oSIST prEN IEC 63409-7:2026
(Main)Photovoltaic power generating systems connection with the grid - Testing of power conversion equipment - Part 7: Remote configuration, control and monitoring
- Status
- Not Published
- Public Enquiry End Date
- 07-Sep-2026
- Technical Committee
- PVS - Solar photovoltaic energy systems
- Current Stage
- 4020 - Public enquire (PE) (Adopted Project)
- Start Date
- 26-Jun-2026
- Due Date
- 13-Nov-2026
- Completion Date
- 20-Aug-2026
oSIST prEN IEC 63409-7:2026 is a CLC committee draft for vote from IEC Technical Committee 82. It specifies how to test power conversion equipment (PCE) used in photovoltaic power generating systems connected to the grid, with or without DC-coupled electrical energy storage devices. The focus is on remote configuration, control and monitoring functions implemented through information exchange with a distributed energy resources management system (DERMS).
What does oSIST prEN IEC 63409-7:2026 specify?
oSIST prEN IEC 63409-7:2026 specifies test requirements for PCE functions that are carried out remotely through communication with an energy management system. It covers configuration, control and monitoring, and it also defines the test environment and communication model used to evaluate those functions.
The document is organized around a short test framework and then function-by-function procedures:
- Clause 1 Scope
- Clause 2 Normative references
- Clause 3 Terms and definitions
- Clause 4 Testing environment
- Clause 5 Testing requirements
- Annex A to Annex D
- Bibliography
| Annex | What it covers |
|---|---|
| Annex A | IEC 61850 logical nodes, data objects, information models and services used for testing |
| Annex B | Sign conventions for voltage, current and power measurements |
| Annex C | Example testing environments and recommended power supply and measurement specifications |
| Annex D | Influence of MPPT control and PV simulator behavior on test results |
In practice, this means the standard is not only about what to test, but also about how to set up the equipment so the results are comparable and traceable.
What are the key requirements of oSIST prEN IEC 63409-7:2026?
Test setup and communication model
Clause 4 requires testing in the manufacturer’s factory or in a testing premise equipped with suitable power supplies and measuring instruments. Clause 4.1 also requires the test report to state the specifications of the power supplies and measuring devices used.
Clause 4.2 sets the communication basis: the information model comes from IEC 61850-7-4 and IEC 61850-7-420, and IEC 61850-8-2 is used for the outer public communication network. In practice, the PCE acts as the server side and the DERMS acts as the client side, so the test is really checking whether the remote functions work through the same communication structure used in service.
Measurement basis and reporting
Clause 4 requires performance to be evaluated at the AC power ports of the PCE, using measurements such as voltage, current and power. Annex B defines the sign conventions for those measurements, which matters because grid-connected generators and loads use opposite reference directions.
The standard also requires the test report to record the test environment and, where relevant, whether the DC source was a constant-voltage supply or a PV simulator. That matters because the source can affect transient behavior and therefore the measured result.
Monitoring evaluation
Clause 5.2 checks monitored nameplate data, basic information, status and measured values. Tables 1 to 4 list the minimum monitored items, including vendor data, ratings, frequency-related information, breaker or switch status, grid protection status, and measured AC and DC quantities.
The practical point is simple: the values shown on DERMS must match the PCE settings and the measuring instruments. Clause 5.2.4 says the monitored data must not be empty, must agree with the manufacturer’s specifications, and the difference from measured values must stay within the manufacturer’s declared tolerance.
Remote control functions
Clause 5.3 evaluates remote control through DERMS commands and measured response at the PCE. The test items include autonomous connection and disconnection, active power control, maximum active power, reactive power and constant power factor.
For each function, the test checks three things in practice:
- the command changes the PCE status as expected
- the measured power or power factor follows the command
- the response time stays within the manufacturer’s declared range
For autonomous connection and disconnection, the test cases cover stable grid conditions, changed voltage, changed frequency, and recovery after OV, UV, OF or UF protection operation. For active power, reactive power and constant power factor, the procedures use setpoints, ramp-rate limits and monitored values to check that the device responds to remote commands in a controlled way.
