D04.30 - Methods of Sampling
Methods of Sampling
General Information
SIGNIFICANCE AND USE
4.1 Sampling is as important as testing, and precautions shall be taken to obtain samples to show the true nature and condition of the materials.
4.2 Samples are taken for either of the following two purposes:
4.2.1 To represent as nearly as possible an average of the bulk of the materials sampled, or
4.2.2 To ascertain the maximum variation in characteristics which the material possesses.
SCOPE
1.1 This practice applies to the sampling of asphalt materials at points of manufacture, storage, or delivery.
1.2 The values stated in either SI units or inch-pound units are to be regarded separately as standard. The values stated in each system may not be exact equivalents; therefore, each system shall be used independently of the other. Combining values from the two systems may result in nonconformance with the standard.
1.3 This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate safety, health, and environmental practices and determine the applicability of regulatory limitations prior to use.
1.4 This international standard was developed in accordance with internationally recognized principles on standardization established in the Decision on Principles for the Development of International Standards, Guides and Recommendations issued by the World Trade Organization Technical Barriers to Trade (TBT) Committee.
- Standard6 pagesEnglish language
SIGNIFICANCE AND USE
4.1 Samples obtained in accordance with the procedure given in this practice may be used to measure many different properties of a compacted asphalt pavement including, but not limited to: pavement thickness, density, resilient or dynamic modulus, tensile strength, Marshall or Hveem stability, or for extraction testing, to determine asphalt content, asphalt properties, and mix gradation.
Note 1: The quality of the results produced by this standard are dependent on the competence of the personnel performing the procedure and the capability, calibration, and maintenance of the equipment used. Agencies that meet the criteria of Specification D3666 are generally considered capable of competent and objective testing, sampling, inspection, etc. Users of this standard are cautioned that compliance with Specification D3666 alone does not completely ensure reliable results. Reliable results depend on many factors; following the suggestions of Specification D3666 or some similar acceptable guideline provides a means of evaluating and controlling some of those factors.
SCOPE
1.1 This practice describes a procedure for removal of a sample of compacted asphalt mixture from a pavement for laboratory testing.
1.2 Units—The values stated in either SI units or inch-pound units are to be regarded separately as standard. The values stated in each system are not necessarily exact equivalents; therefore, to ensure conformance with the standard, each system shall be used independently of the other, and values from the two systems shall not be combined.
1.3 The text of this standard references notes and footnotes which provide explanatory material. These notes and footnotes (excluding those in tables and figures) shall not be considered as requirements of the standard.
1.4 This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate safety, health, and environmental practices and determine the applicability of regulatory limitations prior to use.
1.5 This international standard was developed in accordance with internationally recognized principles on standardization established in the Decision on Principles for the Development of International Standards, Guides and Recommendations issued by the World Trade Organization Technical Barriers to Trade (TBT) Committee.
- Standard3 pagesEnglish language
SIGNIFICANCE AND USE
4.1 General:
4.1.1 Sampling is equally as important as the testing, and the sampler shall take every precaution to obtain samples that will yield an acceptable estimate of the nature and conditions of the materials which they represent.
4.1.2 Samples for the development of preliminary data are obtained by the party responsible for the development of the data. Samples for control of the product at the source of manufacture or storage, or at the site of use, are obtained by the manufacturer, contractor, or other parties responsible for accomplishing the work. Samples for tests to be used in acceptance or rejection decisions by the purchaser are obtained by the purchaser or his authorized representative.
4.1.3 This standard shall not be used for the sampling of compacted asphalt mixtures. Practice D5361/D5361M shall be used.
SCOPE
1.1 This practice covers sampling of asphalt mixtures at points of manufacture, storage, delivery, or in place.
1.2 The values stated in either SI units or inch-pound units are to be regarded separately as standard. The values stated in each system may not be exact equivalents; therefore, each system shall be used independently of the other. Combining values from the two systems may result in nonconformance with the standard.
1.3 This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate safety, health, and environmental practices and determine the applicability of regulatory limitations prior to use.
1.4 This international standard was developed in accordance with internationally recognized principles on standardization established in the Decision on Principles for the Development of International Standards, Guides and Recommendations issued by the World Trade Organization Technical Barriers to Trade (TBT) Committee.
- Standard4 pagesEnglish language
- Standard4 pagesEnglish language
SIGNIFICANCE AND USE
4.1 Sampling is equally as important as the testing, and the sampler shall use every precaution to obtain samples that will show the nature and condition of the materials which they represent.
