Status
Not Published
Publication Date
05-Nov-2026
Technical Committee
CLC/SR 5 - Steam turbines
Drafting Committee
CLC/SR 5 - Steam turbines
Current Stage
5060 - Voting results sent to TC, SR - Formal Approval
Start Date
10-Jul-2026
Completion Date
10-Jul-2026

Buy Documents

Draft

prEN IEC 60953-4:2025 - BARVE

English language (74 pages)
Preview
Preview
e-Library read for
×1 day

FprEN IEC 60953-4:2026 is an IEC/CENELEC standard for routine thermal testing of steam turbines in existing power plants. It sets out simplified procedures for monitoring relative performance, comparing a current test with a reference test, and tracking changes in efficiency, output, steam rate, flow capacity, and component condition. It is written for plant owners, performance engineers, operators, maintenance teams, and test personnel who need a practical basis for periodic turbine monitoring.

What does FprEN IEC 60953-4:2026 specify?

FprEN IEC 60953-4:2026 specifies additional rules for routine testing of steam turbines. It is designed for periodic analysis and supervision of relative performance, not for full acceptance testing of new units.

The standard applies to steam turbines of every type, rating, and application, operating with superheated or saturated steam. It is intended mainly for large condensing steam turbines, but it can also be used for other turbines when the parties agree on a specific procedure. The document is organized into Clauses 1 to 8, followed by Annexes A to K.

AnnexWhat it covers
Annex AFeedwater heater leakage and condenser leakage tests
Annex BEvaluation of multiple measurements and compatibility
Annex CMass flow balances
Annex DShort-statistical definition of measuring uncertainty and error propagation
Annex ETemperature variation method
Annex FGuidance on selecting the type of routine test to be performed
Annex GSensitivity factors for component performance on overall cycle performance
Annex HTypical thermodynamic boundary and instrument layout for routine tests
Annex ICalculation and analysis of test results - numerical example
Annex JNumerical example of uncertainty calculation for periodic routine tests
Annex KTypical reasons for deviations of steam turbine performance from reference or design level

What are the key requirements of FprEN IEC 60953-4:2026?

FprEN IEC 60953-4:2026 focuses on repeatable, economical tests that can be used over the life of a turbine to detect performance drift. In practice, the most important point is that the current test is compared with a reference test under as nearly the same boundary conditions as possible.

Planning and test setup

The standard requires advance agreement on the test type, procedure, measuring points, instruments, valves, and piping arrangement, with cost considered as part of the planning. A single person should be assigned responsibility for the test so the work is coordinated and the results are properly evaluated.

Routine tests may be run whenever needed, but the document recommends regular intervals, at least once a year, and tests before and after overhaul. This helps trend performance over time and makes maintenance planning based on measured condition rather than assumptions.

Plant condition, cycle isolation, and leakage

Before testing, the turbine, driven machine, condenser, feedheaters, and related equipment should be in suitable condition, and leaks should be eliminated as far as practicable. The same cycle arrangement should be used for the reference test and the later comparative tests wherever possible.

Unaccounted leakage should be minimized, identified, and investigated. If the difference from the reference test is more than 0.2% of full-load main steam flow, it should be checked and corrected or allowed for in the results. This matters because leakage directly distorts heat rate, flow balance, and component diagnosis.

Measurements and instruments

The document distinguishes between primary flows and secondary flows. Primary flows are the ones that directly affect output and must be measured with corresponding precision; when water flow cannot be measured, steam flow between the steam generator outlet and turbine throttle may be used in some cases, but with greater uncertainty and only where the steam is sufficiently superheated.

Pressure, temperature, time, and speed measurements are defined for the steam path, heaters, pumps, condenser, and turbine exhaust. Permanently installed instruments may be used for routine monitoring if their calibration status is known and verified before the test. Using the same instrumentation across comparative tests reduces the uncertainty of the performance difference.

Routine results and performance indicators

The routine test results can include thermal efficiency or heat rate, power output, steam rate, main steam flow capacity, and Thermal Load Capacity for nuclear applications. The standard also covers component indicators such as turbine stage flow factor, corrected stage pressure, cylinder efficiency in the superheated region, and feedwater heater and condenser performance parameters such as Terminal Temperature Difference (TTD), Drain Cooler Approach (DCA), and condensate sub-cooling.

These values matter because they let the user separate whole-cycle performance from individual component behavior. That makes it easier to decide whether a decline is caused by the turbine, the feedwater system, the condenser, or leakage.

