waste status, metal fractions with less than 2 % non-metal content, non-metal fractions with less than 2 % other materials, hazardous fractions, and all other fractions. This matters because the reporting level changes with the type of fraction and affects how recycling and recovery are calculated.

Recycling and recovery rates

Clause 5.9 and Annex C require recycling and recovery rates to be determined at least annually for each treatment stream, each operator, and each facility. Where a single treatment stream is processed, annual mass balance data may be used; where mixed streams are processed, batch test results from Annex D are used.

The standard also requires batch tests at least every 2 years per site and per treatment stream. This is the core evidence base for calculating treatment performance, so facilities need repeatable weighing, composition, and downstream documentation.

Disposal and final treatment

Clause 5.10 requires fractions to follow the waste hierarchy and sets conditions for mixed-material fractions sent onward. Hazardous waste designated for disposal must go only to a facility designed and designated for hazardous waste acceptance and disposal.

This matters in practice because the standard does not stop at the treatment plant gate - it follows the fraction until its final treatment route is known and documented.

What terms does kSIST FprEN 50625-1:2026 define?

  • WEEE - waste electrical and electronic equipment, including components, subassemblies, and consumables that are part of the product when it is discarded.
  • de-pollution - selective treatment that removes certain substances, mixtures, and components from the WEEE stream.
  • treatment operator - the operator responsible for treating WEEE.
  • acceptor - the organization that takes ownership of fractions after processing; the document distinguishes first, downstream, and final acceptors.
  • batch - a definite, well-defined amount of WEEE or fractions thereof.
  • batch test - a procedure in which a batch is processed to determine output composition and de-pollution performance.
  • fraction - a separate output stream generated by treatment of WEEE.
  • end-of-waste - the result of treatment when the resulting fractions are no longer classified as waste.

Who uses kSIST FprEN 50625-1:2026?

kSIST FprEN 50625-1:2026 is used by WEEE treatment operators, facility managers, sorting and dismantling staff, logistics operators, and quality, environmental, health, and safety personnel. It is also relevant to downstream acceptors who receive fractions from treatment facilities.

Regulators, auditors, and conformity assessment bodies can use it to check whether a facility has suitable procedures, records, and monitoring for WEEE handling and selective treatment. Buyers and recyclers can use it to understand what evidence they should ask for when they need traceable output fractions and documented downstream treatment.

What changed in kSIST FprEN 50625-1:2026 from the previous edition?

kSIST FprEN 50625-1:2026 supersedes EN 50625-1:2014. The foreword says the revision improves the clarity of requirements, updates outdated references, aligns with technological developments, and clarifies the relationships and boundaries with the CLC/TS 50625 series and EN 50614.

Which standards are used with kSIST FprEN 50625-1:2026?

StandardContribution
CLC/TS 50625-3-1:2015General de-pollution specification and support for monitoring and analysis methods
EN 50625-2-3:2017Treatment requirements for temperature exchange equipment and other WEEE containing VFC and/or VHC
EN 50614:2020Requirements for preparing for re-use
EN 50625-2-1:2014Treatment requirements for lamps
EN 50625-2-2:2015Treatment requirements for WEEE containing CRTs and flat panel displays
EN 50625-2-4:2017Treatment requirements for photovoltaic panels
CLC/TS 50625-3-2:2016De-pollution specification for lamps
CLC/TS 50625-3-3:2017De-pollution specification for CRT and flat panel display equipment
CLC/TS 50625-3-4:2017De-pollution specification for temperature exchange equipment
CLC/TS 50625-3-5:2017De-pollution specification for photovoltaic panels
CLC/TS 50625-4:2017Collection and logistics associated with WEEE
CLC/TS 50625-5:2017Final treatment of WEEE fractions - copper and precious metals
CLC/TR 50625-6:2018Alignment between the Directive 2012/19/EU and the EN 50625 series and EN 50614

What does the kSIST FprEN 50625-1:2026 document contain?

kSIST FprEN 50625-1:2026 contains the procedural and documentary framework for managing WEEE treatment operations. It includes a flow diagram for plastic fractions in Annex A, monitoring methods for capacitors, batteries, and plastics in Annex B, and the rules and formulas for calculating recycling and recovery rates in Annex C.

