Abstract

CENELEC Report * Superseded by CLC/TR 50451:2007

Status
Withdrawn
Publication Date
07-Jun-2001

Buy Documents

Standard

R009-004:2002

English language (111 pages)
Preview
Preview
e-Library read for
×1 day

Buy Documents

Standard

R009-004:2002

English language (111 pages)
Preview
Preview
e-Library read for
×1 day

Frequently Asked Questions

R009-004:2001 is a standard published by CLC. Its full title is "Railway applications - Systematic allocation of safety integrity requirements". This standard covers: CENELEC Report * Superseded by CLC/TR 50451:2007

CENELEC Report * Superseded by CLC/TR 50451:2007

R009-004:2001 is available in PDF format for immediate download after purchase. The document can be added to your cart and obtained through the secure checkout process. Digital delivery ensures instant access to the complete standard document.

Standards Content (Sample)


SLOVENSKI STANDARD
01-marec-2002
Železniške naprave – Sistemska razporeditev zahtev varnostne integritete
Railway applications - Systematic allocation of safety integrity requirements
Ta slovenski standard je istoveten z: R009-004:2001
ICS:
45.020 Železniška tehnika na Railway engineering in
splošno general
2003-01.Slovenski inštitut za standardizacijo. Razmnoževanje celote ali delov tega standarda ni dovoljeno.

CENELEC R009-004
REPORT June 2001
English version
Railway applications
Systematic allocation of safety integrity requirements
This CENELEC Report has been prepared by SC 9XA, Communication, signalling and processing systems,
of Technical Committee CENELEC TC 9X, Electrical and electronic applications for railways. It was approved
by SC9XA on 1999-10-05 and endorsed by the CENELEC Technical Board on 2000-04-01.
CENELEC members are the national electrotechnical committees of Austria, Belgium, Czech Republic,
Denmark, Finland, France, Germany, Greece, Iceland, Ireland, Italy, Luxembourg, Netherlands, Norway,
Portugal, Spain, Sweden, Switzerland and United Kingdom.
CENELEC
European Committee for Electrotechnical Standardization
Comité Européen de Normalisation Electrotechnique
Europäisches Komitee für Elektrotechnische Normung
Central Secretariat: rue de Stassart 35, B - 1050 Brussels
© 2001 CENELEC - All rights of exploitation in any form and by any means reserved worldwide for CENELEC members.
Ref. No. R009-004:2001 E
Foreword
This CENELEC Report was prepared by SC 9XA, Communication, signalling and processing systems, of
Technical Committee CENELEC TC 9X, Electrical and electronic applications for railways.
It was approved by SC9XA on 1999-10-05 and endorsed by the CENELEC Technical Board on 2000-04-01.
Annexes designated "informative" are given for information only.

- 3 - R009-004:2001
Content
Introduction . 8
1 Scope. 9
2 References. 10
2.1 Supporting standards. 10
2.2 Informative references. 10
3 Definitions . 10
4 Symbols and abbreviations. 16
5 Safety Integrity Levels allocation framework.17
5.1 Prerequisites . 17
5.2 Overview of the methodology. 17
5.3 Definition of Safety Integrity Levels. 21
5.4 Qualitative vs. quantitative methods. 22
5.4.1 Qualitative Assessment . 22
5.4.2 Quantitative Assessment . 23
5.5 EN 50126 lifecycle context. 24
6 System definition . 26
7 Hazard identification . 27
7.1 General principles. 27
7.2 Empirical hazard identification methods . 29
7.3 Creative hazard identification methods. 29
7.4 Hazard ranking. 30
7.5 Existing hazard lists. 30
8 Risk analysis . 30
8.1 Risk tolerability . 30
8.2 Determination of Tolerable Hazard Rate . 31
8.2.1 Qualitative Risk Analysis. 31
8.2.2 Quantitative risk analysis . 33
8.2.3 GAMAB and similar approaches . 39
8.2.4 The MEM approach . 40
8.2.4 Other approaches. 41

9 System design analysis . 41
9.1 Apportionment of safety integrity requirements to functions. 42
9.1.1 Physical independence . 43
9.1.2 Functional Independence. 44
9.1.3 Process independence . 45
9.2 Use of SIL tables. 45
9.3 Identification and treatment of new hazards arising from design. 46
9.4 Determination of function and subsystem SIL . 48
9.5 Determination of safety integrity requirements for system elements . 49
Annex A Single-line signalling system example . 51
Annex B Level crossing example. 71
Annex C Comparison of demand and continuous mode. 83
Annex D Proposed changes for annex A of ENV 50129. 97
Annex E Frequently asked questions. 111

