Enterprise-control system integration - Part 4: Objects models attributes for manufacturing operations management integration

Intégration des systèmes entreprises-contrôle - Partie 4: Attributs des modèles d'objets pour l'intégration de la gestion des opérations de fabrication

Integracija sistemov za upravljanje podjetij - 4. del: Predmeti in značilnosti za integracijo poslovnega vodenja proizvodnje

General Information

Status
Not Published
Publication Date
06-Dec-2026
Current Stage
4060 - Enquiry results established and sent to TC, SR, BTTF - Enquiry
Start Date
08-Aug-2025
Completion Date
08-Aug-2025

Relations

Draft
prEN IEC 62264-4:2025 - BARVE
English language
384 pages
sale 10% off
Preview
sale 10% off
Preview
e-Library read for
1 day

Standards Content (Sample)


SLOVENSKI STANDARD
01-julij-2025
Integracija sistemov za upravljanje podjetij - 4. del: Predmeti in značilnosti za
integracijo poslovnega vodenja proizvodnje
Enterprise-control system integration - Part 4: Objects models attributes for
manufacturing operations management integration
Intégration des systèmes entreprises-contrôle - Partie 4: Attributs des modèles d'objets
pour l'intégration de la gestion des opérations de fabrication
Ta slovenski standard je istoveten z: prEN IEC 62264-4:2025
ICS:
03.100.01 Organizacija in vodenje Company organization and
podjetja na splošno management in general
25.040.01 Sistemi za avtomatizacijo v Industrial automation
industriji na splošno systems in general
35.240.50 Uporabniške rešitve IT v IT applications in industry
industriji
2003-01.Slovenski inštitut za standardizacijo. Razmnoževanje celote ali delov tega standarda ni dovoljeno.

65E/1165/CDV
COMMITTEE DRAFT FOR VOTE (CDV)
PROJECT NUMBER:
IEC 62264-4 ED2
DATE OF CIRCULATION: CLOSING DATE FOR VOTING:
2025-05-16 2025-08-08
SUPERSEDES DOCUMENTS:
65E/961/CD, 65E/1069A/CC
IEC SC 65E : DEVICES AND INTEGRATION IN ENTERPRISE SYSTEMS
SECRETARIAT: SECRETARY:
United States of America Mr David Richmond
OF INTEREST TO THE FOLLOWING COMMITTEES: HORIZONTAL FUNCTION(S):

ASPECTS CONCERNED:
SUBMITTED FOR CENELEC PARALLEL VOTING NOT SUBMITTED FOR CENELEC PARALLEL VOTING
Attention IEC-CENELEC parallel voting
The attention of IEC National Committees, members of
CENELEC, is drawn to the fact that this Committee Draft for
Vote (CDV) is submitted for parallel voting.
The CENELEC members are invited to vote through the
CENELEC online voting system.
This document is still under study and subject to change. It should not be used for reference purposes.
Recipients of this document are invited to submit, with their comments, notification of any relevant patent rights of which they
are aware and to provide supporting documentation.
Recipients of this document are invited to submit, with their comments, notification of any relevant “In Some Countries”
clauses to be included should this proposal proceed. Recipients are reminded that the CDV stage is the final stage for
submitting ISC clauses. (SEE AC/22/2007 OR NEW GUIDANCE DOC).

TITLE:
Enterprise-control system integration - Part 4: Objects models attributes for manufacturing operations
management integration
PROPOSED STABILITY DATE: 2030
electronic file, to make a copy and to print out the content for the sole purpose of preparing National Committee positions.
You may not copy or "mirror" the file or printed version of the document, or any part of it, for any other purpose without
permission in writing from IEC.

