Abstract

This document specifies requirements and guidance for production assurance and reliability management as applicable to the assets and operations associated with exploration drilling, exploitation, processing and transport of petroleum, petrochemical and natural gas resources. It covers the assets and associated activities for upstream, midstream, downstream and petrochemical business categories. It focuses on the production assurance of oil and gas with respect to production and associated activities and covers the analysis of reliability and maintenance of the equipment. This includes a variety of associated systems and equipment in the oil and gas value chain. Production assurance addresses not only hydrocarbon production, but also associated activities such as drilling, pipeline installation and subsea intervention.
The document also supports production assurance and reliability management for lower carbon energy assets and associated operations, e.g. carbon capture and storage (CCS), hydrogen, ammonia, and wind energy. It describes the processes, activities, requirements and guidelines for systematic management, effective planning, execution and use of production assurance and reliability technology.
This document defines 12 processes, of which seven are denoted as core production assurance processes and addressed in this document. The remaining five processes are denoted as interacting processes and while they are outside the scope of this document, information is provided as to how they relate to production assurance and reliability management. The relationship of the core production assurance processes with these interacting processes, however, is within the scope of this document as the flow of information to and from these latter processes is required to ensure that production assurance requirements are fulfilled.
The document specifies how to establish and execute a production assurance programme (PAP) and a reliability management programme (RMP).
This document lists processes and activities that can be initiated to add value for the stakeholder (e.g. operator), where the selected process can depend on their business strategy and application area.
This document is intended for the following users and associated activities by their personnel:
Operators: Production assurance and reliability management activities. Related activities include project management and control, technology development, technology qualification, concept and system design, risk management (including HSE), integrity management, and maintenance management.
Contractors: Activities by the main contractor for engineering, procurement, construction, drilling, installation, operation, maintenance services, etc.
Vendors: Activities by manufacturer or supplier related to equipment design and quality management, technology development and qualification.
Authorities: Activities by regulatory bodies to ensure HSE, resource utilization and economic efficiency in operations.
Consultants: Consultancy services aimed at supporting production assurance and reliability management.
Universities: Activities associated with educating industry professionals, as well as conducting fundamental or applied research projects, when related to production assurance, reliability management, and technology development. This includes improvement of the methods and frameworks described herein.
Research institutions: Research activities related to production assurance, reliability management, and technology development. This includes equipment qualification testing and advanced engineering assessments using the methods and frameworks described herein.

Status
Published
Public Enquiry End Date
30-Jul-2025
Publication Date
13-Jul-2026
Technical Committee
I13 - Imaginarni 13
Current Stage
6060 - National Implementation/Publication (Adopted Project)
Start Date
09-Jul-2026
Due Date
13-Sep-2026
Completion Date
14-Jul-2026

Buy Documents

Standard

SIST EN ISO 20815:2026

English language (112 pages)
Preview
Preview
e-Library read for
×1 day

SIST EN ISO 20815:2026 is a CEN European Standard for production assurance and reliability management in oil and gas industries including lower carbon energy. It gives requirements and guidance for planning, executing and documenting production assurance and reliability work for assets and operations across exploration, production, processing and transport, including production assurance programme (PAP) and reliability management programme (RMP) work. The standard is aimed at operators, contractors, vendors, authorities, consultants, universities and research institutions that need a common framework for reliability, performance and decision support.

What does SIST EN ISO 20815:2026 specify?

SIST EN ISO 20815:2026 specifies how to manage production assurance and reliability across the oil and gas value chain, and it also applies the same approach to lower carbon energy assets such as carbon capture and storage (CCS), hydrogen, ammonia and wind energy. The document combines requirements and guidance so that teams can plan work, analyse reliability and maintenance, and connect those activities to project and operating decisions.

The scope covers upstream, midstream, downstream and petrochemical business categories. It focuses on production assurance for oil and gas production and associated activities such as drilling, pipeline installation and subsea intervention.

The standard is organized into Clauses 1 to 5 and Annexes A to I. A key structural point is that it defines 12 processes: seven core production assurance processes and five interacting processes. The core processes are addressed directly, while the interacting processes are described to show how information must flow between disciplines.

AnnexWhat it covers
ARequired structure and content of the PAP and RMP
BCore production assurance processes and activities
CInteracting processes that support production assurance
DProduction performance analyses
EReliability data collection, qualification and use
FPerformance objectives and requirements
GNormative performance measures for production assurance
HDistinguishing production availability analysis from major accident risk
IOutline of analysis techniques and methods

What are the key requirements of SIST EN ISO 20815:2026?