Annex D gives batch-test planning, minimum batch sizes, processing checks, output-fraction handling, and validation steps. Annex G summarizes the information that must be recorded for downstream monitoring and for establishing recycling and recovery rates, including mass, composition, final use, final treatment technology, and acceptor information.

Relations

Effective Date
16-Jul-2024

Buy Documents

Draft

oSIST prEN 50625-1:2025

English language (39 pages)
Preview
Preview
e-Library read for
×1 day

Get Certified

Connect with accredited certification bodies for this standard

IMQ S.p.A. (Certification)

Italian electrical product certification.

ACCREDIA Italy Verified

SLG Prüf- und Zertifizierungs GmbH

German testing and certification body.

DAKKS Germany Verified

UL Solutions

Global safety science company with testing, inspection and certification.

ANAB United States Verified

Sponsored listings

Frequently Asked Questions

kSIST FprEN 50625-1:2026 is a draft published by the Slovenian Institute for Standardization (SIST). Its full title is "Collection, logistics & treatment requirements for WEEE - Part 1: General treatment requirements". This standard covers: This document sets general requirements for the treatment of waste electrical and electronic equipment (WEEE) except for preparing for re-use. The requirements for the treatment process preparing for re-use are described in EN 50614. This document is supplemented, for example by standards covering specific equipment. NOTE 1 This document is intended to cover WEEE arising from electrical and electronic equipment as listed under Annex III of Directive 2012/19/EU. NOTE 2 For the purposes of this document, treatment includes recovery or disposal operations, including preparation prior to recovery or disposal. This document addresses all operators involved in the treatment including related handling, sorting, and storage of WEEE. This document applies to operators processing WEEE and non-WEEE at the same facility and in the same process, regardless the size of the WEEE-related activities.

This document sets general requirements for the treatment of waste electrical and electronic equipment (WEEE) except for preparing for re-use. The requirements for the treatment process preparing for re-use are described in EN 50614. This document is supplemented, for example by standards covering specific equipment. NOTE 1 This document is intended to cover WEEE arising from electrical and electronic equipment as listed under Annex III of Directive 2012/19/EU. NOTE 2 For the purposes of this document, treatment includes recovery or disposal operations, including preparation prior to recovery or disposal. This document addresses all operators involved in the treatment including related handling, sorting, and storage of WEEE. This document applies to operators processing WEEE and non-WEEE at the same facility and in the same process, regardless the size of the WEEE-related activities.

kSIST FprEN 50625-1:2026 is classified under the following ICS (International Classification for Standards) categories: 13.030.99 - Other standards related to wastes; 29.020 - Electrical engineering in general; 29.100.01 - Components for electrical equipment in general; 31.020 - Electronic components in general; 31.220.01 - Electromechanical components in general. The ICS classification helps identify the subject area and facilitates finding related standards.

kSIST FprEN 50625-1:2026 has the following relationships with other standards: It is inter standard links to SIST EN 50625-1:2014. Understanding these relationships helps ensure you are using the most current and applicable version of the standard.

kSIST FprEN 50625-1:2026 is associated with the following European legislation: EU Directives/Regulations: 2012/19/EU; Standardization Mandates: M/518. When a standard is cited in the Official Journal of the European Union, products manufactured in conformity with it benefit from a presumption of conformity with the essential requirements of the corresponding EU directive or regulation.

kSIST FprEN 50625-1:2026 is available in PDF format for immediate download after purchase. The document can be added to your cart and obtained through the secure checkout process. Digital delivery ensures instant access to the complete standard document.

Standards Content (Sample)

69 Introduction

70 This document aims to assist organisations in:

71 — achieving effective and efficient treatment of waste electrical and electronic equipment (WEEE) in order 72 to prevent pollution and minimize emissions; 73 — promoting increased recycling to facilitate a circular economy; 74 — promoting high quality recovery; 75 — preventing inappropriate disposal of WEEE and fractions thereof; 76 — assuring protection of human health and safety, and the environment; 77 — preventing shipments of WEEE to operators whose operations fail to comply with this normative 78 document or a comparable set of requirements.

