Industrial communication networks - Profiles - Part 5-2: Installation of fieldbuses - Installation profiles for CPF 2 (IEC 61784-5-2:2018)

This part of IEC 61784-5 specifies the installation profiles for CPF 2 (CIP™1).
The installation profiles are specified in the annexes. These annexes are read in conjunction with IEC 61918:2018.

Industrielle Kommunikationsnetze - Profile - Teil 5-2: Feldbusinstallation - Installationsprofile für die Kommunikationsprofilfamilie 2 (IEC 61784-5-2:2018)

Réseaux de communication industriels - Profils - Partie 5-2 : Installation des bus de terrain - Profils d'installation pour CPF 2 (IEC 61784-5-2:2018)

L‘IEC 61784-5-2:2018 spécifie les profils d'installation pour le CPF 2 (CIP™ ). La présente contribution contient un certain nombre de fichiers associés couvrant les profils de communication à utiliser conjointement avec la CEI 61918. Les documents de profil d'installation contenus ci-joint fournissent les profils d'installation des profils de communication (CP) d'une famille de profils de communication (CPF) spécifique en indiquant quelles exigences de la CEI 61918 s'appliquent pleinement et, le cas échéant, en complétant, modifiant ou remplaçant les autres exigences. Les profils d'installation sont spécifiés dans les annexes. Ces annexes sont lues conjointement avec la CEI 61918. Cette quatrième édition annule et remplace la troisième édition publiée en 2013. Cette édition constitue une révision technique.
Cette édition comprend les modifications techniques significatives suivantes par rapport à l'édition précédente :
a) les références à l'ISO/IEC 24702 ont été remplacées par des références à l'ISO/IEC 11801-3 dans le Tableau B.1 ;
b) des erreurs ont été corrigées ;
c) Les Tableaux B11 et B13 ont été ajoutés pour prendre en charge l'Ethernet à 4 paires de 1,000 Mb/s ;
d) Clarification des alimentations doubles pour l'Annexe C.

Industrijska komunikacijska omrežja - Profili - 5-2. del: Inštalacija procesnih vodil - Inštalacijski profili za CPF 2 (IEC 61784-5-2:2018)

Ta del standarda IEC 61784-5 določa inštalacijske profile za CPF 2 (CIP™1).
Inštalacijski profili so navedeni v dodatkih. Ti dodatki se navezujejo na standard IEC 61918:2018.

General Information

Status
Published
Publication Date
30-Jan-2019
Current Stage
6060 - National Implementation/Publication (Adopted Project)
Start Date
27-Dec-2018
Due Date
03-Mar-2019
Completion Date
31-Jan-2019

Relations

Buy Standard

Standard
EN IEC 61784-5-2:2019 - BARVE
English language
166 pages
sale 10% off
Preview
sale 10% off
Preview
e-Library read for
1 day

Standards Content (Sample)

SLOVENSKI STANDARD
SIST EN IEC 61784-5-2:2019
01-april-2019
1DGRPHãþD
SIST EN 61784-5-2:2014
Industrijska komunikacijska omrežja - Profili - 5-2. del: Inštalacija procesnih vodil -
Inštalacijski profili za CPF 2 (IEC 61784-5-2:2018)
Industrial communication networks - Profiles - Part 5-2: Installation of fieldbuses -
Installation profiles for CPF 2 (IEC 61784-5-2:2018)
Industrielle Kommunikationsnetze - Profile - Teil 5-2: Feldbusinstallation -
Installationsprofile für die Kommunikationsprofilfamilie 2 (IEC 61784-5-2:2018)
Réseaux de communication industriels - Profils - Partie 5-2 : Installation des bus de
terrain - Profils d'installation pour CPF 2 (IEC 61784-5-2:2018)
Ta slovenski standard je istoveten z: EN IEC 61784-5-2:2018
ICS:
25.040.40 Merjenje in krmiljenje Industrial process
industrijskih postopkov measurement and control
35.100.40 Transportni sloj Transport layer
SIST EN IEC 61784-5-2:2019 en,fr,de
2003-01.Slovenski inštitut za standardizacijo. Razmnoževanje celote ali delov tega standarda ni dovoljeno.

