- Abstract
This document specifies when and how to conduct reviews and controls within the field of fire safety design, from planning and design to construction and finally, operation and maintenance.
This document describes reviews and controls, independent of national regulations, with a primary focus on technical issues within fire safety engineering. It describes how the fire safety design process, including engineering approaches, forms a normal part of the overall control and review of the building process and defines eligibility criteria for the parties performing the controls.
- Status
- Published
- Publication Date
- 03-May-2026
- Technical Committee
- CEN/TC 127 - Fire safety in buildings
- Drafting Committee
- CEN/TC 127/WG 8 - Fire Safety Engineering
- Current Stage
- 6060 - Definitive text made available (DAV) - Publishing
- Start Date
- 23-Sep-2026
- Due Date
- 04-May-2026
- Completion Date
- 04-May-2026
CEN/TS 18332:2026 is a CEN Technical Specification for fire safety engineering in the building process. It explains when and how to review and control fire safety design from planning and design through construction, operation and maintenance, and it is aimed at building authorities, designers, fire safety engineers and other project stakeholders.
The document focuses on technical fire safety issues and is written to work alongside national regulations rather than replace them. It also sets out who can perform reviews and controls, what they should examine, and how the fire safety design should be documented and carried forward through the life of a building.
What does CEN/TS 18332:2026 specify?
CEN/TS 18332:2026 specifies review and control activities for fire safety design across the building life cycle. Its scope covers planning and design, construction, operation and maintenance, and it also touches refurbishment, changes in use and demolition.
The document treats fire safety engineering as part of the normal building process and says that review and control should be adapted to the project’s complexity and fire consequences. It is organized into clauses on fire safety strategy, phases of the building process, control and review, the design process, planning and design reviews, construction-phase checks, and operation and maintenance.
| Annex | What it covers |
|---|---|
| Annex A | How to judge the complexity of a building solution and the consequences of a fire |
| Annex B | Full control of fire safety design documentation and the fire safety strategy |
| Annex C | Checklist for checking detailed design and the documents of other disciplines |
| Annex D | Example inspection and testing plan for the construction phase |
| Annex E | Example instructions for operation and maintenance |
| Annex F | Competencies and recognition for people and companies |
What are the key requirements of CEN/TS 18332:2026?
Fire safety strategy and design approach
CEN/TS 18332:2026 requires a fire safety strategy that states the fire safety objectives, the functional requirements, the main fire hazards and the mitigating measures. It also requires fire safety acceptance criteria, which should be agreed by the relevant stakeholders.
In practice, this means the project team has to decide early whether the building will be designed mainly with pre-accepted solutions, fire safety engineering methods, or a combination of both. The standard says the simplest acceptable route should normally be chosen, but more advanced methods are appropriate for innovative, complex or higher-risk buildings.
Building phases and when to involve the AHJ
CEN/TS 18332:2026 divides the building life cycle into planning and design, construction, operation and maintenance, changes in use, and demolition. In the design concept stage, the team identifies building use, occupancy, fire load, access and key layout features so that a fire safety design brief can be prepared.
The document also explains that the authority having jurisdiction (AHJ) may need to be involved early when the building is complex or the consequences of fire are high. That matters because the timing of review can affect whether the project can still be adjusted before detailed design and construction lock in the solutions.
Levels of control, reviewer competence and independence
CEN/TS 18332:2026 links the level of control and review to complexity and fire consequences. It describes a range from self-checks and internal review through third-party review to review by the AHJ itself.
The reviewer must be competent and independent of the project. In practice, that means the reviewer needs the right fire safety design experience, should not be personally or financially tied to the project, and may need to work as a competence team when the subject matter spans several disciplines.
Fire safety design process and documentation
CEN/TS 18332:2026 describes a fire safety design process that starts with a qualitative design review and initial risk screening. If fire safety engineering methods are used, the process continues with fire scenarios, verification methods, design review and formal documentation.