79 This document supports the objectives of the Community's environment policy. These aim to preserve, protect 80 and improve the quality of the environment, protect human health and utilize natural resources prudently and 81 rationally. That policy is based on the precautionary principle and the maxims that preventive action to 82 minimize environmental damage should, where possible, be rectified at source and the polluter should pay. 83 The requirements of this document are applicable to all types of WEEE. It is supported by other standards 84 covering particular treatment requirements for:

85 — lamps (EN 50625-2-1:2014, CLC/TS 50625-3-2:2016), 86 — flat panel displays (FPD), cathode ray tubes (CRT) (EN 50625-2-2:2015, CLC/TS 50625-3-3:2017), 87 — temperature exchange equipment (EN 50625-2-3:2017, CLC/TS 50625-3-4:2017), 88 — photovoltaic panels (EN 50625-2-4:2017, CLC/TS 50625-3-5:2017), 89 — collection and logistics (CLC/TS 50625-4:2017), 90 — final processing CLC/TS 50625-5:2017), 91 — preparing for re-use (EN 50614: 2020).

92 Additionally this document is supported by a technical report which provides a more detailed comparison 93 between normative treatment requirements derived directly from the legal text of Directive 2012/19/EC, 94 especially Annex VII, and between informative treatment requirements going beyond the strict requirements of 95 Directive 2012/19/EC.

96 This document has been prepared in order to support European legislation and so uses some of the terms 97 defined in European law. In order to ensure that the definitions used in this document are identical to those 98 defined by law these terms are identified as 'void', indicating that this document does not contain a definition, 99 and a 'Note to entry' that identifies which law contains the legal definition and the term as defined in that law. 100 EN 50625-1:2014 was revised in and replaced by this edition to improve the clarity of requirements, to update 101 outdated references, to align with technological developments and to clarify relationships and boundaries with 102 the CLC/TS 50625 series and EN 50625 series and EN 50614.

oSIST prEN 50625-1:2025 prEN 50625-1:2025 (E) 103 1 Scope 104 This document sets general requirements for the treatment of waste electrical and electronic equipment 105 (WEEE) except for preparing for re-use. The requirements for the treatment process preparing for re-use are 106 described in EN 50614:2020. This document is supplemented, for example by standards covering specific 107 equipment.

108 NOTE 1 This document is intended to cover WEEE arising from electrical and electronic equipment as listed under 109 Annex III of Directive 2012/19/EU.

110 NOTE 2 For the purposes of this document, treatment includes recovery or disposal operations, including preparation 111 prior to recovery or disposal.

112 This document addresses all operators involved in the treatment including related handling, sorting, and 113 storage of WEEE.

114 This document applies to operators processing WEEE and non-WEEE at the same facility and in the same 115 process, regardless the size of the WEEE-related activities. 116 2 Normative references 117 The following documents are referred to in the text in such a way that some or all of their content constitutes 118 requirements of this document. For dated references, only the edition cited applies. For undated references, 119 the latest edition of the referenced document (including any amendments) applies. 120 CLC/TS 50625-3-1:2015, Collection, logistics & treatment requirements for WEEE - Part 3-1: Specification for 121 de-pollution - General 122 EN 50625-2-3:2017, Collection, logistics & treatment requirements for WEEE - Part 2-3: Treatment 123 requirements for temperature exchange equipment and other WEEE containing VFC and/or VHC 124 3 Terms and definitions 125 For the purposes of this document, the following terms and definitions apply. 126 3.1 127 acceptor 128 organisation that physically and/or contractually takes ownership of fractions derived from WEEE, after 129 processing has been carried out by a treatment operator 130 Note 1 to entry: For the purposes of this document, this definition also applies to acceptors processing fractions derived 131 from WEEE and other waste at the same facility.

132 Note 2 to entry: Acceptors may include first acceptor (that directly accepts one or more fractions from the treatment 133 operators), downstream acceptor (every acceptor in the processing chain following after the first acceptor), and final 134 acceptor (acceptor where the final processing step takes place). 135 3.2 136 backlight 137 part of the flat panel display, used with certain flat panel display technologies, that illuminates the flat panel to 138 make the image visible 139 3.3 140 batch 141 definite and well-defined amount of WEEE or fractions thereof

oSIST prEN 50625-1:2025 prEN 50625-1:2025 (E) 142 3.4 143 batch test 144 procedure where a batch is processed to determine the composition of the resulting output fractions and de- 145 pollution performance 146 3.5 147 category 148 group of WEEE to describe types of electrical and electronic equipment within its scope 149 Note 1 to entry: When used in this document, the word “category” should be construed as applying in a comparable 150 manner.