- 5 - R009-004:2001
Executive summary
This report presents a systematic methodology to determine safety integrity requirements for railway
signalling equipment, taking into account the operational environment and the architectural design of the
signalling system.
At the heart of this approach is a well defined interface between the operational environment and the
signalling system. From the safety point of view this interface is defined by a list of hazards and tolerable
hazard rates associated with the system. It should be noted that the purpose of this approach is not to
limit co-operation between suppliers and railway authorities but to clarify responsibilities and interfaces.
It is the task (summarized by the term Risk Analysis) of the Railway Authority
• to define the requirements of the railway system (independent of the technical realisation);
• to identify the hazards relevant to the system;
• to derive the tolerable hazard rates, and
• to ensure that the resulting risk is tolerable (with respect to the appropriate risk tolerability criteria).
Definition
System Design Analysis
Figure 0.1 - Global process overview
The only requirement is that the tolerable hazard rates must be derived taking into account the risk
tolerability criteria. Risk tolerability criteria are not defined by this report, but depend on national or
European legislative requirements.

Among the risk analysis methods two are proposed in order to estimate the individual risk explicitly, one
more qualitative, the other more quantitative. Other methods, similar to the GAMAB principle, do not
explicitly determine the resulting risks, but derive the tolerable hazard rates from comparison with the
performance of existing systems, either by statistical or analytical methods. Alternative qualitative
approaches are acceptable, if as a result they define a list of hazards and corresponding THR. The
specification of the system requirements comprising performance and safety (THR) terminates the
Railway Authority’s task.
Near misses
SYSTEM Definition
withTarget
System DESIGN ANALYSIS
Figure 0.2 - Example Risk Analysis process
The supplier’s task (summarized by the term System Design Analysis) comprises
• definition of the system architecture;
• analysis of the causes leading to each hazard;
• determination of the safety integrity requirements (SIL and hazard rates) for the subsystems;
• determination of the reliability requirements for the equipment.

- 7 - R009-004:2001
Causal analysis constitutes two key stages. In the first phase the tolerable hazard rate for each hazard is
apportioned to a functional level. Safety Integrity Levels (SIL) are defined at this functional level for the
subsystems implementing the functionality. The hazard rate for a subsystem is then translated to a SIL
using the SIL table.
During the second phase the hazard rates for subsystems are further apportioned leading to failure rates
for the equipment, but at this physical implementation level the SIL remains unchanged. Consequently
also the software SIL defined by EN 50128 would be the same as the subsystem SIL but for the
exceptions described in EN 50128.
The apportionment process may be performed by any method which allows a suitable representation of
the combination logic, e.g. reliability block diagrams, fault trees, binary decision diagrams, Markov models
etc. In any case particular care must be taken when independence of items is required. While in the first
phase of the causal analysis functional independence is required, physical independence is sufficient in
the second phase. Assumptions made in the causal analysis must be checked and may lead to safety-
relevant application rules for the implementation.
From Risk
Analysis
List of
hazards
and THR
Undetected failure Undetetced failure Undetected failure
of power supply of road-side of LC controller
warnings
Late or no switch-in Undetected failure Undetetced failure Undetected failure 1E-7 1E-7 1E-7
LC set back to
of power supply of road-side of LC controller
warnings normal position
1E-7 1E-7 1E-7 1E-7
Check
System
....
independence
Undetected failure Undetected architecture
of light signals failure of barriers
assumptions 7E-6 7E-6
Undetected failure Undetected Undetected failure Undetected
of switch-in failute of distant
of light signals failure of barriers
function signal
1E-7 7E-6 7E-6
....
SIL and THR
THR
Determine
for subsystems
SIL table
and SIL
SIL and FR
Apportion
hazard rates to for
elements elements
Figure 0.3 - Example System Design Analysis process
Both, the risk analysis and the system design analysis, have to be approved by the Railway Safety
Authority.
However whilst the risk analysis may be carried out once at the railway level, the system design analysis
must be performed for every new architecture. It is prudent to review the risk analysis and system design
analysis when safety related changes are introduced.