IEC CD 62264-4 © IEC 2025 – 2 –

NOTE FROM TC/SC OFFICERS:
– 3 – IEC CD 62264-4 © IEC 2025

CONTENTS
FOREWARD . 14
INTRODUCTION . 16
1 Scope . 17
2 Normative references . 17
3 Terms, definitions, abbreviations, and conventions. 18
3.1 Terms, definitions, and abbreviated terms . 18
3.2 Abbreviations . 21
3.3 Conventions . 21
4 Information exchange between manufacturing operations activities . 22
4.1 Information exchange network between MOM activities . 22
4.2 Relationships of common information models to operations management
information models . 25
4.3 Cross-model relationships between conceptual work information models . 26
4.4 Cross-model relationships for MOM activity context in information exchanges . 28
4.5 Attributes of an object in an information model . 29
5 Resource relationship network information . 30
5.1 Resource relationship network model . 30
5.2 Resource relationship network . 32
5.3 Resource relationship network property . 34
5.4 Resource network connection . 35
5.5 Resource network connection property . 37
5.6 From resource reference . 39
5.7 From resource reference property. 41
5.8 To resource reference . 42
5.9 To resource reference property . 44
5.10 Resource network connection definition . 45
5.11 Resource network connection definition property . 47
6 Work definition information . 49
6.1 Work definition model (abstract) . 49
7 Work master information . 49
7.1 Work master model . 49
7.2 Work master . 56
7.3 Parameter specification (work master) . 61
7.4 Personnel specification (work master) . 64
7.5 Personnel specification property (work master). 67
7.6 Equipment specification (work master) . 70
7.7 Equipment specification property (work master) . 74
7.8 Physical asset specification (work master) . 77
7.9 Physical asset specification property (work master) . 80
7.10 Material specification (work master). 83
7.11 Material specification property (work master) . 88

IEC CD 62264-4 © IEC 2025 – 4 –
8 Work directive information . 91
8.1 Work directive model . 91
8.2 Work directive . 99
8.3 Parameter requirement . 104
8.4 Personnel requirement (work directive) . 107
8.5 Personnel requirement property (work directive) . 111
8.6 Equipment requirement (work directive) . 114
8.7 Equipment requirement property (work directive) . 118
8.8 Physical asset requirement (work directive) . 122
8.9 Physical asset requirement property (work directive) . 125
8.10 Material requirement (work directive) . 129
8.11 Material requirement property (work directive) . 135
9 Manufacturing workflow information . 138
9.1 Manufacturing workflow model . 138
9.2 Manufacturing workflow (abstract) . 141
9.3 Workflow specification . 144
9.4 Workflow specification property . 151
9.5 Workflow requirement . 152
9.6 Workflow requirement property . 155
9.7 Workflow actual . 157
9.8 Workflow actual property . 159
9.9 Workflow node . 161
9.10 Workflow node property . 164
9.11 Workflow connection. 166
9.12 Workflow connection property . 170
9.13 Workflow specification node definition . 172
9.14 Workflow specification node definition property . 173
9.15 Workflow specification connection definition . 176
9.16 Workflow connection definition property . 180
10 Work schedule information . 182
10.1 Work schedule model . 182
10.2 Work schedule . 191
10.3 Work request . 194
10.4 Job list. 196
10.5 Job order . 198
10.6 Job order parameter . 202
10.7 Personnel requirement (job order) . 205
10.8 Personnel requirement property (job order) . 208
10.9 Equipment requirement (job order) . 212
10.10 Equipment requirement property (job order). 215
10.11 Physical asset requirement (job order) . 219
10.12 Physical asset requirement property (job order) . 222
10.13 Material requirement (job order) . 226
10.14 Material requirement property (job order). 231
10.15 Recursive job orders with recursive work master relationship . 235
11 Work performance information . 235

