Industrial communication networks - Profiles - Part 5-21: Installation of fieldbuses - Installation profiles for CPF 21 (IEC 61784-5-21:2018/AMD1:2024)

Industrielle Kommunikationsnetze - Profile - Teil 5-21: Feldbusinstallation - Installationsprofile für die Kommunikationsprofilfamilie 21 (IEC 61784-5-21:2018/AMD1:2024)

Réseaux de communication industriels - Profils - Partie 5- 21: Installation des bus de terrain - Profils d'installation pour CPF 21 (IEC 61784-5-21:2018/AMD1:2024)

Industrijska komunikacijska omrežja - Profili - 5-21. del: Inštalacija procesnih vodil - Inštalacijski profili za CPF 21 - Dopolnilo A1 (IEC 61784-5-21:2018/AMD1:2024)

General Information

Status
Not Published
Public Enquiry End Date
12-Jun-2022
Current Stage
6060 - National Implementation/Publication (Adopted Project)
Start Date
15-May-2024
Due Date
20-Jul-2024

Relations

Buy Standard

Draft
prEN IEC 61784-5-X:2022 - BARVE
English language
92 pages
sale 10% off
Preview
sale 10% off
Preview
e-Library read for
1 day

Standards Content (Sample)


SLOVENSKI STANDARD
oSIST prEN IEC 61784-5-X:2022
01-junij-2022
Industrijska komunikacijska omrežja - Profili - 5-x. del: Inštalacija procesnih vodil -
Inštalacijski profili za CPF x (x = 2, 3, 6, 12, 21)
Industrial communication networks - Profiles - Part 5-x: Installation of fieldbuses -
Installation profiles for CPF x (x=2, 3, 6, 12, 21)
Réseaux de communication industriels - Profils - Partie 5-x: Installation des bus de
terrain - Profils d’installation pour CPF x (x = 2, 3, 6, 12, 21)
Ta slovenski standard je istoveten z: prEN IEC 61784-5-X:2022
ICS:
25.040.40 Merjenje in krmiljenje Industrial process
industrijskih postopkov measurement and control
35.100.40 Transportni sloj Transport layer
oSIST prEN IEC 61784-5-X:2022 en,fr,de
2003-01.Slovenski inštitut za standardizacijo. Razmnoževanje celote ali delov tega standarda ni dovoljeno.

oSIST prEN IEC 61784-5-X:2022
oSIST prEN IEC 61784-5-X:2022
65C/1158/CDV
COMMITTEE DRAFT FOR VOTE (CDV)
PROJECT NUMBER:
IEC 61784-5-X ED5
DATE OF CIRCULATION: CLOSING DATE FOR VOTING:
2022-03-25 2022-06-17
SUPERSEDES DOCUMENTS:
65C/1111/RR
IEC SC 65C : INDUSTRIAL NETWORKS
SECRETARIAT: SECRETARY:
France Ms Valérie DEMASSIEUX
OF INTEREST TO THE FOLLOWING COMMITTEES: PROPOSED HORIZONTAL STANDARD:

SC 22G,TC 57,SC 121A
Other TC/SCs are requested to indicate their interest, if any,
in this CDV to the secretary.
FUNCTIONS CONCERNED:
EMC ENVIRONMENT QUALITY ASSURANCE SAFETY
SUBMITTED FOR CENELEC PARALLEL VOTING NOT SUBMITTED FOR CENELEC PARALLEL VOTING
Attention IEC-CENELEC parallel voting
The attention of IEC National Committees, members of
CENELEC, is drawn to the fact that this Committee Draft for
Vote (CDV) is submitted for parallel voting.
The CENELEC members are invited to vote through the
CENELEC online voting system.
This document is still under study and subject to change. It should not be used for reference purposes.
Recipients of this document are invited to submit, with their comments, notification of any relevant patent rights of which they
are aware and to provide supporting documentation.