4.2 Samples for preliminary investigation tests are obtained by the party responsible for development of the potential source (Note 3). Samples of materials for control of the production at the source or control of the work at the site of use are obtained by the manufacturer, contractor, or other parties responsible for accomplishing the work. Samples for tests to be used in acceptance or rejection decisions by the purchaser are obtained by the purchaser or his authorized representative.
Note 3: The preliminary investigation and sampling of potential aggregate sources and types occupies a very important place in determining the availability and suitability of the largest single constituent entering into the construction. It influences the type of construction from the standpoint of economics and governs the necessary material control to ensure durability of the resulting structure, from the aggregate standpoint. This investigation should be done only by a responsible, trained, and experienced person. For more comprehensive guidance, see the appendixes.
SCOPE
1.1 This practice covers sampling of coarse and fine aggregates for the following purposes:
1.1.1 Preliminary investigation of the potential source of supply,
1.1.2 Control of the product at the source of supply,
1.1.3 Control of the operations at the site of use, and
1.1.4 Acceptance or rejection of the materials.
Note 1: Sampling plans and acceptance and control tests vary with the type of construction in which the material is used.
1.2 The text of this standard references notes and footnotes which provide explanatory material. These notes and footnotes (excluding those in tables and figures) shall not be considered as requirements of the standard.
1.3 The values stated in either SI units or inch-pound units are to be regarded separately as standard. The values stated in each system may not be exact equivalents; therefore, each system shall be used independently of the other. Combining values from the two systems may result in nonconformance with the standard.
Note 2: The quality of the results produced by this standard are dependent on the competence of the personnel performing the procedure and the capability, calibration, and maintenance of the equipment used. Agencies that meet the criteria of Specification D3666 are generally considered capable of competent and objective testing, sampling, inspection, etc. Users of this standard are cautioned that compliance with Specification D3666 alone does not completely ensure reliable results. Reliable results depend on many factors; following the suggestions of Specification D3666 or some similar acceptable guideline provides a means of evaluating and controlling some of those factors.
1.4 This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate safety, health, and environmental practices and determine the applicability of regulatory limitations prior to use.
1.5 This international standard was developed in accordance with internationally recognized principles on standardization established in the Decision on Principles for the Development of International Standards, Guides and Recommendations issued by the World Trade Organization Technical Barriers to Trade (TBT) Committee.
- Standard7 pagesEnglish language
- Standard7 pagesEnglish language
SIGNIFICANCE AND USE
4.1 This practice is useful for determining the location or time, or both, to take a sample in order to minimize any unintentional bias on the part of the person taking the sample.
Note 1: The effectiveness of this practice in achieving random samples is limited only by the conscientiousness of the user in following the stipulated procedures.
4.2 The selection procedures and examples in this standard provide a practical approach for ensuring that construction material samples are obtained in a random manner. Additional details concerning the number of sample increments, the number of samples, the quantities of material in each, and the procedures for extracting sample increments or samples from the construction lot or process are contained in Practices C172, C183, D75, D140, D979, D5361, and Test Method D345.
4.3 This standard contains examples citing road and paving materials. The concepts outlined herein are applicable to the random sampling of any construction material and can easily be adapted thereto.
4.4 Additional sampling guidance is provided in Practice E105 concerning probability sampling, Practice E122 concerning choosing sample sizes to estimate the average quality of a lot or process (see Note 2), and in Practice E141 for acceptance of evidence based on results of probability sampling.
Note 2: The guidance contained in Practice E122 is not available in other documents referenced in this section.
4.5 The best and most practical method for ensuring that samples of construction materials include the full range of a construction process is by incorporating a stratified random sampling procedure into the sampling process. To implement a stratified random sampling procedure, divide the lot to be sampled into the desired number of equal sublots and randomly sample each sublot in accordance with this standard.
Note 3: If the sublots are of unequal size, it will likely be necessary to weigh the samples in order to maintain a fair and defensible...
SCOPE
1.1 This practice covers the determination of random locations (or timing) at which samples of construction materials can be taken. For the exact physical procedures for securing the sample, such as a description of the sampling tool, the number of increments needed for a sample, or the size of the sample, reference should be made to the appropriate standard method. The selection procedures in Section 6 utilize the table of four-digit numbers given in Table 1.
1.2 This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate safety, health, and environmental practices and determine the applicability of regulatory limitations prior to use.
1.3 This international standard was developed in accordance with internationally recognized principles on standardization established in the Decision on Principles for the Development of International Standards, Guides and Recommendations issued by the World Trade Organization Technical Barriers to Trade (TBT) Committee.
- Standard13 pagesEnglish language
SIGNIFICANCE AND USE
4.1 Samples obtained in accordance with the procedure given in this practice may be used to measure many different properties of a compacted asphalt pavement including, but not limited to, pavement thickness, density, resilient or dynamic modulus, tensile strength, Marshall or Hveem stability, or for extraction testing, to determine asphalt content, asphalt properties, and mix gradation.