SIST EN ISO 20815:2026 requires a structured, life-cycle approach. In practice, that means production assurance is not a one-time study. It has to be planned, updated and linked to design, procurement, operation, maintenance and decommissioning decisions.

Set up the PAP or RMP

Clause 4 and Annex A require a PAP or RMP with defined title, purpose, scope, system boundaries, revision control, philosophy, objectives, risk categorization, responsibilities, activity schedule and references. A PAP is generally used for the whole asset or project, while an RMP can be used for a contractor, supplier, manufacturer or technology development project. This matters because it creates one controlled document for who does what, when, and against which targets.

Use economic optimization within real constraints

Clause 4.2 says the main principle is economic optimization within given constraints and framework conditions. These include statutory HSE requirements, regulatory requirements, project budget and timing, contractual conditions, technical constraints and climate change considerations. The standard also says to consider ISO 15663 and the life cycle costing management plan (LCCMP) when establishing the PAP or RMP, so cost, production loss and reliability are evaluated together rather than separately.

Match the amount of work to project risk

Clause 4.3 and Annex B require project risk categorization to justify the extent of production assurance activity. The document says the amount of planned work should depend on the risk class and the life cycle phase. In practice, high-risk projects need more analysis, review and follow-up than low-risk ones, and the chosen activities should be timed early enough to influence decisions before they are fixed.

Define performance objectives and verify them

Annex F requires performance objectives and performance requirements to be stated clearly in the PAP or RMP. They should describe limits, application, failure modes, downtime, relevant time period, operating and maintenance conditions, verification methods, and how non-conformance will be handled. Annex F also points to measurable performance measures such as production availability, production efficiency, system availability, technical availability and operational availability, so teams can check whether the requirement can be demonstrated in practice.

Use the right performance measures and event categories

Annex G is normative and sets the framework for production assurance performance measures. It distinguishes time-based and volume-based measures and says the calculation must clearly state which type is being used. It also requires the analyst to define which events are included or excluded. That is important because a calculation for production availability can change significantly depending on how planned downtime, unplanned downtime, and loss categories are treated.

Track data, qualify it and close the feedback loop

Annex B, Annex D and Annex E require controlled use of reliability and production performance data. The standard expects data to be qualified, traceable and matched as closely as possible to the equipment type, operating conditions and analysis boundary. It also points to CMMIS data and ISO 14224 for reliability and maintenance data, and to ISO/TS 3250 for production loss reporting in the operating phase. In practice, this means operators need a live feedback loop from field data into design, maintenance and reliability decisions.

Keep linked disciplines aligned

Annex C makes clear that several related processes sit outside the core production assurance discipline, but their information flow is still required. These include project risk management, qualification and testing, supply chain management, management of change and organizational learning. The practical effect is that production assurance work has to stay connected to risk registers, design reviews, supplier requirements and lessons learned.

What terms does SIST EN ISO 20815:2026 define?

  • Production assurance programme (PAP) - The planned set of production assurance activities used for an asset or project, with the required organization, schedule and references.
  • Reliability management programme (RMP) - A programme with the same structure and guidance as a PAP, used for a contractor, supplier, manufacturer or technology development scope.
  • Availability - The ability of an item to be in a state to perform as required under given conditions; in practice, it is a measure of whether equipment or a system is ready when needed.
  • Reliability - The ability of an item to perform a required function for a given time under given conditions; this is the basis for judging how likely a system is to keep working.
  • Failure mode - The manner in which failure occurs; this helps analysts connect a problem to its effect on a system.
  • Failure cause - The set of circumstances that leads to failure; this is used to trace root causes across design, manufacture, installation, operation or maintenance.
  • Production potential - The maximum volume that can be produced through wells, plant and export installations within a given period, including market restrictions.

Who uses SIST EN ISO 20815:2026?

SIST EN ISO 20815:2026 is used by operators to manage production assurance and reliability work across project, integrity and maintenance activities. It is also used by contractors for engineering, procurement, construction, drilling, installation and maintenance services.

Vendors use SIST EN ISO 20815:2026 for equipment design, quality management, technology development and qualification. Authorities use it when checking health, safety and environment (HSE), resource use and economic efficiency in operations.

Consultants use it to support production assurance and reliability studies. Universities and research institutions use it for education, research, equipment qualification testing and advanced engineering assessments.

The standard is relevant in oil and gas, petrochemical and related lower carbon energy applications, including CCS, hydrogen, ammonia and wind energy operations.

What changed in SIST EN ISO 20815:2026 from the previous edition?

SIST EN ISO 20815:2026 supersedes EN ISO 20815:2018. The European foreword states that the ISO text was approved by CEN without modification.

Which standards are used with SIST EN ISO 20815:2026?