Introduction
Historically the interoperability of European railways was not only hindered by incompatible technology
but also by different approaches towards safety. The common European market is the main driving force
behind the harmonisation of the different safety cultures. In a joint pan-European effort comprehensive
safety standards have been established for railway signalling by the European electrotechnical
standardisation committee CENELEC:
• EN 50126: Railway applications - The specification and demonstration of Reliability, Availability,
Maintainability and Safety (RAMS)
• EN 50128: Railway applications - Communications, signalling and processing systems - Software for
railway control and protection systems
• ENV 50129: Railway applications - Safety related electronic systems for signalling

These CENELEC standards assume that safety relies both on adequate measures to prevent or tolerate
faults (as safeguards against systematic failure) and on adequate measures to control random failures.
Measures against both causes of failure should be balanced in order to achieve the optimum safety
performance of a system. To achieve this the concept of Safety Integrity Levels (SIL) is used. SILs are
used as a means of creating balance between measures to prevent systematic and random failures, as it
is agreed within CENELEC that it is not feasible to quantify systematic integrity.

A shortcoming of the CENELEC standards as of today is (similar as in other related standards like
IEC 61508 [IEC] or ISA S84.01 [ISA]) that while the guidance on how to fulfil a particular SIL is quite
comprehensive the process and rules to derive SILs for system elements from system safety targets or
the tolerable system risk are not adequately covered. A general convincing solution to this problem is still
an open research problem, see [LM][ZD][YB2][GAM] for some divergent examples. However in order to
achieve cross-acceptance of safety cases and products for railway signalling applications it is necessary
to fill the gap.
This has been realized by SC9XA in 1997 and consequently a working group has been set up in March
1998 in order to find a joint harmonized approach at least for railway signalling applications.

Although the major driving forces behind this work were novel signalling applications which are required
to be interoperable throughout Europe, the scope and applicability of the approach presented in this
report should not be limited to signalling or interoperable applications.

- 9 - R009-004:2001
1 Scope
The scope of this report is to define a method to determine the required Safety Integrity Level of railway
signalling equipment taking in consideration
• the operational conditions of the railway and
• the architecture of the signalling system.
The following picture may be used in order to detail more precisely the scope of this report:
Unified Signalling Safety
Scope of WGA10 work Target
as agreed by SC9XA (individual average risk:
units D /(P h) )
SIG
Legend:
Type of operation
Death
Example parameters:
System
speed, train density .
SIGnalling
Person
hour
Hazard
wrong side failure
Specific Signalling Safety
Rate
Target (hazard rate :
units H /(S h) or
SIG
wsf /(S h) )
SIG
Signalling system
architecture and
functionality (normal,
fallback .)
Allocation to functions
and system elements
(apportionment)
SILs and
failure rates for system
elements. Result:
Element SIL FR
E x λ
1 1 1
...
E x λ
n n
n
Figure 1.1 - Scope of WGA10
From a mechanistic point of view the task of this report is to define a method of calculation, which
determines the integrity requirements (qualitatively and quantitatively) from the inputs stated above.