TITLE:
Industrial communication networks – Profiles – Part 5-x: Installation of fieldbuses – Installation profiles
for CPF x (x=2, 3, 6, 12, 21)
PROPOSED STABILITY DATE: 2028
NOTE FROM TC/SC OFFICERS:
electronic file, to make a copy and to print out the content for the sole purpose of preparing National Committee positions.
You may not copy or "mirror" the file or printed version of the document, or any part of it, for any other purpose without
permission in writing from IEC.

oSIST prEN IEC 61784-5-X:2022
INCLUDED SUBPARTS
NOTE 1: The page numbers of each subpart are prefixed with the CPF number of the subpart to facilitate
identification, and so that the numbering of each subpart can be independent of those that precede it.

NOTE 2: The Contents of each subpart begins on page xxx2, so that the page numbering will be unchanged when
the final International Standard is issued with its IEC-Central-Office-provided cover sheet.

NOTE 3: Part 5-8 (Ed 3.0), Part 5-19 (Ed 2.0) and Part 5-22 (Ed 1.0) are not included since they are circulated
separately (Part 5-8 and Part 5-19 have substantial changes, Part 5-22 is a new part).

NOTE 4: Part 5-1 (Ed 1.0), Part 5-4 (Ed 1.1), Part 5-10 (Ed 2.1), Part 5-11 (Ed 3.0), Part 5-13 (Ed 1.0), Part 5-14
(Ed 2.0), Part 5-15 (Ed 1.1), Part 5-16 (Ed 1.0), Part 5-17 (Ed 1.0), Part 5-18 (Ed 1.0) and Part 5-20
(Ed 1.0) are not included since they are simply reconfirmed, as indicated in 65C/1090/Q, 65C/1097/RQ
and 65C/1111/RR.
IEC 61784-5-2 Ed4.0, Amendment 1, Industrial communication networks - Profiles –
Part 5-2: Installation of fieldbuses – Installation profiles for CPF 2 . 2002

IEC 61784-5-3 Ed4.0, Amendment 1, Industrial communication networks - Profiles –
Part 5-3: Installation of fieldbuses – Installation profiles for CPF 3 . 3002

IEC 61784-5-6 Ed5.0, Industrial communication networks - Profiles –
Part 5-6: Installation of fieldbuses – Installation profiles for CPF 6 . 6002

IEC 61784-5-12 Ed3.0, Industrial communication networks - Profiles –
Part 5-12: Installation of fieldbuses – Installation profiles for CPF 12 . 12002

IEC 61784-5-21 Ed1.0, Amendment 1, Industrial communication networks - Profiles –
Part 5-21: Installation of fieldbuses – Installation profiles for CPF 21 . 21002