  • ISO 14224:2016 - Provides the reliability and maintenance data framework used throughout the standard, including equipment taxonomy, failure data, repair data and data qualification.
  • ISO/TS 3250:2021 - Provides production efficiency calculation and reporting in the operating phase, and supports the production loss categories used in performance tracking.
  • ISO 15663:2021 - Provides the life cycle costing framework used when comparing alternatives by cost, revenue impact and production loss.

What does the SIST EN ISO 20815:2026 document contain?

SIST EN ISO 20815:2026 contains a framework section, normative references, terms and abbreviated terms, then a main body on production assurance and decision support. It uses tables to set out the core and interacting processes, their objectives, inputs, outputs and activities across life cycle phases.

Annex A gives the required structure and content for the PAP and RMP, including title, terms of reference, philosophy, objectives, risk categorization, organization, schedule and references. Annexes B and C break down the 12 processes and show how production assurance links to risk management, qualification, supply chain, change management and organizational learning.

Annexes D, E, F and G cover production performance analysis, reliability data, performance objectives and performance measures. Annex H separates production availability analysis from major accident risk, and Annex I summarizes analysis techniques such as FMEA, FTA, RBD, MPA, BBN, HAZOP, POR, technology maturity assessment, LCC, human factors analysis, software reliability, structural reliability, weather impact analysis, loading performance analysis, RCM, RBI, test interval optimization and spare-parts optimization.

Relations

Effective Date
12-Mar-2025

Buy Documents

Standard

SIST EN ISO 20815:2026

English language (112 pages)
Preview
Preview
e-Library read for
×1 day

Get Certified

Connect with accredited certification bodies for this standard

BSI Group

BSI (British Standards Institution) is the business standards company that helps organizations make excellence a habit.

UKAS United Kingdom Verified

Bureau Veritas

Bureau Veritas is a world leader in laboratory testing, inspection and certification services.

COFRAC France Verified

DNV

DNV is an independent assurance and risk management provider.

NA Norway Verified

Sponsored listings

Frequently Asked Questions

SIST EN ISO 20815:2026 is a standard published by the Slovenian Institute for Standardization (SIST). Its full title is "Oil and gas industries including lower carbon energy - Production assurance and reliability management (ISO 20815:2026)". This standard covers: This document specifies requirements and guidance for production assurance and reliability management as applicable to the assets and operations associated with exploration drilling, exploitation, processing and transport of petroleum, petrochemical and natural gas resources. It covers the assets and associated activities for upstream, midstream, downstream and petrochemical business categories. It focuses on the production assurance of oil and gas with respect to production and associated activities and covers the analysis of reliability and maintenance of the equipment. This includes a variety of associated systems and equipment in the oil and gas value chain. Production assurance addresses not only hydrocarbon production, but also associated activities such as drilling, pipeline installation and subsea intervention. The document also supports production assurance and reliability management for lower carbon energy assets and associated operations, e.g. carbon capture and storage (CCS), hydrogen, ammonia, and wind energy. It describes the processes, activities, requirements and guidelines for systematic management, effective planning, execution and use of production assurance and reliability technology. This document defines 12 processes, of which seven are denoted as core production assurance processes and addressed in this document. The remaining five processes are denoted as interacting processes and while they are outside the scope of this document, information is provided as to how they relate to production assurance and reliability management. The relationship of the core production assurance processes with these interacting processes, however, is within the scope of this document as the flow of information to and from these latter processes is required to ensure that production assurance requirements are fulfilled. The document specifies how to establish and execute a production assurance programme (PAP) and a reliability management programme (RMP). This document lists processes and activities that can be initiated to add value for the stakeholder (e.g. operator), where the selected process can depend on their business strategy and application area. This document is intended for the following users and associated activities by their personnel: Operators: Production assurance and reliability management activities. Related activities include project management and control, technology development, technology qualification, concept and system design, risk management (including HSE), integrity management, and maintenance management. Contractors: Activities by the main contractor for engineering, procurement, construction, drilling, installation, operation, maintenance services, etc. Vendors: Activities by manufacturer or supplier related to equipment design and quality management, technology development and qualification. Authorities: Activities by regulatory bodies to ensure HSE, resource utilization and economic efficiency in operations. Consultants: Consultancy services aimed at supporting production assurance and reliability management. Universities: Activities associated with educating industry professionals, as well as conducting fundamental or applied research projects, when related to production assurance, reliability management, and technology development. This includes improvement of the methods and frameworks described herein. Research institutions: Research activities related to production assurance, reliability management, and technology development. This includes equipment qualification testing and advanced engineering assessments using the methods and frameworks described herein.