151 Note 2 to entry: WEEE are listed in Directive 2012/19/EU, Annex III. 152 3.6 153 component 154 constituent part of a device which cannot be physically divided into smaller parts without losing its particular 155 function 156 [SOURCE: IEV 151-11-21] 157 3.7 158 cathode ray tube 159 CRT 160 component used to display images comprising a vacuum tube and integral fluorescent screen 161 3.8 162 CRT equipment 163 equipment containing at least one cathode ray tube 164 3.9 165 collection 166 gathering of WEEE, including the preliminary sorting and preliminary storage of WEEE for the purposes of 167 transport to a logistics facility or a treatment facility 168 Note 1 to entry: The term “collection” is adapted from Directive 2008/98/EC. “Collection” means the gathering of waste, 169 including the preliminary sorting and preliminary storage of waste for the purposes of transport to a waste treatment 170 facility.

171 3.10 172 collection facility 173 location designated for the gathering of WEEE to facilitate separate collection 174 Note 1 to entry: Collection facilities and their operators are typically registered, listed, or otherwise approved or 175 designated in accordance with the national legislation implementing Directive 2012/19/EU and Directive 2008/98/EU. 176 Note 2 to entry: A collection facility is different from a collection point. For the definition of the collection point see the 177 CLC/TS 50625-4.

178 3.11 179 de-pollution 180 selective treatment during which certain substances, mixtures and components are removed from the WEEE 181 stream 182 Note 1 to entry: Annex F identifies which (certain) substances, mixtures and components shall be removed and treated 183 from separately collected WEEE, the process being de-pollution. 184 Note 2 to entry: For the purposes of this document, de-pollution is concerned only with the removal of substances, 185 mixtures and components that are hazardous or substances of concern.

oSIST prEN 50625-1:2025 prEN 50625-1:2025 (E) 186 3.12 187 disposal 188 void 189 Note 1 to entry: Directive 2008/98/EC defines disposal: “‘disposal’ means any operation which is not recovery even 190 where the operation has as a secondary consequence the reclamation of substances or energy. Annex I sets out a non- 191 exhaustive list of disposal operations”.

192 3.13 193 end-of-waste 194 result of treatment whereby the resulting fractions are no longer classified as waste 195 Note 1 to entry: Fractions that cease to become waste, following a recovery or recycling operation in compliance with 196 specific criteria according to Article 6 of Directive 2008/98/EC, are regarded as secondary materials and so have achieved 197 end-of-waste status.

198 3.14 199 energy recovery 200 production of useful energy through direct and controlled combustion or other processing of waste 201 Note 1 to entry: Energy recovery is a recovery operation where the material is used principally as a fuel or other means 202 to generate energy, see R1 of Annex II of Directive 2008/98/EC. 203 3.15 204 flat panel 205 that part of the flat panel display where the image is produced 206 3.16 207 flat panel display 208 FPD 209 assembly of components that use technologies that produce and display an image without the use of cathode 210 ray tubes 211 Note 1 to entry: The term “flat panel module” is also used as an alternative to the term flat panel display. 212 3.17 213 FPD equipment

214 equipment using a flat panel display having a display screen larger than 100 cm 215 EXAMPLES LCD TV, plasma TV, LCD screens and monitors, and notebooks 216 3.18 217 fraction 218 separate output stream generated by the treatment of WEEE 219 3.19 220 hazardous waste 221 void 222 Note 1 to entry: The term “hazardous waste” – “waste which exhibits one or more hazardous properties” is defined in 223 Directive 2008/98/EC; the properties of hazardous waste are described in Annex III of Directive 2008/98/EC. 224 3.20 225 lamp 226 electric light source, for general or special lighting purposes, but excluding filament bulbs 227 Note 1 to entry: General lighting can include straight and compact fluorescent lamps, high intensity discharge lamps – 228 including high pressure sodium and metal halide lamps, low pressure sodium lamps, and Light Emitting Diodes (including

