TC 5 - Steam turbines
- Abstract
Standardizations in the field of steam turbines, including their design, application, installation, operation, and testing.
Note: In support the advancement of renewable energy power generation, TC5 also focus to include various application scenarios for steam turbines for example: biomass thermal power turbine, geothermal power generation turbines, air turbine expander, etc.- Slovenian
Turbines à vapeur
Normalisation des valeurs assignées et des essais applicables aux turbines à vapeur et des essais des centrales à vapeur.
IEC 60953-4:2026 is intended to establish a Supplementary Standard for routine test of steam turbines. The rules given in this document follow the guidance given in IEC 60953-0, but contain amendments and supplements regarding the analysis and supervision of relative performance by routine testing of steam turbine.
General principles for the preparation, performance evaluation, trends of performance parameters and the determination of the measurement uncertainty of periodic routine tests are given in this document.
This document is applicable to routine testing covering a wide range of accuracy on steam turbines of every type, rating and application, operating with superheated or saturated steam.
This document is not intended for application in acceptance tests of new units or retrofits and its application for such is strongly not recommended.
The purpose of this document is to cover the existing steam turbine components which influence the efficiency of the power plant. This document helps the parties determine the most appropriate parameters that characterize the relative performance change and that could be used as long-term performance monitoring and analysis.
- Standard156 pagesEnglish and French languagesale 15% off
- Standard156 pagesEnglish and French languagesale 15% off
This part of IEC 60953 establishes a Supplementary Standard (SS) for thermal verification tests of retrofitted steam turbines. The rules given in this SS follow the guidance given in IEC 60953-0, hereinafter called the Reference Standard (RS) but contain amendments and supplements regarding guarantees and verification of the guarantees by thermal acceptance tests on retrofitted steam turbines. General principles for the preparation, performance, evaluation, comparison with guaranteed values and the determination of the measurement uncertainties of verification tests are given in this SS. This SS is applicable only when the retrofit involves some hardware change in the steam turbine equipment. Conversely, any modification on the cycle or any retrofit of other equipment of the power plant (e.g. boiler, feedwater heaters, etc.) is not covered by this SS.
- Standard101 pagesEnglish languagee-Library read for
IEC 60953-3:2022 This part establishes a Supplementary Standard for thermal verification tests of retrofitted steam turbines.
The rules given in this document follow the guidance given in IEC 60953-0, but contain amendments and supplements regarding guarantees and verification of the guarantees by thermal acceptance tests on retrofitted steam turbines.
General principles for the preparation, performance, evaluation, comparison with guaranteed values and the determination of the measurement uncertainties of verification tests are given in this document.
This document is applicable only when the retrofit involves some hardware change in the steam turbine equipment. Conversely, any modification on the cycle or any retrofit of other equipment of the power plant (e.g. boiler, feedwater heaters, etc.) is not covered by this document.
- Standard230 pagesEnglish and French languagesale 15% off
The rules given in this document are applicable to thermal acceptance tests covering a wide range of accuracy on steam turbines of every type, rating and application. Only the relevant portion of these rules will apply to any individual case. The rules provide for the testing of turbines, whether operating with either superheated or saturated steam. They include measurements and procedures required to determine specific enthalpy within the moisture region and describe precautions necessary to permit testing while respecting radiological safety rules in nuclear plants. Uniform rules for the preparation, carrying out, evaluation, comparison with guarantee and calculation of measuring uncertainty of acceptance tests are defined in this standard. Details of the conditions under which the acceptance test can take place are included. Should any complex or special case arise which is not covered by these rules, appropriate agreement is to be reached by manufacturer and purchaser before the contract is signed.