This document specifies requirements and guidance for production assurance and reliability management as applicable to the assets and operations associated with exploration drilling, exploitation, processing and transport of petroleum, petrochemical and natural gas resources. It covers the assets and associated activities for upstream, midstream, downstream and petrochemical business categories. It focuses on the production assurance of oil and gas with respect to production and associated activities and covers the analysis of reliability and maintenance of the equipment. This includes a variety of associated systems and equipment in the oil and gas value chain. Production assurance addresses not only hydrocarbon production, but also associated activities such as drilling, pipeline installation and subsea intervention. The document also supports production assurance and reliability management for lower carbon energy assets and associated operations, e.g. carbon capture and storage (CCS), hydrogen, ammonia, and wind energy. It describes the processes, activities, requirements and guidelines for systematic management, effective planning, execution and use of production assurance and reliability technology. This document defines 12 processes, of which seven are denoted as core production assurance processes and addressed in this document. The remaining five processes are denoted as interacting processes and while they are outside the scope of this document, information is provided as to how they relate to production assurance and reliability management. The relationship of the core production assurance processes with these interacting processes, however, is within the scope of this document as the flow of information to and from these latter processes is required to ensure that production assurance requirements are fulfilled. The document specifies how to establish and execute a production assurance programme (PAP) and a reliability management programme (RMP). This document lists processes and activities that can be initiated to add value for the stakeholder (e.g. operator), where the selected process can depend on their business strategy and application area. This document is intended for the following users and associated activities by their personnel: Operators: Production assurance and reliability management activities. Related activities include project management and control, technology development, technology qualification, concept and system design, risk management (including HSE), integrity management, and maintenance management. Contractors: Activities by the main contractor for engineering, procurement, construction, drilling, installation, operation, maintenance services, etc. Vendors: Activities by manufacturer or supplier related to equipment design and quality management, technology development and qualification. Authorities: Activities by regulatory bodies to ensure HSE, resource utilization and economic efficiency in operations. Consultants: Consultancy services aimed at supporting production assurance and reliability management. Universities: Activities associated with educating industry professionals, as well as conducting fundamental or applied research projects, when related to production assurance, reliability management, and technology development. This includes improvement of the methods and frameworks described herein. Research institutions: Research activities related to production assurance, reliability management, and technology development. This includes equipment qualification testing and advanced engineering assessments using the methods and frameworks described herein.

SIST EN ISO 20815:2026 is classified under the following ICS (International Classification for Standards) categories: 03.100.01 - Company organization and management in general; 75.020 - Extraction and processing of petroleum and natural gas. The ICS classification helps identify the subject area and facilitates finding related standards.

SIST EN ISO 20815:2026 has the following relationships with other standards: It is inter standard links to SIST EN ISO 20815:2019. Understanding these relationships helps ensure you are using the most current and applicable version of the standard.

SIST EN ISO 20815:2026 is available in PDF format for immediate download after purchase. The document can be added to your cart and obtained through the secure checkout process. Digital delivery ensures instant access to the complete standard document.

Standards Content (Sample)

Contents

  • Introduction
  • 1 Scope
  • 2 Normative references
  • 3 Terms, definitions and abbreviated terms
  • 3.1 Terms and definitions
  • 3.1.1 active repair time
  • 3.1.2 asset
  • 3.1.3 availability
  • 3.1.4 average availability
  • 3.1.5 barrier
  • 3.1.6 binary item
  • 3.1.7 capital expenditure
  • 3.1.8 common cause failure
  • 3.1.9 common mode failures
  • 3.1.10 condition monitoring
  • 3.1.11 corrective maintenance
  • 3.1.12 deliverability
  • 3.1.13 design life
  • 3.1.14 demand availability
  • 3.1.15 down state
  • 3.1.16 down time
  • 3.1.17 downstream
  • 3.1.18 failure
  • 3.1.19 failure cause
  • 3.1.20 failure data
  • 3.1.21 failure mode
  • 3.1.22 failure rate
  • 3.1.23 fault
  • 3.1.24 fault tolerance
  • 3.1.25 human error
  • 3.1.26 instantaneous availability
  • 3.1.27 integrity
  • 3.1.28 integrity management
  • 3.1.29 item
  • 3.1.30 life cycle costing
  • 3.1.31 life cycle phase
  • 3.1.32 logistic delay
  • 3.1.33 lost revenue
  • 3.1.34 maintainability
  • 3.1.35 maintainable item
  • 3.1.36 maintenance
  • 3.1.37 maintenance data
  • 3.1.38 maintenance management
  • 3.1.39 maintenance supportability
  • 3.1.40 major accident
  • 3.1.41 mean time to failure
  • 3.1.42 midstream
  • 3.1.43 modification
  • 3.1.44 multi-state item
  • 3.1.45 observation period
  • 3.1.46 on-stream availability
  • 3.1.47 operating expenditure
  • 3.1.48 operating state
  • 3.1.49 operating time
  • 3.1.50 operational availability
  • 3.1.51 performance measure
  • 3.1.52 performance objective
  • 3.1.53 performance requirement
  • 3.1.54 periodic tests
  • 3.1.55 petrochemical
  • 3.1.56 plant production capacity
  • 3.1.57 preventive maintenance
  • 3.1.58 production assurance
  • 3.1.59 production availability
  • 3.1.60 production efficiency
  • 3.1.61 production loss
  • 3.1.62 production performance
  • 3.1.63 production performance analysis
  • 3.1.64 production potential
  • 3.1.65 redundancy
  • 3.1.66 reliability
  • 3.1.67 reliability data
  • 3.1.68 reliability management
  • 3.1.69 required function
  • 3.1.70 risk
  • 3.1.71 risk register
  • 3.1.72 state capacity
  • 3.1.73 survival probability
  • 3.1.74 sustainability
  • 3.1.75 system

