IEC 61124:2006
(Main)Reliability testing - Compliance tests for constant failure rate and constant failure intensity
Reliability testing - Compliance tests for constant failure rate and constant failure intensity
This International Standard gives a number of optimized test plans, the corresponding operating characteristic curves and expected test times. In addition the algorithms for designing test plans using a spreadsheet program are also given, together with guidance on how to choose test plans. This standard does not cover guidance on how to plan, perform, analyse and report a test. This information can be found in IEC 60300-3-5. This standard does not describe test conditions. This information can be found in IEC 60605-2 and in IEC 60605, Parts 3-1 to 3-6.
Essais de fiabilité - Plan d'essais de conformité d'un taux de défaillance constant et d'une intensité de défaillance constante
La présente Norme internationale fournit un certain nombre de plans d'essais optimisés, les courbes d'efficacité associées et les valeurs moyennes des temps d'essais. De plus, les algorithmes pour la conception de plans d'essais à l'aide d'un tableur électronique sont également fournis avec des lignes directrices sur la manière de choisir les plans d'essais. La présente norme ne couvre pas les lignes directrices sur la manière de planifier, réaliser, analyser et faire un rapport sur un essai. Ces informations sont données dans la CEI 60300-3-5. La présente norme ne couvre pas les conditions d'essais. Ces informations sont données dans la CEI 60605-2 et la CEI 60605, Parties 3-1 à 3-6.
General Information
Relations
Standards Content (Sample)
NORME CEI
INTERNATIONALE
IEC
INTERNATIONAL
Deuxième édition
STANDARD
Second edition
2006-03
Essais de fiabilité –
Plan d'essais de conformité d'un taux de
défaillance constant et d'une intensité
de défaillance constante
Reliability testing –
Compliance tests for constant failure rate
and constant failure intensity
Numéro de référence
Reference number
CEI/IEC 61124:2006
Numérotation des publications Publication numbering
Depuis le 1er janvier 1997, les publications de la CEI As from 1 January 1997 all IEC publications are
sont numérotées à partir de 60000. Ainsi, la CEI 34-1 issued with a designation in the 60000 series. For
devient la CEI 60034-1. example, IEC 34-1 is now referred to as IEC 60034-1.
Editions consolidées Consolidated editions
Les versions consolidées de certaines publications de la The IEC is now publishing consolidated versions of its
CEI incorporant les amendements sont disponibles. Par publications. For example, edition numbers 1.0, 1.1
exemple, les numéros d’édition 1.0, 1.1 et 1.2 indiquent and 1.2 refer, respectively, to the base publication,
respectivement la publication de base, la publication de the base publication incorporating amendment 1 and
base incorporant l’amendement 1, et la publication de the base publication incorporating amendments 1
base incorporant les amendements 1 et 2. and 2.
Informations supplémentaires Further information on IEC publications
sur les publications de la CEI
Le contenu technique des publications de la CEI est The technical content of IEC publications is kept
constamment revu par la CEI afin qu'il reflète l'état under constant review by the IEC, thus ensuring that
actuel de la technique. Des renseignements relatifs à the content reflects current technology. Information
cette publication, y compris sa validité, sont dispo- relating to this publication, including its validity, is
nibles dans le Catalogue des publications de la CEI available in the IEC Catalogue of publications
(voir ci-dessous) en plus des nouvelles éditions, (see below) in addition to new editions, amendments
amendements et corrigenda. Des informations sur les and corrigenda. Information on the subjects under
sujets à l’étude et l’avancement des travaux entrepris consideration and work in progress undertaken by the
par le comité d’études qui a élaboré cette publication, technical committee which has prepared this
ainsi que la liste des publications parues, sont publication, as well as the list of publications issued,
également disponibles par l’intermédiaire de: is also available from the following:
• Site web de la CEI (www.iec.ch) • IEC Web Site (www.iec.ch)
• Catalogue des publications de la CEI • Catalogue of IEC publications
Le catalogue en ligne sur le site web de la CEI The on-line catalogue on the IEC web site
(www.iec.ch/searchpub) vous permet de faire des (www.iec.ch/searchpub) enables you to search by a
recherches en utilisant de nombreux critères, variety of criteria including text searches,
comprenant des recherches textuelles, par comité technical committees and date of publication. On-
d’études ou date de publication. Des informations en line information is also available on recently
ligne sont également disponibles sur les nouvelles issued publications, withdrawn and replaced
publications, les publications remplacées ou retirées, publications, as well as corrigenda.