Remote configuration and grid support functions
Clause 5.4 covers remote configuration of grid support functions. It uses the common procedures from IEC 63409-6 for several functions, then adds function-specific tests for:
- Voltage – Var control
- Frequency – Watt control
- Voltage – Watt control
- Power - reactive power control
- Power - power factor control
These tests use curve points, ramp-rate limits, response time, and in some cases snapshot behavior. In practice, the standard is checking whether the PCE can be configured remotely with the correct curve data and whether the measured active or reactive power follows that configuration within the declared tolerance.
What terms does oSIST prEN IEC 63409-7:2026 define?
- Photovoltaic power generating system [PV system] - An electric power generating system that uses the photovoltaic effect to convert solar power into electricity.
- Power conversion equipment [PCE] - An electrical device that converts one form of electrical power to another with respect to voltage, current, frequency, phase and number of phases.
- Intelligent electronic device [IED] - A device with one or more processors that can receive data from an external sender or send data to an external receiver.
- Distributed energy resources management system [DERMS] - A system that manages communications and control of individual distributed energy resources and aggregates that information for communication with other utility systems.
These terms matter because the whole test method is built around the interaction between the PCE, the IED and the DERMS.
Who uses oSIST prEN IEC 63409-7:2026?
oSIST prEN IEC 63409-7:2026 is used by manufacturers of inverter-based PCE, test laboratories, certification bodies, and grid-interconnection engineers. It is also relevant to quality managers and buyers who need to confirm that a product’s remote configuration, control and monitoring functions can be tested in a repeatable way.
It is especially relevant where the system uses IEC 61850-based communication and where DERMS is expected to issue commands, read status and verify measured values. Utility-facing engineering teams can use it to define acceptance tests for remote functions before deployment.
What changed in oSIST prEN IEC 63409-7:2026 from the previous edition?
oSIST prEN IEC 63409-7:2026 supersedes 82/2440/CD and 82/2491A/CC.
Which standards are used with oSIST prEN IEC 63409-7:2026?
| Reference | What it contributes |
|---|---|
| IEC TS 62786-1:2023 | General requirements for distributed energy resources connection with the grid |
| IEC TS 61836 | Terms, definitions and symbols for solar photovoltaic energy systems |
| IEC 62934:2021 | Terms and definitions for grid integration of renewable energy generation |
| IEC 61850-7-420:2021 | DER logical nodes and data objects used for the information model |
| IEC 61850-7-1:2011/AMD1:2020 | Principles and models for the basic communication structure |
| IEC 61850-7-4:2010/AMD1:2020 | Compatible logical node classes and data object classes |
| IEC 61850-8-1:2011/AMD1:2020 | Mapping to MMS and ISO/IEC 8802-3 |
| IEC 61850-8-2:2018 | Mapping to XMPP for communication exchange |
| IEC 60375:2018 | Electric circuit conventions used in measurement sign rules |
| IEC 61557-12:2018/AMD1:2021 | Context for power metering and monitoring devices |
| IEC 62053-23:2020 | Context for static meters for reactive energy |
| IEC 63409-6 | Common testing procedures for several grid support functions |
These references matter because this part depends on the IEC 61850 model, the communication mappings and the shared test approach used in the wider IEC 63409 series.
What does the oSIST prEN IEC 63409-7:2026 document contain?
The document contains tables of minimum required monitored data, control parameters and configuration parameters, plus step-by-step procedures and performance criteria for each test case. It also includes figures for the overall IEC 63409 structure, a general test setup, IEC 61850 test principles, sign conventions, and example waveforms.
Clause 5 is the main technical core: it tells the tester what to read on DERMS, what to set remotely, what to measure at the AC power ports, and what to compare. Annex A explains the IEC 61850 modeling and service concepts behind the test method, while Annex B gives the sign rules needed to interpret measurements consistently.
Annex C gives example environments and recommended specifications for AC and DC power supplies, power quality measurement and waveform recording. Annex D explains why MPPT behavior and the choice of PV simulator or constant DC source can change the observed transient response, which is important when judging settling time and similar dynamic results.
Get Certified
Connect with accredited certification bodies for this standard

DNV
DNV is an independent assurance and risk management provider.

Lloyd's Register
Lloyd's Register is a global professional services organisation specialising in engineering and technology.

DNV Energy Systems
Energy and renewable energy certification.
