SIST EN IEC 61784-5-3:2019
(Main)Industrial communication networks - Profiles - Part 5-3: Installation of fieldbuses - Installation profiles for CPF 3 (IEC 61784-5-3:2018)
Industrial communication networks - Profiles - Part 5-3: Installation of fieldbuses - Installation profiles for CPF 3 (IEC 61784-5-3:2018)
This part of IEC 61784-5 specifies the installation profiles for CPF 3 (PROFIBUS/PROFINET)1.
The installation profiles are specified in the annexes. These annexes are read in conjunction
with IEC 61918:2018.
Industrielle Kommunikationsnetze - Profile - Teil 5-3: Feldbusinstallation - Installationsprofile für die Kommunikationsprofilfamilie 3 (IEC 61784-5-3:2018)
Réseaux de communication industriels - Profils - Partie 5-3: Installation des bus de terrain - Profils d'installation pour CPF 3 (IEC 61784-5-3:2018)
L’IEC 61784-5-3:2018 spécifie les profils d’installation pour la CPF 3 (PROFIBUS/PROFINET) .
Les profils d'installation spécifiques sont donnés dans les annexes. Ces annexes sont utilisées conjointement avec l’IEC 61918:2018.
Industrijska komunikacijska omrežja - Profili - 5-3. del: Inštalacija procesnih vodil - Inštalacijski profili za CPF 3 (IEC 61784-5-3:2018)
Ta del standarda IEC 61784-5 določa inštalacijske profile za CPF 3 (PROFIBUS/PROFINET)1. Inštalacijski profili so navedeni v dodatkih. Ti dodatki se navezujejo na standard IEC 61918:2018.
General Information
Relations
Standards Content (Sample)
SLOVENSKI STANDARD
SIST EN IEC 61784-5-3:2019
01-februar-2019
Nadomešča:
SIST EN 61784-5-3:2014
Industrijska komunikacijska omrežja - Profili - 5-3. del: Inštalacija procesnih vodil -
Inštalacijski profili za CPF 3 (IEC 61784-5-3:2018)
Industrial communication networks - Profiles - Part 5-3: Installation of fieldbuses -
Installation profiles for CPF 3 (IEC 61784-5-3:2018)
Industrielle Kommunikationsnetze - Profile - Teil 5-3: Feldbusinstallation -
Installationsprofile für die Kommunikationsprofilfamilie 3 (IEC 61784-5-3:2018)
Réseaux de communication industriels - Profils - Partie 5-3: Installation des bus de
terrain - Profils d'installation pour CPF 3 (IEC 61784-5-3:2018)
Ta slovenski standard je istoveten z: EN IEC 61784-5-3:2018
ICS:
25.040.40 Merjenje in krmiljenje Industrial process
industrijskih postopkov measurement and control
35.100.40 Transportni sloj Transport layer
SIST EN IEC 61784-5-3:2019 en,fr,de
2003-01.Slovenski inštitut za standardizacijo. Razmnoževanje celote ali delov tega standarda ni dovoljeno.
---------------------- Page: 1 ----------------------
SIST EN IEC 61784-5-3:2019
---------------------- Page: 2 ----------------------
SIST EN IEC 61784-5-3:2019
EUROPEAN STANDARD EN IEC 61784-5-3
NORME EUROPÉENNE
EUROPÄISCHE NORM
November 2018
ICS 25.040.40; 35.100.40 Supersedes EN 61784-5-3:2013
English Version
Industrial communication networks - Profiles - Part 5-3:
Installation of fieldbuses - Installation profiles for CPF 3
(IEC 61784-5-3:2018)
Réseaux de communication industriels - Profils - Partie 5-3: Industrielle Kommunikationsnetze - Profile - Teil 5-3:
Installation des bus de terrain - Profils d'installation pour Feldbusinstallation - Installationsprofile für die
CPF 3 Kommunikationsprofilfamilie 3
(IEC 61784-5-3:2018) (IEC 61784-5-3:2018)
This European Standard was approved by CENELEC on 2018-10-04. CENELEC members are bound to comply with the CEN/CENELEC
Internal Regulations which stipulate the conditions for giving this European Standard the status of a national standard without any alteration.
Up-to-date lists and bibliographical references concerning such national standards may be obtained on application to the CEN-CENELEC
Management Centre or to any CENELEC member.
This European Standard exists in three official versions (English, French, German). A version in any other language made by translation
under the responsibility of a CENELEC member into its own language and notified to the CEN-CENELEC Management Centre has the
same status as the official versions.
