Industrial communication networks - Installation of communication networks in industrial premises

IEC 61918:2013 specifies basic requirements for the installation of media for communication networks in industrial premises and within and between the automation islands, of industrial sites. This standard covers balanced and optical fibre cabling. It also covers the cabling infrastructure for wireless media, but not the wireless media itself. Additional media are covered in the IEC 61784-5 series. This third edition cancels and replaces the second edition published in 2010 and constitutes a technical revision. It includes the following changes:
- some terms and abbreviated terms have been added to Clause 3;
- Subclauses 4.4.3.4.1 and 4.4.7.3 have been updated;
- Subclause 8.1 has been updated;
- Figure 13, Figure 29, Figure H.1, Table 3, Table 6, Table 7 and Table B.5 have been updated;
- Annex D and Annex M have been extended to cover additional communication profile families;
- A new informative Annex O has been added.
This publication is to be read in conjunction with the IEC 61784-5 series and  ISO/IEC 14763-2:2012.

Réseaux de communication industriels - Installation de réseaux de communication dans les locaux industriels

La CEI 61918:2013 spécifie les exigences de base pour l'installation d'un support de réseaux de communication dans des locaux industriels et à l'intérieur et entre des îlots d'automatisation de sites industriels. La présente norme couvre le câblage symétrique et à fibres optiques. Elle couvre également l'infrastructure de câblage des supports sans fil, mais pas le support sans fil lui-même. D'autres supports sont couverts par la série CEI 61784-5. Cette troisième édition annule et remplace la deuxième édition parue en 2010 et constitue une révision technique. Elle inclut les modifications suivantes:
- certains termes et abréviations ont été ajoutés à l'Article 3;
- les Paragraphes 4.4.3.4.1 et 4.4.7.3 ont été mis à jour;
- le Paragraphe 8.1 a été mis à jour;
- la Figure 13, la Figure 29, la Figure H.1, le Tableau 3, le Tableau 6, le Tableau 7 et le Tableau B.5 ont été mis à jour;
- Annexe D et l'Annexe M ont été étendues pour couvrir des familles de profil de communication supplémentaires;
- une nouvelle Annexe O informative a été ajoutée.
Cette publication doit être lue conjointement avec la série CEI 61784-5 et l' ISO/IEC 14763-2:2012

General Information

Status
Published
Publication Date
27-Aug-2013
Technical Committee
Drafting Committee
Current Stage
DELPUB - Deleted Publication
Start Date
20-Sep-2018
Completion Date
26-Oct-2025
Ref Project

Relations

Standard
IEC 61918:2013 - Industrial communication networks - Installation of communication networks in industrial premises Released:8/28/2013
English and French language
377 pages
sale 15% off
Preview
sale 15% off
Preview

Standards Content (Sample)


IEC 61918 ®
Edition 3.0 2013-08
INTERNATIONAL
STANDARD
NORME
INTERNATIONALE
colour
inside
Industrial communication networks –
Installation of communication networks in industrial premises

Réseaux de communication industriels –
Installation de réseaux de communication dans des locaux industriels

All rights reserved. Unless otherwise specified, no part of this publication may be reproduced or utilized in any form

or by any means, electronic or mechanical, including photocopying and microfilm, without permission in writing from
either IEC or IEC's member National Committee in the country of the requester.
If you have any questions about IEC copyright or have an enquiry about obtaining additional rights to this publication,

please contact the address below or your local IEC member National Committee for further information.

Droits de reproduction réservés. Sauf indication contraire, aucune partie de cette publication ne peut être reproduite ni
utilisée sous quelque forme que ce soit et par aucun procédé, électronique ou mécanique, y compris la photocopie et les

microfilms, sans l'accord écrit de la CEI ou du Comité national de la CEI du pays du demandeur.

Si vous avez des questions sur le copyright de la CEI ou si vous désirez obtenir des droits supplémentaires sur cette

publication, utilisez les coordonnées ci-après ou contactez le Comité national de la CEI de votre pays de résidence.