Correction and comparison with the reference test

The standard corrects routine test results to reference conditions and compares them with reference values rather than with guarantee values. The same correction method should be used for the reference test and subsequent comparative tests so the trend remains meaningful.

Correction guidance is given for initial steam conditions, exhaust pressure, reheater conditions, feedwater heating, and BFP turbine effects. The document also gives cycle-specific correction variables for turbines with regenerative feed-water heating, turbines without steam addition or extraction after partial expansion, and extraction turbines. This is the part that lets a buyer, engineer, or operator compare tests fairly even when plant conditions are not identical.

Uncertainty and trend analysis

The standard treats uncertainty for steam and water properties, output, mass flow, final results, and routine performance differences. For routine testing uncertainty, it points to the method in IEC 60953-3:2023 Annex F. It also emphasizes trending of corrected performance parameters over time, including heat rate versus power output and first-stage or extraction pressure trends, to support diagnosis of deterioration.

What terms does FprEN IEC 60953-4:2026 define?

  • Reference condition - the set of external parameters outside the test boundary to which the test results are corrected.
  • Reference test - a test carried out under reference conditions and used as the benchmark for later comparisons.
  • Comparative test - a current test, or series of tests, carried out to show relative performance change against the reference test.
  • Repeatability - the ability of the measurement system to produce the same output/input relationship over time, which is the key quality measure for routine testing.
  • Primary parameters - measured variables that significantly affect the test result and therefore need instruments with known calibration status.
  • Secondary parameters - measured variables with a smaller effect on the test result.
  • Thermal Load Capacity - for nuclear applications, the thermal load capacity of the steam turbine under defined conditions.

Who uses FprEN IEC 60953-4:2026?

FprEN IEC 60953-4:2026 is used by power plant owners and operators, turbine performance engineers, maintenance planners, and test coordinators. The document names performance engineers, operators, and maintenance staff as typical test parties.

It is most relevant in steam power generation, including condensing turbines, combined cycles, co-generating units, and nuclear applications. People use it to plan routine monitoring, select a test method, diagnose efficiency loss, set maintenance priorities, and support long-term performance trending.

What changed in FprEN IEC 60953-4:2026 from the previous edition?

FprEN IEC 60953-4:2026 is built as a supplementary standard to IEC 60953-0 for routine testing. Compared with IEC 60953-0, it adds routine-testing-specific scope, definitions, guiding principles, measurement practices, result correction methods, and uncertainty treatment.

It also adds new annexes for choosing a routine test type, assessing sensitivity, defining measurement layouts, and working through calculation and uncertainty examples. IEC 60953-3:2023 is added to the normative references for the uncertainty method used in routine testing.

Which standards are used with FprEN IEC 60953-4:2026?

  • IEC 60953-0:2022 - provides the base rules for steam turbine thermal acceptance tests and the shared terminology and methods that this part builds on.
  • IEC 60953-3:2023 - provides the method used for determining the uncertainty of performance differences in routine testing.

What does the FprEN IEC 60953-4:2026 document contain?

FprEN IEC 60953-4:2026 contains equations and procedures for routine performance indicators, including turbine efficiency, turbine stage flow factor, corrected stage pressures, heat rate and power output characteristics, and component performance measures. It also includes guidance on test planning, instrumentation, flow and pressure measurement, temperature measurement, steam quality determination, data evaluation, and result correction.

The document includes Figures 1 to 3 for efficiency and instrumentation layouts, plus informative figures in Annexes H and I. It also includes sensitivity tables, numerical examples for result calculation, and numerical examples for uncertainty calculation. These worked examples are there to help users set up test boundaries, interpret measurements, and diagnose performance changes without reproducing the full acceptance-test procedure.

Buy Documents

Draft

prEN IEC 60953-4:2025 - BARVE

English language (74 pages)
Preview
Preview
e-Library read for
×1 day

Get Certified

Connect with accredited certification bodies for this standard

DNV

DNV is an independent assurance and risk management provider.

NA Norway Verified

Lloyd's Register

Lloyd's Register is a global professional services organisation specialising in engineering and technology.

UKAS United Kingdom Verified

DNV Energy Systems

Energy and renewable energy certification.

NA Norway Verified

Sponsored listings

Frequently Asked Questions

FprEN IEC 60953-4:2026 is a draft published by CLC. Its full title is "Rules for steam turbine thermal acceptance tests - Part 4: Routine testing". This standard covers: Rules for steam turbine thermal acceptance tests - Part 4: Routine testing

Rules for steam turbine thermal acceptance tests - Part 4: Routine testing

FprEN IEC 60953-4:2026 is classified under the following ICS (International Classification for Standards) categories: 27.040 - Gas and steam turbines. Steam engines. The ICS classification helps identify the subject area and facilitates finding related standards.