– 5 – IEC CD 62264-4 © IEC 2025

11.1 Work performance model . 235
11.2 Work performance . 242
11.3 Work response . 245
11.4 Job response list . 247
11.5 Job response . 249
11.6 Job response data . 252
11.7 Personnel actual (work) . 255
11.8 Personnel actual property (work) . 258
11.9 Equipment actual (work) . 261
11.10 Equipment actual property (work) . 264
11.11 Physical asset actual (work) . 267
11.12 Physical asset actual property (work) . 271
11.13 Material actual (work) . 274
11.14 Material actual property (work) . 279
12 Work capability information . 282
12.1 Work capability model . 282
12.2 Work capability . 285
12.3 Personnel capability (work) . 288
12.4 Personnel capability property (work) . 289
12.5 Equipment capability (work) . 291
12.6 Equipment capability property (work) . 292
12.7 Physical asset capability (work) . 293
12.8 Physical asset capability property (work) . 295
12.9 Material capability (work) . 296
12.10 Material capability property (work) . 298
12.11 Workflow capability . 300
12.12 Workflow capability property . 303
13 Work master capability information . 304
13.1 Work master capability model . 304
13.2 Work master capability . 306
13.3 Personnel capability (work master) . 309
13.4 Personnel capability property (work master) . 311
13.5 Equipment capability (work master) . 312
13.6 Equipment capability property (work master) . 313
13.7 Physical asset capability (work master) . 314
13.8 Physical asset capability property (work master) . 315
13.9 Material capability (work master) . 316
13.10 Material capability property (work master) . 318
13.11 Workflow specification capability . 319
13.12 Workflow specification capability property. 321
14 Work KPI information . 323
15 Work alert information . 323
15.1 Work alert model . 323
15.2 Work alert definition. 324
15.3 Work alert definition property . 325

IEC CD 62264-4 © IEC 2025 – 6 –
15.4 Work alert . 327
15.5 Work alert property . 329
16 Work calendar information . 330
16.1 Work calendar model . 330
16.2 Work calendar definition . 332
16.3 Work calendar definition property . 333
16.4 Work calendar definition entry . 334
16.5 Work calendar definition entry property . 336
16.6 Work calendar . 337
16.7 Work calendar property . 338
16.8 Work calendar entry . 339
16.9 Work calendar entry property . 340
17 Work documents information . 341
18 Work record information . 342
18.1 Operations record model (abstract) . 342
18.2 Work record information, an operations record specialization . 342
18.3 Work record model . 343
18.4 Work record specification . 344
18.5 Work record . 348
18.6 Work record entry . 350
19 List of objects . 353
20 Compliance . 355
Annex A (informative) Questions and answers about object use . 358
A.1 How are dependencies in the work schedule and work response handled? . 358
A.2 Use of hierarchy scope in workflow specification model . 358
A.3 What are examples of resource relationships? . 358
Annex B (informative) Related standards . 361
Annex C (informative) Representing a workflow specification in BPMN . 363
Annex D (informative) Representing a workflow specification in flowchart notation . 367
Annex E (informative) Example of work calendars . 369
E.1 Four-day 24-hour shift pattern . 369
E.2 Example of ISO 8601 format strings . 370
E.3 Bank holiday work calendar . 371
Annex F (informative) Examples of work record implementation . 2
F.1 Representation of IEC 61512 production record . 2
F.2 Extension of IEC 61512 production record to included IEC 62264 objects . 3
F.3 Work record model implementation example . 3
Bibliography . 12

FIGURES
Figure 1 – Information exchanges between manufacturing operations management
activities . 23
Figure 2 – inter-relationships between conceptual information models for MOM exchanges . 27

– 7 – IEC CD 62264-4 © IEC 2025

Figure 3 – Data flow diagram for defined cross-model MOM relationships between
operations management & work information models . 28
Figure 4 – Resource relationship network model . 31
Figure 5 – Work master model . 51
Figure 6 – Work directive model . 93
Figure 7 – Relationship from work directive to work master . 99
Figure 8 – Manufacturing workflow model . 139
Figure 9 – Example, a workflow specification in BPMN format . 145
Figure 10 – Example, workflow specification in flowchart notation format . 145
Figure 11 – Example (1 of 2): Nested Workflow Levels = Site Procedure > Area
Procedure > Process Procedure . 147
Figure 12 – Example (2 of 2): IEC 61512-1 Nested Workflow Levels = Process
Procedure > Unit Procedure > Operation > Phase > Sequence . 148
Figure 13 – Work schedule model. 184
Figure 14 – Example, operations schedule for a site . 189
Figure 15 – Example, work schedule for an area . 190
Figure 16 – Example, work request, job order, and job list . 190
Figure 17 – Example, work request for continuous processing . 191
Figure 18 – Example, job orders and work master relationships . 235
Figure 19 – Work performance model . 237
Figure 20 – Work capability model . 283
Figure 21 – Work master capability model . 305
Figure 22 – Work alert model. 324
Figure 23 – Work calendar model . 331
Figure 24 – Work record activities . 343
Figure 25 – Work record model. 344
Figure A.1 – Equipment specifications as resource reference objects . 359
Figure A.2 – Routing relationship network . 359
Figure A.3 – Gas main relationship network . 360
Figure A.4 – “Usable in” relationship network . 360
Figure B.1 – Relationship between IEC 62264-2, IEC 62264-4, and IEC 61512 standards . 362
Figure C.1 – Example, workflow specification in BPMN notation . 365
Figure C.2 – Example workflow process an a workflow specification . 366
Figure D.1 – Example, workflow specification in flowchart notation . 367
Figure D.2 – Example workflow process as the workflow specification . 368
Figure F.1 – Work record activities . 4
Figure F.2 – Example, work record container . 7
Figure F.3 – Example, work record element reference . 8
Figure F.4 – Example, work record model . 9