CENELEC members are the national electrotechnical committees of Austria, Belgium, Bulgaria, Croatia, Cyprus, the Czech Republic,
Denmark, Estonia, Finland, Former Yugoslav Republic of Macedonia, France, Germany, Greece, Hungary, Iceland, Ireland, Italy, Latvia,
Lithuania, Luxembourg, Malta, the Netherlands, Norway, Poland, Portugal, Romania, Serbia, Slovakia, Slovenia, Spain, Sweden,
Switzerland, Turkey and the United Kingdom.
European Committee for Electrotechnical Standardization
Comité Européen de Normalisation Electrotechnique
Europäisches Komitee für Elektrotechnische Normung
CEN-CENELEC Management Centre: Rue de la Science 23, B-1040 Brussels
© 2018 CENELEC All rights of exploitation in any form and by any means reserved worldwide for CENELEC Members.
Ref. No. EN IEC 61784-5-3:2018 E
---------------------- Page: 3 ----------------------
SIST EN IEC 61784-5-3:2019
EN IEC 61784-5-3:2018 (E)
European foreword
The text of document 65C/924/FDIS, future edition 4 of IEC 61784-5-3, prepared by SC 65C
"Industrial networks" of IEC/TC 65 "Industrial-process measurement, control and automation" was
submitted to the IEC-CENELEC parallel vote and approved by CENELEC as EN IEC 61784-5-3:2018.
The following dates are fixed:
• latest date by which the document has to be implemented at national (dop) 2019-07-04
level by publication of an identical national standard or by endorsement
• latest date by which the national standards conflicting with the (dow) 2021-10-04
document have to be withdrawn
Attention is drawn to the possibility that some of the elements of this document may be the subject of
patent rights. CENELEC shall not be held responsible for identifying any or all such patent rights.
Endorsement notice
The text of the International Standard IEC 61784-5-3:2018 was approved by CENELEC as a
European Standard without any modification.
2
---------------------- Page: 4 ----------------------
SIST EN IEC 61784-5-3:2019
EN IEC 61784-5-3:2018 (E)
Annex ZA
(normative)
Normative references to international publications
with their corresponding European publications
The following documents are referred to in the text in such a way that some or all of their content
constitutes requirements of this document. For dated references, only the edition cited applies. For
undated references, the latest edition of the referenced document (including any amendments)
applies.
NOTE 1 Where an International Publication has been modified by common modifications, indicated by (mod), the relevant
EN/HD applies.
NOTE 2 Up-to-date information on the latest versions of the European Standards listed in this annex is available here:
www.cenelec.eu.
Publication Year Title EN/HD Year
IEC 61918 2018 Industrial communication networks - Installation of EN IEC 61918 2018
communication networks in industrial premises
3
---------------------- Page: 5 ----------------------
SIST EN IEC 61784-5-3:2019
---------------------- Page: 6 ----------------------
SIST EN IEC 61784-5-3:2019
IEC 61784-5-3
®
Edition 4.0 2018-08
INTERNATIONAL
STANDARD
colour
inside
Industrial communication networks – Profiles –
Part 5-3: Installation of fieldbuses – Installation profiles for CPF 3
INTERNATIONAL
ELECTROTECHNICAL
COMMISSION
ICS 25.040.40; 35.100.40 ISBN 978-2-8322-5939-9
Warning! Make sure that you obtained this publication from an authorized distributor.
® Registered trademark of the International Electrotechnical Commission
---------------------- Page: 7 ----------------------
SIST EN IEC 61784-5-3:2019
– 2 – IEC 61784-5-3:2018 IEC 2018
CONTENTS
FOREWORD . 7
INTRODUCTION . 9
1 Scope . 10
2 Normative references . 10
3 Terms, definitions and abbreviated terms . 10
4 CPF 3: Overview of installation profiles . 10
5 Installation profile conventions . 11
6 Conformance to installation profiles . 11
Annex A (normative) CP 3/1 (PROFIBUS) specific installation profile . 13
A.1 Installation profile scope . 13
A.2 Normative references . 13
A.3 Installation profile terms, definitions, and abbreviated terms . 13
A.3.1 Terms and definitions. 13
A.3.2 Abbreviated terms . 14
A.3.3 Conventions for installation profiles . 14
A.4 Installation planning . 14
A.4.1 General . 14
A.4.2 Planning requirements . 14
A.4.3 Network capabilities . 16
A.4.4 Selection and use of cabling components . 18
A.4.5 Cabling planning documentation . 28
A.4.6 Verification of cabling planning specification . 28
A.5 Installation implementation . 28
A.5.1 General requirements . 28
A.5.2 Cable installation . 28
A.5.3 Connector installation . 30
A.5.4 Terminator installation . 34
A.5.5 Device installation . 34
A.5.6 Coding and labelling . 34