IEC Central Office Tel.: +41 22 919 02 11
3, rue de Varembé Fax: +41 22 919 03 00
CH-1211 Geneva 20 info@iec.ch
Switzerland www.iec.ch
About the IEC
The International Electrotechnical Commission (IEC) is the leading global organization that prepares and publishes
International Standards for all electrical, electronic and related technologies.

About IEC publications
The technical content of IEC publications is kept under constant review by the IEC. Please make sure that you have the
latest edition, a corrigenda or an amendment might have been published.

Useful links:
IEC publications search - www.iec.ch/searchpub Electropedia - www.electropedia.org
The advanced search enables you to find IEC publications The world's leading online dictionary of electronic and
by a variety of criteria (reference number, text, technical electrical terms containing more than 30 000 terms and
committee,…). definitions in English and French, with equivalent terms in
It also gives information on projects, replaced and additional languages. Also known as the International
withdrawn publications. Electrotechnical Vocabulary (IEV) on-line.

IEC Just Published - webstore.iec.ch/justpublished Customer Service Centre - webstore.iec.ch/csc
Stay up to date on all new IEC publications. Just Published If you wish to give us your feedback on this publication
details all new publications released. Available on-line and or need further assistance, please contact the
also once a month by email. Customer Service Centre: csc@iec.ch.

A propos de la CEI
La Commission Electrotechnique Internationale (CEI) est la première organisation mondiale qui élabore et publie des
Normes internationales pour tout ce qui a trait à l'électricité, à l'électronique et aux technologies apparentées.

A propos des publications CEI
Le contenu technique des publications de la CEI est constamment revu. Veuillez vous assurer que vous possédez
l’édition la plus récente, un corrigendum ou amendement peut avoir été publié.

Liens utiles:
Recherche de publications CEI - www.iec.ch/searchpub Electropedia - www.electropedia.org
La recherche avancée vous permet de trouver des Le premier dictionnaire en ligne au monde de termes
publications CEI en utilisant différents critères (numéro de électroniques et électriques. Il contient plus de 30 000
référence, texte, comité d’études,…). termes et définitions en anglais et en français, ainsi que
Elle donne aussi des informations sur les projets et les les termes équivalents dans les langues additionnelles.
publications remplacées ou retirées. Egalement appelé Vocabulaire Electrotechnique
International (VEI) en ligne.
Just Published CEI - webstore.iec.ch/justpublished
Service Clients - webstore.iec.ch/csc
Restez informé sur les nouvelles publications de la CEI.
Just Published détaille les nouvelles publications parues. Si vous désirez nous donner des commentaires sur
Disponible en ligne et aussi une fois par mois par email. cette publication ou si vous avez des questions
contactez-nous: csc@iec.ch.
IEC 61918 ®
Edition 3.0 2013-08
INTERNATIONAL
STANDARD
NORME
INTERNATIONALE
colour
inside
Industrial communication networks –

Installation of communication networks in industrial premises

Réseaux de communication industriels –

Installation de réseaux de communication dans des locaux industriels

INTERNATIONAL
ELECTROTECHNICAL
COMMISSION
COMMISSION
ELECTROTECHNIQUE
PRICE CODE
INTERNATIONALE
CODE PRIX XH
ICS 25.040.40; 33.020; 35.240.50 ISBN 978-2-8322-1054-3