2 References
This CENELEC Report incorporates by dated or undated references, provisions from other publications.
These references are cited at the appropriate place in the text and the publications are listed hereafter.
For dated references, subsequent amendments to or revisions of any of these publications apply to this
Report only when incorporated in it by amendment or revision. For undated references the latest edition
of the publication referred to applies.
2.1 Supporting standards
[126] Railway applications - The specification and demonstration of Reliability, Availability,
Maintainability and Safety (RAMS), EN 50126:1999
[128] Railway applications - Communications, signalling and processing systems - Software for railway
control and protection systems, EN 50128:2001
[129] Railway applications - Safety related electronic systems for signalling, ENV 50129:1998
2.2 Informative references
[0056] UK Ministry of Defence, Safety Management Requirements for Defence Systems, Def Stan 00-56
[GAM] CASCADE: Generalised Assessment Method , Part II: Guidelines, ESPRIT 9032 report,
ref. CAS/IC/MK/D2.3.2/V3, 1996
[HK] Kumamotu, H. and Henley, E.: Probabilistic risk assessment and management for engineers and
scientists, IEEE Press, 1996
[IEC] IEC: Functional safety of electrical/electronic/programmable electronic safety-related systems,
IEC 61508 series
[ISA] ISA: Application of Safety Instrumented Systems for the Process Industries, ISA S84.01,
February 1996
[ISO] ISO/IEC: Information technology - System and software integrity levels, ISO/IEC 15026
[Lev95] Leveson, N. G.: Safeware - System safety and computers, Addison-Wesley, 1995
[LM] Lindsay, P. A. and McDermid, J. A.: A systematic approach to software safety integrity levels, in:
Peter Daniel (Ed.): SAFECOMP'97 , Springer Verlag, 1997, 70-82
[R01] Railway applications - Communication, signalling and processing systems - Hazardous failure
rates and Safety Integrity Levels (SIL), R009-001:1997
[RSH] Railway Signalling Hazards, Swedish National Rail Administration, Technical Report 1999:1
nd
[SAH] System Safety Analysis Handbook, 2 edition, System Safety Society, 1998
[VIL] Villemeur, A.: Reliability, Availability, Maintainability and Safety Assessment, Volume 1: Methods
and Techniques, Wiley, 1992
[YB2] Engineering Safety Management System, Issue 2.0, "Yellow Book", Railtrack, 1997
[ZD] Zerkani, H. and Dumolo, D.: System Safety Lifecycle Based on IEC 61508 and its Use for
th
Railway Applications, Proc. 16 International System Safety Conference, Sept. 14-19, 1998,
Seattle
3 Definitions
For the purpose of this report, the following definitions apply. For terms not defined here, the following
references should be consulted in order of priority:
- IEC 60050(191): International Electrotechnical Vocabulary (Chapter 191, dependability and quality of
service);
- ISO 8402: Quality Vocabulary;
- ISO/IEC 2382: Information Technology Vocabulary.

- 11 - R009-004:2001
accident
an unintended event or series of events that results in death, injury, loss of a system or service, or
environmental damage (ENV 50129)
apportionment
a process whereby the RAMS elements for a system are sub-divided between the various items which
comprise the system to provide individual targets (EN 50126)
can
is possible (ENV50129)
causal analysis
analysis of the reasons how and why a particular hazard may come into existence
collective risk
a risk which is related to a group of people
common cause failure
a failure which is the result of an event(s) which causes a coincidence of failure states of two or more
components leading to a system failing to perform its required function (EN 50126)
common-mode fault
fault common to items which are intended to be independent (ENV 50129)
consequence analysis
analysis of events which are likely to happen after a hazard has occurred
cross-acceptance
the status achieved by a product that has been accepted by one Authority to the relevant European
Standards and is acceptable to other Authorities without the necessity for further assessment
(ENV 50129)
dependent failure
the failure of a set of events; the probability of which cannot be expressed as the simple product of the
unconditional probabilities of the individual events (EN 50126)
diversity
a means of achieving all or part of the specified requirements in more than one independent and
dissimilar manner (ENV 50129)
element
a part of a product that has been determined to be a basic unit or building block. An element may be
simple or complex (ENV 50129)
environment
the surrounding objects or region or circumstances which may influence the behaviour of the system and
or may be influenced by the system (ENV 50121-5)
equipment
a functional physical item (ENV 50129)

error
a deviation from the intended design which could result in unintended system behaviour or failure
(ENV 50129)
failure
a deviation from the specified performance of a system. A failure is the consequence of an fault or error in
a system (ENV 50129)
failure cause
the circumstances during design; manufacture or use which have led to a failure (EN 50126, IEC)
failure mode
the predicted or observed results of a failure cause on a stated item in relation to the operating conditions
at the time of the failure (EN 50126, IEC)
failure rate
the limit; if this exists; of the ratio of the conditional probability that the instant of time; T; of a failure of a
product falls within a given time interval (t+(t) and the length of this interval; (t; when (t tends towards
zero; given that the item is in an up state at the start of the time interval (EN 50126, IEC)
fault
an abnormal condition that could lead to an error in a system. A fault can be random or systematic
(EN 50126, IEC)
fault detection time
time span which begins at the instant when a fault occurs and ends when the existence of the fault is
detected (ENV 50129)
fault mode
one of the possible states of a faulty product for a given required function (EN 50126, IEC)
fault tree analysis
an analysis to determine which fault modes of the product; sub-products or external events; or
combinations thereof; may result in a stated fault mode of the product; presented in the form of a fault
tree (EN 50126, IEC)
FMEA
an acronym meaning Failure Modes and Effects Analysis. A qualitative method of reliability analysis
which involves the study of the fault modes which can exist in every sub-product of the product and the
determination of the effects of each fault mode on other sub-products of the product and on the required
functions of the product (EN 50126, IEC)
function
a mode of action or activity by which a product fulfils its purpose (EN 50126, IEC)
hazard
an object, condition or state that could lead to an accident [YB2].In the context of a system safety, a
hazard is an unprotected state of the system, which under certain external conditions leads to an accident
hazard identification
the process used to define potential hazards related to a system