Sponsored listings
Frequently Asked Questions
oSIST prEN IEC 63409-7:2026 is a draft published by the Slovenian Institute for Standardization (SIST). Its full title is "Photovoltaic power generating systems connection with the grid - Testing of power conversion equipment - Part 7: Remote configuration, control and monitoring". This standard covers: Photovoltaic power generating systems connection with the grid - Testing of power conversion equipment - Part 7: Remote configuration, control and monitoring
Photovoltaic power generating systems connection with the grid - Testing of power conversion equipment - Part 7: Remote configuration, control and monitoring
oSIST prEN IEC 63409-7:2026 is classified under the following ICS (International Classification for Standards) categories: 27.160 - Solar energy engineering; 29.240.01 - Power transmission and distribution networks in general. The ICS classification helps identify the subject area and facilitates finding related standards.
oSIST prEN IEC 63409-7:2026 is available in PDF format for immediate download after purchase. The document can be added to your cart and obtained through the secure checkout process. Digital delivery ensures instant access to the complete standard document.
Standards Content (Sample)
Contents
- 4 FOREWORD
- 5 INTRODUCTION
- 6 1 Scope
- 7 2 Normative references
- 8 3 Terms and definitions
- 9 4 Testing enviroment
- 10 4.1 Test setup
- 11 4.2 Communication specification
- 12 5 Testing requirements
- 13 5.1 General
- 14 5.2 Evaluation of the nameplate data, the basic information and the monitoring 15 function
- 16 5.2.1 Testing items
- 17 5.2.2 Testing conditions
- 18 5.2.3 Testing procedures
- 19 5.2.4 Performance criteria
- 20 5.3 Evaluation of the remote control and monitoring functions
- 21 5.3.1 Testing items
- 22 5.3.2 Testing conditions
- 23 5.3.3 Testing procedures
- 24 5.4 Evaluation of the remote configuration and monitoring functions
- 25 5.4.1 Testing items
- 26 5.4.2 Testing conditions
- 27 Annex A (informative) Overviews and basic principles of logical nodes and data 28 objects in IEC 61850 series
- 29 A.1 The Basics of the IEC 61850 standard series
- 30 A.1.1 General
- 31 A.1.2 Information model
- 32 A.1.3 Information exchange mechanisms
- 33 A.2 Use of IEC 61850 for testing
- 34 A.2.1 Test procedure (principle)
- 35 A.2.2 Use of IEC 61850 models and services
- 36 A.2.3 Summary
- 37 Annex B (normative) Sign conventions for measurements of voltage, current and 38 power
- 39 B.1 General
- 40 B.2 Reference polarity and direction
- 41 B.2.1 Reference polarity of voltage
- 42 B.2.2 Reference direction of current
- 43 B.2.3 Sign conventions for measurements of voltage, current and power
- 44 B.3 Reference frame of active and reactive power
- 45 B.4 Physical meanings of the power flows of generators in regional standards
- 46 Annex C (informative) Examples of testing environments
- 47 C.1 Outline
- 48 C.2 Recommended specification of power supplies
- 49 C.3 Recommended specification of measuring instruments
- 50 Annex D (informative) Influence of MPPT control and PV simulator to the test results
- 51 D.1 General
179 INTRODUCTION 180 Since 2016, TC82 has been contributing to the standardization of requirements for DER 181 connection with the grid under TC8/JWG10, which is a joint working group consisting with TC82, 182 TC120 and SC22E. In parallel with the join work with TC8, since 2016, TC82 has been 183 considering the development of testing standards to evaluate performance and characteristics 184 of power conversion equipment which are relevant to connection with the grid. 185 Having multiple issues into a single document may not only require a lot of time and effort but 186 could also cause difficulties where a single issue could delay the standardization process. 187 Therefore, TC82/WG6 agreed to separate the IEC 63409 into seven parts. In 2021, TC82/WG6 188 started the official project to develop IEC 63409 series.
189 Figure 1 gives an overview of the structure of the whole IEC 63409 series. 190 The part 7 specifies testing conditions and procedures to evaluate functions which can be 191 realised by information exchange with energy management systems.