- Standard105 pagesEnglish languagee-Library read for
IEC 60953-0:2022 constitutes a technical revision.This edition includes the following significant technical changes with respect to the previous edition:
a) IEC 60953-2:1990 has been used as the basis to develop IEC 60953-0;
b) Outdated measuring techniques have been updated and the corresponding reduction of the expected test result measuring uncertainty indicated;
c) Guarantee of power output at specified steam flow has been included;
d) A proposal for assignment of unaccounted for leakages has been included;
e) Correction methods and guarantee comparisons are updated;
f) Various appendices deleted:
- Appendix B (flow nozzle)
- Appendix E (generalized correction curves)
- Appendix G (power measurement uncertainty)
g) Annex added:
- Annex E (Temperature variation method) taken over from IEC 60953-3:2002,Annex L
The rules given in this document are applicable to thermal acceptance tests covering a wide range of accuracy on steam turbines of every type, rating and application. Only the relevant portion of these rules will apply to any individual case.
The rules provide for the testing of turbines, whether operating with either superheated or saturated steam. They include measurements and procedures required to determine specific enthalpy within the moisture region and describe precautions necessary to permit testing while respecting radiological safety rules in nuclear plants.
Uniform rules for the preparation, carrying out, evaluation, comparison with guarantee and calculation of measuring uncertainty of acceptance tests are defined in this standard. Details of the conditions under which the acceptance test can take place are included.
Should any complex or special case arise which is not covered by these rules, appropriate agreement is to be reached by manufacturer and purchaser before the contract is signed.
This first edition cancels and replaces IEC 60953-2, published in 1990.
- Standard209 pagesEnglish and French languagesale 15% off
IEC TR 63388:2021 introduces the widely used technical scheme of cogeneration (also known as combined heat and power (CHP)), and gives the corresponding cases. The technical schemes of cogeneration covered in this technical report can be divided into two categories. One is cogeneration based on steam turbine, which is generally applied in thermal power plants; The other is cogeneration based on other prime movers, such as fuel cell, micro gas turbine, internal combustion engine, Stirling engine, ORC, etc.
This document gives some cases of cogeneration, mainly including:
• CHP based on extraction turbine;
• CHP based on back pressure turbine;
• Low-vacuum heating mode;
• LP cylinder steam bypassed heating mode;
• CHP based on steam turbine with synchro-self-shift clutches;
• Gas-steam combined cycle CHP;
• Micro gas turbine CHP;
• Stirling engine CHP;
• Fuel cell CHP; and
• ORC CHP.
The characteristics, components and technical requirements of these technical schemes are introduced in this document.
By collecting existing standards of CHP, this document also identifies the gaps of CHP standardization and put forward a roadmap for future CHP standards.
This document is prepared based on limited expert resources. Thus, some cogeneration cases could not be covered in this document, such as:
• Solar cogeneration; and
• Internal combustion engine cogeneration.
- Technical report43 pagesEnglish languagesale 15% off
IEC 60045-1:2020 is applicable primarily to land-based horizontal steam turbines driving generators for electrical power services. Some of its provisions are relevant to turbines for other applications. Generator, gear box and other auxiliaries which are considered as a part of the system are also mentioned in this document. Detailed specifications for this equipment are not included in this document. The purpose of this document is to make an intending purchaser aware of options and alternatives which it may wish to consider, and to enable it to state its technical requirements clearly to potential suppliers. Consequently, final technical requirements will be in accordance with an agreement between the purchaser and the supplier in the contract. This second edition cancels and replaces the first edition published in 1991. This edition constitutes a technical revision. This edition includes the following significant technical changes with respect to the previous edition: a) Scope clarification and boundaries of applicability; b) general update to state-of-the-art technology; c) integration of product safety: Clause 5; d) integration of automation, incorporating the former annex on electronic governors: Clause 11; e) Informative Annex A on welding added.
- Standard75 pagesEnglish languagee-Library read for
IEC 60045-1:2020 is applicable primarily to land-based horizontal steam turbines driving generators for electrical power services. Some of its provisions are relevant to turbines for other applications. Generator, gear box and other auxiliaries which are considered as a part of the system are also mentioned in this document. Detailed specifications for this equipment are not included in this document.