---------------------- Page: 1 ----------------------

SIST EN IEC 61784-5-2:2019

---------------------- Page: 2 ----------------------

SIST EN IEC 61784-5-2:2019


EUROPEAN STANDARD EN IEC 61784-5-2

NORME EUROPÉENNE

EUROPÄISCHE NORM
December 2018
ICS 25.040.40; 35.100.40 Supersedes EN 61784-5-2:2013
English Version
Industrial communication networks - Profiles - Part 5-2:
Installation of fieldbuses - Installation profiles for CPF 2
(IEC 61784-5-2:2018)
Réseaux de communication industriels - Profils - Partie 5-2 : Industrielle Kommunikationsnetze - Profile - Teil 5-2:
Installation des bus de terrain - Profils d'installation pour Feldbusinstallation - Installationsprofile für die
CPF 2 Kommunikationsprofilfamilie 2
(IEC 61784-5-2:2018) (IEC 61784-5-2:2018)
This European Standard was approved by CENELEC on 2018-10-04. CENELEC members are bound to comply with the CEN/CENELEC
Internal Regulations which stipulate the conditions for giving this European Standard the status of a national standard without any alteration.
Up-to-date lists and bibliographical references concerning such national standards may be obtained on application to the CEN-CENELEC
Management Centre or to any CENELEC member.
This European Standard exists in three official versions (English, French, German). A version in any other language made by translation
under the responsibility of a CENELEC member into its own language and notified to the CEN-CENELEC Management Centre has the
same status as the official versions.
CENELEC members are the national electrotechnical committees of Austria, Belgium, Bulgaria, Croatia, Cyprus, the Czech Republic,
Denmark, Estonia, Finland, Former Yugoslav Republic of Macedonia, France, Germany, Greece, Hungary, Iceland, Ireland, Italy, Latvia,
Lithuania, Luxembourg, Malta, the Netherlands, Norway, Poland, Portugal, Romania, Serbia, Slovakia, Slovenia, Spain, Sweden,
Switzerland, Turkey and the United Kingdom.


European Committee for Electrotechnical Standardization
Comité Européen de Normalisation Electrotechnique
Europäisches Komitee für Elektrotechnische Normung
CEN-CENELEC Management Centre: Rue de la Science 23, B-1040 Brussels
© 2018 CENELEC All rights of exploitation in any form and by any means reserved worldwide for CENELEC Members.
 Ref. No. EN IEC 61784-5-2:2018 E

---------------------- Page: 3 ----------------------

SIST EN IEC 61784-5-2:2019
EN IEC 61784-5-2:2018 (E)
European foreword
The text of document 65C/924/FDIS, future edition 4 of IEC 61784-5-2, prepared by SC 65C
"Industrial networks" of IEC/TC 65 "Industrial-process measurement, control and automation" was
submitted to the IEC-CENELEC parallel vote and approved by CENELEC as EN IEC 61784-5-2:2018.
The following dates are fixed:
• latest date by which the document has to be implemented at national (dop) 2019-07-04
level by publication of an identical national standard or by endorsement
• latest date by which the national standards conflicting with the (dow) 2021-10-04
document have to be withdrawn

This document supersedes EN 61784-5-2:2013.
Attention is drawn to the possibility that some of the elements of this document may be the subject of
patent rights. CENELEC shall not be held responsible for identifying any or all such patent rights.

Endorsement notice
The text of the International Standard IEC 61784-5-2:2018 was approved by CENELEC as a
European Standard without any modification.