FprEN IEC 60953-4:2026 is available in PDF format for immediate download after purchase. The document can be added to your cart and obtained through the secure checkout process. Digital delivery ensures instant access to the complete standard document.

Standards Content (Sample)


SLOVENSKI STANDARD
oSIST prEN IEC 60953-4:2025
01-oktober-2025
Pravila za preskuse toplotne sprejemljivosti parne turbine - 4. del: Rutinsko
preskušanje
Rules for steam turbine thermal acceptance tests - Part 4: Routine testing
Ta slovenski standard je istoveten z: prEN IEC 60953-4:2025
ICS:
27.040 Plinske in parne turbine. Gas and steam turbines.
Parni stroji Steam engines
oSIST prEN IEC 60953-4:2025 en
2003-01.Slovenski inštitut za standardizacijo. Razmnoževanje celote ali delov tega standarda ni dovoljeno.

oSIST prEN IEC 60953-4:2025
oSIST prEN IEC 60953-4:2025
5/282/CDV
COMMITTEE DRAFT FOR VOTE (CDV)
Project number:
IEC 60953-4 ED1
Date of circulation: Closing date for voting:
2025-08-29 2025-11-21
Supersedes documents:
5/279/CD, 5/281A/CC
IEC TC 5 : Steam turbines
Secretariat: Secretary:
China Mr Chang Fu
Of interest to the following committees: Horizontal function(s):

Aspects concerned:
Energy Efficiency
Submitted for CENELEC parallel voting Not submitted for CENELEC parallel voting
Attention IEC-CENELEC parallel voting
The attention of IEC National Committees, members of
CENELEC, is drawn to the fact that this Committee Draft for
Vote (CDV) is submitted for parallel voting.
The CENELEC members are invited to vote through the
CENELEC online voting system.
This document is still under study and subject to change. It should not be used for reference purposes.
Recipients of this document are invited to submit, with their comments, notification of any relevant patent rights of which t hey
are aware and to provide supporting documentation.
Recipients of this document are invited to submit, with their comments, notification of any relevant “In Some Countries”
clauses to be included should this proposal proceed. Recipients are reminded that the CDV stage is the final stage for
submitting ISC clauses. (SEE AC/22/2007 OR NEW GUIDANCE DOC).

Title:
Rules for steam turbine thermal acceptance tests - Part 4: Routine testing

proposed stability date: 2035
Note from TC/SC officers:
electronic file, to make a copy and to print out the content for the sole purpose of preparing National Committee positions.
You may not copy or "mirror" the file or printed version of the document, or any part of it, for any other purpose without
permission in writing from IEC.

oSIST prEN IEC 60953-4:2025
IEC CDV 60953-4 ED1 © IEC 2025

1 CONTENTS
2 FOREWORD . 8
3 INTRODUCTION . 10
4 1 Scope . 12
5 1.1 General . 12
6 1.2 Object . 12
7 2 Normative references . 13
8 3 Units, symbols, terms and definitions . 13
9 3.1 General . 13
10 3.2 Symbols, units . 13
11 3.3 Subscripts, superscripts and definitions . 13
12 3.3.1 Reference condition . 13
13 3.3.2 Reference test . 13
14 3.3.3 Comparative test . 13
15 3.3.4 Repeatability . 14
16 3.3.5 Primary parameters . 14
17 3.3.6 Secondary parameters . 14
18 3.4 Definition of routine test results . 14
19 3.4.1 Guidance on routine performance parameters . 14
20 3.4.2 Thermal efficiency . 14
21 3.4.3 Heat rate . 14
22 3.4.4 Thermodynamic efficiency . 14
23 3.4.5 Steam rate . 14
24 3.4.6 Main steam flow capacity . 14
25 3.4.7 Power output . 14
26 3.4.8 Guarantee values for extraction and mixed-pressure turbines . 14
27 3.4.9 Thermal Load Capacity (for Nuclear applications) . 15
28 3.5 Additional definition of routine test results . 15
29 3.5.1 Turbine efficiency -Expansion in superheated region . 15
30 3.5.2 Turbine stage flow factor . 15
31 3.5.3 Corrected Turbine stage pressures . 16
32 3.5.4 Heat rate and power output characteristic . 17
33 3.5.5 Heat input and power output characteristic . 17
34 3.5.6 Component performance . 17
35 4 Guiding principles . 19
36 4.1 Advance planning for test. 19
37 4.2 Preparatory agreements and arrangements for tests . 19
38 4.3 Planning for test. 19
39 4.3.1 Time for routine test . 19
40 4.3.2 Direction of routine tests . 20
41 4.4 Preparation of the tests . 20
42 4.4.1 Condition of the plant . 20
43 4.4.2 Condition of the steam turbine . 20
44 4.4.3 Condition of the condenser . 20
45 4.4.4 Isolation of the cycle . 21
46 4.4.5 Checks for leakage of condenser and feed water heaters . 21
47 4.4.6 Cleanliness of the steam strainers . 21
48 4.4.7 Checking of the test measuring equipment . 21
oSIST prEN IEC 60953-4:2025
IEC CDV 60953-4 ED1 © IEC 2025