The fire safety design documentation has to record the objectives, building description, assumptions, fire scenarios, analysis methods, sensitivity and uncertainty work, results, conclusions and references. This matters because later checks, construction changes and maintenance decisions depend on being able to trace why the fire safety solution was accepted.
Verification methods and review contents
CEN/TS 18332:2026 recognizes both absolute and comparative approaches to verification. It also refers to qualitative, deterministic and probabilistic assessment methods, and it requires the chosen method and acceptance criteria to be justified.
For a practical review, the document says the reviewer should look at performance criteria, assumptions, fire scenarios, choice of method, validation and verification, and uncertainty. Annex B gives detailed questions for checking both the fire safety design brief and the fire safety verification package.
Construction-phase control and commissioning
CEN/TS 18332:2026 requires an inspection and testing plan (ITP) for fire safety systems during construction and commissioning. It also requires consultation with the builder and local authority, early and final controls, and documentation of deviations and field changes.
This is important because many fire safety failures happen when systems are installed differently from the design. The standard also calls for integrated system testing, as-built documentation, and verification that the fire safety requirements have been carried into the construction documents of other disciplines.
Operation, maintenance and changes
CEN/TS 18332:2026 requires instructions for operation and maintenance of fire safety systems as part of the as-built documentation. It also says the building owner or facility manager needs to keep fire safety measures working during the building’s service life.
For changes in use or major alterations, the fire safety design may need to be revisited. Minor changes can be recorded within the existing documentation, but changes that go beyond the original design boundaries require a new fire safety design process.
What terms does CEN/TS 18332:2026 define?
- Acceptance criteria - The criteria used to judge whether a fire safety design is acceptable.
- Authority having jurisdiction (AHJ) - The organization, office or individual responsible for approving designs, equipment, installations, materials or procedures.
- Fire safety design brief - The agreed summary of the performance criteria and methods used as the basis for the fire safety design.
- Fire safety design documentation - The document set that describes the fire safety strategy, including the brief and the verification of sufficient safety.
- Fire safety strategy - The combination of fire safety measures shown to satisfy the functional objective.
- Inspection and testing plan (ITP) - The plan that identifies the inspections and tests to be performed during construction and commissioning.
- Third party reviewer - An organisation or individual independent of the project stakeholders who carries out the review.
- Operation and maintenance (O&M) - The building use phase in which fire safety systems must be kept effective.
Who uses CEN/TS 18332:2026?
CEN/TS 18332:2026 is used by building authorities and AHJs to decide how much review is needed and what evidence they should expect. Designers and fire safety engineers use it to build the fire safety strategy, select verification methods and prepare documentation.
Architects, structural engineers, HVAC engineers, electrical engineers, contractors and construction managers use it because fire safety requirements have to be carried into the drawings, models, site controls and commissioning steps of other disciplines. Owners, facility managers, tenants, maintenance organizations and emergency-related stakeholders use it to keep the building’s fire safety measures understandable and working over time.
Which standards are used with CEN/TS 18332:2026?
The only normative reference listed in Clause 2 is EN ISO 13943, which provides the fire safety vocabulary used in the document.
Other cited standards and guidance support specific parts of the process:
- ISO 23932 (all parts) - general fire safety engineering principles.
- ISO 16730 - assessment, verification and validation of calculation methods.
- CEN/TR 17524 - the performance-based code model referenced for functional and performance requirements.
- Fire parts of Eurocodes (EN 199x-1) - structural fire design and verification.
- NFPA 4 - integrated fire protection and life safety system testing.
- EN 16893 - fire-related issues for cultural heritage storage or use.
- ISO 26367 - assessing adverse environmental impact of fire effluents.
- BS 7974 and the SFPE peer review and performance-based fire protection guidance - referenced for design review and fire safety engineering practice.
- INSTA 952 and related Nordic guidance - cited as inspiration for review and control methods.
What does the CEN/TS 18332:2026 document contain?