ainsi que sur les corrigenda.
• IEC Just Published • IEC Just Published
Ce résumé des dernières publications parues This summary of recently issued publications
(www.iec.ch/online_news/justpub) est aussi dispo- (www.iec.ch/online_news/justpub) is also available
nible par courrier électronique. Veuillez prendre by email. Please contact the Customer Service
contact avec le Service client (voir ci-dessous) Centre (see below) for further information.
pour plus d’informations.
• Service clients • Customer Service Centre
Si vous avez des questions au sujet de cette If you have any questions regarding this
publication ou avez besoin de renseignements publication or need further assistance, please
supplémentaires, prenez contact avec le Service contact the Customer Service Centre:
clients:
Email: custserv@iec.ch Email: custserv@iec.ch
Tél: +41 22 919 02 11 Tel: +41 22 919 02 11
Fax: +41 22 919 03 00 Fax: +41 22 919 03 00
.
NORME CEI
INTERNATIONALE
IEC
INTERNATIONAL
Deuxième édition
STANDARD
Second edition
2006-03
Essais de fiabilité –
Plan d'essais de conformité d'un taux de
défaillance constant et d'une intensité
de défaillance constante
Reliability testing –
Compliance tests for constant failure rate
and constant failure intensity
IEC 2006 Droits de reproduction réservés Copyright - all rights reserved
Aucune partie de cette publication ne peut être reproduite ni No part of this publication may be reproduced or utilized in any
utilisée sous quelque forme que ce soit et par aucun procédé, form or by any means, electronic or mechanical, including
électronique ou mécanique, y compris la photocopie et les photocopying and microfilm, without permission in writing from
microfilms, sans l'accord écrit de l'éditeur. the publisher.
International Electrotechnical Commission, 3, rue de Varembé, PO Box 131, CH-1211 Geneva 20, Switzerland
Telephone: +41 22 919 02 11 Telefax: +41 22 919 03 00 E-mail: inmail@iec.ch Web: www.iec.ch
CODE PRIX
XF
PRICE CODE
Commission Electrotechnique Internationale
International Electrotechnical Commission
МеждународнаяЭлектротехническаяКомиссия
Pour prix, voir catalogue en vigueur
For price, see current catalogue
– 2 – 61124 © CEI:2006
SOMMAIRE
AVANT-PROPOS . 14
1 Domaine d'application. 18
2 Références normatives. 18
3 Termes, définitions, symboles et acronymes. 20
3.1 Termes et définitions . 20
3.2 Acronymes et symboles . 20
4 Exigences générales et domaine d’applicabilité . 24
4.1 Exigences . 24
4.2 Applicabilité aux entités réparées et remplacées . 24
4.3 Types de plans d’essais. 26
5 Méthode générale d'essai. 28
5.1 Conditions d’essai. 28
5.2 Caractéristiques générales des plans d’essais . 28
5.3 Données à enregistrer . 30
*
5.4 Calcul du temps d’essai accumulé, T . 30
5.5 Nombre de défaillances . 32
6 Plans d’essais progressifs . 32
6.1 Généralités. 32
6.2 Méthode d'essai commune. 32
6.3 Critères de décision . 34
6.4 Vue d’ensemble des plans d’essais. 34
7 Plans d’essais censurés – Plans d’essais à durée fixe. 36
7.1 Généralités. 36
7.2 Méthode d'essai commune. 36
7.3 Critères de décision . 36
7.4 Plans d’essais . 38
8 Etude de plans d’essais tronqués/censurés alternatifs. 38
8.1 Généralités. 38
8.2 Procédures de conception. 40
8.3 Méthode d'essai commune. 40
8.4 Critères de décision . 40