- 13 - R009-004:2001
hazard log
the document in which all safety management activities, hazards identified, decisions made and solutions
adopted, are recorded or referenced (EN 50126, IEC)
human error
a human action (mistake), which can result in unintended system behaviour/failure (ENV 50129)
independence (functional)
two items are functionally independent, if they do not have any common cause failures, neither
systematic nor random
independence (physical)
two items are physically independent, if they do not have any random common cause failures
independence (technical)
freedom from any mechanism which can affect the correct operation of more than one item (ENV 50129)
individual risk
a risk which is related to a single individual only
item
element under consideration (ENV 50129)
loss analysis
analysis of safety, environmental or economical harm or damage
may
is permissible (ENV 50129)
negation
enforcement of a safe state following detection of a hazardous fault (ENV 50129)
negation time
time span which begins when the existence of a fault is detected and ends when a safe state is enforced
(ENV 50129)
product
a collection of elements, interconnected to form a system, subsystem or item of equipment, in a manner
which meets the specified requirements (ENV 50129)
railway authority
the body with the overall accountability to a Regulator for operating a railway system (EN 50126, IEC)
RAMS
an acronym meaning a combination of Reliability; Availability; Maintainability and Safety (EN 50126, IEC)
random failure integrity
the degree to which a system is free from hazardous random faults (ENV 50129)
random fault
the occurrence of a fault based on probability theory and previous performance (ENV 50129)

random hardware failures
failures; occurring at random times; which result from a variety of degradation mechanisms in the
hardware (EN 50126, IEC)
redundancy
the provision of one or more additional elements, usually identical, to achieve or maintain availability
under the failure of one or more of those elements. (ENV 50129)
reliability
the probability that an item can perform a required function under given conditions for a given time
interval (t1; t2) (EN 50126, IEC)
risk
likelihood of an event occurring and its consequences
Risk Analysis
systematic use of available information to estimate the likelihood and consequences of hazards
risk assessment
overall process of risk analysis and risk evaluation
risk aversion
the ambivalent attitude of society towards catastrophic outcomes. This may be taken into account by
additional risk aversion factors, which give a weight to avoidance of catastrophic outcomes
risk reduction
a process of selection and implementation of options that is applied to reduce either the likelihood or
consequences, or both, of a particular risk
safe state
a condition which continues to preserve safety (ENV 50129)
safety
freedom from unacceptable levels of risk (ENV 50129)
safety authority
the body responsible for certifying that a safety-related system is fit for service and complies with relevant
statutory and regulatory safety requirements (ENV 50129)
safety case
the documented demonstration that the product complies with the specified safety requirements
(ENV 50129)
safety integrity
the likelihood of a safety-related system achieving its required safety features under all the stated
conditions within a stated operational environment and within a stated period of time (ENV 50129)
(system) safety integrity level
a number which indicates the required degree of confidence that a system will meet its specified safety
features (ENV 50129)
- 15 - R009-004:2001
safety life-cycle
the additional series of activities carried out in conjunction with the system life-cycle for safety-related
systems (ENV 50129)
safety loss
the measure of injury and fatality arising from an accident
safety process
the series of procedures that are followed to enable all safety requirements of a product to be identified
and met (ENV 50129)
safety requirements
the requirements of the safety functions that have to be performed by the safety related systems;
comprising safety functional requirements and safety integrity requirements . (EN 50126, IEC)
safety target
in the context of this report the safety target relates to a tolerable hazard rate derived by the Railway
Authority by risk analysis
shall
is mandatory (ENV 50129)
should
is recommended (ENV 50129)
signalling system
particular kind of system used on a railway to control and protect the operation of trains (ENV 50129)
SIL table
a set of allocations between the values of safety integrity levels and the corresponding bands of tolerable
hazard rates (= safety target)
Software Safety Integrity Level
a classification number which determines the techniques and measures that have to be applied in order
to reduce residual software faults to an appropriate level (EN 50128)
system
a set of subsystems or elements which interact according to a design (ENV 50129)
NOTE  The system is a matter of perspective. It is not a fixed term, but can be defined arbitrarily.
system design analysis
the process of analysing the causes of hazards and of identification of requirements to limit the likelihood
of hazards to a tolerable level. “System Design Analysis” should better be called ”System Hazard
Analysis” or similar. But this definition would be contradictory to the EN 50126 definition of hazard
analysis
system function
a system manifests a emergent property, which is not necessarily inherent in its constituent parts