– 2 – 61918 © IEC:2013
CONTENTS
FOREWORD . 10

INTRODUCTION . 12

1 Scope . 15

2 Normative references . 15

3 Terms, definitions, and abbreviated terms . 18

3.1 Terms and definitions . 18

3.2 Abbreviated terms . 28

3.3 Conventions for installation profiles . 30
4 Installation planning . 30
4.1 General . 30
4.1.1 Objective . 30
4.1.2 Cabling in industrial premises . 30
4.1.3 The planning process . 33
4.1.4 Specific requirements for CPs . 34
4.1.5 Specific requirements for generic cabling in accordance with
ISO/IEC 24702 . 34
4.2 Planning requirements . 34
4.2.1 Safety . 34
4.2.2 Security . 34
4.2.3 Environmental considerations and EMC . 35
4.2.4 Specific requirements for generic cabling in accordance with
ISO/IEC 24702 . 36
4.3 Network capabilities . 36
4.3.1 Network topology . 36
4.3.2 Network characteristics . 38
4.4 Selection and use of cabling components . 42
4.4.1 Cable selection . 42
4.4.2 Connecting hardware selection . 46
4.4.3 Connections within a channel/permanent link . 48
4.4.4 Terminators . 54
4.4.5 Device location and connection . 55
4.4.6 Coding and labelling . 55
4.4.7 Earthing and bonding of equipment and devices and shielded cabling . 55

4.4.8 Storage and transportation of cables . 65
4.4.9 Routing of cables . 65
4.4.10 Separation of circuits . 67
4.4.11 Mechanical protection of cabling components . 68
4.4.12 Installation in special areas . 69
4.5 Cabling planning documentation . 69
4.5.1 Common description . 69
4.5.2 Cabling planning documentation for CPs . 69
4.5.3 Network certification documentation . 70
4.5.4 Cabling planning documentation for generic cabling in accordance
with ISO/IEC 24702 . 70
4.6 Verification of cabling planning specification . 70
5 Installation implementation . 70
5.1 General requirements . 70

61918 © IEC:2013 – 3 –
5.1.1 Common description . 70

5.1.2 Installation of CPs . 70

5.1.3 Installation of generic cabling in industrial premises . 70

5.2 Cable installation . 70

5.2.1 General requirements for all cabling types . 70

5.2.2 Installation and routing . 77

5.2.3 Specific requirements for CPs . 78

5.2.4 Specific requirements for wireless installation . 78

5.2.5 Specific requirements for generic cabling in accordance with

ISO/IEC 24702 . 78

5.3 Connector installation . 78
5.3.1 Common description . 78
5.3.2 Shielded connectors . 79
5.3.3 Unshielded connectors . 79
5.3.4 Specific requirements for CPs . 79
5.3.5 Specific requirements for wireless installation . 79
5.3.6 Specific requirements for generic cabling in accordance with
ISO/IEC 24702 . 79
5.4 Terminator installation . 79
5.4.1 Common description . 79
5.4.2 Specific requirements for CPs . 80
5.5 Device installation . 80
5.5.1 Common description . 80
5.5.2 Specific requirements for CPs . 80
5.6 Coding and labelling . 80
5.6.1 Common description . 80
5.6.2 Specific requirements for CPs . 80
5.7 Earthing and bonding of equipment and devices and shield cabling . 80
5.7.1 Common description . 80
5.7.2 Bonding and earthing of enclosures and pathways . 81
5.7.3 Earthing methods . 82
5.7.4 Shield earthing methods . 84
5.7.5 Specific requirements for CPs . 86
5.7.6 Specific requirements for generic cabling in accordance with
ISO/IEC 24702 . 86
5.8 As-implemented cabling documentation . 86

6 Installation verification and installation acceptance test . 87
6.1 General . 87
6.2 Installation verification . 87
6.2.1 General . 87
6.2.2 Verification according to cabling planning documentation . 88
6.2.3 Verification of earthing and bonding . 89
6.2.4 Verification of shield earthing . 90
6.2.5 Verification of cabling system . 90
6.2.6 Cable selection verification . 90
6.2.7 Connector verification . 91
6.2.8 Connection verification . 91
6.2.9 Terminators verification . 92
6.2.10 Coding and labelling verification . 93