IEC CD 62264-4 © IEC 2025 – 8 –
TABLES
Table 1 – Cross-model MOM relationship description . 29
Table 2 – Resource relationship network model relationships . 32
Table 3 – Resource relationship network relationships roles . 33
Table 4 – Resource relationship network attributes . 33
Table 5 – Resource relationship network property relationship roles . 34
Table 6 – Resource relationship network property attributes . 35
Table 7 – Resource network connection relationship roles . 36
Table 8 – Resource network connection attributes . 37
Table 9 – Resource network connection property relationship roles . 38
Table 10 – Resource network connection property attributes . 38
Table 11 – From resource reference relationship roles . 39
Table 12 – From resource reference attributes . 40
Table 13 – From resource reference property relationships roles . 41
Table 14 – From resource reference property attributes . 42
Table 15 – To resource reference relationships roles . 43
Table 16 – To resource reference attributes . 43
Table 17 – To resource reference property relationships roles . 44
Table 18 – To resource reference property attributes . 45
Table 19 – Resource network connection definition relationship roles . 46
Table 20 – Resource network connection definition attributes . 46
Table 21 – Resource network connection definition property relationship roles . 47
Table 22 – Resource network connection definition property attributes . 48
Table 23 – Work master model relationships . 51
Table 24 – Work master relationship roles . 57
Table 25 – Work master attributes . 59
Table 26 – Parameter specification relationship roles . 62
Table 27 – Parameter specification attributes . 63
Table 28 – Personnel specification relationship roles. 65
Table 29 – Personnel specification attributes . 66
Table 30 – Personnel specification property relationship roles . 68
Table 31 – Personnel specification property attributes . 69
Table 32 – Equipment specification relationship roles . 71
Table 33 – Equipment specification attributes . 73
Table 34 – Equipment specification property relationship roles . 74
Table 35 – Equipment specification property attributes . 76
Table 36 – Physical asset specification relationship roles . 78
Table 37 – Physical asset specification attributes . 79
Table 38 – Physical asset specification property relationship roles . 81
Table 39 – Physical asset specification property attributes . 82
Table 40 – Material specification relationship roles . 84

– 9 – IEC CD 62264-4 © IEC 2025

Table 41 – Material specification attributes . 86
Table 42 – Material specification property relationship roles . 89
Table 43 – Material specification property attributes . 90
Table 44 – Work directive model relationships . 94
Table 45 – Work directive relationship roles . 101
Table 46 – Work directive attributes . 102
Table 47 – Parameter requirement relationship roles . 105
Table 48 – Parameter requirement attributes . 106
Table 49 – Personnel requirement relationship roles . 108
Table 50 – Personnel requirement attributes . 110
Table 51 – Personnel requirement property relationship roles . 111
Table 52 – Personnel requirement property attributes . 113
Table 53 – Equipment requirement relationship roles . 115
Table 54 – Equipment requirement attributes. 117
Table 55 – Equipment requirement property relationship roles . 119
Table 56 – Equipment requirement property attributes . 121
Table 57 – Physical asset requirement relationship roles . 123
Table 58 – Physical asset requirement attributes . 125
Table 59 – Physical asset requirement property relationship roles . 126
Table 60 – Physical asset requirement property attributes . 128
Table 61 – Material requirement relationship roles . 130
Table 62 – Material requirement attributes . 132
Table 63 – Material requirement property relationship roles . 135
Table 64 – Material requirement property attributes . 137
Table 65 – Manufacturing workflow model relationships . 140
Table 66 – Manufacturing workflow relationship roles . 143
Table 67 – Workflow specification relationship roles . 148
Table 68 – Workflow specification attributes . 149
Table 69 – Workflow specification property relationship roles . 151
Table 70 – Workflow specification property attributes . 151
Table 71 – Workflow requirement relationship roles . 153
Table 72 – Workflow requirement attributes . 154
Table 73 – Workflow requirement property relationship roles . 155
Table 74 – Workflow requirement property attributes . 156
Table 75 – Workflow actual relationship roles . 157
Table 76 – Workflow actual attributes . 158
Table 77 – Workflow actual property relationship roles . 159
Table 78 – Workflow actual property attributes . 160
Table 79 – Workflow node relationship roles . 162
Table 80 – Workflow node attributes . 163