The purpose of this document is to make an intending purchaser aware of options and alternatives which it may wish to consider, and to enable it to state its technical requirements clearly to potential suppliers. Consequently, final technical requirements will be in accordance with an agreement between the purchaser and the supplier in the contract.
This second edition cancels and replaces the first edition published in 1991. This edition constitutes a technical revision.
This edition includes the following significant technical changes with respect to the previous edition:
a) Scope clarification and boundaries of applicability;
b) general update to state-of-the-art technology;
c) integration of product safety: Clause 5;
d) integration of automation, incorporating the former annex on electronic governors: Clause 11;
e) Informative Annex A on welding added.
- Standard146 pagesEnglish and French languagesale 15% off
ISO 10494:2018 specifies methods for measuring the noise emission of a turbine or turbine set under steady-state operating conditions. It specifies methods for measuring the sound pressure levels on a measurement surface enveloping a source, and for calculating the sound power level produced by the source. It gives requirements for the test environment and instrumentation, as well as techniques for obtaining the surface sound pressure level from which the A-weighted sound power level of the source and octave or one-third-octave band sound power levels are calculated. These methods can be used to conduct performance tests even if the purpose of the test is simply to determine the sound pressure level around the machine.
ISO 10494:2018 is applicable to turbines and turbine sets:
- for power plant and industrial applications (e.g. stationary);
- for installation on board ships, or offshore installations, road and railway vehicles.
ISO 10494:2018 does not apply to gas turbines in aircraft applications.
ISO 10494:2018 is applicable to only the part of the turbine set (turbine, driven equipment and attached components) located above the floor and inside a continuous enveloping measurement surface bounded by this floor.
ISO 10494:2018 is applicable to steady-state operation and excludes transients such as start-up and shut-down, when the noise emission can be higher for short times. Under these conditions, this document does not apply.
- Standard37 pagesEnglish languagesale 15% off
- Standard37 pagesFrench languagesale 15% off
This part of IEC 60953, also called "retrofit code" (RC), establishes a supplementary retrofit code for thermal verification tests of retrofitted steam turbines.
- Standard157 pagesEnglish and French languagesale 15% off
This standard gives guidance on writing the technical specification for the procurement of processes and equipment for the removal of nitrogen oxides from the flue gas of steam generating plant for use in electricity generating stations (power stations). This Guide for procurement is not applicable to equipment for use in the nuclear reactor plant area of nuclear power stations. Other possible applications of such equipment have not been considered in the preparation of this Guide.
- Standard25 pagesEnglish languagee-Library read for
This standard gives guidance on writing the technical specification for the procurement of the pump units for use in electricity generating stations (power stations). This Guide for procurement is not applicable to equipment for use in the nuclear reactor plant area of nuclear power stations. Other possible applications of such equipment have not been considered in the preparation of this Guide. This Guide covers: - Feedwater pumps (including the start-up and booster pumps); Condensate pumps and condensate booster pumps; - Condenser cooling water pumps; - Boiler recirculation pumps;...
- Standard31 pagesEnglish languagee-Library read for
This standard gives guidance on writing the technical specification for the procurement of natural draught and mechanical draught wet and wet/dry (hybrid) cooling tower and cooling towers internals for use in electricity generating stations (power stations). This Guide for procurement is not applicable to equipment for use in the nuclear reactor plant area of nuclear power stations. Other possible applications of such equipment have not been considered in the preparation of this Guide. This Guide covers: - water distribution system; - spray assembly; - filling (film packing, splash grids or laths, etc.);...
- Standard23 pagesEnglish languagee-Library read for
This standard gives guidance on writing the technical specification for the procurement of water tube boilers for the use in electricity generating stations(power stations). This Guide for procurement is not applicable to equipment for use in the nuclear reactor plant area of the nuclear power stations. Other possible applications of such equipment have not been considered in the preparation of this Guide. This Guide covers water tube boilers: - using solid, liquid or gaseous fuels and for heat recovery; - with pulverised fuel, stoker or cyclone firing, gas or oil firing;...