– 4 – 61918 © IEC:2013
6.2.11 Verification report . 93

6.3 Installation acceptance test . 93

6.3.1 General . 93

6.3.2 Acceptance test of Ethernet-based cabling . 95

6.3.3 Acceptance test of non-Ethernet-based cabling . 97

6.3.4 Specific requirements for wireless installation . 98

6.3.5 Acceptance test report . 98

7 Installation administration . 98

7.1 General . 98

7.2 Fields covered by the administration . 99
7.3 Basic principles for the administration system . 99
7.4 Working procedures . 99
7.5 Device location labelling . 100
7.6 Component cabling labelling . 100
7.7 Documentation . 101
7.8 Specific requirements for administration . 101
8 Installation maintenance and installation troubleshooting . 101
8.1 General . 101
8.2 Maintenance . 102
8.2.1 Scheduled maintenance . 102
8.2.2 Condition-based maintenance . 104
8.2.3 Corrective maintenance . 104
8.3 Troubleshooting . 104
8.3.1 General description . 104
8.3.2 Evaluation of the problem . 105
8.3.3 Typical problems . 105
8.3.4 Troubleshooting procedure . 108
8.3.5 Simplified troubleshooting procedure . 109
8.4 Specific requirements for maintenance and troubleshooting . 110
Annex A (informative) Overview of generic cabling for industrial premises . 111
Annex B (informative) MICE description methodology . 112
B.1 General . 112
B.2 Overview of MICE . 112
B.3 Examples of use of the MICE concept . 113

B.3.1 Common description . 113
B.3.2 Examples of mitigation . 114
B.4 Determining E classification . 115
B.5 The MICE table . 118
Annex C (informative) Network topologies. 120
C.1 Common description . 120
C.2 Total cable demand . 120
C.3 Maximum cable segment length . 120
C.4 Maximum network length . 120
C.5 Fault tolerance . 120
C.5.1 General . 120
C.5.2 Use of redundancy . 120
C.5.3 Failure analysis for networks with redundancy . 121

61918 © IEC:2013 – 5 –
C.6 Network access for diagnosis convenience . 121

C.7 Maintainability and on-line additions . 121

Annex D (informative) Connector tables . 122

Annex E (informative) Power networks with respect to electromagnetic interference –

TN-C and TN-S approaches . 135

Annex F (informative) Conductor sizes in electrical cables . 137

Annex G (informative) Installed cabling verification checklists . 139

G.1 General . 139

G.2 Copper cabling verification checklist . 139

G.3 Optical fibre cabling verification checklist . 143
Annex H (normative) Cord sets . 144
H.1 General . 144
H.2 Constructing cord sets . 144
H.2.1 Straight through cord sets with M12-4 D-coding connectors . 144
H.2.2 Crossover cord sets with M12-4 D-coding connectors . 145
H.2.3 Straight through cord sets with 8-way modular connectors . 145
H.2.4 Crossover cord sets with 8-way modular connectors . 146
H.2.5 Straight conversion from one connector family to another . 147
H.2.6 Crossover conversion from one connector family to another . 147
Annex I (informative) Guidance for terminating cable ends . 149
I.1 General . 149
I.2 Guidance for terminating shielded twisted pair cable ends for 8-way modular plugs . 149
I.3 Guidance for terminating unshielded twisted pair cable ends for 8-way modular
plugs . 152
I.4 Guidance for M12-4 D-coding connector installation . 153
I.5 Guidance for terminating optical fibre cable ends . 155
Annex J (informative) Recommendations for bulkhead connection performance and
channel performance with more than 4 connections in the channel . 156
J.1 General . 156
J.2 Recommendations . 156
Annex K (informative) Fieldbus data transfer testing . 157
K.1 Background . 157
K.2 Allowable error rates for control systems . 157
K.2.1 Bit errors . 157
K.2.2 Burst errors . 157
K.3 Testing channel performance . 158
K.4 Testing cable parameters . 158
K.4.1 General . 158
K.4.2 Generic cable testing. 158
K.4.3 Fieldbus cable testing. 159
K.5 Testing fieldbus data rate performance . 159
K.5.1 General . 159
K.5.2 Fieldbus test . 159
K.5.3 Planning for fieldbus data rate testing . 159
K.5.4 Fieldbus data rate test reporting template . 160
K.5.5 Values for acceptable fieldbus performance . 160

– 6 – 61918 © IEC:2013
Annex L (informative) Communication network installation work responsibility . 161