A.5.7 Earthing and bonding of equipment and device and shielded cabling . 35
A.5.8 As-implemented cabling documentation . 36
A.6 Installation verification and installation acceptance test . 36
A.6.1 General . 36
A.6.2 Installation verification . 36
A.6.3 Installation acceptance test . 38
A.7 Installation administration . 43
A.8 Installation maintenance and installation troubleshooting . 43
Annex B (normative) CP 3/2 (PROFIBUS) specific installation profile . 44
B.1 Installation profile scope . 44
B.2 Normative references . 44
B.3 Installation profile terms, definitions, and abbreviated terms . 44
B.3.1 Terms and definitions. 44
B.3.2 Abbreviated terms . 45
B.3.3 Conventions for installation profiles . 45
---------------------- Page: 8 ----------------------
SIST EN IEC 61784-5-3:2019
IEC 61784-5-3:2018 IEC 2018 – 3 –
B.4 Installation planning . 46
B.4.1 General . 46
B.4.2 Planning requirements . 47
B.4.3 Network capabilities . 54
B.4.4 Selection and use of cabling components . 60
B.4.5 Cabling planning documentation . 75
B.4.6 Verification of cabling planning specification . 75
B.5 Installation implementation . 75
B.5.1 General requirements . 75
B.5.2 Cable installation . 75
B.5.3 Connector installation . 76
B.5.4 Terminator installation . 77
B.5.5 Device installation . 77
B.5.6 Coding and labelling . 77
B.5.7 Earthing and bonding of equipment and device and shielded cabling . 77
B.5.8 As-implemented cabling documentation . 77
B.6 Installation verification and installation acceptance test . 77
B.6.1 General . 77
B.6.2 Installation verification . 78
B.6.3 Installation acceptance test . 78
B.7 Installation administration . 79
B.8 Installation maintenance and installation troubleshooting . 79
Annex C (normative) CP 3/3, CP 3/4, CP 3/5, CP 3/6 (PROFINET) specific installation
profile . 80
C.1 Installation profile scope . 80
C.2 Normative references . 80
C.3 Installation profile terms, definitions, and abbreviated terms . 80
C.3.1 Terms and definitions. 80
C.3.2 Abbreviated terms . 80
C.3.3 Conventions for installation profiles . 80
C.4 Installation planning . 81
C.4.1 General . 81
C.4.2 Planning requirements . 81
C.4.3 Network capabilities . 81
C.4.4 Selection and use of cabling components . 84
C.4.5 Cabling planning documentation . 106
C.4.6 Verification of cabling planning specification . 106
C.5 Installation implementation . 106
C.5.1 General requirements . 106
C.5.2 Cable installation . 106
C.5.3 Connector installation . 108
C.5.4 Terminator installation . 110
C.5.5 Device installation . 110
C.5.6 Coding and labelling . 110
C.5.7 Earthing and bonding of equipment and device and shielded cabling . 111
C.5.8 As-implemented cabling documentation . 112
C.6 Installation verification and installation acceptance test . 112
C.6.1 General . 112
---------------------- Page: 9 ----------------------
SIST EN IEC 61784-5-3:2019
– 4 – IEC 61784-5-3:2018 IEC 2018
C.6.2 Installation verification . 112
C.6.3 Installation acceptance test . 113
C.7 Installation administration . 114
C.8 Installation maintenance and installation troubleshooting . 114
Bibliography . 115
Figure 1 – Standards relationships . 9
Figure A.1 – Recommended combination of shielding and earthing for CP 3/1
networks with RS 485-IS . 26
Figure A.2 – Sub-D connector pin numberings (front view) . 31
Figure A.3 – 5-pin M12 female socket . 32
Figure A.4 – 5-pin M12 male plug for CP 3/1 . 33
Figure A.5 – Test circuit A – Resistance measurement of data line B and shield . 39
Figure A.6 – Test circuit B – Resistance measurement of data line A and shield . 39
Figure A.7 – Test circuit C – Resistance measurement of data line A, data line B, and
shield . 39
Figure A.8 – Test circuit D – Resistance measurement between data line A and B. 40
Figure A.9 – Resistance measurement without 9-pin Sub-D plug . 40
Figure A.10 – Loop core resistance (cable type A) . 41
Figure A.11 – Action and resolution tree for measurement 1 (RS 485 and RS 485-IS) . 41
Figure A.12 – Action and resolution tree for measurement 2 (RS 485 and RS 485-IS) . 42
Figure A.13 – Action and resolution tree for measurement 3 (RS 485 and RS 485-IS) . 42
Figure B.1 – Connection of CP 3/1 networks . 47
Figure B.2 – Typical fieldbus architecture . 50
Figure B.3 – Fieldbus with stations supplied by auxiliary power sources . 50
Figure B.4 – Fieldbus model . 53
Figure B.5 – Current modulation (Manchester II code) . 53
Figure B.6 – Tree topology . 55
Figure B.7 – Bus topology . 55
Figure B.8 – Combination of the tree topology and the bus topology . 56
Figure B.9 – Fieldbus extension . 56
Figure B.10 – Recommended combination of shielding and earthing . 70
