Corrigendum 1 - Uninterruptible power systems (UPS) - Part 1-2: General and safety requirements for UPS used in restricted access locations

General Information

Status
Replaced
Publication Date
12-Dec-2002
Current Stage
DELPUB - Deleted Publication
Start Date
25-Feb-2004
Completion Date
13-Feb-2026

Relations

Effective Date
05-Sep-2023
Effective Date
05-Sep-2023
Effective Date
05-Sep-2023
Standard

IEC 62040-1-2:2002/COR1:2002 - Corrigendum 1 - Uninterruptible power systems (UPS) - Part 1-2: General and safety requirements for UPS used in restricted access locations Released:12/13/2002

English language
10 pages
sale 15% off
Preview
sale 15% off
Preview

Frequently Asked Questions

IEC 62040-1-2:2002/COR1:2002 is a standard published by the International Electrotechnical Commission (IEC). Its full title is "Corrigendum 1 - Uninterruptible power systems (UPS) - Part 1-2: General and safety requirements for UPS used in restricted access locations". This standard covers: Corrigendum 1 - Uninterruptible power systems (UPS) - Part 1-2: General and safety requirements for UPS used in restricted access locations

Corrigendum 1 - Uninterruptible power systems (UPS) - Part 1-2: General and safety requirements for UPS used in restricted access locations

IEC 62040-1-2:2002/COR1:2002 has the following relationships with other standards: It is inter standard links to IEC 62040-1:2008, IEC 62040-1-2:2002, IEC 62040-1-2:2002/COR2:2004. Understanding these relationships helps ensure you are using the most current and applicable version of the standard.

IEC 62040-1-2:2002/COR1:2002 is available in PDF format for immediate download after purchase. The document can be added to your cart and obtained through the secure checkout process. Digital delivery ensures instant access to the complete standard document.

Standards Content (Sample)


IEC 62040-1-2
(First edition – 2002)
Uninterruptible power systems (UPS) –

Part 1-2: General and safety requirements for UPS used

in restricted access locations

CORRIGENDUM 1
Page 20
5.9 AC and d.c. power isolation
Third paragraph
Replace, in line 2, the words “…and the UPS…” by “…and for a UPS…”.
Page 21
5.10.1 Basic requirements
Replace, in line 4 of item d), the words “…not be provided if…” by “…not be specified if…”.
Page 35
Annex L
L.1 General
Replace, in line 3, the words “…the measurement need not…” by “…the measurement of
current need not…”.
L.4 Single-fault cond
...

Questions, Comments and Discussion

Ask us and Technical Secretary will try to provide an answer. You can facilitate discussion about the standard in here.

Loading comments...