Note 1: The quality of the results produced by this standard are dependent on the competence of the personnel performing the procedure and the capability, calibration, and maintenance of the equipment used. Agencies that meet the criteria of Specification D3666 are generally considered capable of competent and objective testing/sampling/inspection/etc. Users of this standard are cautioned that compliance with Specification D3666 alone does not completely assure reliable results. Reliable results depend on many factors; following the suggestions of Specification D3666 or some similar acceptable guideline provides a means of evaluating and controlling some of those factors.
SCOPE
1.1 This practice describes a procedure for removal of a sample of compacted asphalt mixture from a pavement for laboratory testing.
1.2 Units—The values stated in either SI units or inch-pound units are to be regarded separately as standard. The values stated in each system may not be exact equivalents; therefore, each system shall be used independently of the other. Combining values from the two systems may result in non-conformance with the standard.
1.3 The text of this standard references notes and footnotes which provide explanatory material. These notes and footnotes (excluding those in tables and figures) shall not be considered as requirements of the standard.
1.4 This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate safety and health practices and determine the applicability of regulatory limitations prior to use.
- Standard3 pagesEnglish language
- Standard3 pagesEnglish language
SIGNIFICANCE AND USE
4.1 Sampling is as important as testing, and precautions shall be taken to obtain samples to show the true nature and condition of the materials.
4.2 Samples are taken for either of the following two purposes:
4.2.1 To represent as nearly as possible an average of the bulk of the materials sampled, or
4.2.2 To ascertain the maximum variation in characteristics which the material possesses.
SCOPE
1.1 This practice applies to the sampling of asphalt materials at points of manufacture, storage, or delivery.
1.2 The values stated in either SI units or inch-pound units are to be regarded separately as standard. The values stated in each system may not be exact equivalents; therefore, each system shall be used independently of the other. Combining values from the two systems may result in non-conformance with the standard.
1.3 This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate safety and health practices and determine the applicability of regulatory limitations prior to use.
- Standard6 pagesEnglish language
- Standard6 pagesEnglish language
- Standard6 pagesEnglish language
SIGNIFICANCE AND USE
3.1 Sampling is as important as testing, and precautions shall be taken to obtain samples to show the true nature and condition of the materials.
3.2 Samples are taken for either of the following two purposes:
3.2.1 To represent as nearly as possible an average of the bulk of the materials sampled, or
3.2.2 To ascertain the maximum variation in characteristics which the material possesses.
SCOPE
1.1 This practice applies to the sampling of bituminous materials at points of manufacture, storage, or delivery.
1.2 The values stated in either SI units or inch-pound units are to be regarded separately as standard. The values stated in each system may not be exact equivalents; therefore, each system shall be used independently of the other. Combining values from the two systems may result in non-conformance with the standard.
1.3 This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate safety and health practices and determine the applicability of regulatory limitations prior to use.
- Standard6 pagesEnglish language
- Standard6 pagesEnglish language
SIGNIFICANCE AND USE
4.1 General:
4.1.1 Sampling is equally as important as the testing, and the sampler shall take every precaution to obtain samples that will yield an acceptable estimate of the nature and conditions of the materials which they represent.
4.1.2 Samples for the development of preliminary data are obtained by the party responsible for the development of the data. Samples for control of the product at the source of manufacture or storage, or at the site of use, are obtained by the manufacturer, contractor, or other parties responsible for accomplishing the work. Samples for tests to be used in acceptance or rejection decisions by the purchaser are obtained by the purchaser or his authorized representative.
4.1.3 This standard shall not be used for the sampling of compacted bituminous paving mixtures. Practice D5361 shall be used.
SCOPE
1.1 This practice covers sampling of bituminous paving mixtures at points of manufacture, storage, delivery, or in place.
1.2 The values stated in either SI units or inch-pound units are to be regarded separately as standard. The values stated in each system may not be exact equivalents; therefore, each system shall be used independently of the other. Combining values from the two systems may result in non-conformance with the standard.
1.3 This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate safety and health practices and determine the applicability of regulatory limitations prior to use.
- Standard4 pagesEnglish language
- Standard4 pagesEnglish language
SIGNIFICANCE AND USE
4.1 Sampling is equally as important as the testing, and the sampler shall use every precaution to obtain samples that will show the nature and condition of the materials which they represent.