- Standard30 pagesEnglish languagee-Library read for
This standard gives guidance on writing the technical specification for the procurement of fired and unfired shell boilers for use in electricity generating stations (power stations). This Guide for procurement is not applicable to equipment for use in the nuclear reactor plant area of nuclear power stations. Other possible applications of such equipment have not been considered in the preparation of this Guide. This Guide covers shell boilers: - using solid, liquid or gaseous or derived fuels, waste heat utilisation;...
- Standard29 pagesEnglish languagee-Library read for
This standard gives guidance on writing the technical specification for the procurement of main and auxiliary cooling water systems for use in electricity generating stations (power stations). This Guide for procurement is not applicable to equipment for use in the nuclear reactor plant area of nuclear power stations. Other possible applications of such equipment have not been considered in the preparation of this Guide. This Guide covers: - pump intake screening plant (coarse and fine screens) and associated cleaning systems; - pressure filters; - pipework and valves; - penstock gates; - priming and venting equipment;...
- Standard25 pagesEnglish languagee-Library read for
This standard gives guidance on writing the technical specification for the procurement of boiler (with fluidized bed firing) for use in electricity generating stations (power stations). This Guide for Procurement is not applicable to equipment for use in the nuclear reactor plant area of nuclear power stations. Other possible applications of such equipment have not been considered in the preparation of this Guide.
- Standard30 pagesEnglish languagee-Library read for
This standard gives guidance on writing the technical specification for the procurement of natural draught and mechanical draught dry cooling towers, aircooled condensers and their internals for use in electricity generating stations (power stations). This Guide for procurement is not applicable to equipment for use in the nuclear reactor plant area of nuclear power stations. Other possible applications of such equipment have not been considered in the preparation of this Guide. This Guide covers: - water distribution system; - heat exchangers; - supporting frame and footbrigdes;...
- Standard23 pagesEnglish languagee-Library read for
This Standard gives guidance on writing the technical specification for the procurement of high pressure piping systems, for use in electricity generating stations (power stations). This Guide for procurement is not applicable to equipment for use in the nuclear reactor plant area of nuclear power stations. Other possible applications of such equipment have not been considered in the preparation of this Guide. This Guide covers: - Live steam lines; - Hot reheat lines; - Cold reheat lines; - Feedwater lines; - Spray water lines for HP and RH-attemperators and steam-bypass-systems; - Pump minimum flow and balancing leak off lines;...
- Standard26 pagesEnglish languagee-Library read for
This standard gives guidance on the writing the technical specification for the procurement of Boiler and High Pressure Piping Valves including Safety valves for use in electricity generating stations (power stations). This Guide for procurement is not applicable to equipment for use in the nuclear reactor plant area of nuclear power stations. Other possible applications of such equipment have not been considered in the preparation of this Guide. This Guide covers valves (including safety valves) for installation in - Boiler plants (water tube boilers, shell boilers, boilers with fluidized bed firing);...
- Standard24 pagesEnglish languagee-Library read for
This standard gives guidance on writing the technical specification for the procurement of any lifting equipment used in the electricity generating stations (power stations). This Guide for procurement is not applicable to equipment used in the nuclear reactor plant area of the nuclear power station. Other possibleapplications of such equipment have been considered in the preparation of this Guide. This Guide covers: - Travelling cranes; - Portal or semi-portal bridge cranes; - Fixed or articulated jigs; - Hoist monorails; - Mobile cranes.
- Standard27 pagesEnglish languagee-Library read for
This standard gives guidance on writing the technical specification for the procurement of sootblower equipment associated with steam generating plant for use in electricity generating stations (power stations). This Guide for procurement is not applicable to equipment for use in the nuclear reactor plant area of nuclear power stations. Other possible applications of such equipment have not been considered in the preparation of this Guide.
- Standard23 pagesEnglish languagee-Library read for
This standard gives guidance on writing the technical specification for the procurement of equipment for dust handling associated with coal fired steam generating plant for use in the electricity generating stations (power stations). This Guide for procurement is not applicable to equipment for use in the nuclear reactor plant area of nuclear power stations. Other possible applications of such equipment have not been considered in the preparation of this Guide. This Guide covers the devices for pneumatic, mechanical and hydraulic conveying of different design.