49 4.5 Comparison measurements . 21
50 4.6 Settings for tests . 22
51 4.6.1 Load settings . 22
52 4.6.2 Special settings . 22
53 4.7 Preliminary tests . 22
54 4.8 Acceptance tests . 22
55 4.8.1 Constancy of test conditions . 22
56 4.8.2 Maximum deviation and fluctuation in test conditions . 22
57 4.8.3 Duration of test runs and frequency of reading. 22
58 4.8.4 Reading of integrating measuring instruments . 22
59 4.8.5 Alternative methods . 22
60 4.8.6 Recording of tests . 22
61 4.8.7 Additional measurement . 22
62 4.8.8 Preliminary calculations . 22
63 4.8.9 Consistency and number of tests . 22
64 4.9 Repetition of Acceptance tests . 23
65 5 Measuring techniques and measuring instruments . 23
66 5.1 Overview . 23
67 5.1.1 Instrument accuracy requirements . 23
68 5.1.2 Measuring instruments . 23
69 5.1.3 Measuring uncertainty . 23
70 5.1.4 Calibration of instruments . 23
71 5.1.5 Alternative instrumentation . 23
72 5.1.6 Consistency of comparative test instruments . 23
73 5.1.7 Special considerations of permanently installed instrument . 24
74 5.2 Measurement of power. 25
75 5.2.1 Determination of mechanical turbine output . 25
76 5.2.2 Measurement of boiler feed pump power . 25
77 5.2.3 Determination of electrical power of a turbine generator . 25
78 5.2.4 Measurement of electrical power . 25
79 5.2.5 Electrical instrument connections. 25
80 5.2.6 Electrical instruments . 25
81 5.2.7 Instrument transformers . 25
82 5.3 Flow measurement . 25
83 5.3.1 Determination of flows to be measured . 25
84 5.3.2 Measurement of primary flow . 29
85 5.3.3 Installation and location of flow measuring devices . 29
86 5.3.4 Calibration of primary flow devices for water flow . 29
87 5.3.5 Inspection of flow measuring devices . 30
88 5.3.6 Differential pressure measurements . 30
89 5.3.7 Water flow fluctuation . 30
90 5.3.8 Secondary flow measurements . 30
91 5.3.9 Occasional secondary flows. 31
92 5.3.10 Density of water and steam . 31
93 5.3.11 Determination of cooling water flow of condenser . 31
94 5.4 Pressure measurement (excluding condensing turbine exhaust pressure) . 31
95 5.4.1 Pressures to be measured . 31
96 5.4.2 Instruments . 32
97 5.4.3 Main pressure measurements . 32
oSIST prEN IEC 60953-4:2025
IEC CDV 60953-4 ED1 © IEC 2025