IEC CD 62264-4 © IEC 2025 – 10 –
Table 81 – Workflow node property relationship roles . 164
Table 82 – Workflow node property attributes . 165
Table 83 – Workflow connection relationship roles . 166
Table 84 – Workflow connection attributes . 167
Table 85 – Workflow connection property relationship roles . 170
Table 86 – Workflow connection property attributes . 171
Table 87 – Workflow specification node definition relationship roles . 172
Table 88 – Workflow specification node definition attributes . 173
Table 89 – Workflow specification node definition property relationship roles . 174
Table 90 – Workflow specification node definition property attributes . 174
Table 91 – Workflow specification connection definition relationship roles . 176
Table 92 – Workflow specification connection definition attributes . 177
Table 93 – Workflow specification connection definition property relationship roles . 180
Table 94 – Workflow specification connection definition property attributes . 181
Table 95 – Work schedule model relationships . 185
Table 96 – Work schedule relationship roles . 191
Table 97 – Work schedule attributes . 192
Table 98 – Work request relationship roles . 194
Table 99 – Work request attributes . 195
Table 100 – Job list relationship roles . 197
Table 101 – Job list attributes . 197
Table 102 – Job order relationship roles . 198
Table 103 – Job order attributes . 199
Table 104 – Job order parameter relationship roles . 203
Table 105 – Job order parameter attributes . 204
Table 106 – Personnel requirement relationship roles . 206
Table 107 – Personnel requirement attributes . 207
Table 108 – Personnel requirement property relationship roles . 209
Table 109 – Personnel requirement property attributes . 211
Table 110 – Equipment requirement relationship roles. 213
Table 111 – Equipment requirement attributes . 214
Table 112 – Equipment requirement property relationship roles . 216
Table 113 – Equipment requirement property attributes . 218
Table 114 – Physical asset requirement relationship roles . 220
Table 115 – Physical asset requirement attributes . 222
Table 116 – Physical asset requirement property relationship roles . 223
Table 117 – Physical asset requirement property attributes . 225
Table 118 – Material requirement relationship roles . 227
Table 119 – Material requirement attributes . 229
Table 120 – Material requirement property relationship roles . 232
Table 121 – Material requirement property attributes . 234

– 11 – IEC CD 62264-4 © IEC 2025

Table 122 – Work performance model relationships . 238
Table 123 – Work performance relationship roles . 242
Table 124 – Work performance attributes . 243
Table 125 – Work response relationship roles . 245
Table 126 – Work response attributes . 246
Table 127 – Job response list relationship roles . 248
Table 128 – Job response list attributes . 248
Table 129 – Job response relationship roles . 249
Table 130 – Job response attributes . 251
Table 131 – Job response data relationship roles . 253
Table 132 – Job response data attributes . 254
Table 133 – Personnel actual relationship roles . 256
Table 134 – Personnel actual attributes . 257
Table 135 – Personnel actual property relationship roles . 259
Table 136 – Personnel actual property attributes . 260
Table 137 – Equipment actual relationship roles .
...

Questions, Comments and Discussion

Ask us and Technical Secretary will try to provide an answer. You can facilitate discussion about the standard in here.

Loading comments...