oSIST prEN IEC 61784-5-X:2022
– 2002 – IEC CDV 61784-5-2:2018/AMD1
© IEC 2022
1 INTERNATIONAL ELECTROTECHNICAL COMMISSION
2 ____________
4 INDUSTRIAL COMMUNICATION NETWORKS –
5 PROFILES –
7 Part 5-2: Installation of fieldbuses –
8 Installation profiles for CPF 2
10 AMENDMENT 1
12 FOREWORD
13 1) The International Electrotechnical Commission (IEC) is a worldwide organization for standardization comprising
14 all national electrotechnical committees (IEC National Committees). The object of IEC is to promote
15 international co-operation on all questions concerning standardization in the electrical and electronic fields. To
16 this end and in addition to other activities, IEC publishes International Standards, Technical Specifications,
17 Technical Reports, Publicly Available Specifications (PAS) and Guides (hereafter referred to as “IEC
18 Publication(s)”). Their preparation is entrusted to technical committees; any IEC National Committee interested
19 in the subject dealt with may participate in this preparatory work. International, governmental and non-
20 governmental organizations liaising with the IEC also participate in this preparation. IEC collaborates closely
21 with the International Organization for Standardization (ISO) in accordance with conditions determined by
22 agreement between the two organizations.
23 2) The formal decisions or agreements of IEC on technical matters express, as nearly as possible, an international
24 consensus of opinion on the relevant subjects since each technical committee has representation from all
25 interested IEC National Committees.
26 3) IEC Publications have the form of recommendations for international use and are accepted by IEC National
27 Committees in that sense. While all reasonable efforts are made to ensure that the technical content of IEC
28 Publications is accurate, IEC cannot be held responsible for the way in which they are used or for any
29 misinterpretation by any end user.
30 4) In order to promote international uniformity, IEC National Committees undertake to apply IEC Publications
31 transparently to the maximum extent possible in their national and regional publications. Any divergence
32 between any IEC Publication and the corresponding national or regional publication shall be clearly indicated in
33 the latter.
34 5) IEC itself does not provide any attestation of conformity. Independent certification bodies provide conformity
35 assessment services and, in some areas, access to IEC marks of conformity. IEC is not responsible for any
36 services carried out by independent certification bodies.
37 6) All users should ensure that they have the latest edition of this publication.
38 7) No liability shall attach to IEC or its directors, employees, servants or agents including individual experts and
39 members of its technical committees and IEC National Committees for any personal injury, property damage or
40 other damage of any nature whatsoever, whether direct or indirect, or for costs (including legal fees) and
41 expenses arising out of the publication, use of, or reliance upon, this IEC Publication or any other IEC
42 Publications.
43 8) Attention is drawn to the Normative references cited in this publication. Use of the referenced publications is
44 indispensable for the correct application of this publication.
45 9) Attention is drawn to the possibility that some of the elements of this document may be the subject of patent
46 rights. IEC shall not be held responsible for identifying any or all such patent rights.
47 Amendment 1 to IEC 61784-5-2:2018 has been prepared by subcommittee 65C: Industrial
48 networks, of IEC technical committee 65: Industrial-process measurement, control and
49 automation.
50 The text of this Amendment is based on the following documents:
Draft Report on voting
65C/XX/XXXX 65C/XX/XXX
52 Full information on the voting for its approval can be found in the report on voting indicated in
53 the above table.
oSIST prEN IEC 61784-5-X:2022
IEC CDV 61784-5-2:2018/AMD1
© IEC 2022 – 2003 –
54 The language used for the development of this Amendment is English.
55 This document was drafted in accordance with ISO/IEC Directives, Part 2, and developed in
56 accordance with ISO/IEC Directives, Part 1 and ISO/IEC Directives, IEC Supplement,
57 available at www.iec.ch/members_experts/refdocs. The main document types developed by
58 IEC are described in greater detail at www.iec.ch/standardsdev/publications/.
59 A list of all parts of IEC 61784-5 series, under the general title Industrial communications
60 networks – Profiles – Installation of fieldbuses, can be found on the IEC website.
61 The committee has decided that the contents of this document will remain unchanged until the
62 stability date indicated on the IEC website under webstore.iec.ch in the data related to the
63 specific document. At this date, the document will be
64 • reconfirmed,
65 • withdrawn,
66 • replaced by a revised edition, or
67 • amended.
IMPORTANT – The 'colour inside' logo on the cover page of this publication indicates that it
contains colours which are considered to be useful for the correct understanding of its
contents. Users should therefore print this document using a colour printer.
70 ___________
72 INTRODUCTION to Amendment 1
73 This Amendment 1 includes the following significant technical changes with respect to
74 IEC 61784-5-2:2018:
75 a) Update references of IEC 61918:2018 to include additions of IEC 61918:2018/AMD1:—
76 b) Add references for consideration of security to clause B.4.2.2
77 c) Update optical fiber specifications and references in clauses B.4.3.3.2 and B.4.4.1.4
78 d) Add definition of electromagnetic compatibility options for conformance to clause
79 B.4.4.1.2.1
80 e) Add support of mesh bonding systems to clauses B.4.4 and B.5
81 f) Add acceptance of end-to-end link verification and certification testing to clause B.6
oSIST prEN IEC 61784-5-X:2022
– 2004 – IEC CDV 61784-5-2:2018/AMD1
© IEC 2022
85 FOREWORD
86 Replace “This document is to be used in conjunction with IEC 61918:2018” with “This
87 document is to be used in conjunction with IEC 61918:2018 and IEC 61918:2018/AMD1:—”.
88 INTRODUCTION
89 Replace, at the beginning of the second paragraph, “IEC 61918:2018” with “IEC 61918:2018
90 and IEC 61918:2018/AMD1:—”.
91 Replace Figure 1 with the following updated Figure.
93 Figure 1 – Standards relationships
94 1 Scope
95 Replace, in the second paragraph, “IEC 61918:2018” with “IEC 61918:2018 and IEC
96 61918:2018/AMD1:—”.
97 2 Normative references
98 Add the following normative reference:
99 IEC 61918:2018/AMD1:—, Amendment 1 – Industrial communication networks – Installation of
100 communication networks in industrial premises
___________
Under preparation. Stage at the time of publication: IEC/FDIS 61918:2018/AMD1