192 193 Figure 1 – Overview of IEC 63409 series 196 PHOTOVOLTAIC POWER GENERATING SYSTEMS CONNECTION WITH 197 THE GRID 198 – TESTING OF POWER CONVERSION EQUIPMENT – 199 200 Part 7: Remote configuration, control and monitoring 201 202 203 204 1 Scope 205 The IEC 63409 series specifies requirements for the testing of power conversion equipment 206 (PCE) for use in photovoltaic power systems (PV systems) with or without DC-coupled electrical 207 energy storage devices. Part 7 of IEC 63409 series specifies testing requirements for the 208 evaluation of performance and characteristics of the following three functions with which the 209 PCE may be equipped:
210 • configuration, 211 • control, 212 • monitoring.
213 Those functions can be realized by information exchange with the management system. 214 Therefore, this document specifies the general test environment and setup which consists of 215 the PCE, communication interfaces and the energy management system. Testing conditions 216 and operating conditions of PCE are given for the evaluation of three functions. 217 2 Normative references 218 The following documents are referred to in the text in such a way that some or all of their content 219 constitutes requirements of this document. For dated references, only the edition cited applies. 220 For undated references, the latest edition of the referenced document (including any 221 amendments) applies.
222 IEC TS 62786-1:2023, Distributed energy resources connection with the grid – Part 1: General 223 requirements 224 IEC TS 61836, Solar photovoltaic energy systems - Terms, definitions and symbols 225 IEC 62934:2021, Grid integration of renewable energy generation - Terms and definitions 226 IEC 61850-7-420:2021, Communication networks and systems for power utility automation - 227 Part 7-420: Basic communication structure - Distributed energy resources and distribution 228 automation logical nodes 229 IEC 61850-7-1:2011/AMD1:2020, Amendment 1 - Communication networks and systems for 230 power utility automation - Part 7-1: Basic communication structure - Principles and models 231 IEC 61850-7-4:2010/AMD1:2020, Amendment 1 - Communication networks and systems for 232 power utility automation - Part 7-4: Basic communication structure - Compatible logical node 233 classes and data object classes 234 IEC 61850-8-1:2011/AMD1:2020, Amendment 1 – Communication networks and systems for 235 power utility automation – Part 8-1: Specific communication service mapping (SCSM) – 236 Mappings to MMS (ISO 9506-1 and ISO 9506-2) and to ISO/IEC 8802-3 237 IEC 61850-8-2:2018, Communication networks and systems for power utility automation - Part 238 8-2: Specific communication service mapping (SCSM) - Mapping to Extensible Messaging 239 Presence Protocol (XMPP) 240 IEC 60375:2018, Conventions concerning electric circuits 241 IEC 61557-12:2018/AMD1:2021, Amendment 1 - Electrical safety in low voltage distribution 242 systems up to 1 000 V AC and 1 500 V DC - Equipment for testing, measuring or monitoring of 243 protective measures - Part 12: Power metering and monitoring devices (PMD) 244 IEC 62053-23:2020, Electricity metering equipment - Particular requirements - Part 23: Static 245 meters for reactive energy (classes 2 and 3) 246 IEC 63409-6, Photovoltaic power generating systems connection with the grid – Testing of 247 power conversion equipment – Part6: Power control functions and grid support 248 3 Terms and definitions 249 For the purposes of this document, the terms and definitions given in IEC TS 61836, IEC 62934, 250 IEC TS 62786-1, and the following apply.
251 ISO and IEC maintain terminology databases for use in standardization at the following 252 addresses:
253 • IEC Electropedia: available at https://www.electropedia.org/ 254 • ISO Online browsing platform: available at https://www.iso.org/obp 255 3.1 256 photovoltaic power generating system 257 PV system 258 electric power generating system which uses the photovoltaic effect to convert solar power into 259 electricity 260 3.2 261 power conversion equipment 262 PCE 263 electrical device converting one form of electrical power to another form of electrical power with 264 respect to voltage, current, frequency, phase and the number of phases 265 [SOURCE: IEC 62109-1:2010, 3.66, modified – The definition has been rephrased, and the note 266 has been deleted.] 267 3.3 268 intelligent electronic device 269 IED 270 any device incorporating one or more processors, with the capability to receive data from an 271 external sender or to send data to an external receiver 272 3.4 273 distributed energy resources management system 274 DERMS 275 The system which, on the behalf of other interested systems, manages the communications and 276 control of individual Distributed Energy Resource (DER (and may do this with a variety of field 277 message protocols), and aggregates this information and communicates with other utility 278 systems, such as a DMS.
