Corrigendum 1 - Solderless connections - Part 5: Press-in connections - General requirements, test methods and practical guidance

Corrigendum 1 - Connexions sans soudure - Partie 5: Connexions insérées à force - Exigences générales, méthodes d'essai et guide pratique

General Information

Status
Published
Publication Date
02-Sep-2014
Technical Committee
SC 48B - Electrical connectors
Current Stage
DELPUB - Deleted Publication
Start Date
22-Jul-2020
Completion Date
13-Feb-2026

Relations

Effective Date
05-Sep-2023
Effective Date
05-Sep-2023
Standard

IEC 60352-5:2012/COR1:2014 - Corrigendum 1 - Solderless connections - Part 5: Press-in connections - General requirements, test methods and practical guidance Released:9/3/2014

English and French language
10 pages
sale 15% off
Preview
sale 15% off
Preview

Frequently Asked Questions

IEC 60352-5:2012/COR1:2014 is a standard published by the International Electrotechnical Commission (IEC). Its full title is "Corrigendum 1 - Solderless connections - Part 5: Press-in connections - General requirements, test methods and practical guidance". This standard covers: Corrigendum 1 - Solderless connections - Part 5: Press-in connections - General requirements, test methods and practical guidance

Corrigendum 1 - Solderless connections - Part 5: Press-in connections - General requirements, test methods and practical guidance

IEC 60352-5:2012/COR1:2014 is classified under the following ICS (International Classification for Standards) categories: 31.220.10 - Plug-and-socket devices. Connectors. The ICS classification helps identify the subject area and facilitates finding related standards.

IEC 60352-5:2012/COR1:2014 has the following relationships with other standards: It is inter standard links to IEC 60352-5:2012, IEC 60352-5:2020. Understanding these relationships helps ensure you are using the most current and applicable version of the standard.

IEC 60352-5:2012/COR1:2014 is available in PDF format for immediate download after purchase. The document can be added to your cart and obtained through the secure checkout process. Digital delivery ensures instant access to the complete standard document.

Standards Content (Sample)


IEC 60352-5
(4th edition – 2012)
SOLDERLESS CONNECTIONS –
Part 5: Press-in connections –

General requirements, test methods and practical guidance

CO RRI G E NDUM 1
Replace existing Table 5 by the following new Table 5 :

Table 5 – Qualification test schedule – Test group C
Test Measurement to be performed Requirement
Test phase
Test No. of
Title Subclause Title Subclause
IEC 60512
CP1 Mounting 5.3.2.2
CP2 if applicable Replacement 5.2.2.6
CP3  Contact resistance 2a 5.2.3.1
– millivolt level
method
CP4 5.2.4.2 11d
Rapid change of
temperature
CP5 Climatic 5.2.4.3 11a
sequence
CP6 Dry heat 5.2.4.4 11i
CP7 No required tests and measurements
CP8  Contact resistance 2a 5.2.3.1
– millivolt level
method
a)
CP9 5.2.2.3 Push-out force 5.2.2.3 ,
minimum push-
out force per
termination
according to
4.6 e)
a)
The test for push-out force has to be performed on 14 of the 200 terminations, 7 of them out of range a and 7 of
them out of range b.
Figure 9, in the bottom section of the flow chart, last column, delete:

"– Flowing mixed gas corrosion test"

September 2014
IEC 60352-5
(4ème édition – 2012)
CONNEXIONS SANS
...

Questions, Comments and Discussion

Ask us and Technical Secretary will try to provide an answer. You can facilitate discussion about the standard in here.

Loading comments...