oSIST prEN 50625-1:2025 prEN 50625-1:2025 (E) 229 organic). Special lighting is provided by lamps for the purpose of spreading or controlling light (UV lamps, projection 230 lamps, xenon lamps, etc.). A non-exhaustive list can be found in Directive 2012/19/EU. 231 3.21 232 gas discharge 233 void 234 Note 1 to entry: Commission Regulation (EU) 2019/2020 of 1 October 2019 laying down ecodesign requirements for 235 light sources and separate control gears pursuant to Directive 2009/125/EC of the European Parliament and of the Council 236 and repealing Commission Regulations (EC) No 244/2009, (EC) No 245/2009 and (EU) No 1194/2012 (Text with EEA 237 relevance.) contains the following: “gas discharge’ means a phenomenon where light is produced, directly or indirectly, by 238 an electric discharge through a gas, plasma, metal vapour or mixture of gases and vapours; 239 Note 2 to entry: Examples of lamps featuring gas discharge technology include straight fluorescent lamps, compact 240 fluorescent lamps, fluorescent lamps, high intensity discharge lamps – including pressure sodium lamps and metal halide 241 lamps, low pressure sodium lamps, and exclude LED lamps and filament lamps. 242 Note 3 to entry: Some backlighting lamps (typically non-LED types), as mentioned in Annex F and Directive 2012/19/EU 243 Annex VII, contain mercury.

244 3.22 245 logistics 246 planning, implementing and controlling of the transportation, handling, preliminary storage and/or preliminary 247 sorting of WEEE from the point of origin to point of delivery 248 [SOURCE: CLC/TS 50625-4:2017, 3.10, modified] 249 3.23 250 logistics facility 251 facility where an operator performs receiving and preparing for transportation to WEEE treatment operators 252 3.24 253 material recovery 254 void 255 Note 1 to entry: Decision 2011/753/EU contains the following: “’material recovery’ means any recovery operation, 256 excluding energy recovery and the reprocessing into materials which are to be used as fuel”. 257 3.25 258 national competent authority 259 body appointed in accordance with the prevailing laws of a Member State to execute various functions 260 Note 1 to entry: Examples of such functions include performing market surveillance and issuing licences or permits 261 3.26 262 operator 263 entity that performs one or more processes on WEEE 264 Note 1 to entry: Processes on WEEE could include collection, logistics, handling, shipping, sorting, storage, transport, 265 trading, treatment, or preparing for re-use.

266 Note 2 to entry: For the purposes of this document, this definition applies to operators processing WEEE and non-WEEE 267 at the same facility and in the same process, regardless the size of the WEEE related activities. 268 3.27 269 photovoltaic panel 270 PV panel 271 equipment intended to be permanently installed to a fixed installation that converts solar radiation into 272 electrical energy

oSIST prEN 50625-1:2025 prEN 50625-1:2025 (E) 273 3.28 274 preparing for re-use 275 void 276 Note 1 to entry: Directive 2008/98/EC contains the following: “‘preparing for re-use’ means checking, cleaning or 277 repairing recovery operations, by which products or components of products that have become waste are prepared so that 278 they can be re-used without any other pre-processing”.

279 3.29 280 recovery 281 void 282 Note 1 to entry: Directive 2008/98/EC contains the following: “‘recovery’ means any operation the principal result of 283 which is waste serving a useful purpose by replacing other materials which would otherwise have been used to fulfil a 284 particular function, or waste being prepared to fulfil that function, in the plant or in the wider economy. Annex II sets out a 285 non-exhaustive list of recovery operations”.

286 3.30 287 recycling 288 void 289 Note 1 to entry: Directive 2008/98/EC contains the following: “‘recycling’ means any recovery operation by which waste 290 materials are reprocessed into products, materials or substances whether for the original or other purposes. It includes the 291 reprocessing of organic material but does not include energy recovery and the reprocessing into materials that are to be 292 used as fuels or for backfilling operations”.

293 3.31 294 removal 295 void 296 Note 1 to entry: Directive 2012/19/EU contains the following: “‘removal’ means manual, mechanical, chemical or 297 metallurgic handling with the result that hazardous substances, mixtures and components are contained in an identifiable 298 stream or are an identifiable part of a stream within the treatment process. A substance, mixture or component is 299 identifiable if it can be monitored to verify environmentally safe treatment”. 300 Note 2 to entry: Where used in this standard, it is essential that the word “remove” be construed as having a meaning 301 that corresponds to the defined word “removal”.