Introduction

The oil and gas industries, including petrochemical and lower carbon energy activities, involve large capital expenditure (CAPEX) and operating expenditure (OPEX). The safety and profitability of the associated assets are dependent upon the reliability, availability and maintainability of the systems and components that are used. Therefore, production assurance and reliability management are essential for optimal production availability. This contributes to delivering affordable energy in a sustainable manner. The concept of production assurance, introduced in this document, enables a common understanding with respect to use of reliability technology in the various life cycle phases. Production assurance covers the activities implemented to achieve and maintain an optimal performance level in terms of the overall economy, which is consistent with applicable regulatory requirements and framework conditions.

SIST EN ISO 20815:2026

SIST EN ISO 20815:2026 International Standard ISO 20815:2026(en) Oil and gas industries including lower carbon energy — Production assurance and reliability management

1 Scope

This document specifies requirements and guidance for production assurance and reliability management as applicable to the assets and operations associated with exploration drilling, exploitation, processing and transport of petroleum, petrochemical and natural gas resources. It covers the assets and associated activities for upstream, midstream, downstream and petrochemical business categories. It focuses on the production assurance of oil and gas with respect to production and associated activities and covers the analysis of reliability and maintenance of the equipment. This includes a variety of associated systems and equipment in the oil and gas value chain. Production assurance addresses not only hydrocarbon production, but also associated activities such as drilling, pipeline installation and subsea intervention. The document also supports production assurance and reliability management for lower carbon energy assets and associated operations, e.g. carbon capture and storage (CCS), hydrogen, ammonia, and wind energy. It describes the processes, activities, requirements and guidelines for systematic management, effective planning, execution and use of production assurance and reliability technology. This document defines 12 processes, of which seven are denoted as core production assurance processes and addressed in this document. The remaining five processes are denoted as interacting processes and while they are outside the scope of this document, information is provided as to how they relate to production assurance and reliability management. The relationship of the core production assurance processes with these interacting processes, however, is within the scope of this document as the flow of information to and from these latter processes is required to ensure that production assurance requirements are fulfilled. The document specifies how to establish and execute a production assurance programme (PAP) and a reliability management programme (RMP).

This document lists processes and activities that can be initiated to add value for the stakeholder (e.g. operator), where the selected process can depend on their business strategy and application area. This document is intended for the following users and associated activities by their personnel:

  • Operators: Production assurance and reliability management activities. Related activities include project management and control, technology development, technology qualification, concept and system design, risk management (including HSE), integrity management, and maintenance management.
  • Contractors: Activities by the main contractor for engineering, procurement, construction, drilling, installation, operation, maintenance services, etc.
  • Vendors: Activities by manufacturer or supplier related to equipment design and quality management, technology development and qualification.
  • Authorities: Activities by regulatory bodies to ensure HSE, resource utilization and economic efficiency in operations.
  • Consultants: Consultancy services aimed at supporting production assurance and reliability management.
  • Universities: Activities associated with educating industry professionals, as well as conducting fundamental or applied research projects, when related to production assurance, reliability management, and technology development. This includes improvement of the methods and frameworks described herein.

SIST EN ISO 20815:2026 ISO 20815:2026(en) - Research institutions: Research activities related to production assurance, reliability management, and technology development. This includes equipment qualification testing and advanced engineering assessments using the methods and frameworks described herein.