98 5.4.4 Pressure tapping holes and connecting lines . 32
99 5.4.5 Shut-off valves . 32
100 5.4.6 Calibration of pressure measuring devices . 32
101 5.4.7 Atmospheric pressure . 33
102 5.4.8 Correction of readings . 33
103 5.5 Condensing turbine exhaust pressure measurement . 33
104 5.5.1 General . 33
105 5.5.2 Plane of measurement . 33
106 5.5.3 Pressure taps . 33
107 5.5.4 Manifolds . 33
108 5.5.5 Connecting lines . 33
109 5.5.6 Instruments . 33
110 5.5.7 Calibration . 33
111 5.6 Temperature measurement . 34
112 5.6.1 Points of temperature measurement . 34
113 5.6.2 Instruments . 34
114 5.6.3 Main temperature measurements . 34
115 5.6.4 Feed train temperature measurements (including bled steam) . 34
116 5.6.5 Condenser cooling water temperature measurement . 34
117 5.6.6 Thermometer wells . 34
118 5.6.7 Precautions to be observed in the measurement of temperature . 34
119 5.7 Steam quality determination . 35
120 5.7.1 General . 35
121 5.7.2 Tracer technique . 35
122 5.7.3 Condensing method . 35
123 5.7.4 Constant rate injection method . 35
124 5.7.5 Extraction enthalpy determined by constant rate injection method . 35
125 5.7.6 Tracers and their use . 35
126 5.8 Time measurement . 35
127 5.9 Speed measurement . 36
128 6 Evaluation of tests . 36
129 6.1 Preparation of evaluation . 36
130 6.2 Computation of results . 36
131 6.2.1 Calculation of average values of instrument readings . 36
132 6.2.2 Correction and conversion of averaged readings . 36
133 6.2.3 Checking of measured data . 36
134 6.2.4 Thermodynamic properties of steam and water . 37
135 6.2.5 Calculation of test results . 37
136 7 Correction of test results and comparison with guarantee . 37
137 7.1 Guarantee values and guarantee conditions . 37
138 7.2 Correction of initial steam flow capacity . 37
139 7.3 Correction of output . 37
140 7.3.1 Correction of maximum output . 37
141 7.3.2 Correction of Output with specified initial steam flow . 37
142 7.4 Correction of the thermal performance . 37
143 7.5 Definition and application of correction values . 38
144 7.6 Correction methods . 38
145 7.6.1 General . 38
146 7.6.2 Correction by heat balance calculation . 38
oSIST prEN IEC 60953-4:2025
IEC CDV 60953-4 ED1 © IEC 2025

147 7.6.3 Correction by use of correction curves prepared by the manufacturer . 38
148 7.6.4 Tests to determine correction values . 38
149 7.7 Variables to be considered in the correction of specific turbine cycles . 38
150 7.7.1 Scope of corrections . 38
151 7.7.2 Turbines with regenerative feed-water heating . 38
152 7.7.3 Turbines which have no provision for the addition or extraction of steam
153 after partial expansion . 39
154 7.7.4 Turbines with steam extraction for purposes other than feed-water
155 heating (extraction turbines) . 40
156 7.7.5 Other types of turbine . 40
157 7.8 Guarantee comparison . 40
158 7.8.1 Tolerance and weighting . 40
159 7.8.2 Guarantee comparison with locus curve . 40
160 7.8.3 Guarantee comparison with guarantee point . 40
161 7.8.4 Guarantee comparison for turbines with throttle governing . 40
162 7.8.5 Guarantee comparison for extraction turbines . 40
163 7.8.6 Additional consideration for routine test results comparison . 40
164 7.9 Deterioration of turbine performance (ageing) . 42
165 7.9.1 Timing to minimise deterioration . 42
166 7.9.2 Correction with comparison tests . 42
167 7.9.3 Correction without comparison tests . 42
168 8 Measuring uncertainty . 42
169 8.1 General . 42
170 8.2 Determination of measuring uncertainty of steam and water properties . 42
171 8.2.1 Pressure . 42
172 8.2.2 Temperature . 42
173 8.2.3 Enthalpy and enthalpy difference . 42
174 8.3 Calculation of measuring uncertainty of output . 42
175 8.3.1 Electrical measurement . 42
176 8.3.2 Mechanical measurement . 43
177 8.3.3 Additional uncertainty allowance because of unsteady load conditions . 43
178 8.4 Determination of measuring uncertainty of mass flow . 43
179 8.4.1 Measuring uncertainty of mass flow measurements . 43
180 8.4.2 Measuring uncertainty of multiple measurements of primary flow . 43
181 8.4.3 Uncertainty allowance for cycle imperfections . 43
182 8.5 Calculation of measuring uncertainty of results . 43
183 8.5.1 General . 43
184 8.5.2 Measuring uncertainty of thermal efficiency . 43
185 8.5.3 Measuring uncertainty of thermodynamic efficiency . 43
186 8.5.4 Uncertainty of corrections . 43
187 8.5.5 Guiding values for the measuring uncertainty of results . 43
188 8.5.6 Routine testing uncertainty . 43
189 8.6 Example uncertainty calculation . 43
190 Annex A (normative) Feedwater heater leakage and condenser leakage tests . 44
191 Annex B (normative) Evaluation of multiple measurements, compatibility . 45
192 Annex C (normative) Mass flow balances . 46
193 Annex D (informative) Short-statistical definition of measuring uncertainty and error
194 propagation in acceptance test . 47
195 Annex E (informative/normative) Temperature variation method . 48
oSIST prEN IEC 60953-4:2025
IEC CDV 60953-4 ED1 © IEC 2025