9 Plans d’essais à durée calendaire censurés pour entités non réparées . 42
9.1 Généralités. 42
9.2 Méthode d'essai commune. 42
9.3 Critères de décision . 42
9.4 Utilisation du Tableau 2 de la CEI 61123:1991 pour les essais à durée
calendaire . 44
10 Plans d’essais combinés . 46
10.1 Généralités. 46
10.2 Méthode d'essai commune. 46
10.3 Critères de décision . 46
10.4 Plans d’essais . 48
11 Réalisation de l’essai . 48
12 Présentation des résultats . 48
61124 © IEC:2006 – 3 –
CONTENTS
FOREWORD. 15
1 Scope. 19
2 Normative references. 19
3 Terms, definitions, symbols and acronyms . 21
3.1 Terms and definitions . 21
3.2 Acronyms and symbols . 21
4 General requirements and area of application. 25
4.1 Requirements . 25
4.2 Applicability to replaced and repaired items . 25
4.3 Types of test plans. 27
5 General test procedure. 29
5.1 Test conditions . 29
5.2 General characteristics of the test plans. 29
5.3 Data to be recorded. 31
*
5.4 Calculation of accumulated test time, T . 31
5.5 Number of failures. 33
6 Sequential test plans . 33
6.1 General. 33
6.2 Common test procedure. 33
6.3 Decision criteria. 35
6.4 Overview of test plans . 35
7 Fixed time/failure terminated test plans – Fixed duration test plans. 37
7.1 General. 37
7.2 Common test procedure. 37
7.3 Decision criteria. 37
7.4 Test plans . 39
8 Design of alternative time/failure terminated test plans . 39
8.1 General. 39
8.2 Design procedures . 41
8.3 Common test procedure. 41
8.4 Decision criteria. 41
9 Calendar time/failure terminated test plans for non-replaced items . 43
9.1 General. 43
9.2 Common test procedure. 43
9.3 Decision criteria. 43
9.4 Use of Table 2 of IEC 61123:1991 for fixed calendar time tests . 45
10 Combined test plans . 47
10.1 General. 47
10.2 Common test procedure. 47
10.3 Decision criteria. 47
10.4 Test plans . 49
11 Performing the test . 49
12 Presentation of results . 49
– 4 – 61124 © CEI:2006
Annexe A (normative) Tableaux et graphiques relatifs aux plans d’essais progressifs. 50
Annexe B (normative) Graphiques relatifs aux plans d’essais censurés systématiques . 88
Annexe C (normative) Graphiques relatifs aux plans d’essais censurés alternatifs . 106
Annexe D (normative) Tableaux et graphiques pour plan d’essais combinés et plans
d’essais progressifs supplémentaires . 120
Annexe E (informative) Exemple et référence mathématiques pour les plans d’essais
progressifs. 158
Annexe F (informative) Conception des plans d’essais progressifs en utilisant un
tableur électronique . 174
Annexe G (informative) Exemples et références mathématiques relatifs aux plans
d’essais censurés à durée fixe. 196
Annexe H (informative) Conception des plans d’essais progressifs en utilisant un
tableur électronique . 200
Annexe I (informative) Exemples et référence mathématiques relatifs à l'étude de
plans d’essais censurés alternatifs. 212
Annexe J (informative) Exemples et références mathématiques relatifs aux plans
d’essais à durée calendaire censurés . 228
Annexe K (informative) Déduction et référence mathématique pour les plans d’essais
optimisés de GOST 27.402. 232
Bibliographie. 248
Figure A.1 – Lignes d’acceptation et de rejet pour le plan d’essais A.1. 50
Figure A.2 – Plan d’essais A.1 – Courbe d'efficacité. 54
Figure A.3 – Plan d’essais A.1 – Valeur moyenne du temps d'essai cumulé au moment