279 [SOURCE: IEC 61968-5:2020, 3.1.1] 280 281 4 Testing environment 282 4.1 Test setup 283 Figure 2 shows an example of the general test setup for the evaluation of the configuration, 284 control and monitoring functions equipped with PCE. The evaluation of performance of those 285 three functions shall be performed in manufacture’s factories and/or in testing premises 286 equipped with power supplies and measuring instrument/devices as shown in Figure 2. 287 Examples of the power supplies and the measuring instrument/devices are specified in Annex C. 288 Specifications of the power supplies and the measuring instrument/devices shall be reported in 289 the test report.
290 The performance and characteristics of PCE shall be evaluated with electrical quantity such as 291 voltage, current and power, which are measured at the AC power ports of PCE. Annex B 292 specifies the definitions of sign conventions for measurements of voltage, current and power. 293 Information exchange with PCE shall be based on the client/server role specified in IEC 61850- 294 7-1. The PCE with the IED (Intelligent Electronic Device) is the server, and DERMS (Distributed 295 Energy Resources Management System) is the client. The IED can be a part of the PCE or be 296 an external device. In both cases, the inner (local) communication network between the IED 297 and the PCE is out of scope. The server which consists of PCE and IED are the devices under 298 test (DUT).
299 Clients issue service requests, such as configuration, control and monitoring. Then, clients 300 receive confirmations of the service that has been processed in the server. A client may also 301 receive report indications from a server. Therefore, configuration, control and monitoring 302 functions of PCE shall be remotely implemented at the DERMS.
304 Figure 2 – Example of the general test setup 305 The testing of the DUT shall not be influenced by the performance of DC power supply used for 306 the test. Therefore, where the EUT has the capability to disable MPPT control, it is allowed to 307 do so and a DC power supply that is able to provide constant voltage at any required power 308 levels shall be used. A PV simulator may be used provided that the test results are not 309 influenced by any DC instability by the PV simulator. In each case, remarks shall be written in 310 the test report to note the type of the DC power supply or PV simulator used in the test. See 311 Annex D for supplemental information regarding the influences from the PV simulator. 312 4.2 Communication specification 313 The information model is used for the information exchange to implement remote configuration, 314 control and monitoring of the PCE. The information model is defined in IEC 61850-7-4 and IEC 315 61850-7-420, and Annex A describes overviews of information model.
316 IEC 61850-8-2 shall be used as the communication mapping for the outer (public) 317 communication network.
318 5 Testing requirements 319 5.1 General 320 The evaluation of the performance of the information exchange shall be implemented in the 321 following order.
322 • First, the evaluation of the monitoring function shall be done as specified in 5.2. 323 • Second, the evaluation of the control function shall be done as specified in 5.3. 324 • Finally, the evaluation of the configuration function shall be done as specified 5.4. 325 Results of the evaluation of three functions shall be recorded in test reports.
326 5.2 Evaluation of the nameplate data, the basic information and the monitoring 327 function 328 5.2.1 Testing items 329 All data listed from Table 1 to Table 4 shall be read on DERMS while PCE is under halt or rated 330 power condition. Data which are monitored at DERMS shall be evaluated with data which are 331 set in PCE and measured by measuring instruments.
332 Table 1 and Table 2 show the lists of the minimum required monitored data for the confirmation 333 of the nameplate data and the basic information of PCE.
334 Table 3 and Table 4 show the lists of the minimum required monitored data for the confirmation 335 of the status and measured values of PCE.
336 When there are other data to be monitored, all additional monitored data shall be reported in a 337 test report.
338 Table 1 – Nameplate data
IEC 61850
Item
Standard LN message parameter Description
Name of the vendor PhyNam.vendor Name of the vendor.
Serial Number PhyNam.serNum Serial number.
IEC 61850-7-4 LPHD
Hardware revision. PhyNam.hwRev HW-revision.
Software revision PhyNam.swRev SW-revision.
Rated apparent power VARtg The continuous apparent power capability of the power inverter.
Rated active power WRtg Rated active power of the inverter
Rated voltage VRtg Rated voltage
IEC 61850-7-420 DINV
Maximum Input voltage InVMax Maximum Input voltage limit limit.