196 Annex F (informative) Guidance on selection a type of routine test to be performed . 49
197 F.1 Routine monitoring . 49
198 F.1.1 Components performance (cylinder, Heater, Deaerator, Condenser,
199 Pump& feed Turbine, system leakage) . 49
200 F.1.2 Output monitoring . 49
201 F.1.3 Flow capacity monitoring . 49
202 F.1.4 Pressure and temperature profiles . 50
203 F.2 Periodical performance tests . 50
204 F.2.1 Maximum power test . 50
205 F.2.2 Steam rate test . 50
206 F.2.3 Thermal efficiency test (Heat rate) . 50
207 F.2.4 Cylinder isentropic efficiency test(Enthalpy drop test) . 50
208 F.2.5 Measurement of heat input to cycle . 51
209 F.2.6 Measurement of heat rejected from cycle. 51
210 Annex G (informative) Sensitivity factors for some component performance on overall
211 cycle performance . 52
212 G.1 Large reheat fossil cycle . 52
213 G.2 Small industrial back pressure turbine with extraction . 52
214 G.3 Combined cycle condensing turbine with injection . 53
215 Annex H (informative) Typical thermodynamic boundary and instrument layout for
216 routine tests . 54
217 H.1 Typical thermodynamic boundary and instrument layouts . 54
218 Annex I (informative) Calculation and analysis of test results – numerical example . 57
219 I.1 General . 57
220 I.2 Instrumentation . 58
221 I.3 Measuring points layout . 61
222 I.4 Conduct of the test. 61
223 I.5 Calculation and Interpretation of test results . 62
224 I.5.1 Corrections and main test results for turbine . 62
225 I.5.2 Heat Rate Diagnosis . 64
226 I.5.3 Flow capacity and power output . 65
227 I.5.4 HP/IP cylinder efficiency . 65
228 I.5.5 HP Heaters performance . 66
229 I.5.6 System leakage status . 67
230 Annex J (informative) Numerical example of uncertainty calculation –periodic routine
231 tests . 68
232 J.1 General . 68
233 J.2 Measurement uncertainty . 68
234 J.3 Uncertainty calculation results . 68
235 Annex K (informative) Typical reasons for deviations of steam turbine performance
236 from reference or design level . 72
237 Bibliography . 74
239 Figure 1 – Isentropic efficiency of cylinder . 15
240 Figure 2 – Diagram showing location and type of test instrumentation for a typical
241 periodical thermal efficiency test . 27
242 Figure 3 – Diagram showing location and type of test instrumentation for a typical
243 periodical thermal efficiency test(final feedwater flow as primary flow) . 28
244 Figure H.1 – Example 1 . 54
oSIST prEN IEC 60953-4:2025
IEC CDV 60953-4 ED1 © IEC 2025

245 Figure H.2 – Example 2 . 55
246 Figure H.3 – Example 3 . 56
247 Figure H.4 – Example 3 . 56
248 Figure I.1 – Measuring points layout . 61
249 Figure I.2 – Corrected heat rate vs. power output relationship curve . 65
251 Table 1 – Apportionment of unaccounted leakages . 37
252 Table G.1 – Sensitivity of component performance on overall cycle performance for a
253 typical reheat fossil cycle . 52
254 Table G.2 – Sensitivity of components on overall cycle performance for a typical co-
255 generating unit . 52
256 Table G.3 – Sensitivity of components on overall cycle performance for a CCGT
257 turbine unit . 53
258 Table I.1 – Turbine technical specifications . 57
259 Table I.2 – Instrumentation list . 58
260 Table I.3 – Main test results of 350MW and VWO condition . 62
261 Table I.4 – Main test results of partial load conditions . 63
262 Table I.5 – Heat rate change due to boundary parameters (350MW, Post-outage test) . 64
263 Table I.6 – Heat rate change due to component performance (350MW, Post-outage
264 test) 64
265 Table I.7 – Heaters performance results . 66
266 Table J.1 – Assumed total measured variable uncertainty for pressure, temperature,
267 flow and generator output . 68
268 Table J.2 – The uncertainty result for Heat Rate difference of a fossil fired plant . 70
oSIST prEN IEC 60953-4:2025
IEC CDV 60953-4 ED1 © IEC 2025

