EN 62264-5:2016
(Main)Enterprise-control system integration - Part 5: Business to manufacturing transactions
Enterprise-control system integration - Part 5: Business to manufacturing transactions
IEC 62264-5:2016 defines transactions in terms of information exchanges between applications performing business and manufacturing activities associated with Levels 3 and 4. The exchanges are intended to enable information collection, retrieval, transfer and storage in support of enterprise-control system integration. This part of IEC 62264 is consistent with the IEC 62264-2 and IEC 62264-4 object models attributes. This standard also defines transactions that specify how to exchange the objects defined in IEC 62264-2, IEC 62264-4 and this standard. This second edition cancels and replaces the first edition published in 2011. This edition constitutes a technical revision. This edition includes the following significant technical changes with respect to the previous edition: The addition of transaction rules for objects defined in IEC 62264-4: Job, Job List, Job Response, Job Response List, Work Alert Definition, Work Alert, Work Calendar Definition, Work Calendar, Work Capability Work Directive, Work Master, Work Performance, Work Record, Work Schedule, Workflow Specification Node Type, Workflow Specification. It is published as a double logo standard.
Integration von Unternehmensführungs- und Leitsystemen - Teil 5: Transaktionen zwischen Unternehmungsführungs- und Produktionsleitsystemen
Intégration du système de commande d'entreprise - Partie 5 : Transactions entre systèmes de gestion de commande d'entreprise et systèmes de fabrication
IEC 62264-5:2016 définit des transactions en termes d'échanges d'informations entre des applications de gestion d'entreprise et de fabrication associées au Niveau 3 et au Niveau 4. L'objectif de ces échanges est la capture, l'extraction, le transfert et le stockage des informations, confortant en cela l'intégration du système de commande d'entreprise. La présente Partie de l'IEC 62264 est conforme aux attributs des modèles d'objet de l'IEC 62264-2 et l'IEC 62264-4. La présente norme définit également des transactions spécifiant comment échanger les objets définis dans l'IEC 62264-2, l'IEC 62264-4 et dans la présente norme. Cette deuxième édition annule et remplace la première édition parue en 2011. Cette édition constitue une révision technique. Cette édition inclut les modifications techniques majeures suivantes par rapport à l'édition précédente: Ajout des règles de transaction pour les objets définis dans l'IEC 62264-4: Tâche, Liste de tâches, Réponse de tâche, Liste de réponses de tâches, Définition d'alerte de travail, Alerte de travail, Définition du calendrier de travail, Calendrier de travail, Aptitude de travail, Directive de travail, Travail maitre, Rapport de travail, Registre de travail, Sous-objets d'un registre de travail, Noeud de la spécification de plan de travail, Spécification de plan de travail. Elle est publiée en tant que norme double-logo.
Integracija sistemov za upravljanje podjetij - 5. del: Prenosi posla v proizvodnjo (IEC 62264-5:2016)
Ta del standarda IEC 62264 določa prenose v smislu izmenjave informacij med aplikacijami, ki izvajajo poslovne in proizvodne dejavnosti, povezane z ravnema 3 in 4. Izmenjave so namenjene omogočanju zbiranja, pridobivanja, prenosa in shranjevanja v podporo integraciji sistemov za upravljanje podjetij. Ta del standarda IEC 62264 je skladen z lastnostmi objektnega modela iz standardov IEC 62264-2 in IEC 62264-4. Ta standard opredeljuje tudi prenose, ki določajo, kako je treba izmenjati objekte, določene v standardih IEC 62264-2, IEC 62264-4
in tem standardu. Drugi načini uporabe modela prenosa v tem delu niso opredeljeni.