CEN/TS 18332:2026 contains process descriptions, review levels, control checklists and example working documents for fire safety engineering in buildings. Annex A helps the team judge complexity and fire consequences, while Annex B gives a detailed control checklist for the fire safety strategy and verification package.
It also includes an example checklist for coordinating fire safety requirements with other disciplines, an example ITP for construction, and example O&M instructions for the service life of the building. Annex F adds competence and recognition guidance for people and companies, which is useful when selecting reviewers, specialists and third-party assessors.
Get Certified
Connect with accredited certification bodies for this standard

DIBt (Deutsches Institut für Bautechnik)
German Institute for Building Technology.
DIN CERTCO
DIN Group product certification.

Kiwa BDA Testing
Building and construction product certification.
Sponsored listings
Frequently Asked Questions
CEN/TS 18332:2026 is a technical specification published by the European Committee for Standardization (CEN). Its full title is "Fire safety engineering - Review and control in the building process". This standard covers: This document specifies when and how to conduct reviews and controls within the field of fire safety design, from planning and design to construction and finally, operation and maintenance. This document describes reviews and controls, independent of national regulations, with a primary focus on technical issues within fire safety engineering. It describes how the fire safety design process, including engineering approaches, forms a normal part of the overall control and review of the building process and defines eligibility criteria for the parties performing the controls.
This document specifies when and how to conduct reviews and controls within the field of fire safety design, from planning and design to construction and finally, operation and maintenance. This document describes reviews and controls, independent of national regulations, with a primary focus on technical issues within fire safety engineering. It describes how the fire safety design process, including engineering approaches, forms a normal part of the overall control and review of the building process and defines eligibility criteria for the parties performing the controls.
CEN/TS 18332:2026 is classified under the following ICS (International Classification for Standards) categories: 13.220.99 - Other standards related to protection against fire; 91.080.01 - Structures of buildings in general. The ICS classification helps identify the subject area and facilitates finding related standards.
CEN/TS 18332:2026 is available in PDF format for immediate download after purchase. The document can be added to your cart and obtained through the secure checkout process. Digital delivery ensures instant access to the complete standard document.
Standards Content (Sample)
Contents
- Introduction
- 1 Scope
- 2 Normative references
- 3 Terms and definitions
- 3.1 acceptance criteria
- 3.2 approval body
- 3.3 authority having jurisdiction
- 3.4 building solution
- 3.5 concept design
- 3.6 contractor
- 3.7 design objective
- 3.8 design review
- 3.9 detailed design
- 3.10 fire scenario
- 3.11 fire safety design
- 3.12 fire safety engineer
- 3.13 fire safety engineering
- 3.14 fire safety design brief
- 3.15 fire safety design documentation
- 3.16 fire safety strategy
- 3.17 design review
- 3.18 performance criteria
- 3.19 pre-accepted solution
- 3.20 quality assurance
- 3.21 qualitative design review
- 3.22 stakeholder
- 3.23 third party reviewer
- 3.24 trial design
- 3.25 validation
- 3.26 verification
- 3.27 compliant design system
- 3.28 factory acceptance test
- 3.29 inspection and testing plan
- 3.30 non-compliance report
- 3.31 site acceptance test
- 3.32 operation and maintenance
- 3.33 health and safety
- 3.34 integrated acceptance test
- 3.35 competent
- 3.36 competence team
- 4 Fire safety strategy
- 4.1 General fire safety objectives
- 4.2 Additional objectives
- 4.3 Functional requirements
- 4.4 Implementation of the fire safety strategy
- 5 Description of the phases of the building process
- 5.1 General
- 5.2 Planning and design phase
- 5.3 Construction phase
- 5.4 Operation and maintenance phase
- 5.5 Refurbishment or changes in use
- 5.6 Demolition
- 6 Control and review of fire safety aspects
- 6.1 General
- 6.2 Levels of control and review
- 6.3 Third party review
- 6.4 Reviewer qualifications
- 6.5 Initiation and timing of review
- 7 Fire safety design within the building process
- 7.1 General
- 7.2 The fire safety design process
- 7.3 Documentation and communication
- 7.4 Detailed design
- 8 Review and control in the planning and design phase
- 8.1 General
- 8.2 Purpose
- 8.3 Extent of review
- 8.4 Review contents
- 8.5 Procedure for a third-party review
- 9 Review and control during the construction phase
- 9.1 General
- 9.2 Inspection and testing plan (ITP)
- 9.3 Procedure
- 9.4 Integrated system testing
- 9.5 Compliance verification
- 9.6 As-built documentation
- 9.7 Fire prevention on construction sites
- 10 Review and control during the operation and maintenance phase
- 10.1 Process
- 10.2 Operation and maintenance plan
Introduction
This document has been prepared to support the development of the fire safety engineering development in Europe.