270 INTERNATIONAL ELECTROTECHNICAL COMMISSION
271 ____________
273 RULES FOR STEAM TURBINE THERMAL ACCEPTANCE TESTS –
274 Part4: Routine testing
276 FOREWORD
277 1) The International Electrotechnical Commission (IEC) is a worldwide organization for standardization comprising
278 all national electrotechnical committees (IEC National Committees). The object of IEC is to promote
279 international co-operation on all questions concerning standardization in the electrical and electronic fields. To
280 this end and in addition to other activities, IEC publishes International Standards, Technical Specifications,
281 Technical Reports, Publicly Available Specifications (PAS) and Guides (hereafter referred to as “IEC
282 Publication(s)”). Their preparation is entrusted to technical committees; any IEC National Committee interested
283 in the subject dealt with may participate in this preparatory work. International, governmental and non -
284 governmental organizations liaising with the IEC also participate in this preparation. IEC collaborates closely
285 with the International Organization for Standardization (ISO) in accordance with conditions determined by
286 agreement between the two organizations.
287 2) The formal decisions or agreements of IEC on technical matters express, as nearly as possible, an international
288 consensus of opinion on the relevant subjects since each technical committee has representation from all
289 interested IEC National Committees.
290 3) IEC Publications have the form of recommendations for international use and are accepted by IEC National
291 Committees in that sense. While all reasonable efforts are made to ensure that the technical content of IEC
292 Publications is accurate, IEC cannot be held responsible for the way in which they are used or for any
293 misinterpretation by any end user.
294 4) In order to promote international uniformity, IEC National Committees undertake to apply IEC Publications
295 transparently to the maximum extent possible in their national and regional publications. Any divergence
296 between any IEC Publication and the corresponding national or regional publication shall be clearly indicated in
297 the latter.
298 5) IEC itself does not provide any attestation of conformity. Independent certification bodies provide conformity
299 assessment services and, in some areas, access to IEC marks of conformity. IEC is not responsible for any
300 services carried out by independent certification bodies.
301 6) All users should ensure that they have the latest edition of this publication.
302 7) No liability shall attach to IEC or its directors, employees, servants or agents including individual experts and
303 members of its technical committees and IEC National Committees for any personal injury, property damage or
304 other damage of any nature whatsoever, whether direct or indirect, or for costs (including legal fees) and
305 expenses arising out of the publication, use of, or reliance upon, this IEC Publication or any other IEC
306 Publications.
307 8) Attention is drawn to the Normative references cited in this publication. Use of the referenced publications is
308 indispensable for the correct application of this publication.
309 9) Attention is drawn to the possibility that some of the elements of this IEC Publication may be the subject of
310 patent rights. IEC shall not be held responsible for identifying any or all such patent rights.
311 IEC 60953-4 has been prepared by subcommittee WG11/PT60953-4: Thermal Acceptance Test, of IEC technical
312 committee 5: Steam Turbines.
313 The text of this International Standard is based on the following documents:
Draft Report on voting
5/XX/FDIS 5/XX/RVD
315 Full information on the voting for its approval can be found in the report on voting indicated in the above table.
316 The language used for the development of this International Standard is English.
317 A list of all parts in the IEC 60953 series, published under the general title Rules for steam turbine thermal
318 acceptance tests, can be found on the IEC website.
319 This document was drafted in accordance with ISO/IEC Directives, Part 2, and developed in accordance with
320 ISO/IEC Directives, Part 1 and ISO/IEC Directives, IEC Supplement, available at
321 www.iec.ch/members_experts/refdocs. The main document types developed by IEC are described in greater detail
322 at www.iec.ch/standardsdev/publications.
oSIST prEN IEC 60953-4:2025
IEC CDV 60953-4 ED1 © IEC 2025

323 The committee has decided that the contents of this document will remain unchanged until the stability date
324 indicated on the IEC website under webstore.iec.ch in the data related to the specific document. At this date, the
325 document will be
326 • reconfirmed,
327 • withdrawn,
328 • replaced by a revised edition, or
329 • amended.
oSIST prEN IEC 60953-4:2025
IEC CDV 60953-4 ED1 © IEC 2025