V tem standardu so zajeti naslednji modeli:
– model za osebje
– model za opremo
– model fizičnih sredstev
– model za material
– model za procesni segment
– model za zmogljivost operacij
– model za opredelitev operacij
– model za razpored operacij
– model za učinkovitost operacij
– model omrežja za odnose med viri
– model za zmožnost dela
– model za opredelitev dela
– model za razporeditev dela
– model za seznam nalog
–model za učinkovitost dela
– model za specifikacijo poteka dela
– delovni koledar
– poročilo dela
– model za opozorila pri delu
General Information
Relations
Standards Content (Sample)
SLOVENSKI STANDARD
01-maj-2017
1DGRPHãþD
SIST EN 62264-5:2012
Integracija sistemov za upravljanje podjetij - 5. del: Prenosi posla v proizvodnjo
(IEC 62264-5:2016)
Enterprise-control system integration - Part 5: Business to manufacturing transactions
(IEC 62264-5:2016)
Integration von Unternehmensführungs- und Leitsystemen - Teil 5: Transaktionen
zwischen Unternehmungsführungs- und Produktionsleitsystemen (IEC 62264-5:2016)
Intégration du système de commande d'entreprise - Partie 5 : transactions entre
systèmes de gestion de commande d'entreprise et systèmes de fabrication (IEC 62264-
5:2016)
Ta slovenski standard je istoveten z: EN 62264-5:2016
ICS:
03.100.01 Organizacija in vodenje Company organization and
podjetja na splošno management in general
25.040.01 Sistemi za avtomatizacijo v Industrial automation
industriji na splošno systems in general
35.240.50 Uporabniške rešitve IT v IT applications in industry
industriji
2003-01.Slovenski inštitut za standardizacijo. Razmnoževanje celote ali delov tega standarda ni dovoljeno.
EUROPEAN STANDARD EN 62264-5
NORME EUROPÉENNE
EUROPÄISCHE NORM
November 2016
ICS 25.040.99; 35.100; 35.200 Supersedes EN 62264-5:2012
English Version
Enterprise-control system integration -
Part 5: Business to manufacturing transactions
(IEC 62264-5:2016)
Intégration du système de commande d'entreprise - Integration von Unternehmensführungs- und Leitsystemen -
Partie 5 : Transactions entre systèmes de gestion de Teil 5: Transaktionen zwischen Unternehmungsführungs-
commande d'entreprise et systèmes de fabrication und Produktionsleitsystemen
(IEC 62264-5:2016) (IEC 62264-5:2016)
This European Standard was approved by CENELEC on 2016-08-23. CENELEC members are bound to comply with the CEN/CENELEC
Internal Regulations which stipulate the conditions for giving this European Standard the status of a national standard without any alteration.
Up-to-date lists and bibliographical references concerning such national standards may be obtained on application to the CEN-CENELEC
Management Centre or to any CENELEC member.
This European Standard exists in three official versions (English, French, German). A version in any other language made by translation
under the responsibility of a CENELEC member into its own language and notified to the CEN-CENELEC Management Centre has the
same status as the official versions.
CENELEC members are the national electrotechnical committees of Austria, Belgium, Bulgaria, Croatia, Cyprus, the Czech Republic,
Denmark, Estonia, Finland, Former Yugoslav Republic of Macedonia, France, Germany, Greece, Hungary, Iceland, Ireland, Italy, Latvia,
Lithuania, Luxembourg, Malta, the Netherlands, Norway, Poland, Portugal, Romania, Slovakia, Slovenia, Spain, Sweden, Switzerland,
Turkey and the United Kingdom.
European Committee for Electrotechnical Standardization
Comité Européen de Normalisation Electrotechnique
Europäisches Komitee für Elektrotechnische Normung
CEN-CENELEC Management Centre: Avenue Marnix 17, B-1000 Brussels
© 2016 CENELEC All rights of exploitation in any form and by any means reserved worldwide for CENELEC Members.
Ref. No. EN 62264-5:2016 E
European foreword
The text of document 65E/459/CDV, future edition 2 of IEC 62264-5, prepared by SC 65E "Devices
and integration in enterprise systems", of IEC/TC 65 "Industrial-process measurement, control and
automation" and ISO/SC 5/JWG 5, of ISO/TC 184 "Automation systems and integration" was
submitted to the IEC-CENELEC parallel vote and approved by CENELEC as EN 62264-5:2016.
The following dates are fixed:
• latest date by which the document has to be implemented at (dop) 2017-05-25
national level by publication of an identical national
standard or by endorsement
(dow) 2019-11-25
• latest date by which the national standards conflicting with
the document have to be withdrawn
This document supersedes EN 62264-5:2012
Attention is drawn to the possibility that some of the elements of this document may be the subject of
patent rights. CENELEC [and/or CEN] shall not be held responsible for identifying any or all such
patent rights.
Endorsement notice
The text of the International Standard IEC 62264-5:2016 was approved by CENELEC as a European
Standard without any modification.
Annex ZA
(normative)
Normative references to international publications
with their corresponding European publications
The following documents, in whole or in part, are normatively referenced in this document and are
indispensable for its application. For dated references, only the edition cited applies. For undated
references, the latest edition of the referenced document (including any amendments) applies.
