IEC 62337:2012/COR1:2012
(Corrigendum)Corrigendum 1 - Commissioning of electrical, instrumentation and control systems in the process industry - Specific phases and milestones
Corrigendum 1 - Commissioning of electrical, instrumentation and control systems in the process industry - Specific phases and milestones
Corrigendum 1 - Mise en service des systèmes électriques, de mesure et de commande dans l'industrie de transformation - Phases et jalons spécifiques
General Information
- Status
- Published
- Publication Date
- 10-Dec-2012
- Technical Committee
- SC 65E - Devices and integration in enterprise systems
- Current Stage
- PPUB - Publication issued
- Start Date
- 11-Dec-2012
- Completion Date
- 09-Dec-2012
Relations
- Effective Date
- 05-Sep-2023
Get Certified
Connect with accredited certification bodies for this standard

ICC Evaluation Service
Building products evaluation and certification.

QAI Laboratories
Building and construction product testing and certification.

Aboma Certification B.V.
Specialized in construction, metal, and transport sectors.
Sponsored listings
Frequently Asked Questions
IEC 62337:2012/COR1:2012 is a standard published by the International Electrotechnical Commission (IEC). Its full title is "Corrigendum 1 - Commissioning of electrical, instrumentation and control systems in the process industry - Specific phases and milestones". This standard covers: Corrigendum 1 - Commissioning of electrical, instrumentation and control systems in the process industry - Specific phases and milestones
Corrigendum 1 - Commissioning of electrical, instrumentation and control systems in the process industry - Specific phases and milestones
IEC 62337:2012/COR1:2012 is classified under the following ICS (International Classification for Standards) categories: 91.010.20 - Contractual aspects; 91.040.20 - Buildings for commerce and industry. The ICS classification helps identify the subject area and facilitates finding related standards.
IEC 62337:2012/COR1:2012 has the following relationships with other standards: It is inter standard links to IEC 62337:2012. Understanding these relationships helps ensure you are using the most current and applicable version of the standard.
IEC 62337:2012/COR1:2012 is available in PDF format for immediate download after purchase. The document can be added to your cart and obtained through the secure checkout process. Digital delivery ensures instant access to the complete standard document.
Standards Content (Sample)
IEC 62337 CEI 62337
(Second edition – 2012) (Deuxième édition – 2012)
Commissioning of electrical, instrumentation Mise en service des systèmes électriques, de
and control systems in the mesure et de commande dans
process industry – l'industrie de transformation –
Specific phases and milestones Phases et jalons spécifiques
CO RRI G ENDU M 1
3.29 plot plan I&D 3.29 plan d'implantation I&D
Replace the existing term by the following new Remplacer le terme existant par le nouveau
term: terme suivant:
plot plan E&I plan d'implantation E&I
6.1 General 6.1 Généralités
Replace, in the existing text, the reference Remplacer, dans le texte existant, la
to "5.2" by "6.2". référence à "5.2" par "6.2".
6.2 Procedure 6.2 Procédure
Replace, in the existing item d), the Remplacer, dans le point d) existant, la
reference to "Annex D" by "Annex B". référence à "Annexe D" par "Annexe B".
7.1 General 7.1 Généralités
Replace, in the existing text, the reference Remplacer, dans le texte existant, la
to "6.2" by "7.2". référence à "6.2" par "7.2".
Delete the existing titles and texts of Supprimer les titres et textes existants des
Subclauses 7.3 and 7.4. Paragraphes 7.3 et 7.4.
8.3 Execution of performance test 8.3 Exécution de l’essai de
fonctionnement
Replace, in the existing item a), the
reference to "7.2" by "8.2". Remplacer, dans le point a) existant, la
référence à "7.2" par "8.2".
Repla
...




Questions, Comments and Discussion
Ask us and Technical Secretary will try to provide an answer. You can facilitate discussion about the standard in here.
Loading comments...