de la décision. 54
Figure A.4 – Lignes d’acceptation et de rejet pour le plan d’essais A.2. 56
Figure A.5 – Plan d’essais A.2 – Courbe d'efficacité. 58
Figure A.6 – Plan d’essais A.2 – Valeur moyenne du temps d'essai cumulé au moment
de la décision. 58
Figure A.7 – Lignes d’acceptation et de rejet pour le plan d’essais A.3. 60
Figure A.8 – Plan d’essais A.3 – Courbe d'efficacité. 62
Figure A.9 – Plan d’essais A.3 – Valeur moyenne du temps d'essai cumulé au moment
de la décision. 62
Figure A.10 – Lignes d’acceptation et de rejet pour le plan d’essais A.4. 64
Figure A.11 – Plan d’essais A.4 – Courbe d'efficacité. 66
Figure A.12 – Plan d’essais A.4 – Valeur moyenne du temps d'essai cumulé au
moment de la décision . 66
Figure A.13 – Lignes d’acceptation et de rejet pour le plan d’essais A.5. 68
Figure A.14 – Plan d’essais A.5 – Courbe d'efficacité. 70
Figure A.15 – Plan d’essais A.5 – Valeur moyenne du temps d'essai cumulé au
moment de la décision . 70
Figure A.16 – Lignes d’acceptation et de rejet pour le plan d’essais A.6. 72
Figure A.17 – Plan d’essais A.6 – Courbe d'efficacité. 74
Figure A.18 – Plan d’essais A.6 – Valeur moyenne du temps d'essai cumulé au
moment de la décision . 74
Figure A.19 – Lignes d’acceptation et de rejet pour le plan d’essais A.7. 76
Figure A.20 – Plan d’essais A.7 – Courbe d'efficacité. 78
61124 © IEC:2006 – 5 –
Annex A (normative) Tables and graphs for sequential test plans . 51
Annex B (normative) Graphs for fixed time/failure terminated test plans . 89
Annex C (normative) Graphs for alternative time/failure terminated test plans. 107
Annex D (normative) Tables and graphs for combined test plans and additional
sequential test plans. 121
Annex E (informative) Examples and mathematical references for sequential test
plans. 159
Annex F (informative) Design of sequential test plans using a spreadsheet program. 175
Annex G (informative) Examples and mathematical references for fixed duration
time/failure terminated test plans . 197
Annex H (informative) Design of fixed duration time/failure terminated test plans
using a spreadsheet program. 201
Annex I (informative) Examples and mathematical references for the design of
alternative time/failure terminated test plans . 213
Annex J (informative) Examples and mathematical references for the calendar time
terminated test plans . 229
Annex K (informative) Derivation and mathematical reference for the optimized test
plans of GOST 27.402 . 233
Bibliography. 249
Figure A.1 – Accept and reject lines for test plan A.1 . 51
Figure A.2 – Test plan A.1 – Operating characteristic curve . 55
Figure A.3 – Test plan A.1 – Expected accumulated test time to decision. 55
Figure A.4 – Accept and reject lines for test plan A.2 . 57
Figure A.5 – Test plan A.2 – Operating characteristic curve . 59
Figure A.6 – Test plan A.2 – Expected accumulated test time to decision. 59
Figure A.7 – Accept and reject lines for test plan A.3 . 61
Figure A.8 – Test plan A.3 – Operating characteristic curve . 63
Figure A.9 – Test plan A.3 – Expected accumulated test time to decision. 63
Figure A.10 – Accept and reject lines for test plan A.4. 65
Figure A.11 – Test plan A.4 – Operating characteristic curve . 67
Figure A.12 – Test plan A.4 – Expected accumulated test time to decision . 67