4.2 Samples for preliminary investigation tests are obtained by the party responsible for development of the potential source (Note 3). Samples of materials for control of the production at the source or control of the work at the site of use are obtained by the manufacturer, contractor, or other parties responsible for accomplishing the work. Samples for tests to be used in acceptance or rejection decisions by the purchaser are obtained by the purchaser or his authorized representative. Note 3—The preliminary investigation and sampling of potential aggregate sources and types occupies a very important place in determining the availability and suitability of the largest single constituent entering into the construction. It influences the type of construction from the standpoint of economics and governs the necessary material control to ensure durability of the resulting structure, from the aggregate standpoint. This investigation should be done only by a responsible trained and experienced person. For more comprehensive guidance, see the Appendix.
SCOPE
1.1 This practice covers sampling of coarse and fine aggregates for the following purposes:
1.1.1 Preliminary investigation of the potential source of supply,
1.1.2 Control of the product at the source of supply,
1.1.3 Control of the operations at the site of use, and
1.1.4 Acceptance or rejection of the materials. Note 1—Sampling plans and acceptance and control tests vary with the type of construction in which the material is used.
1.2 The text of this standard references notes and footnotes which provide explanatory material. These notes and footnotes (excluding those in tables and figures) shall not be considered as requirements of the standard.
1.3 The values stated in either SI units or inch-pound units are to be regarded separately as standard. The values stated in each system may not be exact equivalents; therefore, each system shall be used independently of the other. Combining values from the two systems may result in non-conformance with the standard.
1.4 This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate safety and health practices and determine the applicability of regulatory limitations prior to use.Note 2—The quality of the results produced by this standard are dependent on the competence of the personnel performing the procedure and the capability, calibration, and maintenance of the equipment used. Agencies that meet the criteria of Practice D3666 are generally considered capable of competent and objective testing/sampling/inspection/etc. Users of this standard are cautioned that compliance with Practice D3666 alone does not completely assure reliable results. Reliable results depend on many factors; following the suggestions of Practice D3666 or some similar acceptable guideline provides a means of evaluating and controlling some of those factors.
- Standard8 pagesEnglish language
- Standard8 pagesEnglish language
SIGNIFICANCE AND USE
3.1 Sampling is as important as testing, and precautions shall be taken to obtain samples to show the true nature and condition of the materials.
3.2 Samples are taken for either of the following two purposes:
3.2.1 To represent as nearly as possible an average of the bulk of the materials sampled, or
3.2.2 To ascertain the maximum variation in characteristics which the material possesses.
SCOPE
1.1 This practice applies to the sampling of bituminous materials at points of manufacture, storage, or delivery.
1.2 The values stated in either SI units or inch-pound units are to be regarded separately as standard. The values stated in each system may not be exact equivalents; therefore, each system shall be used independently of the other. Combining values from the two systems may result in non-conformance with the standard.
1.3 This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate safety and health practices and determine the applicability of regulatory limitations prior to use.
- Standard6 pagesEnglish language
- Standard6 pagesEnglish language
SIGNIFICANCE AND USE
3.1 Samples obtained in accordance with the procedure given in this practice may be used to measure pavement thickness, density, resilient or dynamic modulus, tensile strength, Marshall or Hveem stability, or for extraction testing, to determine asphalt content, asphalt properties and mix gradation.Note 1—The quality of the results produced by this standard are dependent on the competence of the personnel performing the procedure and the capability, calibration, and maintenance of the equipment used. Agencies that meet the criteria of Specification D3666 are generally considered capable of competent and objective testing/sampling/inspection/etc. Users of this standard are cautioned that compliance with Specification D3666 alone does not completely assure reliable results. Reliable results depend on many factors; following the suggestions of Specification D3666 or some similar acceptable guideline provides a means of evaluating and controlling some of those factors.
SCOPE
1.1 This practice describes a procedure for removal of a sample of compacted bituminous mixture from a pavement for laboratory testing.
1.2 Units—The values stated in either SI units or inch-pound units are to be regarded separately as standard. The values stated in each system may not be exact equivalents; therefore, each system shall be used independently of the other. Combining values from the two systems may result in non-conformance with the standard.
1.3 The text of this standard references notes and footnotes which provide explanatory material. These notes and footnotes (excluding those in tables and figures) shall not be considered as requirements of the standard.
1.4 This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate safety and health practices and determine the applicability of regulatory limitations prior to use.
- Standard3 pagesEnglish language
SIGNIFICANCE AND USE
4.1 Sampling is equally as important as the testing, and the sampler shall use every precaution to obtain samples that will show the nature and condition of the materials which they represent.
