CEN/CLC/TC 2 - Power Engineering
Joint CEN/CENELEC steering coordination and programming group entrusted: a) with the task to manage the different project teams to develop guides for procurement and submit them through the secretariat to the common CEN/CENELEC procedures. b) and with the task to make a survey of supporting standards needed, identifying the existing and missing standards as well as the responsible CEN or CENELEC technical committee for their drafting or redrafting.
Power Engineering
Joint CEN/CENELEC steering coordination and programming group entrusted: a) with the task to manage the different project teams to develop guides for procurement and submit them through the secretariat to the common CEN/CENELEC procedures. b) and with the task to make a survey of supporting standards needed, identifying the existing and missing standards as well as the responsible CEN or CENELEC technical committee for their drafting or redrafting.
General Information
This standard gives guidance on writing the technical specification for the procurement of static a.c. and d.c. high power convertors for use in electricity generating stations (power stations). This Guide for procurement is not applicable to equipment for use in the nuclear reactor plant area of nuclear power stations. Other possible applications of such equipment have not been considered
in the preparation of this Guide. This Guide covers each type of power convertor, i.e. rectifier, inverter, static excitation system, conversion of a.c. to a.c./d.c. to d.c. and switching, for the purpose of changing and/or controlling one or more characteristics.
This type of equipment is used for many applications such as motor drives and actuators, e.g. variable frequency starting equipment, a.c. and d.c. power supplies for computers and instrumentation, in chemical process plant, e.g. rectifiers for electrolysis in hydrogen production, in mechanical plant, e.g. electrostatic precipitators, etc. For additional, or specific, requirements for batteries, battery chargers or uninterruptible power supplies (UPS) refer to the relevant guides in this series. The equipment covered by this Guide is defined by its function rather than design type. Therefore, the guidance to the specification is stated in performance terms rather than being specified by a detailed description of the equipment to be supplied.
This Guide indicates to potential purchasers how their specification should be prepared so that:
- the equipment type and capacity interfaces correctly with other elements of the systems;
- predicted performance is achieved;
- ancillary equipment is properly sized;
- reliability, availability and safety requirements are achieved;
- proper consideration is given to the evaluation process and the quality measures to be applied.
This Guide does not determine the type of specification (e.g. detailed, performance, functional) or the extent of supply for any given contract which is
- Standard29 pagesEnglish languagesale 10% offe-Library read for1 day
This standard gives guidance on writing the technical specification for the procurement of Control and Instrumentation (C&I) for use in electricity generating stations (power stations). This Guide for procurement is not applicable to equipment for use in the nuclear reactor plant area of nuclear power stations. Other possible applications of such equipment have not been considered in the preparation of this Guide.
- Standard42 pagesEnglish languagesale 10% offe-Library read for1 day
This standard gives guidance on writing the technical specifications for the procurement of wind turbines for use in electrity generating stations (wind power stations. Other possible applications of such equipment have not been considered in the preparation of this guide. This Guide covers wind turbine generator systems (WTGS) with swept area equal to or larger than 40 m2. This guide for procurement of wind turbines has been prepared to be used with the existing international standard IEC 1400-1, it should therefore be read in addition and complementary to the International standard.
- Standard24 pagesEnglish languagesale 10% offe-Library read for1 day
This standard gives guidance on writing the technical specification for the procurement of Hydraulic Turbines, Storage Pumps and Pump-Turbines for use in electricity generating stations (hydraulic power stations). This Guide for procurement is not applicable to equipment for use in the nuclear reactor plant area of nuclear power stations. Other possible applications of such equipment have not been considered in the preparation of this Guide.
- Standard27 pagesEnglish languagesale 10% offe-Library read for1 day
This standard gives guidance on writing the technical specification for the procurement of equipment for use in electricity generating stations (power stations). This Guide for procurement is not applicable to equipment for use in the nuclear reactor plant area of nuclear power stations. Other possible applications of such equipment have not been considered in the preparation of this Guide.
- Standard24 pagesEnglish languagesale 10% offe-Library read for1 day