system life-cycle
the activities occurring during a period of time that starts when a system is conceived and ends when the
system is no longer available for use (EN 50126, IEC)
systematic failure
failure due to errors in any safety lifecycle activity; within any phase; which cause it to fail under some
particular combination of inputs or under some particular environmental condition (EN 50126, IEC)
systematic failure integrity
the degree to which a system is free from unidentified hazardous errors and the causes thereof
(ENV 50129)
systematic fault
an inherent fault in the specification, design, construction, installation, operation or maintenance of a
system, subsystem or equipment (ENV 50129)
target individual risk
an individual risk which is tolerated by society
tolerable hazard rate
a hazard rate which guarantees that the resulting risk does not exceed a target individual risk
tolerable risk
the maximum level of risk of a product that is acceptable to the Railway Authority (EN 50126, IEC)
4 Symbols and abbreviations
A accident type k
k
ALARP as low as reasonably practicable
k
C consequence probability (for hazard j leading to accident k)
j
CCA cause consequence analysis
CCF common cause failure
D duration of hazard j
j
DR detection rate
E exposure of individual i to hazard j
ij
k
F probability of fatality for individual i in accident type k
i
FR failure rate
GAMAB globalement au moins aussi bon
HR hazard rate
IRF individual risk of datality
LC level crossing
MEM minimum endogenous mortality
MTBF mean time between failure
N number of uses
N number of people in a population
P
RAMS Reliability, Availability, Maintainability and Safety
SIL Safety Integrity Level
S severity of accident type k
k
T periodic testing time
THR tolerable hazard rate
TIR target individual risk
- 17 - R009-004:2001
5 Safety Integrity Levels allocation framework
5.1 Prerequisites
The report does not define any safety targets for signalling systems or system elements. It gives a
generic methodology, therefore all numerical values shall be seen only as illustrative and may not be
relied upon.
This methodology does not deal with safety acceptance or risk tolerability.
Note that the definition and usage of the SIL table is different from the current ENV 50129 [129]. The
explanation is given in 9.2.
This report deals with system SILs as utilized by ENV 50129, not with software SILs as defined by
EN 50128. Guidance on software SILs can be found in EN 50128 only.
Some definitions, mainly from ENV 50129, have been changed or extended. Refer to clause 3.
5.2 Overview of the methodology
This subclause is intended to give a bird’s eye perspective of the methodology. It can not explain all
details, which are worked out in the following sections. Major aspects of the methodology are highlighted.
Risk Tolerability Criteria
System Definition
Hazard Identification
Risk Analysis
Consequence analysis
Loss Analysis
Risk Assessment
Hazards, THR
Apportionment of random
System Design Analysis
and systematic integrity
Causal Analysis
requirements
CCF Analysis
SIL Allocation
(Functional level) Apportionment of random
integrity requirements
SIL table
Subsystems, THR, SIL
(reliability)
(Technical level)
Components, FR, SIL
Figure 5.1 - Process overview
The general steps of the methodology can be summarized as follows (see Figure 5.1):
1) Define the system adequately.
2) Identify key operational hazards.
3) Determine the tolerable hazard rate THR for each hazard by analysing the consequences of the
i
hazards (taking into account the operational parameters).
4) For each hazard: Analyse the causes down to a functional level taking into account system definition
and architecture.
5) Decide which function(s) are implemented by which subsystem.
For each subsystem:
• collect contributions of each function, which is realized by the subsystem, to all hazards;
• calculate overall tolerable hazard rate THR for the subsystem;
S
• translate THR into a safety integrity level SIL for the subsystem using a SIL table;
S S
• determine failure rates for the system elements to meet THR for the subsystem.
S
Note that this approach inherently divides the world into railway operation (the “real” world, for which the
railway authority is responsible) and the technical solutions (the “technical” world, for which the supplier of
signalling equipment is responsible). The natural border between these is defined by essential functions,
the failure of which constitutes the hazards. These may have consequences (accidents in the worst case)
and causes. Thus the approach defines a natural interface between railway authorities and suppliers. A
different top-level perspective is given in Figure 5.2, which shows the flow of activities for a top-down
application of the methodology and the relation to some major input and output documents.