2 Normative references

The following documents are referred to in the text in such a way that some or all of their content constitutes requirements of this document. For dated references, only the edition cited applies. For undated references, the latest edition of the referenced document (including any amendments) applies. ISO 14224:2016, Petroleum, petrochemical and natural gas industries — Collection and exchange of reliability and maintenance data for equipment ISO/TS 3250:2021, Petroleum, petrochemical and natural gas industries — Calculation and reporting production efficiency in the operating phase ISO 15663:2021, Petroleum, petrochemical and natural gas industries — Life cycle costing

3 Terms, definitions and abbreviated terms

3.1 Terms and definitions

For the purposes of this document, the following terms and definitions apply. ISO and IEC maintain terminology databases for use in standardization at the following addresses:

  • ISO Online browsing platform: available at https:// www .iso .org/ obp
  • IEC Electropedia: available at https:// www .electropedia .org/

3.1.1 active repair time

effective time to achieve repair of an item (3.1.29) Note 1 to entry: The expectation of the effective time to repair is called MART (mean active repair time). Note 2 to entry: ISO 14224 distinguishes between the terms mean active repair time (MART), mean time to repair (MTTR), mean time to restoration (MTTRes), and mean overall repairing time (MRT). See ISO 14224:2016, 3.59, 3,61, 3.63 and 3.64 for further details.

Note 3 to entry: The mean active repair time (MART) is defined as “expected active repair time” in ISO/TR 12489:2013, 3.1.34. See also ISO/TR 12489:2013, Figures 5 and 6.

[SOURCE: ISO 14224:2016, 3.2, modified — Notes 1 to 2 to entry have been added; notes 1 and 2 to entry have been consolidated to become note 3 to entry.]

3.1.2 asset

item (3.1.29), thing or entity that has potential or actual value to an organization Note 1 to entry: Assets can be physical or non-physical.

Note 2 to entry: A grouping of assets referred to as an "asset system," can also be considered as an asset. Note 3 to entry: In this document, "asset" only refers to the physical assets, which are tangible assets. An organization can also operate assets that are wholly owned or partly owned through joint ventures or other arrangements. Typically, an asset is a facility or an installation, or a group of facilities. The facility corresponds to an installation category in ISO 14224:2016, Table A.1. These installations can be subdivided into plants or units, systems (3.1.75), equipment classes (see ISO 14224:2016, 3.18), subunits, components, etc. as described in ISO 14224:2016, Table 2. [SOURCE: ISO 55000:2024, 3.1.1, modified — Note 3 to entry has been added.]

SIST EN ISO 20815:2026 ISO 20815:2026(en)

3.1.3 availability

ability to be in a state to perform as required under given conditions Note 1 to entry: For a binary item (3.1.6), the measure of the availability is the probability of being in up state (3.1.79) (i.e. in a state belonging to the up state class).

Note 2 to entry: Figure 1 shows a system that is available at time t and unavailable at time t . 1 2 Note 3 to entry: See ISO 14224:2016, Annex C for a more detailed description and interpretation of availability. Note 4 to entry: Technical availability (3.1.76) or operational availability (3.1.50) can be used as derived performance measures (3.1.51) to reflect estimated availability. Case specific definition of system availability is needed to reflect the system (3.1.75) being addressed.

Note 5 to entry: Further terms are given in ISO/TR 12489.

Note 6 to entry: See Figure G.1 for further information.

[SOURCE: IEC 60050-192:2015, 192-01-23, modified — Notes to entry have been replaced by the new notes 1 to 6 to entry.]

3.1.4 average availability

mean availability Ā(t , t ) 1 2 average value of the instantaneous availability (3.1.26) over a given time interval (t , t ) 1 2 Note 1 to entry: The average availability is the ratio between the accumulated time spent in up state (3.1.79) and the length of the considered period of observation. For example, Figure 1 shows the average availability of the system over the interval [0, t ] which is equal to (δ + δ + δ + δ + δ + δ + δ + δ )/t , i.e. 1 ̶ δ /t where δ /t is the average 3 1 2 3 4 5 6 8 9 3 7 3 7 3 unavailability of the system. This formula is similar to the formula obtained for production availability (3.1.59) calculations when only two levels, 100 % and 0 %, are considered. Note 2 to entry: The average availability can be interpreted as the long-run proportion of time where the item is able to function. Mathematically speaking, the average availability is the mathematical expectation of the term availability (3.1.3), as this term does not have the mathematical property of a normal probability and cannot be handled as such. [SOURCE: IEC 60050-192:2015, 192-08-05, modified — Note 1 to entry has been replaced by the new notes 1 and 2 to entry.]