302 3.32 303 re-use 304 void 305 Note 1 to entry: Directive 2008/98/EC contains the following: “‘re-use’ means any operation by which products or 306 components that are not waste are used again for the same purpose for which they were conceived”. 307 3.33 308 storage 309 process whereby WEEE is selected and placed in a particular location awaiting treatment or preparing for re- 310 use 311 3.34 312 temperature exchange equipment 313 equipment using fluids other than water for temperature exchange 314 Note 1 to entry: This is a category of electrical and electronic equipment covered by Directive 2012/19/EU. This Directive 315 does not define what is meant by “temperature exchange equipment” but Annex IV contains the following non-exhaustive 316 list: refrigerators, freezers, equipment which automatically delivers cold products, air conditioning equipment, 317 dehumidifying equipment, heat pumps, radiators containing oil and other temperature exchange equipment using fluids

oSIST prEN 50625-1:2025 prEN 50625-1:2025 (E) 318 other than water for the temperature exchange. If this term is clarified further by the European Commission or the Courts 319 then it is essential that the term as used in this standard is construed in the same way as those clarifications. 320 3.35 321 treatment 322 void 323 Note 1 to entry: Directive 2008/98/EC contains the following: “‘treatment’ means recovery or disposal operations, 324 including preparation prior to recovery or disposal”.

325 Note 2 to entry: Requirements for the treatment operation of preparing for re-use are set out in EN 50614. 326 3.36 327 treatment facility 328 location where WEEE undergoes treatment 329 3.37 330 treatment operator 331 operator responsible for the treatment of WEEE 332 3.38 333 volatile fluorocarbon 334 VFC 335 organic chemical compound consisting of carbon and fluorine atoms (in some cases also with chlorine and/or 336 hydrogen), which is able to change phase when used as a refrigerant or produce cells in plastic structure of an 337 insulating foam when used as a blowing agent 338 Note 1 to entry: Common commercial designations for these materials are R12, R11 for CFCs, R22, R141b for HCFCs 339 and R134a, R410A, R407C, R32, R1234yf and R1234ze for HFCs. 340 Note 2 to entry: Chemically, volatile fluorocarbons could be either alkyl halides or alkene halides. 341 Note 3 to entry: CFC, HCFC, HFC and HC are all VOCs – Volatile Organic Compounds. 342 Note 4 to entry: Annex F and Directive 2012/19/EU Annex VII part 2 refers to ‘foam’ rather than ‘insulating foam’, as 343 used in the above definition.

344 3.39 345 volatile hydrocarbon 346 VHC 347 organic chemical compound consisting entirely of hydrogen and carbon which is able to change phase when 348 used as a refrigerant or produce cells in plastic structure of an insulating foam when used as a blowing agent 349 Note 1 to entry: Common designations for volatile hydrocarbons are R290 for propane, R600a for isobutane, R1270 for 350 propene and RC601 for cyclopentane. Mixtures of VHC are also possible. 351 Note 2 to entry: Annex F and Directive 2012/19/EU Annex VII part 2 refers to ‘foam’ rather than ‘insulating foam’, as 352 used in the above definition.

353 3.40 354 waste 355 void 356 Note 1 to entry: Directive 2008/98/EC contains the following: “‘waste’ means any substance or object which the holder 357 discards or intends or is required to discard”.

oSIST prEN 50625-1:2025 prEN 50625-1:2025 (E) 358 3.41 359 waste electrical and electronic equipment 360 WEEE 361 void 362 Note 1 to entry: Directive 2012/19/EU contains the following: “‘waste electrical and electronic equipment’ or ‘WEEE’ 363 means electrical or electronic equipment which is waste within the meaning of Article 3(1) of Directive 2008/98/EC, 364 including all components, subassemblies and consumables which are part of the product at the time of discarding”. 365 Note 2 to entry: Considering note 1 to entry, this standard covers whole equipment discarded as WEEE and fractions 366 thereof.

367 Note 3 to entry: For the purposes of this document the terms equipment and appliances have the same meaning. 368 4 Administrative and organisational requirements 369 4.1 Management principles 370 The treatment operator shall ensure that a management system is in place for all WEEE-related activities in 371 the fields of health, safety, environment and quality.

...