- Standard25 pagesEnglish languagee-Library read for
This standard gives guidance on writing the technical specification for the procurement of dust emission reduction equipment for use in electricity generating stations (power stations). This Guide for procurement is not applicable to equipment for use in the nuclear reactor plant area of nuclear power stations. Other possible applications of such equipment have not been considered in the preparation of this Guide.
- Standard24 pagesEnglish languagee-Library read for
This standard gives guidance on writing the technical specification for the procurement of fans, ducts and dampers associated with steam generating plant and flue gas treatment plant for use in electricity generating stations (power stations). This Guide for procurement is not applicable to equipment for use in the nuclear reactor plant area of nuclear power stations. Other possible applications of such equipment have not been considered in the preparation of this Guide.
- Standard24 pagesEnglish languagee-Library read for
This standard gives guidance on writing the technical specification for the procurement of processes and equipment for the removal of sulphur oxides from the flue gas of steam generating plant for use in electricity generations stations (power stations). This Guide for procurement is not applicable to equipment for use in the nuclear reactor plant area of nuclear power stations. Other possible applications of such equipment have not been considered in the preparation of this Guide.
- Standard24 pagesEnglish languagee-Library read for
This standard gives guidance on writing the technical specification for the procurement of air heating equipment associated with steam generating plant and gas reheating equipment associated with flue gas treatment plant for use in electricity generating stations (power stations). This Guide for procurement is not applicable to equipment for use in the nuclear reactor plant area of nuclear power stations. Other possible applications of such equipment have not been considered in the preparation of this Guide.
- Standard25 pagesEnglish languagee-Library read for
This standard gives guidance on writing the technical specification for the procurement of equipment for ash handling associated with coal fired steam generating plant for use in electricity generating stations (power stations). This Guide for procurement is not applicable to equipment for use in the nuclear reactor plant area of nuclear power stations. Other possible applications of such equipment have not been considered in the preparation of this Guide.
- Standard24 pagesEnglish languagee-Library read for
This standard gives guidance on writing the technical specification for the procurement of condenser plants for use in electricity generating stations (power stations). This Guide for procurement is not applicable to equipment for use in the nuclear reactor plant area of nuclear power stations. Other possible applications of such equipment have not been considered in the preparation of this Guide.
- Standard25 pagesEnglish languagee-Library read for
This standard gives guidance on writing the technical specification for the procurement of deaerators associated with steam generating plants and steam turbine plant for use in electricity generating stations (power stations). This guide for procurement is not applicable to equipment for use in the nuclear reactor plant area of nuclear power stations. Other possible applications of such equipment have not been considered in the preparation of this guide.
- Standard23 pagesEnglish languagee-Library read for
This standard gives guidance on writing the technical specification for the procurement of gas turbines, including gas turbines for combined-cycle systems, and their auxiliairies for use in electricity generating stations (power stations). This Guide for procurement is not applicable to equipment for use in the nuclear reactor plant area of nuclear pouwer stations. Other possible applications of such equipment have not been considered in the preparation of this guide.
- Standard28 pagesEnglish languagee-Library read for
This standard gives guidance on writing the technical specification for the procurement of steam turbines driving generators for use in electricity generating stations (power stations). This Guide for procurement is not applicable to equipment for use in the nuclear reactor plant area of nuclear power stations. Other possible applications of such equipment have not been considered in the preparation of this Guide.
- Standard38 pagesEnglish languagee-Library read for
This standard gives guidance on writing the technical specification for the procurement of moisture separator reheaters for usein electricity generating stations (power stations). This Guide for procurement is not applicable to equipment for use in the nuclear reactor plant area of nuclear power stations. Other possible applications of such equipment have not been considered in the preparation of this guide.
