IEC 62040-1-2:2002/COR1:2002
(Corrigendum)Corrigendum 1 - Uninterruptible power systems (UPS) - Part 1-2: General and safety requirements for UPS used in restricted access locations
Corrigendum 1 - Uninterruptible power systems (UPS) - Part 1-2: General and safety requirements for UPS used in restricted access locations
General Information
- Status
- Replaced
- Publication Date
- 12-Dec-2002
- Technical Committee
- SC 22H - Uninterruptible power systems (UPS)
- Current Stage
- DELPUB - Deleted Publication
- Start Date
- 25-Feb-2004
- Completion Date
- 13-Feb-2026
Relations
- Effective Date
- 05-Sep-2023
- Effective Date
- 05-Sep-2023
- Effective Date
- 05-Sep-2023
Frequently Asked Questions
IEC 62040-1-2:2002/COR1:2002 is a standard published by the International Electrotechnical Commission (IEC). Its full title is "Corrigendum 1 - Uninterruptible power systems (UPS) - Part 1-2: General and safety requirements for UPS used in restricted access locations". This standard covers: Corrigendum 1 - Uninterruptible power systems (UPS) - Part 1-2: General and safety requirements for UPS used in restricted access locations
Corrigendum 1 - Uninterruptible power systems (UPS) - Part 1-2: General and safety requirements for UPS used in restricted access locations
IEC 62040-1-2:2002/COR1:2002 has the following relationships with other standards: It is inter standard links to IEC 62040-1:2008, IEC 62040-1-2:2002, IEC 62040-1-2:2002/COR2:2004. Understanding these relationships helps ensure you are using the most current and applicable version of the standard.
IEC 62040-1-2:2002/COR1:2002 is available in PDF format for immediate download after purchase. The document can be added to your cart and obtained through the secure checkout process. Digital delivery ensures instant access to the complete standard document.
Standards Content (Sample)
IEC 62040-1-2
(First edition – 2002)
Uninterruptible power systems (UPS) –
Part 1-2: General and safety requirements for UPS used
in restricted access locations
CORRIGENDUM 1
Page 20
5.9 AC and d.c. power isolation
Third paragraph
Replace, in line 2, the words “…and the UPS…” by “…and for a UPS…”.
Page 21
5.10.1 Basic requirements
Replace, in line 4 of item d), the words “…not be provided if…” by “…not be specified if…”.
Page 35
Annex L
L.1 General
Replace, in line 3, the words “…the measurement need not…” by “…the measurement of
current need not…”.
L.4 Single-fault cond
...




Questions, Comments and Discussion
Ask us and Technical Secretary will try to provide an answer. You can facilitate discussion about the standard in here.
Loading comments...