4.2 Samples for preliminary investigation tests are obtained by the party responsible for development of the potential source (Note 3). Samples of materials for control of the production at the source or control of the work at the site of use are obtained by the manufacturer, contractor, or other parties responsible for accomplishing the work. Samples for tests to be used in acceptance or rejection decisions by the purchaser are obtained by the purchaser or his authorized representative. Note 3—The preliminary investigation and sampling of potential aggregate sources and types occupies a very important place in determining the availability and suitability of the largest single constituent entering into the construction. It influences the type of construction from the standpoint of economics and governs the necessary material control to ensure durability of the resulting structure, from the aggregate standpoint. This investigation should be done only by a responsible trained and experienced person. For more comprehensive guidance, see the Appendix.
SCOPE
1.1 This practice covers sampling of coarse and fine aggregates for the following purposes:
1.1.1 Preliminary investigation of the potential source of supply,
1.1.2 Control of the product at the source of supply,
1.1.3 Control of the operations at the site of use, and
1.1.4 Acceptance or rejection of the materials. Note 1—Sampling plans and acceptance and control tests vary with the type of construction in which the material is used.
1.2 The text of this standard references notes and footnotes which provide explanatory material. These notes and footnotes (excluding those in tables and figures) shall not be considered as requirements of the standard.
1.3 The values stated in either SI units or inch-pound units are to be regarded separately as standard. The values stated in each system may not be exact equivalents; therefore, each system shall be used independently of the other. Combining values from the two systems may result in non-conformance with the standard.
1.4 This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate safety and health practices and determine the applicability of regulatory limitations prior to use.Note 2—The quality of the results produced by this standard are dependent on the competence of the personnel performing the procedure and the capability, calibration, and maintenance of the equipment used. Agencies that meet the criteria of Practice D3666 are generally considered capable of competent and objective testing/sampling/inspection/etc. Users of this standard are cautioned that compliance with Practice D3666 alone does not completely assure reliable results. Reliable results depend on many factors; following the suggestions of Practice D3666 or some similar acceptable guideline provides a means of evaluating and controlling some of those factors.
- Standard7 pagesEnglish language
- Standard7 pagesEnglish language
SIGNIFICANCE AND USE
This practice is useful for determining the location or time, or both, to take a sample in order to minimize any unintentional bias on the part of the person taking the sample.
Note 1—The effectiveness of this practice in achieving random samples is limited only by the conscientiousness of the user in following the stipulated procedures.
The selection procedures and examples in this standard provide a practical approach for ensuring that construction material samples are obtained in a random manner. Additional details concerning the number of sample increments, the number of samples, the quantities of material in each, and the procedures for extracting sample increments or samples from the construction lot or process are contained in Practices C172, C183, D75, D140, D979, D5361, and Test Method D345.
This standard contains examples citing road and paving materials. The concepts outlined herein are applicable to the random sampling of any construction material and can easily be adapted thereto.
Additional sampling guidance is provided in Practice E105 concerning probability sampling, Practice E122 concerning choosing sample sizes to estimate the average quality of a lot or process (see Note 2), and in Practice E141 for acceptance of evidence based on results of probability sampling.
Note 2—The guidance contained in Practice E122 is not available in other documents referenced in this section.
The best and most practical method for ensuring that samples of construction materials include the full range of a construction process is by incorporating a stratified-random sampling procedure into the sampling process. To implement a stratified-random sampling procedure, divide the lot to be sampled into the desired number of equal sublots and randomly sample each sublot in accordance with this standard.
Note 3—If the sublots are of unequal size, it will likely be necessary to weight the samples in order to maintain a fair and defensible sampling process.
SCOPE
1.1 This practice covers the determination of random locations (or timing) at which samples of construction materials can be taken. For the exact physical procedures for securing the sample, such as a description of the sampling tool, the number of increments needed for a sample, or the size of the sample, reference should be made to the appropriate standard method. The selection procedures in Section 6 utilize the table of four-digit numbers given in Table 1.
1.2 This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate safety and health practices and determine the applicability of regulatory limitations prior to use.
- Standard13 pagesEnglish language
- Standard13 pagesEnglish language
SIGNIFICANCE AND USE
General:
Sampling is equally as important as the testing, and the sampler shall take every precaution to obtain samples that will yield an acceptable estimate of the nature and conditions of the materials which they represent.
Samples for the development of preliminary data are obtained by the party responsible for the development of the data. Samples for control of the product at the source of manufacture or storage, or at the site of use, are obtained by the manufacturer, contractor, or other parties responsible for accomplishing the work. Samples for tests to be used in acceptance or rejection decisions by the purchaser are obtained by the purchaser or his authorized representative.
This standard shall not be used for the sampling of compacted bituminous paving mixtures. shall be used.
SCOPE
1.1 This practice covers sampling of bituminous paving mixtures at points of manufacture, storage, delivery, or in place.