Figure A.13 – Accept and reject lines for test plan A.5. 69
Figure A.14 – Test plan A.5 – Operating characteristic curve . 71
Figure A.15 – Test plan A.5 – Expected accumulated test time to decision . 71
Figure A.16 – Accept and reject lines for test plan A.6. 73
Figure A.17 – Test plan A.6 - Operating characteristic curve. 75
Figure A.18 – Test plan A.6 – Expected accumulated test time to decision . 75
Figure A.19 – Accept and reject lines for test plan A.7. 77
Figure A.20 – Test plan A.7 – Operating characteristic curve . 79
– 6 – 61124 © CEI:2006
Figure A.21 – Plan d’essais A.7 – Valeur moyenne du temps d'essai cumulé au
moment de la décision . 78
Figure A.22 – Lignes d’acceptation et de rejet pour le plan d’essais A.8. 80
Figure A.23 – Plan d’essais A.8 – Courbe d'efficacité. 82
Figure A.24 – Plan d’essais A.8 – Valeur moyenne du temps d'essai cumulé au
moment de la décision . 82
Figure A.25 – Lignes d’acceptation et de rejet pour le plan d’essais A.9. 84
Figure A.26 – Plan d’essais A.9 – Courbe d'efficacité. 86
Figure A.27 – Plan d’essais A.9 – Valeur moyenne du temps d'essai cumulé au
moment de la décision . 86
Figure B.1 – Courbes d’efficacité pour les plans d’essais B.1, B.2, B.3 et B.4 . 88
Figure B.2 – Plan d’essais B.1 – Durée d'essai cumulée au moment de la décision . 90
Figure B.3 – Plan d’essais B.2 –Durée d'essai cumulée au moment de la décision . 90
Figure B.4 – Plan d’essais B.3 – Durée d'essai cumulée au moment de la décision . 92
Figure B.5 – Plan d’essais B.4 – Durée d'essai cumulée au moment de la décision . 92
Figure B.6 – Courbes d’efficacité pour les plans d’essais B.5, B.6, B.7 et B.8 . 94
Figure B.7 – Plan d’essais B.5 – Durée d'essai cumulée au moment de la décision . 94
Figure B.8 – Plan d’essais B.6 – Durée d'essai cumulée au moment de la décision . 96
Figure B.9 – Plan d’essais B.7 – Durée d'essai cumulée au moment de la décision . 96
Figure B.10 – Plan d’essais B.8 – Durée d'essai cumulée au moment de la décision . 98
Figure B.11 – Courbes d’efficacité pour les plans d’essais B.9, B.10 et B.11 . 98
Figure B.12 – Plan d’essais B.9 – Durée d'essai cumulée au moment de la décision . 100
Figure B.13 – Plan d’essais B.10 – Durée d'essai cumulée au moment de la décision . 100
Figure B.14 – Plan d’essais B.11 – Durée d'essai cumulée au moment de la décision . 102
Figure B.15 – Courbes d’efficacité pour les plans d’essais B.12 et B.13 . 102
Figure B.16 – Plan d’essais B.12 – Durée d'essai cumulée au moment de la décision . 104
Figure B.17 – Plan d’essais B.13 – Durée d'essai cumulée au moment de la décision . 104
Figure C.1 – Rapport de discrimination, D, et nombre acceptable de défaillances c = 0
à 8, en fonction de l'espérance mathématique du nombre de défaillances, µ , pour les
valeurs recommandées de 2,5 %, 5 %, 10 %, 20 % et 30 % de
α = β . 112
Figure C.2 – Courbes d'efficacité pour c = 0 à 8; probabilité d'acceptation, P en
a
fonction de l'espérance mathématique du nombre (inconnu) vrai de défaillances, µ. 114
Figure C.3 – Rapport de discrimination, D, en fonction de l'espérance mathématique
du nombre de défaillances, µ , pour les valeurs recommandées de 2,5 %, 5 %, 10 %,
15 %, 20 % et 30 % de α = β . 116
Figure C.4 – Nombre acceptable de défaillance, c, moins l’espérance mathématique du