Over-Excited Power OvPFRtg Specified Over-Excited Factor Rating Power Factor Rating
Under-Excited Power UnPFRtg Specified Under-Excited Factor Rating Power Factor Rating 339 Table 2 – Basic information (Those data not in the nameplate) IEC 61850
Item
Standard LN message parameter Description
Rated Nominal HzNomRtg Rated Nominal frequency frequency of usage of the DER
Rated minimal frequency HzMinRtg Rated minimal frequency of usage of the DER
IEC 61850-7-420 DGEN
Rated maximum HzMaxRtg Rated maximum frequency frequency of usage of the DER
Sign convention for power
PFSign Power factor convention:
factor 'PF' IEC or EEI 340 Table 3 – Status of PCE
IEC 61850
Item
Standard LN message parameter Description
CSWI Pos.stVal Circuit breaker / switch
Switch controller IEC 61850-7-4 position
Over frequency DHFT TrZnSt True = the frequency of the Referenced ECP exceeds the Trip zone
Under Frequency DLFT True = the frequency of the Referenced ECP
TrZnSt exceeds the Trip zone
IEC 61850-7-420
AC Over Voltage DHVT True = the voltage of the TrZnSt Referenced ECP exceeds the Trip zone
AC Under Voltage DLVT True = the voltage of the TrZnSt Referenced ECP exceeds the Trip zone 341 Table 4 – Measured values of PCE
IEC 61850
Item
Standard LN message parameter Description
AC voltage MMXU PPV.phsAB / "PPV: Phase to Phase PNV.phsA Voltage
PNV: Phase to Neutral
Voltage"
PPV.phsBC / "PPV: Phase to Phase
PNV.phsB Voltage
PNV: Phase to Neutral
Voltage"
PPV.phsCA / "PPV: Phase to Phase
PNV.phsC Voltage
PNV: Phase to Neutral
Voltage"
AC current A.phsA phase current
A.phsB phase current
A.phsC phase current
Apparent power TotVA The total apparent power in a three-phase circuit
IEC 61850-7-4 [VA].
Active power TotW The total Active power in a three-phase circuit [W].
Reactive power TotVAr The total Reactive power in a three-phase circuit [VAr].
Power factor TotPF The total power factor in a three-phase circuit
Frequency Hz Frequency [Hz].
AC voltage MMXN Vol Non-phase-related AC rms voltage.
AC current Amp Non-phase-related AC rms current.
Apparent power VolAmp Non-phase-related AC apparent power.
Active power Watt Non-phase-related AC real power.
Non-phase-related AC
Reactive power VolAmpr reactive power.
Power factor PwrFact Average power factor in a three-phase circuit.
Frequency Hz Frequency [Hz].
DC voltage MMDC Vol DC voltage.
DC current Amp DC current.
DC power Watt DC power.
342 5.2.2 Testing conditions 343 Connect PCE to DC and AC power supplies according to manufacturer’s instructions and 344 specifications.
345 Set operating conditions of the AC power supply so that PCE can operate with nominal voltage 346 and frequency.
347 Voltage of DC power supply shall be set within the operating range of PCE. 348 5.2.3 Testing procedures 349 a) Set DERMS to send command to PCE so that PCE is set under the halt condition. 350 b) Read the nameplate data monitored on DERMS.
351 c) Confirm that the monitored nameplate data are correct, by referring to manufacturer’s 352 specifications.
353 d) Confirm that the status and measured values of PCE on DERMS are correct, by observing 354 the operation of PCE and data which are measured by measuring instruments. 355 5.2.4 Performance criteria 356 The following points shall be evaluated.
357 • Confirm that the monitored nameplate data is not empty and is the same with manufacturer’s 358 specifications.
359 • The status displayed on DERMS is the same with those observing the operation of PCE. 360 • Compare monitored values of DUT and measured values with measuring devices and 361 confirm that the difference of those values is kept within the tolerance which is declared by 362 the manufacturer.
363 5.3 Evaluation of the remote control and monitoring functions 364 5.3.1 Testing items 365 The operation and status of PCE shall be evaluated according to the setting of testing items 366 listed on Table 5.
367 All data listed in Table 3 and Table 4 shall be confirmed on DERMS during the test. Data which 368 are monitored at DERMS shall be evaluated with data which are set in PCE and measured by 369 measuring instruments.