oSIST prEN IEC 61784-5-X:2022
IEC CDV 61784-5-2:2018/AMD1
© IEC 2022 – 2005 –
101 Replace, in the last sentence, “IEC 61918:2018 Clause 2” with “IEC 61918:2018 Clause 2 and
102 IEC 61918:2018/AMD1:— Clause 2”
103 3 Terms, definitions, and abbreviated terms
104 Replace, in the first sentence, “IEC 61918:2018 Clause 3” with “IEC 61918:2018, Clause 3
105 and IEC 61918:2018/AMD1:—, Clause 3, and the Annexes, Clause 3”
106 6 Conformance to installation profiles
107 Replace the two items in the list following the second paragraph with the following items:
108 “Compliance with IEC 61784-5-2:2018 and IEC 61784-5-2:2018/AMD1:— for CP 2/m
109 or”
110 “Compliance with IEC 61784-5-2 (Ed.4.1:—) for CP 2/m ”.
111 B.2 Normative references
112 Replace “ANSI/TIA-568-C.1” with “ANSI/TIA-568.2-D” (no change to title).
113 B.4.2.2 Security
114 Replace the last paragraph with the following new paragraph:
115 CP 2/2 has provisions for supporting secure system designs aligned with IEC 62443.
116 IEC 62443 breaks down the design of security within a system to security levels based on risk
117 level. For each level there are different measures such as identification and authentication,
118 data access control, tamper detection, data access restriction, data confidentiality, response
119 time, and resource availability. Aspects of the system may need mitigations depending on the
120 level of security risk identified.
121 NOTE See [45] for more information on securing the installation of CP 2/2 systems. See ANSI/TIA 5017 [46] for
122 more information for deterrence or restricted access measures that may be taken for securing the physical
123 infrastructure of zones where it is deemed necessary or appropriate.
124 B.4.3.1.4 Combination of basic topologies
125 Replace “Not applicable” with the following new text and figure:
126 Replacement:
127 Through IEEE 802.1 bridging, CP 2/2 provides for routing of data through active topologies
128 and allows interfacing of all equipment through a hierarchical star topology. This is typically
129 facilitated through a network zone approach where an individual node on a network can be
130 replaced with an entire subnetwork configured in an independent topology such as a ring,
131 active linear bus, redundant active linear bus, or an additional active star. This concept is
132 shown in Figure B.18.
___________
The date should not be used when the edition number is used.

oSIST prEN IEC 61784-5-X:2022
– 2006 – IEC CDV 61784-5-2:2018/AMD1
© IEC 2022
Redundant
Linear
Linear
Star
Ring
Node
134 Figure B.18 – Example of combination of basic active topologies
136 B.4.3.3.2 Network characteristics for optical fibre cabling
137 Replace, in the first row of Ta
...

Questions, Comments and Discussion

Ask us and Technical Secretary will try to provide an answer. You can facilitate discussion about the standard in here.