nombre de défaillances, µ Δµ = c − µ en fonction de l’espérance mathématique du
0 0
nombre de défaillances µ pour les valeurs recommandées 2,5 %, 5 %, 10 %, 20 %, et
30 % de α = β . 118
Figure D.1 – Lignes d'acceptation et de rejet. 122
∗
Figure D.2 – Durée d’essai cumulée au moment de la décision T . 124
e
*
Figure D.3 – Durée d’essai cumulée au moment de l’acceptation T ()+ . 124
e
Figure D.4 – Courbe d'efficacité P . 124
a
Figure D.5 – Lignes d'acceptation et de rejet. 126
∗
Figure D.6 – Durée d’essai cumulée au moment de la décision T . 130
e
61124 © IEC:2006 – 7 –
Figure A.21 – Test plan A.7 – Expected accumulated test time to decision . 79
Figure A.22 – Accept and reject lines for test plan A.8. 81
Figure A.23 – Test plan A.8 – Operating characteristic curve . 83
Figure A.24 – Test plan A.8 – Expected accumulated test time to decision . 83
Figure A.25 – Accept and reject lines for test plan A.9. 85
Figure A.26 – Test plan A.9 – Operating characteristic curve . 87
Figure A.27 – Test plan A.9 – Expected accumulated test time to decision . 87
Figure B.1 – Operating characteristic curves for test plans B.1, B.2, B.3 and B.4 . 89
Figure B.2 – Test plan B.1 – Expected test time to decision . 91
Figure B.3 – Test plan B.2 – Expected test time to decision . 91
Figure B.4 – Test plan B.3 – Expected test time to decision . 93
Figure B.5 – Test plan B.4 – Expected test time to decision . 93
Figure B.6 – Operating characteristic curves for test plans B.5, B.6, B.7 and B.8 . 95
Figure B.7 – Test plan B.5 – Expected test time to decision . 95
Figure B.8 – Test plan B.6 – Expected test time to decision . 97
Figure B.9 – Test plan B.7 – Expected test time to decision . 97
Figure B.10 – Test plan B.8 – Expected test time to decision . 99
Figure B.11 – Operating characteristic curves for test plans B.9, B.10 and B.11. 99
Figure B.12 – Test plan B.9 – Expected test time to decision . 101
Figure B.13 – Test plan B.10 – Expected test time to decision. 101
Figure B.14 – Test plan B.11– Expected test time to decision . 103
Figure B.15 – Operating characteristic curves for test plans B.12 and B.13 . 103
Figure B.16 – Test plan B.12 – Expected test time to decision. 105
Figure B.17 – Test plan B.13 – Expected test time to decision. 105
Figure C.1 – Discrimination ratio, D, and the acceptable number of failures, c = 0 to 8,
as a function of the expected number of failures, μ , for recommended values, 2,5%,
5%, 10%, 20%, and 30% of α = β. 113
Figure C.2 – Operation characteristic curves for c = 0 to 8; probability of acceptance
P as a function of the (unknown) true expected number of failures, μ. 115
a
Figure C.3 – Discrimination ratio, D, as a function of the expected number of failures,
μ , for recommended values, 2,5%, 5%, 10%, 15%, 20% and 30% of α = β . 117
Figure C.4 – Acceptable number of failures c minus expected number of failures, μ
Δμ = c − μ as a function of the expected number of failures μ for recommended
0 0 0
values 2,5%, 5%, 10%, 20%, and 30% of α = β. 119
Figure D.1 – Accept and reject lines . 123
∗
Figure D.2 – Expected test time to decision T . 125
e
∗
Figure D.3 – Expected test time to decision of acceptance T (+) . 125
e
Figure D.4 – Operating characteristic P . 125
a