In fire safety design, compliance with fire safety regulations can be demonstrated either by using preaccepted solutions that are defined by the building authorities, or by using fire safety engineering methods.
This document describes the review and control of fire safety design in the building process and includes both design alternatives. It is inspired by Nordic Standards INSTA 952 – 2019 (ICS 13.220.01) [1], work conducted by ISO/TC 92/SC 4 on fire safety engineering [17], [18], [19], [20], [21], [22] and SFPE Guidelines (SFPE, 2007 and 2009) [4], [5]. Clauses 6 and 7 provide a general description of the phases and the fire safety design within the building process.
The aim is to facilitate verification of building solutions including innovative and sustainable solutions and to provide a process for control within the field of fire safety engineering, which can assist member states to implement or improve their review and control regime. This document is intended to be used as a reference document for building authorities and for use in connection with regulations by designers, local authorities and stakeholders in the building industry.
Performance based building regulations provide the appropriate framework for the development of fire safety engineering in the countries. They establish the fire performance objectives and harmonized functional requirements focussing on the expected performance of the building but not on the specific solutions.
Traditionally, fire regulations have had a prescriptive character. This type of regulations originated from empirical information, are assumed to deliver adequate levels of fire safety through the implementation of specific building physical requirements. Today, prescriptive codes remain a basic tool to determine the fire safety characteristics in many buildings and applications. Prescriptive-based and performance-based regulations differ in the way of developing, implementing, and enforcing regulations that are essential to develop and maintain an efficient legal framework. The multidisciplinary nature of fire safety engineering projects and the direct involvement of all construction stakeholders (e.g. owners, architects, designers, users, enforcers, fire engineers) are two reasons why projects can benefit from specific rules for the application of fire safety engineering principles. The function of control, normally developed by the code enforcers, should also be determined and adapted.
SIST-TS CEN/TS 18332:2026 CEN/TS 18332:2026 (E)
1 Scope
This document specifies when and how to conduct reviews and controls within the field of fire safety design, from planning and design to construction and finally, operation and maintenance. This document describes reviews and controls, independent of national regulations, with a primary focus on technical issues within fire safety engineering. It describes how the fire safety design process, including engineering approaches, forms a normal part of the overall control and review of the building process and defines eligibility criteria for the parties performing the controls.
2 Normative references
The following documents are referred to in the text in such a way that some or all of their content constitutes requirements of this document. For dated references, only the edition cited applies. For undated references, the latest edition of the referenced document (including any amendments) applies. EN ISO 13943, Fire safety — Vocabulary (ISO 13943)
3 Terms and definitions
For the purposes of this document, the terms and definitions given in EN ISO 13943 and the following apply.
ISO and IEC maintain terminology databases for use in standardization at the following addresses:
- ISO Online browsing platform: available at https://www.iso.org/obp/
- IEC Electropedia: available at https://www.electropedia.org/
3.1 acceptance criteria
criteria that form the basis for assessing the acceptability of the safety of a design of a built environment Note 1 to entry: The criteria can be qualitative, quantitative or a combination of both. [SOURCE: EN ISO 13943:2017 [6]]
3.2 approval body
organization, office or individual authorised to approve the design of a building Note 1 to entry: Depending on national legislation, the approval body can be local or national authorities or a privately held third-/party designer with the necessary notification. Alternatively, the companies responsible for designing the building can be authorized to “approve” their own work.