1.2 The values stated in either SI units or inch-pound units are to be regarded separately as standard. The values stated in each system may not be exact equivalents; therefore, each system shall be used independently of the other. Combining values from the two systems may result in non-conformance with the standard.
1.3 This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate safety and health practices and determine the applicability of regulatory limitations prior to use.
- Standard3 pagesEnglish language
- Standard3 pagesEnglish language
SIGNIFICANCE AND USE
General:
Sampling is equally as important as the testing, and the sampler shall take every precaution to obtain samples that will yield an acceptable estimate of the nature and conditions of the materials which they represent.
Samples for the development of preliminary data are obtained by the party responsible for the development of the data. Samples for control of the product at the source of manufacture or storage, or at the site of use, are obtained by the manufacturer, contractor, or other parties responsible for accomplishing the work. Samples for tests to be used in acceptance or rejection decisions by the purchaser are obtained by the purchaser or his authorized representative.
This standard shall not be used for the sampling of compacted bituminous paving mixtures. shall be used.
SCOPE
1.1 This practice covers sampling of bituminous paving mixtures at points of manufacture, storage, delivery, or in place.
1.2 The values stated in SI units are to be regarded as the standard. The values in parentheses are provided for information purposes only.
1.3 This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate safety and health practices and determine the applicability of regulatory limitations prior to use.
- Standard3 pagesEnglish language
- Standard3 pagesEnglish language
SIGNIFICANCE AND USE
Samples obtained in accordance with the procedure given in this practice may be used to measure pavement thickness, density, resilient or dynamic modulus, tensile strength, Marshall or Hveem stability, or for extraction testing, to determine asphalt content, asphalt properties and mix gradation.
SCOPE
1.1 This practice describes a procedure for removal of a sample of compacted bituminous mixture from a pavement for laboratory testing.
1.2 The values stated in SI units are to be regarded as the standard. The values given in parentheses are for information only.
1.3 This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate safety and health practices and determine the applicability of regulatory limitations prior to use.
- Standard3 pagesEnglish language
- Standard3 pagesEnglish language
SIGNIFICANCE AND USE
Samples obtained in accordance with the procedure given in this practice may be used to measure pavement thickness, density, resilient or dynamic modulus, tensile strength, Marshall or Hveem stability, or for extraction testing, to determine asphalt content, asphalt properties and mix gradation.
SCOPE
1.1 This practice describes a procedure for removal of a sample of compacted bituminous mixture from a pavement for laboratory testing.
1.2 The values stated in SI units are to be regarded as the standard. The values given in parentheses are for information only.
1.3 This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate safety and health practices and determine the applicability of regulatory limitations prior to use.
- Standard3 pagesEnglish language
- Standard3 pagesEnglish language
SIGNIFICANCE AND USE
Sampling is equally as important as the testing, and the sampler shall use every precaution to obtain samples that will show the nature and condition of the materials which they represent.
Samples for preliminary investigation tests are obtained by the party responsible for development of the potential source (Note 3). Samples of materials for control of the production at the source or control of the work at the site of use are obtained by the manufacturer, contractor, or other parties responsible for accomplishing the work. Samples for tests to be used in acceptance or rejection decisions by the purchaser are obtained by the purchaser or his authorized representative.
Note 3—The preliminary investigation and sampling of potential aggregate sources and types occupies a very important place in determining the availability and suitability of the largest single constituent entering into the construction. It influences the type of construction from the standpoint of economics and governs the necessary material control to ensure durability of the resulting structure, from the aggregate standpoint. This investigation should be done only by a responsible trained and experienced person. For more comprehensive guidance, see the Appendix.
SCOPE
1.1 This practice covers sampling of coarse and fine aggregates for the following purposes:
1.1.1 Preliminary investigation of the potential source of supply,
1.1.2 Control of the product at the source of supply,
1.1.3 Control of the operations at the site of use, and
1.1.4 Acceptance or rejection of the materials.
Note 1—Sampling plans and acceptance and control tests vary with the type of construction in which the material is used.
1.2 The text of this standard references notes and footnotes which provide explanatory material. These notes and footnotes (excluding those in tables and figures) shall not be considered as requirements of the standard.
1.3 The values stated in either SI units or inch-pound units are to be regarded separately as standard. The values stated in each system may not be exact equivalents; therefore, each system shall be used independently of the other. Combining values from the two systems may result in non-conformance with the standard.
1.4 This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate safety and health practices and determine the applicability of regulatory limitations prior to use.