- Standard24 pagesEnglish languagee-Library read for
This standard gives guidance on writing the technical specification for the procurement of feedwater heaters for use in electricity generating stations (power stations). This Guide for procurement is not applicable to equipment for use in the nuclear reactor plant area of nuclear power stations. Other possible applications of such equipment have not been considered in the preparation of this Guide.
- Standard25 pagesEnglish languagee-Library read for
Specifies very accurate testing of steam turbines to obtain the level of performance with minimum measuring uncertainty. Defines uniform rules for preparing and carrying out an evaluation of the acceptance tests. Defines also the conditions under which the acceptance tests shall take place. The cost for conducting this test method will generally be justified economically for large and/or proptotype units.
- Standard85 pagesEnglish languagee-Library read for
Contains recommendations for the conduct of tests of speed control systems of steam turbines. Applies primarily to constant speed steam turbines but may be applied where appropriate for other types of turbines. The purpose of the tests described in this publication is to verify the criteria guaranteed by the manufacturer and to check compliance with EN 60045-1.
- Standard37 pagesEnglish languagee-Library read for
Describes the importance of the chemical characteristics of steam supplied to steam turbines and the need to prevent corrosion and deposition in steam space, in order to minimize the risk of turbine corrosion failures or loss of efficiency or output. Is applicable to turbines of all electrical output rating and any exhaust condition, i.e. condensing or back pressure. It is designed for new plant, but may be adapted for use on existing plant. The limits described in this specification are specifically designed to protect the steam turbine. This specification is applicable to steam turbines driven from any source, except geothermal plants in which the turbine is fed direct from the geothermal sources.
- Technical specification33 pagesEnglish and French languagesale 15% off
This part of EN 60953, also called retrofit code (RC), establishes a supplementary retrofit code for thermal verification tests of retrofitted steam turbines.
- Standard82 pagesEnglish languagee-Library read for
Describes a method for the measurement of noise emitted by steam turbines including driven machinery operating under steady state conditions. The results are expressed in sound power levels and in sound pressure levels. Applies to steam turbines of all sizes without limitation of output.
- Standard23 pagesEnglish languagee-Library read for
Provides for acceptance tests of steam turbines of various types and capacities with appropriate measuring uncertainty. Only the relevant portion of these rules will apply to any individual case. The resulting measuring uncertainty of the test result is determined by calculating methods presented in this standard.
- Standard120 pagesEnglish languagee-Library read for
Applies to steam turbines driving generators for electrical power services. Includes provisions relevant to turbines for other applications. Enables a prospective purchaser to be aware of the available options and alternatives and to explain his technical requirements to suppliers. (1970).
- Standard47 pagesEnglish languagee-Library read for
Frequently Asked Questions
TC 5 is a Technical Committee within the International Electrotechnical Commission (IEC). It is named "Steam turbines" and is responsible for: Standardizations in the field of steam turbines, including their design, application, installation, operation, and testing. Note: In support the advancement of renewable energy power generation, TC5 also focus to include various application scenarios for steam turbines for example: biomass thermal power turbine, geothermal power generation turbines, air turbine expander, etc. This committee has published 41 standards.
TC 5 develops IEC standards in the area of Information technology. The scope of work includes: Standardizations in the field of steam turbines, including their design, application, installation, operation, and testing. Note: In support the advancement of renewable energy power generation, TC5 also focus to include various application scenarios for steam turbines for example: biomass thermal power turbine, geothermal power generation turbines, air turbine expander, etc. Currently, there are 41 published standards from this technical committee.
The International Electrotechnical Commission (IEC) is the world's leading organization for the preparation and publication of international standards for electrical, electronic, and related technologies. Founded in 1906, the IEC provides a global platform for companies, industries, and governments to meet, discuss, and develop the international standards they require.
A Technical Committee (TC) in IEC is a group of experts responsible for developing international standards in a specific technical area. TCs are composed of national member body delegates and work through consensus to create standards that meet global industry needs. Each TC may have subcommittees (SCs) and working groups (WGs) for specialized topics.