Figure B.11 – Ideal combination of shielding and earthing . 71
Figure B.12 – Capacitive earthing . 72
Figure B.13 – Galvanic isolated field device . 73
Figure B.14 – Pin assignment of the male and female connectors IEC 60947-5-2 (A-
coding) . 77
Figure C.1 – Definition of End-to-end link. 101
Figure C.2 – End-to-end link without interconnections . 101
Figure C.3 – Assembled End-to-end link . 101
Figure C.4 – Connectionless optical fibre link . 102
Figure C.5 – Assembled optical fibre link . 102
Figure C.6 – Shielded connectors for CP 3/3, CP 3/4, CP 3/5 and CP 3/6 fieldbus
networks . 108
Figure C.7 – Pin-assignment for a straight cable . 109
---------------------- Page: 10 ----------------------
SIST EN IEC 61784-5-3:2019
IEC 61784-5-3:2018 IEC 2018 – 5 –
Table A.1 – Excerpt of MICE definition . 16
Table A.2 – Basic network characteristics for balanced cabling not based on Ethernet
(ISO/IEC 8802-3) . 17
Table A.3 – Network characteristics for optical fibre cabling . 18
Table A.4 – Information relevant to copper cable: fixed cables . 19
Table A.5 – Information relevant to optical fibre cables . 20
Table A.6 – Connectors for copper cabling CPs not based on Ethernet . 21
Table A.7 – Optical fibre connecting hardware . 21
Table A.8 – Relationship between FOC and fibre types (CP 3/1) . 21
Table A.9 – Parameters for balanced cables . 29
Table A.10 – Parameters for silica optical fibre cables . 29
Table A.11 – Parameters for POF optical fibre cables . 29
Table A.12 – Parameters for hard clad silica optical fibre cables . 30
Table A.13 – Use of 9 pin Sub-D connector pins (RS 485) . 31
Table A.14 – Use of 9 pin Sub-D connector pins (RS 485-IS) . 32
Table A.15 – Use of M12 connector pins (RS 485) . 33
Table A.16 – Use of M12 connector pins (RS 485-IS) . 34
Table A.17 – Maximum fibre channel attenuation for CP 3/1 (PROFIBUS) . 43
Table B.1 – Valid parameter range of the FISCO model for use as EEx ib IIC / IIB . 51
Table B.2 – Valid parameter range of the FISCO model for use as EEx ia IIC . 52
Table B.3 – Power supply (operational values) . 58
Table B.4 – Line lengths which can be achieved . 58
Table B.5 – Limit values for distortion, reflection and signal delay. 59
Table B.6 – Recommended maximum cable lengths including spurs . 59
Table B.7 – Recommended length of the spurs . 60
Table B.8 – Maximum length of the splices . 60
Table B.9 – Information relevant to copper cable: fixed cables . 61
Table B.10 – Safety limit values for the fieldbus cable . 62
Table B.11 – Connectors for copper cabling CPs not based on Ethernet . 63
Table B.12 – Mixing devices from different categories . 65
Table B.13 – Electrical characteristics of fieldbus interfaces . 66
Table B.14 – Recommended data sheet specifications for CP 3/2 devices . 67
Table B.15 – Parameters for balanced cables . 75
Table B.16 – Contact assignments for the external connector for harsh industrial
environments . 76
Table C.1 – General transmission media selection information . 82
Table C.2 – Network characteristics for balanced cabling based on Ethernet
(ISO/IEC 8802-3) . 83
Table C.3 – Network characteristics for optical fibre cabling . 83
Table C.4 – Information relevant to copper cable: CP 3/3, CP 3/4, CP 3/5 and CP 3/6
type A fixed cables . 85
Table C.5 – Information relevant to copper cable: CP 3/3, CP 3/4, CP 3/5 and CP 3/6
type B flexible cables . 86
---------------------- Page: 11 ----------------------
SIST EN IEC 61784-5-3:2019
– 6 – IEC 61784-5-3:2018 IEC 2018
Table C.6 – Information relevant to copper cable: CP 3/3, CP 3/4, CP 3/5 and CP 3/6
type C special cables . 87
Table C.7 – Information relevant to copper cable: CP 3/3, CP 3/4, CP 3/5 and CP 3/6
of cabinet cord sets . 88
Table C.8 – Requirement data cable inside and outside cabinet: CP 3/3, CP 3/4,
CP 3/5 and CP 3/6 type B flexible cables . 89
Table C.9 – Requirement to copper cable inside and outside cabinet: CP 3/3, CP 3/4,
CP 3/5 and CP 3/6 type B flexible cables . 90
Table C.10 – Information relevant to optical fibre cables . 91
Table C.11 – Requirements for plastic and hard clad silica optical fibre cables . 91
Table C.12 – Requirements for glass multimode optical fibre cables . 93
Table C.13 – Requirements for glass singlemode optical fibre cables . 94
Table C.14 – Requirements of industrial FO-cord sets . 95
Table C.15 – Standard of test of industrial FO-cord sets . 96
Table C.16 – Information relevant to hybrid cables (application type B) . 96
Table C.17 – Information relevant to hybrid cables (application type C) . 97
Table C.18 – Connectors for balanced cabling CPs based on Ethernet .