Note 2—The quality of the results produced by this standard are dependent on the competence of the personnel performing the procedure and the capability, calibration, and maintenance of the equipment used. Agencies that meet the criteria of Practice D 3666 are generally considered capable of competent and objective testing/sampling/inspection/etc. Users of this standard are cautioned that compliance with Practice D 3666 alone does not completely assure reliable results. Reliable results depend on many factors; following the suggestions of Practice D 3666 or some similar acceptable guideline provides a means of evaluating and controlling some of those factors.
- Standard6 pagesEnglish language
- Standard6 pagesEnglish language
SIGNIFICANCE AND USE
Sampling is as important as testing, and precautions shall be taken to obtain samples to show the true nature and condition of the materials.
Samples are taken for either of the following two purposes:
To represent as nearly as possible an average of the bulk of the materials sampled, or
To ascertain the maximum variation in characteristics which the material possesses.
SCOPE
1.1 This practice applies to the sampling of bituminous materials at points of manufacture, storage, or delivery.
1.2 The values stated in either SI units or inch-pound units are to be regarded separately as standard. The values stated in each system may not be exact equivalents; therefore, each system shall be used independently of the other. Combining values from the two systems may result in non-conformance with the standard.
1.3 This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate safety and health practices and determine the applicability of regulatory limitations prior to use.
- Standard6 pagesEnglish language
- Standard6 pagesEnglish language
SCOPE
1.1 This practice covers the determination of random locations (or timing) at which samples of construction materials can be taken. For the exact physical procedures for securing the sample, such as a description of the sampling tool, the number of increments needed for a sample, or the size of the sample, reference should be made to the appropriate standard method. The selection procedures in Section 6 utilize the table of four-digit numbers given in Table 1.
This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate safety and health practices and determine the applicability of regulatory limitations prior to use.
- Standard13 pagesEnglish language
SIGNIFICANCE AND USE
This practice is useful for determining the location or time, or both, to take a sample in order to minimize any unintentional bias on the part of the person taking the sample.
Note 1—The effectiveness of this practice in achieving random samples is limited only by the conscientiousness of the user in following the stipulated procedures.
The selection procedures and examples in this standard provide a practical approach for ensuring that construction material samples are obtained in a random manner. Additional details concerning the number of sample increments, the number of samples, the quantities of material in each, and the procedures for extracting sample increments or samples from the construction lot or process are contained in Practices C172, C183, D75, D140, D979, D5361, and Test Method D345.
This standard contains examples citing road and paving materials. The concepts outlined therein are applicable to the random sampling of any construction material and can easily be adapted thereto.
Additional sampling guidance is provided in Practice E105 concerning probability sampling, Practice E122 concerning choosing sample sizes to estimate the average quality of a lot or process (see Note 2), and in Practice E141 for acceptance of evidence based on results of probability sampling.
Note 2—The guidance contained in Practice E122 is not available in other documents referenced in this section.
The best and most practical method for ensuring that samples of construction materials include the full range of a construction process is by incorporating a stratified-random sampling procedure into the sampling process. To implement a stratified-random sampling procedure, divide the lot to be sampled into the desired number of equal sublots and randomly sample each sublot in accordance with this standard.
Note 3—If the sublots are of unequal size, it will likely be necessary to weight the samples in order to maintain a fair and defensible sampling process.
SCOPE
1.1 This practice covers the determination of random locations (or timing) at which samples of construction materials can be taken. For the exact physical procedures for securing the sample, such as a description of the sampling tool, the number of increments needed for a sample, or the size of the sample, reference should be made to the appropriate standard method. The selection procedures in Section 6 utilize the table of four-digit numbers given in Table 1.
1.2 This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate safety and health practices and determine the applicability of regulatory limitations prior to use.
- Standard13 pagesEnglish language
SIGNIFICANCE AND USE
Sampling is as important as testing, and precautions shall be taken to obtain samples to show the true nature and condition of the materials.
Samples are taken for either of the following two purposes:
3.2.1 To represent as nearly as possible an average of the bulk of the materials sampled, or
3.2.2 To ascertain the maximum variation in characteristics which the material possesses.
SCOPE
1.1 This practice applies to the sampling of bituminous materials at points of manufacture, storage, or delivery.
1.2 The values stated in SI units are to be regarded as the standard. The values given in parentheses are for information only.
1.3 This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate safety and health practices and determine the applicability of regulatory limitations prior to use.
- Standard5 pagesEnglish language
SIGNIFICANCE AND USE
Samples obtained in accordance with the procedure given in this practice may be used to measure pavement thickness, density, resilient or dynamic modulus, tensile strength, Marshall or Hveem stability, or for extraction testing, to determine asphalt content, asphalt properties and mix gradation.
SCOPE
1.1 This practice describes a procedure for removal of a sample of compacted bituminous mixture from a pavement for laboratory testing.