3.1.5 barrier

functional grouping of safeguards or controls selected to prevent a major accident (3.1.40) or limit the consequences [SOURCE: ISO 17776:2016, 3.1.1, modified — Notes to entry have been removed.]

3.1.6 binary item

item (3.1.29) with two classes of states Note 1 to entry: The two classes can be up state (3.1.79) and down state (3.1.15). EXAMPLE 1 An item that only has an up state and a down state is a binary item. Components A and B in Figure 1 are binary items.

EXAMPLE 2 A system made up of two redundant binary items, components A and B, has four states: φ (both A and

B in up state), φ (A in up state and B in down state), φ (A in down state and B in up state), φ (both A and B in down 2 3 4 state). If the system is able to operate as required in states φ , φ and φ and not able in state φ , it is a binary item 1 2 3 4 with the up state class {φ , φ , φ } and the down class {φ }. This is illustrated in Figure 1. 1 2 3 4

SIST EN ISO 20815:2026 ISO 20815:2026(en) Key A component A B component B S system δ period of time t time X state of component A (binary item) A X state of component B (binary item) B φ state of the system S (multi-state item) C class of states of system S (binary item) NOTE The two components each have states 1 (Up) and 0 (Down). System S as a binary item has classes 1 (Up) and 0 (Down).

Figure 1 — Illustration of availability behaviour of an 1oo2 system

3.1.7 capital expenditure

CAPEX investment used to purchase, install and commission an asset (3.1.2) Note 1 to entry: See further information regarding estimation of CAPEX in ISO 15663:2021, Clause C.2. [SOURCE: ISO 15663:2021, 3.1.7]

3.1.8 common cause failure

failure of multiple items (3.1.29), which would otherwise be considered independent of one another, resulting from a single cause Note 1 to entry: Common cause failures can also be common mode failures (3.1.9).

SIST EN ISO 20815:2026 ISO 20815:2026(en) Note 2 to entry: The potential for common cause failures reduces the effectiveness of system redundancy. Note 3 to entry: It is generally accepted that the failures occur simultaneously or within a short time of each other. Note 4 to entry: Components that fail due to a shared cause normally fail in the same functional mode. The term common mode is therefore sometimes used. It is, however, not considered to be a precise term for communicating the characteristics that describe a common cause failure.

Note 5 to entry: Explicit and implicit common mode failures are defined in ISO/TR 12489:2013, 5.4.2. Note 6 to entry: Regarding interpretation rules for common cause failure parameters, see also ISO 14224:2016, C.1.6. [SOURCE: IEC 60050-192:2015, 192-03-18, modified — Notes 3 through 6 to entry have been added.]

3.1.9 common mode failures

failures of different items characterized by the same failure mode Note 1 to entry: Common mode failures can have different causes. Note 2 to entry: Common mode failures can also be common cause failures (3.1.8). Note 3 to entry: The potential for common mode failures reduces the effectiveness of system redundancy. [SOURCE: IEC 60050-192:2015, 192-03-19]

3.1.10 condition monitoring

obtaining information about physical state or operational parameters Note 1 to entry: Condition monitoring is used to determine when preventive maintenance (3.1.57) may be required. Note 2 to entry: Condition monitoring may be conducted automatically during operation or at planned intervals. Note 3 to entry: Condition monitoring is part of condition-based maintenance. See also ISO 14224:2016, Figure 6. [SOURCE: IEC 60050-192:2015, 192-06-28, modified — Note 3 to entry has been replaced.]

3.1.11 corrective maintenance

maintenance (3.1.36) carried out after fault (3.1.23) detection to effect restoration Note 1 to entry: See also ISO/TR 12489:2013, Figures 5 and 6, which illustrate terms used for quantifying corrective maintenance.

[SOURCE: IEC 60050-192:2015, 192-06-06, modified — Note 1 to entry has been replaced.]

3.1.12 deliverability

ratio of deliveries to planned deliveries over a specified period of time, when the effect of compensating elements, such as substitution from other producers and downstream (3.1.17) buffer storage, is included Note 1 to entry: See Figure G.1 for further information.

3.1.13 design life

planned usage time for the total system (3.1.75) Note 1 to entry: It is important not to confuse design life with the mean time to failure (MTTF) (3.1.41). Several items can fail within the design life of the system. As long as repair or replacement is feasible, the design life of the system is not affected by such failures.

Note 2 to entry: The design life is decided during the life cycle phase "Define". Design life in this document can thus mean a lifetime that can change and that can be chosen based on production assurance (3.1.58) activities or life cycle costing (3.1.30).