...
SLOVENSKI STANDARD
SIST EN 61784-5-3:2019
01-februar-2019
1DGRPHãþD
SIST EN 61784-5-3:2014
Industrijska komunikacijska omrežja - Profili - 5-3. del: Inštalacija procesnih vodil -
Inštalacijski profili za CPF 3 (IEC 61784-5-3:2018)
Industrial communication networks - Profiles - Part 5-3: Installation of fieldbuses -
Installation profiles for CPF 3 (IEC 61784-5-3:2018)
Industrielle Kommunikationsnetze - Profile - Teil 5-3: Feldbusinstallation -
Installationsprofile für die Kommunikationsprofilfamilie 3 (IEC 61784-5-3:2018)
Réseaux de communication industriels - Profils - Partie 5-3: Installation des bus de
terrain - Profils d'installation pour CPF 3 (IEC 61784-5-3:2018)
Ta slovenski standard je istoveten z: EN IEC 61784-5-3:2018
ICS:
25.040.40 Merjenje in krmiljenje Industrial process
industrijskih postopkov measurement and control
35.100.40 Transportni sloj Transport layer
SIST EN 61784-5-3:2019 en,fr,de
2003-01.Slovenski inštitut za standardizacijo. Razmnoževanje celote ali delov tega standarda ni dovoljeno.
---------------------- Page: 1 ----------------------
SIST EN 61784-5-3:2019
---------------------- Page: 2 ----------------------
SIST EN 61784-5-3:2019
EUROPEAN STANDARD EN IEC 61784-5-3
NORME EUROPÉENNE
EUROPÄISCHE NORM
November 2018
ICS 25.040.40; 35.100.40
English Version
Industrial communication networks - Profiles - Part 5-3:
Installation of fieldbuses - Installation profiles for CPF 3
(IEC 61784-5-3:2018)
Réseaux de communication industriels - Profils - Partie 5-3: Industrielle Kommunikationsnetze - Profile - Teil 5-3:
Installation des bus de terrain - Profils d'installation pour Feldbusinstallation - Installationsprofile für die
CPF 3 Kommunikationsprofilfamilie 3
(IEC 61784-5-3:2018) (IEC 61784-5-3:2018)
This European Standard was approved by CENELEC on 2018-10-04. CENELEC members are bound to comply with the CEN/CENELEC
Internal Regulations which stipulate the conditions for giving this European Standard the status of a national standard without any alteration.
Up-to-date lists and bibliographical references concerning such national standards may be obtained on application to the CEN-CENELEC
Management Centre or to any CENELEC member.
This European Standard exists in three official versions (English, French, German). A version in any other language made by translation
under the responsibility of a CENELEC member into its own language and notified to the CEN-CENELEC Management Centre has the
same status as the official versions.
CENELEC members are the national electrotechnical committees of Austria, Belgium, Bulgaria, Croatia, Cyprus, the Czech Republic,
Denmark, Estonia, Finland, Former Yugoslav Republic of Macedonia, France, Germany, Greece, Hungary, Iceland, Ireland, Italy, Latvia,
Lithuania, Luxembourg, Malta, the Netherlands, Norway, Poland, Portugal, Romania, Serbia, Slovakia, Slovenia, Spain, Sweden,
Switzerland, Turkey and the United Kingdom.
European Committee for Electrotechnical Standardization
Comité Européen de Normalisation Electrotechnique
Europäisches Komitee für Elektrotechnische Normung
CEN-CENELEC Management Centre: Rue de la Science 23, B-1040 Brussels
© 2018 CENELEC All rights of exploitation in any form and by any means reserved worldwide for CENELEC Members.