Figure D.5 – Accept and reject lines . 127
∗
T
Figure D.6 – Expected test time to decision . 131
e
– 8 – 61124 © CEI:2006
*
Figure D.7 – Durée d’essai cumulée au moment de l’acceptation T ()+ . 130
e
Figure D.8 – Courbe d'efficacité P . 130
a
Figure D.9 – Lignes d'acceptation et de rejet. 134
∗
Figure D.10 – Durée d’essai cumulée au moment de la décision T . 136
e
*
Figure D.11– Durée d’essai cumulée au moment de l’acceptation T ()+ . 136
e
Figure D.12 – Courbe d'efficacité P . 136
a
Figure D.13 – Lignes d'acceptation et de rejet . 138
∗
Figure D.14 – Durée d’essai cumulée au moment de la décision T . 140
e
*
Figure D.15 – Durée d’essai cumulée au moment de l’acceptation T ()+ . 140
e
Figure D.16 – Courbe d’efficacité P . 140
a
Figure D.17 – Lignes d'acceptation et de rejet . 142
∗
Figure D.18 – Durée d’essai cumulée au moment de la décision . 144
T
e
*
Figure D.19 – Durée d’essai cumulée au moment de l’acceptation T ()+ . 144
e
Figure D.20 – Courbe d'efficacité P . 144
a
Figure D.21 – Lignes d'acceptation et de rejet . 146
∗
Figure D.22 – Durée d’essai cumulée au moment de la décision T . 148
e
*
Figure D.23 – Durée d’essai cumulée au moment de l’acceptation T ()+ . 148
e
Figure D.24 – Courbe d'efficacité P . 148
a
Figure D.25 – Lignes d'acceptation et de rejet . 150
∗
Figure D.26 – Durée d’essai cumulée au moment de la décision T . 152
e
∗
Figure D.27 – Durée d’essai cumulée au moment de l’acceptation T ()+ . 152
e
Figure D.28 – Courbe d'efficacité P . 152
a
Figure D.29 – Lignes d'acceptation et de rejet . 154
∗
Figure D.30 – Durée d’essai cumulée au moment de la décision T . 156
e
*
Figure D.31– Durée d’essai cumulée au moment de l’acceptation T ()+ . 156
e
Figure D.32 – Courbe d'efficacité P . 156
a
Figure E.1 – Exemple d’essai progressif utilisant le plan d’essais A.3 – α = β = 10 %,
*
D = 3, m = 1,11×10 h; r contre t . 164
Figure F.1 – Début du tableur préparé pour obtenir un essai progressif et un graphique . 176
Figure F.2 – Poursuite du calcul des paramètres pour les lignes nécessaires au
graphique PRST. 178
Figure F.3 – Calcul de la ligne d'acceptation et de rejet pour le graphique PRST . 178
Figure F.4 – Détermination du temps de fin de l'essai . 180
Figure E.5 – Equations pour la ligne d'acceptation et de rejet avec la fin de l'essai . 184
Figure F.6 – Exemple de graphique de tableur SPRT . 186
Figure F.7 – Elaboration du tableur pour la réalisation des courbes d'efficacité pour le
SPRT . 190
Figure F.8 – Courbe d’efficacité pour probabilité d’acceptation, P . 192
a
61124 © IEC:2006 – 9 –
∗
Figure D.7 – Expected test time to decision of acceptance T (+) . 131
e
Figure D.8 – Operating characteristic P . 131
a
Figure D.9 – Accept and reject lines . 135
∗
Figure D.10 – Expected test time to decision T . 137
e
∗
Figure D.11 – Expected test time to decision of acceptance T (+) . 137
e
Figure D.12 – Operating characteristic P . 137
a
Figure D.13 – Accept and reject lines . 139
∗
Figure D.14 – Expected test time to decision T . 141
e
∗
Figure D.15 – Expected test time to decision of acceptance T (+) . 141
e
Figure D.16 – Operating characteristic P . 141
a
Figure D.17 – Accept and reject lines . 143
∗
Figure D.18 – Expected test time to decision . 145
T
e
∗
Figure D.19 – Expected test time to decision of acceptance T (+) . 145