3.3 authority having jurisdiction
AHJ organization, office or individual responsible for approving designs, equipment, installations, materials and/or procedures [SOURCE: SFPE Engineering Guide to Performance-Based Fire Protection, 2nd edition [4]]
3.4 building solution
solution adopted to any aspects related to the life of the building (from design to demolition)
SIST-TS CEN/TS 18332:2026 CEN/TS 18332:2026 (E)
3.5 concept design
design that takes place after feasibility studies and options appraisals have been carried out and a project brief has been prepared
3.6 contractor
company responsible for the physical construction of a building
3.7 design objective
description of the performance benchmark against which the predicted performance of a design is evaluated [SOURCE: FPE Engineering Guide to Performance-Based Fire Protection, 2nd edition [4]]
3.8 design review
overall review process during the design [SOURCE: SFPE Guidelines for Peer Review in the Fire Protection Design Process [3]]
3.9 detailed design
process of taking on and developing the approved concept design
3.10 fire scenario
qualitative description of the course of a fire with respect to time, identifying key events that characterize the studied fire and differentiate it from other possible fires [SOURCE: EN ISO 13943:2017 [6]]
3.11 fire safety design
design of fire safety selected for implementation from the successful trial design [SOURCE: SFPE Engineering Guide to Performance-Based Fire Protection, 2nd edition, amended [4]]
3.12 fire safety engineer
person undertaking fire safety engineering
3.13 fire safety engineering
application of engineering methods to the development or assessment of designs in the built environment through the analysis of specific fire scenarios or through the quantification of risk for a group of fire scenarios [SOURCE: EN ISO 13943:2017 [6]]
3.14 fire safety design brief
summary of the agreed upon performance criteria and methods that will be used as a basis for the fire safety design [SOURCE: SFPE Engineering Guide to Performance-Based Fire Protection, 2nd edition, amended [4]]
SIST-TS CEN/TS 18332:2026 CEN/TS 18332:2026 (E)
3.15 fire safety design documentation
set of documents that describes the fire safety strategy including both the fire safety design brief and the complete verification of sufficient safety based on the level of fire safety engineering aspects that have been reviewed
3.16 fire safety strategy
combination of fire safety measures that has been shown by reference to design codes or analysis to be capable of satisfying the specified functional objective [SOURCE: EN ISO 13943:2023 – [6]]
3.17 design review
evaluation of the conceptual and technical soundness of a design
3.18 performance criteria
quantitative criteria which form an acceptable basis for assessing the safety of a design for a built environment Note 1 to entry: The performance criteria are usually ones that have been agreed by an authority having jurisdiction or by codes or a standardization committee.
[SOURCE: EN ISO 13943:2023 – [6]]
3.19 pre-accepted solution
solution that has been determined by the authority having jurisdiction (AHJ) to comply with the objectives stipulated in the fire safety requirements Note 1 to entry: The definition may vary in different countries. Other terms are, for example, deemed-to-satisfy solutions, acceptable solutions, prescriptive solutions.
[SOURCE: INSTA/TS 950:2014 – [7]]
3.20 quality assurance
process to ensure correct quality during an internal quality control review
3.21 qualitative design review
first step in the fire safety design process that focuses on conducting an initial risk screening to identify possible ways in which a fire hazard might arise with regards to the fire safety objectives
3.22 stakeholder
person or organization who has a share or an interest in the building Note 1 to entry: Example of stakeholders:
- building owner;
- building manager;
SIST-TS CEN/TS 18332:2026 CEN/TS 18332:2026 (E) - design team; - authorities having jurisdiction, (AHJ):
- fire;
- building;
- insurance;
- accreditation agencies;
- construction team:
- construction manager;
- general contractor;
- subcontractors;
- tenants;
- building operations and maintenance;
- emergency responders;
- enforcers.