Ref. No. EN IEC 61784-5-3:2018 E
---------------------- Page: 3 ----------------------
SIST EN 61784-5-3:2019
EN IEC 61784-5-3:2018 (E)
European foreword
The text of document 65C/924/FDIS, future edition 4 of IEC 61784-5-3, prepared by SC 65C
"Industrial networks" of IEC/TC 65 "Industrial-process measurement, control and automation" was
submitted to the IEC-CENELEC parallel vote and approved by CENELEC as EN IEC 61784-5-3:2018.
The following dates are fixed:
• latest date by which the document has to be implemented at national (dop) 2019-07-04
level by publication of an identical national standard or by endorsement
• latest date by which the national standards conflicting with the (dow) 2021-10-04
document have to be withdrawn
Attention is drawn to the possibility that some of the elements of this document may be the subject of
patent rights. CENELEC shall not be held responsible for identifying any or all such patent rights.
Endorsement notice
The text of the International Standard IEC 61784-5-3:2018 was approved by CENELEC as a
European Standard without any modification.
2
---------------------- Page: 4 ----------------------
SIST EN 61784-5-3:2019
EN IEC 61784-5-3:2018 (E)
Annex ZA
(normative)
Normative references to international publications
with their corresponding European publications
The following documents are referred to in the text in such a way that some or all of their content
constitutes requirements of this document. For dated references, only the edition cited applies. For
undated references, the latest edition of the referenced document (including any amendments)
applies.
NOTE 1 Where an International Publication has been modified by common modifications, indicated by (mod), the relevant
EN/HD applies.
NOTE 2 Up-to-date information on the latest versions of the European Standards listed in this annex is available here:
www.cenelec.eu.
Publication Year Title EN/HD Year
IEC 61918 2018 Industrial communication networks - Installation of EN IEC 61918 2018
communication networks in industrial premises
3
---------------------- Page: 5 ----------------------
SIST EN 61784-5-3:2019
---------------------- Page: 6 ----------------------
SIST EN 61784-5-3:2019
IEC 61784-5-3
®
Edition 4.0 2018-08
INTERNATIONAL
STANDARD
colour
inside
Industrial communication networks – Profiles –
Part 5-3: Installation of fieldbuses – Installation profiles for CPF 3
INTERNATIONAL
ELECTROTECHNICAL
COMMISSION
ICS 25.040.40; 35.100.40 ISBN 978-2-8322-5939-9
Warning! Make sure that you obtained this publication from an authorized distributor.
® Registered trademark of the International Electrotechnical Commission
---------------------- Page: 7 ----------------------
SIST EN 61784-5-3:2019
– 2 – IEC 61784-5-3:2018 IEC 2018
CONTENTS
FOREWORD . 7
INTRODUCTION . 9
1 Scope . 10
2 Normative references . 10
3 Terms, definitions and abbreviated terms . 10
4 CPF 3: Overview of installation profiles . 10
5 Installation profile conventions . 11
6 Conformance to installation profiles . 11
Annex A (normative) CP 3/1 (PROFIBUS) specific installation profile . 13
A.1 Installation profile scope . 13
A.2 Normative references . 13
A.3 Installation profile terms, definitions, and abbreviated terms . 13
A.3.1 Terms and definitions. 13
A.3.2 Abbreviated terms . 14
A.3.3 Conventions for installation profiles . 14
A.4 Installation planning . 14
A.4.1 General . 14
A.4.2 Planning requirements . 14
A.4.3 Network capabilities . 16
A.4.4 Selection and use of cabling components . 18
A.4.5 Cabling planning documentation . 28
A.4.6 Verification of cabling planning specification . 28
A.5 Installation implementation . 28
A.5.1 General requirements . 28
A.5.2 Cable installation . 28
A.5.3 Connector installation . 30
A.5.4 Terminator installation . 34
A.5.5 Device installation . 34
A.5.6 Coding and labelling . 34
A.5.7 Earthing and bonding of equipment and device and shielded cabling . 35
A.5.8 As-implemented cabling documentation . 36
A.6 Installation verification and installation acceptance test . 36
A.6.1 General . 36
A.6.2 Installation verification . 36
A.6.3 Installation acceptance test . 38
A.7 Installation administration . 43
A.8 Installation maintenance and installation troubleshooting . 43
Annex B (normative) CP 3/2 (PROFIBUS) specific installation profile . 44
B.1 Installation profile scope . 44
B.2 Normative references . 44
B.3 Installation profile terms, definitions, and abbreviated terms . 44