2

---------------------- Page: 4 ----------------------

SIST EN IEC 61784-5-2:2019
EN IEC 61784-5-2:2018 (E)
Annex ZA
(normative)

Normative references to international publications
with their corresponding European publications
The following documents are referred to in the text in such a way that some or all of their content
constitutes requirements of this document. For dated references, only the edition cited applies. For
undated references, the latest edition of the referenced document (including any amendments)
applies.
NOTE 1  Where an International Publication has been modified by common modifications, indicated by (mod), the relevant
EN/HD applies.
NOTE 2  Up-to-date information on the latest versions of the European Standards listed in this annex is available here:
www.cenelec.eu.

Publication Year Title EN/HD Year
IEC 61918 2018 Industrial communication networks - Installation of EN IEC 61918 2018
communication networks in industrial premises
The normative references of EN IEC 61918:2018, Clause 2, apply.
NOTE For profile specific normative references, see Clauses A.2, B.2, and C2.


3

---------------------- Page: 5 ----------------------

SIST EN IEC 61784-5-2:2019

---------------------- Page: 6 ----------------------

SIST EN IEC 61784-5-2:2019




IEC 61784-5-2

®


Edition 4.0 2018-08




INTERNATIONAL



STANDARD








colour

inside










Industrial communication networks – Profiles –

Part 5-2: Installation of fieldbuses – Installation profiles for CPF 2



























INTERNATIONAL

ELECTROTECHNICAL


COMMISSION





ICS 25.040.40; 35.100.40 ISBN 978-2-8322-5938-2




  Warning! Make sure that you obtained this publication from an authorized distributor.


® Registered trademark of the International Electrotechnical Commission

---------------------- Page: 7 ----------------------

SIST EN IEC 61784-5-2:2019
– 2 – IEC 61784-5-2:2018 © IEC 2018
CONTENTS
FOREWORD . 10
INTRODUCTION . 12
1 Scope . 13
2 Normative references . 13
3 Terms, definitions and abbreviated terms . 13
4 CPF 2: Overview of installation profiles . 13
5 Installation profile conventions . 14
6 Conformance to installation profiles . 15
Annex A (normative) CP 2/1 (ControlNet™) specific installation profile . 16
A.1 Installation profile scope . 16
A.2 Normative references . 16
A.3 Installation profile terms, definitions, and abbreviated terms . 16
A.3.1 Terms and definitions. 16
A.3.2 Abbreviated terms . 16
A.3.3 Conventions for installation profiles . 16
A.4 Installation planning . 17
A.4.1 General . 17
A.4.2 Planning requirements . 18
A.4.3 Network capabilities . 19
A.4.4 Selection and use of cabling components . 25
A.4.5 Cabling planning documentation . 43
A.4.6 Verification of cabling planning specification . 43
A.5 Installation implementation . 43
A.5.1 General requirements . 43
A.5.2 Cable installation . 43
A.5.3 Connector installation . 45
A.5.4 Terminator installation . 54
A.5.5 Device installation . 54
A.5.6 Coding and labelling . 56
A.5.7 Earthing and bonding of equipment and devices and shield cabling . 57
A.5.8 As-implemented cabling documentation . 58
A.6 Installation verification and installation acceptance test . 58
A.6.1 General . 58
A.6.2 Installation verification . 58
A.6.3 Installation acceptance test . 61
A.7 Installation administration . 63
A.8 Installation maintenance and installation troubleshooting . 63
A.8.1 General . 63
A.8.2 Maintenance . 63
A.8.3 Troubleshooting . 63
A.8.4 Specific requirements for maintenance and troubleshooting . 68
Annex B (normative) CP 2/2 (EtherNet/IP™) specific installation profile . 69
B.1 Installation profile scope . 69