SIST EN ISO 20815:2026 ISO 20815:2026(en)

3.1.14 demand availability

ability of the production facility to satisfy the demand over a specified period of time Note 1 to entry: This performance measure (3.1.51) expresses the fraction of time or number of times the produced volume that is exported is equal to or above demand. See also Table G.1.

3.1.15 down state

state of being unable to perform as required, due to internal fault (3.1.23), or preventive maintenance (3.1.57) Note 1 to entry: This concept is related to a binary item (3.1.6), which can have several down states forming the down state class of the item. All the states in the down state class are considered to be equivalent with regard to the unavailability of the considered item.

EXAMPLE In Figure 1, the down state class of the system S comprises only one state {S } and the system S is in

down state at time t .

[SOURCE: IEC 60050-192:2015, 192-02-20, modified — Note 1 to entry has been replaced, and note 2 to entry has been removed; EXAMPLE has been added.]

3.1.16 down time

time interval during which an item (3.1.29) is in a down state (3.1.15) Note 1 to entry: The down time includes all the delays between the item failure and the restoration of its service. Down time can be either planned or unplanned (see ISO 14224:2016, Table 4). Note 2 to entry: Down time can be equipment down time (see ISO 14224:2016, Figure 4 and Table 4), production down time (see Figures I.1 and I.2) or down time for other operations (e.g. drilling). It is important to distinguish between the equipment down time itself and the down time of the plant to which the equipment belongs. [SOURCE: IEC 60050-192:2015, 192-02-21, modified — Notes to entry have been replaced.]

3.1.17 downstream

business category most commonly used in the petroleum industry to describe post-production processes Note 1 to entry: See ISO 14224:2016, A.1.4 for further details. [SOURCE: ISO 14224:2016, 3.17, modified — EXAMPLE has been removed.]

3.1.18 failure

loss of ability to perform as required Note 1 to entry: A failure of an item is an event that results in a fault (3.1.23) (i.e. a state) of that item. This is illustrated in Figure 2 for a binary system S comprising two redundant components A and B. [SOURCE: IEC 60050-192:2015, 192-03-01, modified — The notes to entry have been replaced by a new note 1 to entry.]

3.1.19 failure cause

root cause set of circumstances that leads to failure (3.1.18) Note 1 to entry: A failure cause can originate during specification, design, manufacture, installation, operation or maintenance of an item.

Note 2 to entry: See ISO 14224:2016, B.2.3 and Table B.3, which define failure causes for all equipment classes. [SOURCE: IEC 60050-192:2015, 192-03-11, modified — Note 2 to entry has been added.]

SIST EN ISO 20815:2026 ISO 20815:2026(en)

3.1.20 failure data

data characterizing the occurrence of a failure (3.1.18) event Note 1 to entry: See ISO 14224:2016, Table 6.

[SOURCE: ISO 14224:2016, 3.25]

3.1.21 failure mode

manner in which failure (3.1.18) occurs Note 1 to entry: See ISO 14224:2016, Tables B.6 to B.15, on the relevant failure modes, which define failure modes to be used for each equipment class.

[SOURCE: IEC 60050-192:2015, 192-03-17, modified — The notes to entry have been replaced by a new note 1 to entry.]

3.1.22 failure rate

conditional probability per unit of time that the item (3.1.29) fails between t and t + dt, provided that it works over (0, t) Note 1 to entry: See ISO 14224:2016, Clause C.3 for further explanation of the failure rate. Note 2 to entry: This definition applies for the first failure (3.1.18) of binary items (3.1.6). Note 3 to entry: Under the assumptions that the failure rate is constant and that the item is as good as new after repairs the failure rate can be estimated as the number of failures relative to the corresponding accumulated up time (3.1.80) divided by this accumulated up time. In this case this is the reciprocal of MTTF (3.1.41). In some cases, time can be replaced by units of use.

Note 4 to entry: The estimation of the failure rate can be based on operating time (3.1.49) or calendar time. [SOURCE: ISO/TR 12489:2013, 3.1.18, modified — The symbol "λ(t)" has been removed; the notes to entry have been replaced by the new notes 1 to 4 to entry.]

3.1.23 fault

inability to perform as required, due to an internal state EXAMPLE Down states (3.1.15) of items A, B and system S is illustrated in Figure 2. Note 1 to entry: A fault of an item results from a failure (3.1.18), either of the item itself, or from a deficiency in an earlier stage of the life cycle, such as specification, design, manufacture or maintenance. See latent fault (ISO 14224:2016, 3.44).

Note 2 to entry: An item made of several sub-items (e.g. a system) which continues to perform as required in presence of faults of one or several sub-items is called fault tolerant. Note 3 to entry: See also ISO/TR 12489:2013, 3.2.2.

...