B.3.1 Terms and definitions. 44
B.3.2 Abbreviated terms . 45
B.3.3 Conventions for installation profiles . 45
---------------------- Page: 8 ----------------------
SIST EN 61784-5-3:2019
IEC 61784-5-3:2018 IEC 2018 – 3 –
B.4 Installation planning . 46
B.4.1 General . 46
B.4.2 Planning requirements . 47
B.4.3 Network capabilities . 54
B.4.4 Selection and use of cabling components . 60
B.4.5 Cabling planning documentation . 75
B.4.6 Verification of cabling planning specification . 75
B.5 Installation implementation . 75
B.5.1 General requirements . 75
B.5.2 Cable installation . 75
B.5.3 Connector installation . 76
B.5.4 Terminator installation . 77
B.5.5 Device installation . 77
B.5.6 Coding and labelling . 77
B.5.7 Earthing and bonding of equipment and device and shielded cabling . 77
B.5.8 As-implemented cabling documentation . 77
B.6 Installation verification and installation acceptance test . 77
B.6.1 General . 77
B.6.2 Installation verification . 78
B.6.3 Installation acceptance test . 78
B.7 Installation administration . 79
B.8 Installation maintenance and installation troubleshooting . 79
Annex C (normative) CP 3/3, CP 3/4, CP 3/5, CP 3/6 (PROFINET) specific installation
profile . 80
C.1 Installation profile scope . 80
C.2 Normative references . 80
C.3 Installation profile terms, definitions, and abbreviated terms . 80
C.3.1 Terms and definitions. 80
C.3.2 Abbreviated terms . 80
C.3.3 Conventions for installation profiles . 80
C.4 Installation planning . 81
C.4.1 General . 81
C.4.2 Planning requirements . 81
C.4.3 Network capabilities . 81
C.4.4 Selection and use of cabling components . 84
C.4.5 Cabling planning documentation . 106
C.4.6 Verification of cabling planning specification . 106
C.5 Installation implementation . 106
C.5.1 General requirements . 106
C.5.2 Cable installation . 106
C.5.3 Connector installation . 108
C.5.4 Terminator installation . 110
C.5.5 Device installation . 110
C.5.6 Coding and labelling . 110
C.5.7 Earthing and bonding of equipment and device and shielded cabling . 111
C.5.8 As-implemented cabling documentation . 112
C.6 Installation verification and installation acceptance test . 112
C.6.1 General . 112
---------------------- Page: 9 ----------------------
SIST EN 61784-5-3:2019
– 4 – IEC 61784-5-3:2018 IEC 2018
C.6.2 Installation verification . 112
C.6.3 Installation acceptance test . 113
C.7 Installation administration . 114
C.8 Installation maintenance and installation troubleshooting . 114
Bibliography . 115
Figure 1 – Standards relationships . 9
Figure A.1 – Recommended combination of shielding and earthing for CP 3/1
networks with RS 485-IS . 26
Figure A.2 – Sub-D connector pin numberings (front view) . 31
Figure A.3 – 5-pin M12 female socket . 32
Figure A.4 – 5-pin M12 male plug for CP 3/1 . 33
Figure A.5 – Test circuit A – Resistance measurement of data line B and shield . 39
Figure A.6 – Test circuit B – Resistance measurement of data line A and shield . 39
Figure A.7 – Test circuit C – Resistance measurement of data line A, data line B, and
shield . 39
Figure A.8 – Test circuit D – Resistance measurement between data line A and B. 40
Figure A.9 – Resistance measurement without 9-pin Sub-D plug . 40
Figure A.10 – Loop core resistance (cable type A) . 41
Figure A.11 – Action and resolution tree for measurement 1 (RS 485 and RS 485-IS) . 41
Figure A.12 – Action and resolution tree for measurement 2 (RS 485 and RS 485-IS) . 42
Figure A.13 – Action and resolution tree for measurement 3 (RS 485 and RS 485-IS) . 42
Figure B.1 – Connection of CP 3/1 networks . 47
Figure B.2 – Typical fieldbus architecture . 50
Figure B.3 – Fieldbus with stations supplied by auxiliary power sources . 50
Figure B.4 – Fieldbus model . 53
Figure B.5 – Current modulation (Manchester II code) . 53
Figure B.6 – Tree topology . 55
Figure B.7 – Bus topology . 55
Figure B.8 – Combination of the tree topology and the bus topology . 56
Figure B.9 – Fieldbus extension . 56
Figure B.10 – Recommended combination of shielding and earthing . 70
Figure B.11 – Ideal combination of shielding and earthing . 71
Figure B.12 – Capacitive earthing . 72
Figure B.13 – Galvanic isolated field device . 73
Figure B.14 – Pin assignment of the male and female connectors IEC 60947-5-2 (A-
coding) . 77
Figure C.1 – Definition of End-to-end link. 101
Figure C.2 – End-to-end link without interconnections . 101