370 Communication of PCE shall also be confirmed by monitoring exchanged data.
371 Table 5 – Testing items of remote control Relevant clause IEC 61850 specifying
Items controlled remotely requirements of the Standard LN Description function in IEC TS 62786-1
To cover the Cease to energize authorization, state, 4.10 Connection and
Autonomous connection and and external request, starting to generate IEC 61850-7-420 DCTE disconnection as well as the Return electrical power to service authorizations, state, and external request
To set the power factor and the 4.7.3 Dynamic reactive quadrant of the DER, Constant power factor power support DFPF with the possibility of control capabilities different settings for generating and consuming
To cause the DER to 4.11 Ceasing and limit its maximum
Maximum active power reduction of active power DWMX active power at the control on set point Referenced ECP to the target value
IEC 61850-7-420
To set a target active power value 4.11 Ceasing and (generating or
Active power control reduction of active power DWGC consuming) at the on set point Referenced ECP that the DER should achieve
To the amount of reactive power as a 4.7.3 Dynamic reactive percentage of WMax, Reactive power control power support DVAR
VArMax, or AvlVAr, or capabilities an absolute value of reactive power 372 5.3.2 Testing conditions 373 Connect PCE to DC and AC power supplies according to manufacturer’s instructions and 374 specifications.
375 Set operating conditions of the AC power supply so that PCE can operate with nominal voltage 376 and frequency.
377 Voltage of DC power supply shall be set within the operating range of PCE. 378 Table 6 shows testing items, which are controlled remotely, and parameters, which are changed 379 during the test.
380 Table 6 – Overview of testing procedures for each testing item Items controlled
Sequence of setting of parameters to be changed remotely
Confirmation of autonomous connection and disconnection of PCE with the grid:
- when the grid is stable.
Autonomous connection
- when the grid voltage is changed.
and disconnection
- when the grid frequency is changed.
- after OV, UV, OF, or UF protections are operated.
Start with 1,0, then set to 0,9 over-exciting condition.
Set to 1,0, then set to 0,9 under exciting condition.
Optional:
Constant power factor control
Start with 1,0, then set to the minimum over-exciting condition.
Set to 1,0, then set to the minimum under-exciting condition.
Note: minimum values shall be declared by vendors.
Maximum active power
Start with 80%, then setting to 100%.
control
Start with 80%, then setting to 100%.
Active power control
Set the maximum and minimum limit.
Reactive power control Start with 10%, then setting to 0%.
381 5.3.3 Testing procedures 382 5.3.3.1 Autonomous connection and disconnection 383 5.3.3.1.1 Parameters 384 The remote control function for autonomous connection and disconnection shall be evaluated 385 by setting and changing parameters listed on Table 7.
386 During the test, confirm that the status and measured values of PCE on DERMS are correct by 387 observing the operation of PCE and data which are measured by measuring instruments for the 388 following four cases:
389 1) when the grid is stable.
390 2) when the grid voltage is changed.
391 3) when the grid frequency is changed.
392 4) after OV, UV, OF, or UF protections are operated.
393 For evaluating response time of the remote control function, measure the time from when 394 DERMS sends a command until the PCE begins operating.
395 Table 7 – Minimum required parameters for autonomous connection and disconnection IEC 61850
Item
Standard LN message parameter Description
Switch controller CSWI Pos.ctlVal Circuit breaker / switch position Configuration of HVRT PTOV StrVal Voltage start value setting; if this level is exceeded, 'Str.general' becomes true.
Configuration of LVRT PTUV StrVal Voltage start value setting; if this level is exceeded, 'Str.general' becomes true.
IEC 61850-7-4
Configuration of HFRT StrVal Frequency or frequency rate change setting; if this level is
PTOF exceeded, 'Str.general' becomes true.
Configuration of LFRT StrVal Frequency or frequency rate change setting; if this level is
PTUF exceeded, 'Str.general' becomes true.
If true, the DER is authorized to automatically return to service; if
IEC 61850-7- Enabling function DCTE RtnSvcAuto false, the DER must wait until an 420 external RtnSvcAuth is received to allow it to return to service.
Return to service duration (ms)
Value of ramp rate t that is a time for ramping up that must not be exceeded. Active power shall increase linearly, or
RtnRmpTmms in a stepwise linear ramp, with an average rate-of-change not exceeding the DER nameplate active power rating divided by this return to service duration.
Time delay (ms) before returning to
Delay time service in order to ensure that both the
...