331 INTRODUCTION
332 Routine test in an existing power plant mainly involves an analysis, monitoring and
333 supervision of steam turbine performance. IEC 60953-0, which defines the rules for steam
334 turbine thermal acceptance tests in power plants, does not cater for all the requirements
335 specific to routine test. It was considered necessary to draw up a Supplementary Standard
336 (this document) for guidance on the routine tests of existing steam turbines.
337 However, a large number of the provisions and recommendations of IEC 60953 -0 are still
338 applicable to routine tests and, therefore, in order to avoid a repetitive and bulky document,
339 only the routine-specific addenda will be found in this document.
340 This part of IEC 60953-4 shall be read in conjunction with IEC 60953-0, and the words
341 ‘routine test’ should be read in place of ‘acceptance test’, the words‘ reference conditions’
342 should be read in place of ‘guarantee conditions’, the words ‘reference value’ should be read
343 in place of‘guarantee value’ as well.
344 Although this document is intended to apply to the routine test of large condensing steam
345 turbines, it can nevertheless be used for other types and sizes of turbines to define the basis
346 of a specific procedure to be agreed upon by the parties involved.
347 The purpose of this document is to cover the existing steam turbine components which
348 influence the efficiency of the power plant. This document helps the parties determine the
349 most appropriate parameters that characterise the relative performance change and that
350 could be used as long-term performance monitoring and analysis.
351 The accuracy of the routine test can approach that obtained while following IEC 60953-0, but
352 generally the simplified test results will yield less information about the plant and give less
353 assurance of accuracy. The relative performance rather than absolute value is emphasized in
354 this document. The repeatability of test result rather than test uncertainty is emphasized here
355 as well. In addition depending on the type of test and thermodynamic boundary chosen, the
356 full condition of each component might not be known. In some case, as per the result of
357 routine test, full or further diagnostic test maybe needed.
358 For reference purposes only, a numerical sample calculation and analysis of a fossil steam
359 turbine unit is presented in Annex I
360 The structure and clause numbering of this document follow that of IEC 60953-0. Subclauses
361 found in this document supersede the whole of the equivalent subclause in IEC 60953 -0.
362 Subclause numbering has been extended whenever new items have been included.
363 The main differences between this document and the IEC 60953-0 are listed below.
364 Clause 1: Scope
365 This document gives additional clauses for routine test of steam turbine, regarding the
366 analysis and supervision of relative performance by routine testing.
367 General principles and the determination of the measurement uncertainty of periodic routine
368 tests are given.
369 The purpose of this document is to provide simple and economic test procedures guider for
370 long-term and relative performance of the turbine and turbine cycles.
371 Specific simplified testing procedure is allowed, which results in less accuracy for absolute
372 values and wider uncertainty range. The accuracy for the results of performance changes is
373 sufficient for the purpose of the test.
oSIST prEN IEC 60953-4:2025
IEC CDV 60953-4 ED1 © IEC 2025

374 Clause 2: Normative references
375 IEC 60953-0 and IEC 60953-3 were added as reference.
376 Clause 3: Units symbols, terms and definitions
377 The definitions given in IEC 60953-0 applies to this document. Some new definitions involved
378 features of routine testing were added.
379 Clause 4: Guidance principles
380 The majority of the guiding principles contained in the IEC 60953-0 are also applicable to the
381 routine testing. This document gives further guidelines on the planning, timing, leadership of
382 the tests, the setting of the test and cycle isolation, and allowable test conditions.
383 Clause 4: Measuring techniques and measuring instruments
384 According to the purpose and scope of routine test, the specific requirements of the
385 consistency of the test instruments, the calibration of the instruments and the usage of
386 permanently installed instruments are given.
387 Clause 6: Evaluation of tests
388 This document gives further advice on allowable cycle leakages.
389 Clause 7: Correction of test results and comparison
390 Additional considerations for routine test results comparison including performance
391 parameters trending and heat rate diagnosis are given.
392 Clause 8: Measuring uncertainty
393 This clause of IEC 60953-0 is supplemented by provisions for special cases encountered in
394 routine testing in Annex J. The examples can be used as reference basis.
395 Annexes:
396 Annexes A to E of IEC 60953-0:20222022 applies.
397 Six new annexes were added to the existing ones.
398 Annex F Guidance on selection a type of routine test to be performed.
399 Annex G: Sensitivity factors for some component performance on overall cycle efficiency
400 Annex H: Typical thermodynamic boundary and instrument layout for routine tests
401 Annex I: Calculation and analysis of test results – numerical example
402 Annex J: Numerical examples of uncertainty calculation – periodic comparative test
403 Annex K: Typical reaso
...