- 19 - R009-004:2001
Input Activity Output
Define System
System Definition
(functions, boundary,
interfaces, environment
...)
Hazard Log
Identify
top level
hazards
(system) hazards
risk
Risk tolerability criteria System Requirements
Analyse consequences
(safety) Specification
THRs
of hazards
Analyse causes of
(Sub-)System
Hazard Analysis
hazards
Architecture
Identify additional
hazards
Iterate until
system element
level
Subsystem
Allocate Safety Integrity
SILs
Requirements
Requirements to
failure
Specification
subsystems/system
rates
elements
Figure 5.2 - Process overview in flowchart notation
In the process overview documents referenced by EN 50126 or ENV 50129 are depicted by solid lines,
while documents not explicitly referred to are framed by dotted lines.

In particular step 3 and steps 4/5 can be further subdivided to show more details. Here dotted lines depict
optional steps.
Analyse
System
Operation
Definition
Identify
Hazards
Estimate
Hazard
Rates
Identify
Hazard
Consequen
Log
ces:
• Accidents
• Near miss
• Safe state
Determine
risk
Risk System
Determine
Requirements
tolerability
THR
criteria Specification
(Safety
(safety)
requirements)
System Design
Analysis
Figure 5.3 - Process details of Risk Analysis (steps 1-3) in flowchart notation
Note that the methodology is generic and may be tailored to the user’s needs. For example if the railway
authority or the supplier has ways to define the THR by other means then only a part of the methodology
may be applied. In particular the THR may be derived from arguments like GAMAB by operational and
performance statistics (instead of consequence analysis) or by system design analysis of equipment in
use.
- 21 - R009-004:2001
For each hazard
Risk Analysis
Hazard
Hazards
Analysis
Perform Safety-
and THR
Causal
related
Analysis
application
System
conditions
functions
For each function
Collect
contribution
to hazards
For each subsystem
Determine
System
which
Architecture
function is
Description
realised by
which
subsystem
Determine Subsystem
SIL table
THR and Requirements
SIL Specification
System
Determine
Design
FR for
Description
system
elements
Figure 5.4 - Process details of System Design Analysis (steps 4-5) in flowchart notation
5.3 Definition of Safety Integrity Levels

The CENELEC standards for railway signalling assume that safety relies both on adequate measures to
prevent or tolerate faults (as safeguards against systematic failure) and on adequate measures to control
random failures. Measures against both causes of failure should be balanced in order to achieve the
optimum safety performance of a system. To achieve this the concept of Safety Integrity Levels (SIL) is
used. SILs are used as a means of creating balance between measures to prevent systematic and
random failures, as it is agreed within CENELEC that it is not feasible to quantify systematic integrity.

Signalling
failure
OR
man-made
physical
systematic
failure
random
failure
Figure 5.5 - SIL concept
This concept is clearly explained in annex A of ENV 50129:

Each of these Functions shall have a qualitative Safety Target and/or a Quantitative Target attached to
them. The Qualitative Target shall be in the form of a Safety Integrity Level, and shall cover Systematic
Failure Integrity. The Quantitative Target shall be in the form of a numerical failure rate, and shall cover
Random Failure Integrity.
It is important to recognize that achievement of a specified Safety Integrity Level requires compliance with
all of the factors in Figure A.2, namely:
- Quality Management conditions;
- Safety Management conditions;
- Technical Safety conditions;
- Quantified safety targets.
In many standards like IEC [IEC] or ENV 50129 [129] this balance is expressed in a table, which consists
of a list of integrity levels 0, 1, 2, 3, 4 and a list of corresponding intervals or bands for hazard rates
I ,.,I .
0 4
5.4 Qualitative vs quantitative methods
5.4.1 Qualitative assessment
The qualitative risk assessment process broadly relies on expert judgement and past experience primarily
within a subjective and coarse quantitative process. It is worth noting that mere use of quantification and
numbers does not necessarily qualify an assessment as quantitative. Such quantification is mainly a
reflection of judgement and lacks the objectivity and accuracy to generate a detailed and reliable measure
of risks.
The qualitative framework for assessment of risks arising from hazards of undertakings, products and
processes, yields a number of benefits;
• principally a judgmental process;
• no detailed quantification, data collection and analytical work;
• simple and can be carried out without assistance from process experts;