[SOURCE: Based on SFPE Engineering Guide to Performance-Based Fire Protection, 2nd edition [4]]
3.23 third party reviewer
organisation or individual which is independent of the project stakeholders and conducts the review
3.24 trial design
fire safety system design intended to achieve the stated fire safety goal and expressed in terms that make it possible to assess whether the fire safety goals have been achieved [SOURCE: SFPE Engineering Guide to Performance-Based Fire Protection, 2nd edition [4]]
3.25 validation
process of determining the degree to which a calculation method is an accurate representation of the real world from the perspective of the intended uses of the calculation method [SOURCE: ISO 16730:2008 [8]]
3.26 verification
process of determining that a calculation method implementation accurately represents the developer’s conceptual description of the calculation method and the solution to the calculation method
SIST-TS CEN/TS 18332:2026 CEN/TS 18332:2026 (E) Note 1 to entry: Verification methods can include: qualitative arguments, calculation methods, the use of recognized analytical methods and mathematical models; laboratory tests, the use of tests (sometimes to destruction) on prototype components and systems; in situ tests that may involve the examination of plans and verification by test, in which compliance with specified numbers, dimensions or locations is required (nondestructive tests, such as pipe pressure tests, are also included). [SOURCE: ISO 16730:2008 [8]]
3.27 compliant design system
CDS fire safety design system complying with applicable regulations or standards
3.28 factory acceptance test
FAT test performed in the factory to verify the performance of products
3.29 inspection and testing plan
ITP planning and identification of all the tests and inspections to be performed during the construction and commissioning phases
3.30 non-compliance report
NCR document reporting the non-compliance with the referenced document after an inspection or a test
3.31 site acceptance test
SAT tests performed on construction sites to verify functionality or performance of a product or a system
3.32 operation and maintenance
O&M phase of use of a building
3.33 health and safety
H&S conditions related to the health and safety of persons whatever are their function (e.g. occupants, visitors, workers, firefighters)
3.34 integrated acceptance test
IAT commissioning test performed on site to verify the functionality and performance of an installed system Note 1 to entry: For example for a smoke and heat exhaust system, this would require tests of the system and verification that each component of the system has been correctly installed and performs as designed
SIST-TS CEN/TS 18332:2026 CEN/TS 18332:2026 (E)
3.35 competent
possessing of the skills, knowledge and experience in the required domain
3.36 competence team
group of individuals competent in all domains to be covered
4 Fire safety strategy
4.1 General fire safety objectives
The fire safety objectives are the societal goals, which are normally set by the legislature. They can be divided in the fire safety objectives themselves (objectives that the EU member states have in common) and additional objectives, that can be set by a Member State or a private sector body like an insurance company or that one wishes to fulfil voluntarily.
NOTE For general principles of fire safety engineering, see ISO 23932-1 [24]. The following general safety objectives are relevant to life and safety:
- protection of human life from injuries and death caused by a fire in and around a building;
- protection of animals from injuries and death caused by a fire in and around a building.
4.2 Additional objectives
For completing the set of fire safety objectives that can be applied as a function of the use of the building, additional fire safety objectives such as the following can be required:
- protection of the environment from the effects from a fire in and around a building;
- property protection (buildings, business/operational continuity, strategic functions, cultural heritage (see EN 16893 [26]);
- information impact (see ISO 26367) [27]) from damage caused by a fire in and around a building.
4.3 Functional requirements
Functional requirements are qualitative specifications to ensure that the fire safety objectives are being fulfilled, such as the following:
a) Fire occurrence shall be prevented.
b) The structural stability of load-bearing structures shall be ensured for a specific time. NOTE Local regulations can require that a fire not lead to the likely collapse of a building. c) The spread of fire and smoke within buildings shall be limited.
d) The spread of fire to neighbouring buildings shall be limited. e) The occupants shall be enabled to leave the building themselves or shall be enabled to be rescued by other means.