NOTE 1 When an International Publication has been modified by common modifications, indicated by (mod),
the relevant EN/HD applies.
NOTE 2 Up-to-date information on the latest versions of the European Standards listed in this annex is
available here: www.cenelec.eu.
Publication Year Title EN/HD Year
IEC 62264-2 2013 Enterprise-control system integration - EN 62264-2 2013
Part 2: Objects and attributes for
enterprise-control system integration
IEC 62264-3 - Enterprise-control system integration - EN 62264-3 -
Part 3: Activity models of manufacturing
operations management
IEC 62264-4 - Enterprise-control system integration - EN 62264-4 -
Part 4: Object model attributes for
manufacturing operations management
integration
ISO/IEC 19501 - Information technology - Open - -
Distributed Processing - Unified
Modeling Language (UML) Version 1.4.2
ISO 8601 - Data elements and interchange - -
formats - Information interchange -
Representation of dates and times
IEC 62264-5
Edition 2.0 2016-07
INTERNATIONAL
STANDARD
NORME
INTERNATIONALE
colour
inside
Enterprise-control system integration –
Part 5: Business to manufacturing transactions
Intégration du système de commande d’entreprise –
Partie 5: Transactions entre systèmes de gestion de commande d’entreprise et
systèmes de fabrication
INTERNATIONAL
ELECTROTECHNICAL
COMMISSION
COMMISSION
ELECTROTECHNIQUE
INTERNATIONALE
ICS 25.040.99; 35.100; 35.200 ISBN 978-2-8322-3523-2
– 2 – IEC 62264-5:2016 © IEC 2016
CONTENTS
FOREWORD . 11
INTRODUCTION . 13
1 Scope . 14
2 Normative references. 14
3 Terms, definitions, abbreviations, and conventions . 15
3.1 Terms and definitions . 15
3.2 Abbreviations . 15
3.3 Conventions . 16
4 Transaction messages and verbs . 16
4.1 General . 16
4.2 Transaction models . 17
4.3 Message structure . 18
4.3.1 General structure . 18
4.3.2 Application identification area . 19
4.3.3 Data area . 19
4.3.4 Message nouns . 20
4.3.5 Wildcard . 20
5 Message verbs . 21
5.1 Verbs and transaction models . 21
5.2 GET verb . 23
5.3 SHOW verb . 24
5.4 PROCESS verb . 24
5.5 ACKNOWLEDGE verb . 25
5.6 CHANGE verb . 26
5.7 CANCEL verb . 26
5.8 CONFIRM verb . 27
5.9 RESPOND verb . 29
5.10 SYNC verb . 29
5.11 SYNC ADD verb . 30
5.12 SYNC CHANGE verb . 30
5.13 SYNC DELETE verb . 30
5.14 Verb actions and the use of IDs . 31
6 Message nouns . 31
6.1 General . 31
6.2 Defined message contents . 31
6.2.1 Equipment . 31
6.2.2 Equipment Capability Test Specification . 31
6.2.3 Equipment Class . 31
6.2.4 Job List . 31
6.2.5 Job Response . 32
6.2.6 Job Response List . 32
6.2.7 Material Class . 32
6.2.8 Material Definition . 32
6.2.9 Material Lot . 33
6.2.10 Material Sublot . 33
6.2.11 Material Test Specification . 33
IEC 62264-5:2016 © IEC 2016 – 3 –
6.2.12 Operations Capability . 33
6.2.13 Operations Definition . 33
6.2.14 Operations Schedule . 34
6.2.15 Operations Performance . 34
6.2.16 Person . 34
6.2.17 Personnel Class . 35
6.2.18 Physical Asset . 35
6.2.19 Physical Asset Class . 35
6.2.20 Physical Asset Capability Test Specification . 35
6.2.21 Process Segment . 35
6.2.22 Resource Relationship Network . 35
6.2.23 Resource Relationship Network Connection Type . 36
6.2.24 Qualification Test Specification . 36
6.2.25 Transaction Profile . 36
6.2.26 Work Alert Definition . 36
6.2.27 Work Alert . 36
6.2.28 Work Calendar Definition . 36
6.2.29 Work Calendar .
...
Questions, Comments and Discussion
Ask us and Technical Secretary will try to provide an answer. You can facilitate discussion about the standard in here.