Figure C.3 – Assembled End-to-end link . 101
Figure C.4 – Connectionless optical fibre link . 102
Figure C.5 – Assembled optical fibre link . 102
Figure C.6 – Shielded connectors for CP 3/3, CP 3/4, CP 3/5 and CP 3/6 fieldbus
networks . 108
Figure C.7 – Pin-assignment for a straight cable . 109
---------------------- Page: 10 ----------------------
SIST EN 61784-5-3:2019
IEC 61784-5-3:2018 IEC 2018 – 5 –
Table A.1 – Excerpt of MICE definition . 16
Table A.2 – Basic network characteristics for balanced cabling not based on Ethernet
(ISO/IEC 8802-3) . 17
Table A.3 – Network characteristics for optical fibre cabling . 18
Table A.4 – Information relevant to copper cable: fixed cables . 19
Table A.5 – Information relevant to optical fibre cables . 20
Table A.6 – Connectors for copper cabling CPs not based on Ethernet . 21
Table A.7 – Optical fibre connecting hardware . 21
Table A.8 – Relationship between FOC and fibre types (CP 3/1) . 21
Table A.9 – Parameters for balanced cables . 29
Table A.10 – Parameters for silica optical fibre cables . 29
Table A.11 – Parameters for POF optical fibre cables . 29
Table A.12 – Parameters for hard clad silica optical fibre cables . 30
Table A.13 – Use of 9 pin Sub-D connector pins (RS 485) . 31
Table A.14 – Use of 9 pin Sub-D connector pins (RS 485-IS) . 32
Table A.15 – Use of M12 connector pins (RS 485) . 33
Table A.16 – Use of M12 connector pins (RS 485-IS) . 34
Table A.17 – Maximum fibre channel attenuation for CP 3/1 (PROFIBUS) . 43
Table B.1 – Valid parameter range of the FISCO model for use as EEx ib IIC / IIB . 51
Table B.2 – Valid parameter range of the FISCO model for use as EEx ia IIC . 52
Table B.3 – Power supply (operational values) . 58
Table B.4 – Line lengths which can be achieved . 58
Table B.5 – Limit values for distortion, reflection and signal delay. 59
Table B.6 – Recommended maximum cable lengths including spurs . 59
Table B.7 – Recommended length of the spurs . 60
Table B.8 – Maximum length of the splices . 60
Table B.9 – Information relevant to copper cable: fixed cables . 61
Table B.10 – Safety limit values for the fieldbus cable . 62
Table B.11 – Connectors for copper cabling CPs not based on Ethernet . 63
Table B.12 – Mixing devices from different categories . 65
Table B.13 – Electrical characteristics of fieldbus interfaces . 66
Table B.14 – Recommended data sheet specifications for CP 3/2 devices . 67
Table B.15 – Parameters for balanced cables . 75
Table B.16 – Contact assignments for the external connector for harsh industrial
environments . 76
Table C.1 – General transmission media selection information . 82
Table C.2 – Network characteristics for balanced cabling based on Ethernet
(ISO/IEC 8802-3) . 83
Table C.3 – Network characteristics for optical fibre cabling . 83
Table C.4 – Information relevant to copper cable: CP 3/3, CP 3/4, CP 3/5 and CP 3/6
type A fixed cables . 85
Table C.5 – Information relevant to copper cable: CP 3/3, CP 3/4, CP 3/5 and CP 3/6
type B flexible cables . 86
---------------------- Page: 11 ----------------------
SIST EN 61784-5-3:2019
– 6 – IEC 61784-5-3:2018 IEC 2018
Table C.6 – Information relevant to copper cable: CP 3/3, CP 3/4, CP 3/5 and CP 3/6
type C special cables . 87
Table C.7 – Information relevant to copper cable: CP 3/3, CP 3/4, CP 3/5 and CP 3/6
of cabinet cord sets . 88
Table C.8 – Requirement data cable inside and outside cabinet: CP 3/3, CP 3/4,
CP 3/5 and CP 3/6 type B flexible cables . 89
Table C.9 – Requirement to copper cable inside and outside cabinet: CP 3/3, CP 3/4,
CP 3/5 and CP 3/6 type B flexible cables . 90
Table C.10 – Information relevant to optical fibre cables . 91
Table C.11 – Requirements for plastic and hard clad silica optical fibre cables . 91
Table C.12 – Requirements for glass multimode optical fibre cables . 93
Table C.13 – Requirements for glass singlemode optical fibre cables . 94
Table C.14 – Requirements of industrial FO-cord sets . 95
Table C.15 – Standard of test of industrial FO-cord sets . 96
Table C.16 – Information relevant to hybrid cables (application type B) . 96
Table C.17 – Information relevant to hybrid cables (application type C) . 97
Table C.18 – Connectors for balanced cabling CPs based on Ethernet . 99
Table C.19 – Connectors
...
Questions, Comments and Discussion
Ask us and Technical Secretary will try to provide an answer. You can facilitate discussion about the standard in here.