Surrounding environment, forest, industrial installation, cultural heritage, operation continuity, good property.
SIST-TS CEN/TS 18332:2026 CEN/TS 18332:2026 (E) f) The safety of the rescue teams shall be taken into consideration. g) Effective firefighting shall be enabled.
h) The building elements, technology and operational procedures for fire safety shall be maintained as appropriate during the life of the building.
According to the model of performance-based codes given in CEN/TR 17524:2020 Figure 1 [28], the qualitative functional requirements shall be specified by quantitative performance requirements. The compliance with both functional requirements and the paramount fire safety objectives can be demonstrated by fulfilment of the performance requirements. The design of a building according to given acceptable solutions is an alternative to fulfilling the performance requirements.
4.4 Implementation of the fire safety strategy
The fire safety strategy should satisfy the functional requirements and be based on applicable building code and references, and more generally on stakeholders’ requirements. It should include the list of the main fire hazards and should identify the mitigating measures. Generally, the simplest method to achieve the design objectives and gain approvals by AHJ should be selected, which is usually a “code-compliant” approach. More advanced methods, including fire-engineering, can be deployed in instances where codecompliant methods are inappropriate or if greater confidence is required, notably in case of:
- use of new materials (e.g. bio sourced);
- complex building design (e.g. multi materials, structural approach);
- high-risk building design (e.g. hazards, occupant characteristics, project size, firefighting access). The fire safety strategy should include the building design parameters that affect fire safety design (e.g. structural materials).
The fire safety strategy should specify whether the building should be designed with fire safety engineering methods of any kind or mainly pre-accepted solutions. When prescriptive rules are applied, deviations shall have performance-based applications to justify solutions. Prescriptive rules and performance code shall be strongly connected. The fire safety objectives shall be listed and the functional requirements that are met by performance-based applications should be defined.
Justification for alternative solutions should be given if the performance-based code requires it. However, the requirements of all stakeholders, in particular from insurance, should be mentioned and addressed. In any case, the fire safety strategy shall include the definition of fire safety acceptance criteria, which should be approved by all relevant stakeholders.
5 Description of the phases of the building process
5.1 General
The life phases of a building are the following:
- planning and design;
- construction;
- use and its associated maintenance;
SIST-TS CEN/TS 18332:2026 CEN/TS 18332:2026 (E) - changes in the building or in its the use; - demolition at end of life, noting that materials or products could be reused. This process can generally be described, as in Figure 1, in different phases. The requirements of control and review vary with the life phases depending on the complexity of the project. Using a combination of the different types of control is often the most effective in each life phase.
Figure 1 — Description of the different life phases of the building process
5.2 Planning and design phase
5.2.1 General
The planning and design phase involves different stakeholders (see 3.22). Whether the authorities should be involved depends on the complexity of the building and potential consequences of fire. When the building is complex or the consequences of a fire can be high, it is important to involve the AHJ soon in the project to ensure compliance with the fire safety objective and with the method used for validating the functional requirements. If the project is simple (such as an office of limited size) the required involvement of authorities can be at the end of this stage to validate compliance with national or local requirements.
NOTE Local regulation can apply.
SIST-TS CEN/TS 18332:2026 CEN/TS 18332:2026 (E)
5.2.2 Design concept
In this phase, the outline fire safety strategy and design concept are determined. Key players are the owner of the building, architect and other stakeholders (see 3.22) such as insurance and fire safety engineers. In this phase the following aspects shall be identified:
- general purpose and use of the building, including location and access; - restrictions in the use of the building, number of occupants, type of activities, fire load, etc; - principal features, or main restrictions of the building, main areas for movement of people, any open spaces or atriums, etc.; When these issues have been identified, a fire safety design brief can be produced. Access to the building shall consider relevant rules and local means. A building should be accessible only to the extent it can be safely evacuated or be rescued by other means. NOTE Regarding building access, local regulation can apply.
A plan of reuse of the products or building components, but also of the building as a whole should be established and developed throughout the subsequent stages.
...