L.1 General . 161

L.2 Installation work responsibility . 161

L.3 Installation work responsibility table . 161

Annex M (informative) Trade names of communication profiles . 162

Annex N (informative) Validation measurements . 165

N.1 General . 165

N.2 DCR measurements . 165

N.2.1 Purpose of test . 165
N.2.2 Assumptions . 165
N.2.3 Measurements . 165
N.2.4 Calculations . 167
N.2.5 Measurement results . 167
Annex O (informative) End-to-end link . 171
O.1 General . 171
O.2 End-to-end link . 171
O.3 Deliverables . 172
O.4 End-to-end link test schedules and methods . 172
O.4.1 End-to-end link test method 1 . 172
O.4.2 End-to-end link test method 2 . 173
Bibliography . 174

Figure 1 – Industrial network installation life cycle . 13
Figure 2 – Standards relationships . 14
Figure 3 – Structure of generic cabling connected to an automation island . 31
Figure 4 – Automation island cabling attached to elements of generic cabling. 31
Figure 5 – Automation islands . 32
Figure 6 – Automation island network external connections . 32
Figure 7 – How to meet environmental conditions . 36
Figure 8 – How enhancement, isolation and separation work together . 36
Figure 9 – Basic physical topologies for passive networks . 37
Figure 10 – Basic physical topologies for active networks . 37

Figure 11 – Example of combination of basic topologies . 38
Figure 12 – Basic reference implementation model . 49
Figure 13 – Enhanced reference implementation model . 51
Figure 14 – Selection of the earthing and bonding systems . 58
Figure 15 – Wiring for bonding and earthing in an equipotential configuration . 60
Figure 16 – Wiring of the earths in a star earthing configuration . 61
Figure 17 – Schematic diagram of a field device with direct earthing . 62
Figure 18 – Schematic diagram of a field device with parallel RC circuit earthing . 63
Figure 19 – Insert edge protector . 72
Figure 20 – Use an uncoiling device and avoid forming loop . 73
Figure 21 – Avoid torsion . 73
Figure 22 – Maintain minimum bending radius . 74

61918 © IEC:2013 – 7 –
Figure 23 – Do not pull by the individual wires . 74

Figure 24 – Use cable clamps with a large (wide) surface . 74

Figure 25 – Cable gland with bending protection . 75

Figure 26 – Spiral tube . 75

Figure 27 – Separate cable pathways . 78

Figure 28 – Use of flexible bonding straps at movable metallic pathways . 81

Figure 29 – Surface preparation for earthing and bonding electromechanical

connections . 82

Figure 30 – Example of isolated bus bar . 83

Figure 31 – Example of isolator for mounting DIN rails . 84
Figure 32 – Parallel RC shield earthing . 84
Figure 33 – Direct shield earthing . 85
Figure 34 – Examples for shielding application . 85
Figure 35 – Voltage offset mitigation . 86
Figure 36 – First example of derivatives of shield earthing . 86
Figure 37 – Second example of derivatives of shield earthing . 86
Figure 38 – Installation verification process . 88
Figure 39 – Test of earthing connections . 89
Figure 40 – Pin and pair grouping assignments for two eight position IEC 60603-7
subparts and four position IEC 60603 series to IEC 61076-2-101 connectors . 92
Figure 41 – Two pair 8-way modular connector . 92
Figure 42 – Transposed pairs, split pairs and reversed pair . 92
Figure 43 – Validation process . 94
Figure 44 – Schematic representation of the channel . 95
Figure 45 – Schematic representation of the permanent link . 95
Figure 46 – Communication network maintenance . 103
Figure 47 – Troubleshooting procedure . 108
Figure 48 – Fault detection without special tools . 109
Figure B.1 – MICE classifications . 112
Figure B.2 – Example MICE classifications within a facility . 113
Figure B.3 – Enhancement, isolation and separation . 113
Figure B.4 – Example 1 of mitigation. 114
Figure B.5 – Example 2 of mitigation. 115
Figure B.6 – Frequency range of electromagnetic disturbance from common industrial
devices . 115
Figure B.7 – Example of a general guidance for separation versus EFT value . 117
Figure E.1 – Four-wire power network (TN-C) . 135
Figure E.2 – Five wire power network (TN-S) . 136
Figure H.1 – Straight through cord sets with M12-4 D-coding connectors . 144
Figure H.2 – Straight through cord sets with 8-way modular connectors, 8 poles . 145
Figure H.3 – Straight through cord sets with 8-way modular connectors, 4 poles . 146
Figure I.1 – Stripping the cable jacket . 149
Figure I.2 – Example of wire preparation for type A cables . 150
Figure I.3 – 8-way modular plug . 150

