WG 19 - TC 57/WG 19
TC 57/WG 19
General Information
IEC 62357-2:2019 (E), which is a technical report, establishes the list of Use Cases developed by TC 57, Power systems management and associated information exchanges, in order to prepare International Standards, Technical Reports and Technical Specifications. Use Cases are fundamental to TC 57 publications This Technical Report:
• Identifies in existing standards, technical specification, reports and in ongoing TC 57 work (CD, DTS, DTR etc.) the Use Cases used as well as their links to standards, their status as Use Cases (level of description, standardization of the description referring to IEC 62559) and as IEC deliverables (are they in a TR/TS/IS, what is the status of the document CD, CDV etc.)
• Helps System Committees consolidate Use Cases through terminology and term definition work (link with existing relevant standards on the TC Terminology) and building links between roles and modelling frameworks (Role models). For example in TC 57 building links between the Use Case methodology and the roles used in IEC 62913-2 with CIM Interface Reference Model (IRM – IEC 61968).
• Shares and promotes those Use Cases within TC 57 and outside it. TC 57 mainly describes System Use Cases in the standards it publishes. Business roles and business Use Cases are mainly described within SyC SE (System Committee Smart Energy) deliverables (IEC 62559 series and IEC 62913 series).
• This document provides good input in reusing System Use Cases and System Roles inside and outside TC 57.
• Explains the content of its Use Cases to potential users and providing support on using those Use Cases for standardization (Normative context, maturity of the Use Case, location in standardization work, roles implied)
Those Use Cases aimed to be used as tools to identify requirements as input to further development of technical standards (whether TC 57 or not) and improve the consistency in this work and in that way contribute to interoperability. Use Cases facilitate cooperation at a system level with TCs, other standards-developing organizations, non-traditional players of electrotechnology, and regional organizations. Inside the IEC they provide a convergence platform with overall system level value for support of the Technical Committees and other standard development groups.
This document allows TC 57 to self-assess its work on Use Cases through KPIs (Key Performance Indicator) such as:
• % of Use Cases compliant with IEC 62559-2
• % of Business Use Cases (BUC) and System Use Cases (SUC)
• % of Business Roles and System Roles
- Technical report295 pagesEnglish languagesale 15% off
IEC TS 62361-102:2018(E) outlines a technical approach for achieving effective information exchange between power system installations governed by IEC 61850 and business systems integrated with IEC CIM standard data exchanges, based on a selected specific set of use cases, but also with the goal of creating a framework that will extend successfully to other use cases in the future. This document includes proposals to ‘harmonize’ the two standards by adapting or extending existing information models and/or defining new models, where such changes will enable more effective communication. Both current and future directions of models will be considered. The report will take into account existing standards for semantics, services, protocols, system configuration language, and architecture.
- Technical specification119 pagesEnglish languagesale 15% off
IEC TR 62357-1:2016(E) provides a clear and comprehensive map of all standards which are contributing to support interactions, in an open and interoperable way, between actors, components and systems in the field of electricity grids from generation to consumers, including transmission and distribution. The document also brings the vision of the path which will be followed by the concerned IEC technical committees and working groups in the coming years, to improve the global efficiency, market relevancy and coverage of this series of standards. This second edition includes the following significant technical changes with respect to the previous edition:
- it provides updates and defines layered Reference Architecture to help direct longer term goals and activities, specifically to ensure compatibility of all new standards developed in the IEC by benefitting from lessons learned during development of the current standards and their application to actual utility projects as well as through application of other internationally recognized architecture standards.
- It reflects the most recent editions of the IEC standards relating to power systems management and associated information exchange, including the IEC 61850 series and the IEC 61968, IEC 61970 and IEC 62325 Common Information Model (CIM) standards.
- Technical report111 pagesEnglish languagesale 15% off
IEC 62361-100:2016 describes a mapping from CIM profiles to W3C XML Schemas, intended to facilitate the exchange of information in the form of XML documents whose semantics are defined by the IEC CIM and whose syntax is defined by a W3C XML schema.
- Standard105 pagesEnglish and French languagesale 15% off
IEC 60870-6-702:2014 is a functional profile (FP) and defines the provision of the TASE.2 communications services between two control centre end systems. It is supported by the transport services implemented in accordance with transport-profiles defined for the type of network that interconnects the control centre end systems. The main changes with respect to the previous edition are listed below:
- certain objects were moved from being normative to informative;
- certain TASE.2 conformance blocks have been made out-of-scope. These changes were made in order to remove TASE.2 blocks that were seldom used and whose capabilities are typically implemented by some other means besides TASE.2. This was done to promote interoperability of implementations from an application perspective.
- Standard71 pagesEnglish and French languagesale 15% off
IEC 60870-6-802:2014 specifies a method of exchanging time-critical control centre data through wide-area and local-area networks using a full ISO compliant protocol stack. It contains provisions for supporting both centralized and distributed architectures. The standard includes the exchange of real-time data indications, control operations, time series data, scheduling and accounting information, remote program control and event notification. This new edition includes the following significant technical changes with respect to the previous edition:
- certain objects have been changed from informative to normative;
- certain TASE.2 conformance blocks have been made out of scope.
- Standard188 pagesEnglish and French languagesale 15% off
IEC 60870-6-503:2014 specifies a method of exchanging time-critical control centre data through wide-area and local-area networks using a full ISO compliant protocol stack. It contains provisions for supporting both centralized and distributed architectures. This standard includes the exchange of real-time data indications, control operations, time-series data, scheduling and accounting information, remote program control and event notification. This new edition includes the following significant technical changes with respect to the previous edition:
- certain objects were made informative;
- services associated with the informative objects were made informative;
- certain TASE.2 conformance blocks were made out-of-scope.
- Standard310 pagesEnglish and French languagesale 15% off
IEC 62361-2:2013 documents the quality codes used by existing IEC standards related to supervisory control and data acquisition (SCADA) in the field of power systems management. Meter reading quality coding is not considered to be in the scope of this version of the document. It determines and documents mapping between these standards. Eventual loss of quality information that might occur in mapping is documented. A cohesive and common list of quality codes with semantics is defined. The identified standards to be dealt with in this document are: IEC 60870-5, IEC 60870-6 TASE.2, IEC 61850, IEC 61970, DAIS DA, OPC DA and OPC UA.
- Standard101 pagesEnglish and French languagesale 15% off
IEC/TR 62357-1:2012(E) specifies a reference architecture and framework for the development and application of IEC standards for the exchange of power system information. This technical report provides an overview of these standards as well as guidelines and general principles for their application in distribution, transmission, and generation systems involved in electric utility operations and planning. The future multi-layer reference architecture described in this technical report takes into account new concepts and evolving technologies, such as semantic modelling and canonical data models, in order to build on technology trends of other industries and standards activities to achieve the interoperability goals of the Smart Grid.
- Technical report114 pagesEnglish languagesale 15% off