---------------------- Page: 8 ----------------------

SIST EN IEC 61784-5-2:2019
IEC 61784-5-2:2018 © IEC 2018 – 3 –
B.2 Normative references . 69
B.3 Installation profile terms, definitions, and abbreviated terms . 69
B.3.1 Terms and definitions. 69
B.3.2 Abbreviated terms . 69
B.3.3 Conventions for installation profiles . 70
B.4 Installation planning . 70
B.4.1 General . 70
B.4.2 Planning requirements . 71
B.4.3 Network capabilities . 71
B.4.4 Selection and use of cabling components . 76
B.4.5 Cabling planning documentation . 92
B.4.6 Verification of cabling planning specification . 92
B.5 Installation implementation . 92
B.5.1 General requirements . 92
B.5.2 Cable installation . 92
B.5.3 Connector installation . 93
B.5.4 Terminator installation . 94
B.5.5 Device installation . 94
B.5.6 Coding and labelling . 94
B.5.7 Earthing and bonding of equipment and devices and shield cabling . 94
B.5.8 As-implemented cabling documentation . 96
B.6 Installation verification and installation acceptance test . 96
B.6.1 General . 96
B.6.2 Installation verification . 96
B.6.3 Installation acceptance test . 98
B.7 Installation administration . 99
B.8 Installation maintenance and installation troubleshooting . 99
Annex C (normative) CP 2/3 (DeviceNet™) specific installation profile . 100
C.1 Installation profile scope . 100
C.2 Normative references . 100
C.3 Installation profile terms, definitions, and abbreviated terms . 100
C.3.1 Terms and definitions. 100
C.3.2 Abbreviated terms . 100
C.3.3 Conventions for installation profiles . 100
C.4 Installation planning . 101
C.4.1 General . 101
C.4.2 Planning requirements . 102
C.4.3 Network capabilities . 103
C.4.4 Selection and use of cabling components . 119
C.4.5 Cabling planning documentation . 129
C.4.6 Verification of cabling planning specification . 129
C.5 Installation implementation . 129
C.5.1 General requirements . 129
C.5.2 Cable installation . 129
C.5.3 Connector installation . 131

---------------------- Page: 9 ----------------------

SIST EN IEC 61784-5-2:2019
– 4 – IEC 61784-5-2:2018 © IEC 2018
C.5.4 Terminator installation . 144
C.5.5 Device installation . 146
C.5.6 Coding and labelling . 150
C.5.7 Earthing and bonding of equipment and devices and shield cabling . 150
C.5.8 As-implemented cabling documentation . 151
C.6 Installation verification and installation acceptance test . 151
C.6.1 General . 151
C.6.2 Installation verification . 151
C.6.3 Installation acceptance test . 154
C.7 Installation administration . 155
C.8 Installation maintenance and installation troubleshooting . 155
C.8.1 General . 155
C.8.2 Maintenance . 155
C.8.3 Troubleshooting . 155
C.8.4 Specific requirements for maintenance and troubleshooting . 155
Annex D (informative) Additional information . 159
D.1 Network validation check sheet for CP 2/3 (DeviceNet) . 159
Bibliography . 163

Figure 1 – Standards relationships . 12
Figure A.1 – Interconnection of CPF 2 networks . 17
Figure A.2 – Overview of CPF 2/1 networks . 18
Figure A.3 – Drop cable requirements . 20
Figure A.4 – Placement of BNC/TNC plugs . 20
Figure A.5 – Placement of terminators . 21
Figure A.6 – Extending a network using repeaters . 21
Figure A.7 – Extending a network using active star topology . 21
Figure A.8 – Links . 22
Figure A.9 – Extending the network beyond 99 nodes . 22
Figure A.10 – Maximum allowable taps per segment . 31
Figure A.11 – Example of repeaters in star configuration . 32
Figure A.12 – Repeaters in parallel . 33
Figure A.13 – Repeaters in combination series and parallel . 34
Figure A.14 – Ring repeater . 34
Figure A.15 – Installing bulkheads . 35
Figure A.16 – Coaxial BNC and TNC terminators . 36
Figure A.17 – Terminator placement in a segment . 36
Figure A.18 – RC Shield Termination in Active Devices . 38
Figure A.19 – Redundant network icons . 39
Figure A.20 – Redundant coax media . 39
Figure A.21 – Redundant fibre media . 39
Figure A.22 – Repeaters in series versus length difference for coax media . 40
Figure A.23 – Repeaters in series versus length difference for fibre media . 41
Figure A.24 – Example of redundant coax network with repeaters . 41
Figure A.25 – Example of improper redundant node connection . 42