– 8 – 61918 © IEC:2013
Figure I.4 – Inserting the cable into the connector body . 151

Figure I.5 – Crimping the connector . 151

Figure I.6 – Example of a cable preparation for type A wiring . 152

Figure I.7 – Connector components . 153

Figure I.8 – Cable preparation . 153

Figure I.9 – Connector wire gland, nut and shell on the cable . 153

Figure I.10 – Conductors preparation . 153

Figure I.11 – Jacket removal . 154

Figure I.12 – Shield preparation . 154
Figure I.13 – Conductors preparation . 154
Figure I.14 – Installing conductors in connector . 154
Figure I.15 – Assembling the body of the connector . 155
Figure I.16 – Final assembling . 155
Figure N.1 – Loop resistance measurement wire to wire . 166
Figure N.2 – Loop resistance measurement wire 1 to shield . 166
Figure N.3 – Loop resistance measurement wire 2 to shield . 166
Figure N.4 – Resistance measurement for detecting wire shorts . 166
Figure N.5 – Resistance measurement between wire 1 and wire 2 . 167
Figure N.6 – Validation of the cable DCR . 168
Figure N.7 – Conclusions for cable open or shorts . 169
Figure N.8 – Determination of proper cable terminator value . 170
Figure O.1 – Channel according to ISO/IEC 11801 . 171
Figure O.2 – End-to-end link . 172

Table 1 – Basic network characteristics for balanced cabling not based on Ethernet . 39
Table 2 – Network characteristics for balanced cabling based on Ethernet . 40
Table 3 – Network characteristics for optical fibre cabling . 41
Table 4 – Information relevant to copper cable: fixed cables . 43
Table 5 – Information relevant to copper cable: cords . 44
Table 6 – Information relevant to optical fibre cables . 45
Table 7 – Connectors for balanced cabling CPs based on Ethernet . 47

Table 8 – Connectors for copper cabling CPs not based on Ethernet . 47
Table 9 – Optical fibre connecting hardware . 47
Table 10 – Relationship between FOC and fibre types (CP x/y) . 48
Table 11 – Basic reference implementation formulas . 50
Table 12 – Enhanced reference implementation formulas . 51
Table 13 – Correction factor Z for operating temperature above 20 °C . 52
Table 14 – Equalisation and earthing conductor sizing and length . 57
Table 15 – Bonding straps cross-section . 59
Table 16 – Bonding plates surface protection. 59
Table 17 – Cable circuit types and minimum distances . 68
Table 18 – Parameters for balanced cables . 71
Table 19 – Parameters for silica optical fibre cables . 71

61918 © IEC:2013 – 9 –
Table 20 – Parameters for POF optical fibre cables . 71

Table 21 – Parameters for hard clad silica optical fibre cables . 72

Table 22 – Typical problems in a network with balanced cabling . 106

Table 23 – Typical problems in a network with optical fibre cabling . 107

Table B.1 – Example 1 of targeted MICE area . 114

Table B.2 – Example 2 of targeted MICE area . 114

Table B.3 – Relationship between electromagnetic disturbance-generating devices and

“E” classification . 116

Table B.4 – Coupling mechanism for some interfering devices . 117

Table B.5 – MICE definition . 118
Table D.1 – Conventions for colour code used in the connector table . 122
Table D.2 – Pair numbers and colour scheme . 123
Table D.3 – 8-way modular connector .
...

Questions, Comments and Discussion

Ask us and Technical Secretary will try to provide an answer. You can facilitate discussion about the standard in here.

Loading comments...