e
Figure D.20 – Operating characteristic P . 145
a
Figure D.21 – Accept and reject lines . 147
∗
Figure D.22 – Expected test time to decision T . 149
e
∗
Figure D.23 – Expected test time to decision of acceptance T (+) . 149
e
Figure D.24 – Operating characteristic P . 149
a
Figure D.25 – Accept and reject lines . 151
∗
Figure D.26 – Expected test time to decision T . 153
e
∗
Figure D.27 – Expected test time to decision of acceptance T (+) . 153
e
Figure D.28 – Operating characteristic P . 153
a
Figure D.29 – Accept and reject lines . 155
*
Figure D.30 – Expected test time to decision T . 157
e
∗
Figure D.31 – Expected test time to decision of acceptance T (+) . 157
e
Figure D.32 – Operating characteristic P . 157
a
Figure E.1 – Example of a sequential test using test plan A.3 – α = β = 10 %, D = 3,
*
m = 1,11×10 h; r versus t . 165
Figure F.1 – Beginning of the spreadsheet prepared to obtain a sequential test and
graph . 177
Figure F.2 – Continuation of parameters calculation for the lines necessary for the
SPRT graph. 179
Figure F.3 – Calculations of accept and reject line for the SPRT graph . 179
Figure F.4 – Determination of the test termination time. 181
Figure F.5 – Equations for accept and reject line along with the test termination . 185
Figure F.6 – SPRT spreadsheet graphing example . 187
Figure F.7 – Spreadsheet set-up for construction of the OC curves for the SPRT . 191
Figure F.8 – OC curve for probability of acceptance, P . 193
a
– 10 – 61124 © CEI:2006
Figure H.1 – Elaboration du tableur avec équations intégrées – Exemple . 202
Figure H.2 – Equations intégrées dans le tableur indiqué à la Figure F.1. 204
Figure H.3 – Courbe d'efficacité pour essai censuré à durée fixe. 208
Figure H.4 – Courbe d'efficacité tracée à partir des calculs du tableur . 210
Figure K.1 – Types de plan d’essais et terminologie. 234
Figure K.2 – Principe des plans d’essais. 238
Figure K.3 – Découpage du graphique correspondant au plan d’essais . 238
Figure K.4 – Nœuds intérieurs et nœuds limites . 238
Figure K.5 – Chemins vers la ligne d'acceptation . 240
Figure K.6 – Chemins vers la ligne de rejet . 240
Figure K.7 – Probabilités de transfert de chemins entre les nœuds. 242
Figure K.8 – L’élément récurrent – Deux cas. 246
Tableau 1 – Avantages et inconvénients des différents types de plan d’essais. 26
Tableau 2 – Récapitulatif des plans d’essais progressifs indiqués à l'Annexe A et D. 34
Tableau 3 – Plans d’essais tronqués/censurés systématiques. 38
Tableau 4 – Plans d’essais combinés dans l'Annexe D. 48
Tableau A.1 – Lignes d’acceptation et de rejet pour le plan d’essais A.1 . 52
Tableau A.2 – Lignes d’acceptation et de rejet pour le plan d’essais A.2 . 56
Tableau A.3 – Lignes d’acceptation et de rejet pour le plan d’essais A.3 . 60
Tableau A.4 – Lignes d’acceptation et de rejet pour le plan d’essais A.4 . 64
Tableau A.5 – Lignes d’acceptation et de rejet pour le plan d’essais A.5 . 68
Tableau A.6 – Lignes d’acceptation et de rejet pour le plan d’essais A.6 . 72
Tableau A.7 – Lignes d’acceptation et de rejet pour le plan d’essais A.7 . 76
Ta
...








Questions, Comments and Discussion
Ask us and Technical Secretary will try to provide an answer. You can facilitate discussion about the standard in here.
Loading comments...