---------------------- Page: 10 ----------------------

SIST EN IEC 61784-5-2:2019
IEC 61784-5-2:2018 © IEC 2018 – 5 –
Figure A.26 – Example tool kit for installing BNC connectors . 46
Figure A.27 – Calibration of coaxial stripper . 46
Figure A.28 – Coax PVC strip length detail (informative) . 47
Figure A.29 – Memory cartridge and blade . 48
Figure A.30 – Cable position . 48
Figure A.31 – Locking the cable . 48
Figure A.32 – Stripping the cable . 49
Figure A.33 – Install the crimp ferrule . 49
Figure A.34 – Cable preparation for PVC type cables (informative) . 50
Figure A.35 – Cable preparation for FEP type cables (informative) . 50
Figure A.36 – Strip guides . 50
Figure A.37 – Using the flare tool . 51
Figure A.38 – Expanding the shields . 51
Figure A.39 – Install the centre pin . 51
Figure A.40 – Crimping the centre pin . 52
Figure A.41 – Installing the connector body . 52
Figure A.42 – Installing the ferrule . 52
Figure A.43 – Crimp tool . 53
Figure A.44 – Sealed IP65/67 cable . 54
Figure A.45 – Terminator placement . 54
Figure A.46 – Mounting the taps . 55
Figure A.47 – Mounting the tap assembly using the universal mounting bracket . 56
Figure A.48 – Mounting the tap using tie wraps or screws . 56
Figure A.49 – Redundant network icons . 57
Figure A.50 – Network test tool . 59
Figure A.51 – Shorting the cable to test for continuity . 60
Figure A.52 – Testing fibre segments . 62
Figure A.53 – Multi-fibre backbone cable housing . 64
Figure A.54 – Repeater adapter module . 64
Figure A.55 – Short and medium distance fibre module LEDs . 66
Figure A.56 – Long and extra long repeater module LEDs . 67
Figure B.1 – Interconnection of CPF 2 networks . 70
Figure B.2 – Redundant linear bus . 72
Figure B.3 – Peer-to-peer connections . 72
Figure B.4 – Mated connections . 75
Figure B.5 – The 8-way modular sealed jack & plug (plastic housing) . 82
Figure B.6 – The 8-way modular sealed jack & plug (metal housing) . 82
Figure B.7 – M12-4 connectors . 83
Figure B.8 – Example of a metallic shell M12-8 X-coding connectors . 84
Figure B.9 – Simplex LC connector . 85
Figure B.10 – Duplex LC connector . 85
Figure B.11 – IP65/67 sealed duplex LC connector . 85
Figure B.12 – IP65/67 sealed duplex SC-RJ connector . 86

---------------------- Page: 11 ----------------------

SIST EN IEC 61784-5-2:2019
– 6 – IEC 61784-5-2:2018 © IEC 2018
Figure B.13 – M12-4 to 8-way modular bulkhead . 88
Figure B.14 – The 8-way modular sealed jack & plug (plastic housing) . 93
Figure B.15 – The 8-way modular sealed jack & plug (metal housing) . 93
Figure B.16 – M12-4 connectors . 94
Figure B.17 – Earthing of cable shield . 96
Figure C.1 – Interconnection of CPF 2 networks . 101
Figure C.2 – Connection to generic cabling . 102
Figure C.3 – DeviceNet cable system uses a trunk/drop line topology . 104
Figure C.4 – Measuring the trunk length . 106
Figure C.5 – Measuring the trunk and drop length . 106
Figure C.6 – Measuring drop cable in a network with multiports . 107
Figure C.7 – Removable device using open-style connectors . 107
Figure C.8 – Fixed connection using open-style connector . 108
Figure C.9 – Open-style connector pin out .
...

Questions, Comments and Discussion

Ask us and Technical Secretary will try to provide an answer. You can facilitate discussion about the standard in here.