At first glance this formulation ”and/or” may seem contradictory. But section A.4.2.2 (the one containing the SIL table) gives
guidance what to do if only a qualitative Safety Target or a Quantitative Target is defined, namely to find the missing target by the
SIL table.
- 23 - R009-004:2001
• auditable process with scope for review and improvement;
• does not require customisation or a specific form of a ranking matrix;
• employs the same framework and principles as in the quantitative approach;
• ease of extension/migration to the quantitative assessment where necessary.
The constraints and disbenefits of the qualitative approach must be borne in mind however, these are;
• subjective and coarse nature of assumptions necessitating thorough documentation;
• simplistic hence unsuitable for complex systems and high-risk undertakings;
• inadequate for the assessment of major risks leading to significant losses.
5.4.2 Quantitative assessment
The quantitative risk assessment process generally satisfies the following requirements:
• extensive use of modelling;
• predominate application of objective and validated data;
• treatment of uncertainty associated with input data and results;
• treatment of dependency between significant factors;
• use of statistical simulation where appropriate.

Modelling predominately represents a simplification and generalisation of reality but, enhances our
understanding of causal relationships, highlights important factors and provides a useful tool for
anticipation and potentially prediction of future.
The quantitative framework for assessment of risks arising from hazards of undertakings, products and
processes, yields a number of major advantages over its qualitative counterpart:
• generates a quantified measure of risks in complex situations;
• capable of addressing uncertainty and statistical variations in input data;
• capable of addressing dependencies in the input parameters/data;
• capable of generating confidence intervals for the quantified risks;
• capable of demonstrating compliance with legal duty and Industry Benchmarks;
• auditable objective process with scope for review and improvement;
• does not employ arbitrary tolerability criteria popularized by risk matrices;
• does not require customisation or a specific form of a ranking matrix;
• provides an auditable and traceable approach to decision support;
• employs the same framework and principles as in the qualitative approach.
The constraints and disbenefits of the quantitative approach must be borne in mind however, namely:
• complex hence unsuitable for low risk systems and undertakings;
• requires expert resource in knowledge elicitation and risk modelling;
• need for extensive range of objective data and the requisite pre-processing;
• need for formidable computing resource and know-how;
• resource intensive, costly hence inappropriate for applications where a qualitative approach may
suffice;
• lack of readily available, robust and comprehensive computer based tools.

5.5 EN 50126 lifecycle context
The linking between the WG A10 tasks and the EN 50126 phases is described in this subclause.
Concept
System Definition and 2
Application Conditions
Risk Analysis
System Requirements
Apportionment of
System Requirements
Design and 6
Implementation
Figure 5.6 - Relevant phases of the generic EN 50126 lifecycle
The lifecycle process as described in EN 50126 is a top down approach. Therefore almost identical
requirements appear in several successive phases. The output will of course be more detailed as the
process proceeds through the phases. Even though the lifecycle could be seen as an advancing process,
the results of a later phase could necessitate changes in a previous phases (recursion).
In Table 5.1 the corresponding tasks (requirements) from every lifecycle phase, as these are described in
EN 50126 (or ENV 50129), are summarized and listed opposite the WGA10 tasks described in
Figure 5.2.
- 25 - R009-004:2001
Table 5.1 - Relation with EN 50126 lifecycle phases
WGA10-method task Corresponding lifecycle phase and tasks from EN 50126
Close related to Lifecycle phase 2: System definition.
The definition of the system starts in phase 1 and is refined in phase 2. It is very
Define system
important that the final identification of hazards is not made before the scope, the
(functions, boundary,
boundaries and the application conditions of the system are well defined. Following
interfaces, environment)
the list of requirements for tasks to be performed in phase 1 and 2 will normally result
in a sound system definition.
The requirements of phase 1 and 2 from the EN 50126 are shown in cla
...