1.2 The values stated in SI units are to be regarded as the standard. The values given in parentheses are for information only.
This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate safety and health practices and determine the applicability of regulatory limitations prior to use.
- Standard3 pagesEnglish language
SIGNIFICANCE AND USE
General:
4.1.1 Sampling is equally as important as the testing, and the sampler shall take every precaution to obtain samples that will yield an acceptable estimate of the nature and conditions of the materials which they represent.
4.1.2 Samples for the development of preliminary data are obtained by the party responsible for the development of the data. Samples for control of the product at the source of manufacture or storage, or at the site of use, are obtained by the manufacturer, contractor, or other parties responsible for accomplishing the work. Samples for tests to be used in acceptance or rejection decisions by the purchaser are obtained by the purchaser or his authorized representative.
SCOPE
1.1 This practice covers sampling of bituminous paving mixtures at points of manufacture, storage, delivery, or in place.
1.2 The values stated in SI units are to be regarded as the standard. The values in parentheses are provided for information purposes only.
This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate safety and health practices and determine the applicability of regulatory limitations prior to use.
- Standard3 pagesEnglish language
SCOPE
1.1 This practice covers the determination of random locations (or timing) at which samples of construction materials can be taken. For the exact physical procedures for securing the sample, such as a description of the sampling tool, the number of increments needed for a sample, or the size of the sample, reference should be made to the appropriate standard method. The selection procedures in Section 5 utilize the table of four-digit numbers given in Table 1.
1.2 This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate safety and health practices and determine the applicability of regulatory limitations prior to use.
- Standard13 pagesEnglish language
SCOPE
1.1 This practice describes a procedure for removal of a sample of compacted bituminous mixture from a pavement for laboratory testing.
1.2 The values stated in SI units are to be regarded as the standard. The values given in parentheses are for information only.
1.3 This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate safety and health practices and determine the applicability of regulatory limitations prior to use.
- Standard3 pagesEnglish language
SIGNIFICANCE AND USE
Sampling is equally as important as the testing, and the sampler shall use every precaution to obtain samples that will show the nature and condition of the materials which they represent.
Samples for preliminary investigation tests are obtained by the party responsible for development of the potential source (Note 2). Samples of materials for control of the production at the source or control of the work at the site of use are obtained by the manufacturer, contractor, or other parties responsible for accomplishing the work. Samples for tests to be used in acceptance or rejection decisions by the purchaser are obtained by the purchaser or his authorized representative.
Note 2—The preliminary investigation and sampling of potential aggregate sources and types occupies a very important place in determining the availability and suitability of the largest single constituent entering into the construction. It influences the type of construction from the standpoint of economics and governs the necessary material control to ensure durability of the resulting structure, from the aggregate standpoint. This investigation should be done only by a responsible trained and experienced person. For more comprehensive guidance, see the Appendix.
SCOPE
1.1 This practice covers sampling of coarse and fine aggregates for the following purposes:
1.1.1 Preliminary investigation of the potential source of supply,
1.1.2 Control of the product at the source of supply,
1.1.3 Control of the operations at the site of use, and
1.1.4 Acceptance or rejection of the materials.
Note 1— Sampling plans and acceptance and control tests vary with the type of construction in which the material is used. Attention is directed to Practices E 105 and D 3665.
1.2 This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate safety and health practices and determine the applicability of regulatory limitations prior to use.
- Standard5 pagesEnglish language
SCOPE
1.1 This practice covers the determination of random locations (or timing) at which samples of construction materials can be taken. For the exact physical procedures for securing the sample, such as a description of the sampling tool, the number of increments needed for a sample, or the size of the sample, reference should be made to the appropriate standard method. The selection procedures in Section utilize the table of four-digit numbers given in Table 1.
1.2 This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate safety and health practices and determine the applicability of regulatory limitations prior to use.
- Standard14 pagesEnglish language
SCOPE
1.1 This practice covers sampling of bituminous paving mixtures at points of manufacture, storage, delivery, or in place.
1.2 This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate safety and health practices and determine the applicability of regulatory limitations prior to use.
1.3 The values stated in SI units are to be regarded as the standard. The values in parentheses are provided for information purposes only.
- Standard3 pagesEnglish language
SCOPE
1.1 This practice covers sampling of bituminous paving mixtures at points of manufacture, storage, delivery, or in place.
1.2 This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate safety and health practices and determine the applicability of regulatory limitations prior to use.
1.3 The values stated in SI units are to be regarded as the standard. The values in parentheses are provided for information purposes only.
- Standard3 pagesEnglish language
SCOPE
1.1 This practice applies to the sampling of bituminous materials at points of manufacture, storage, or delivery.
1.2 The values stated in inch-pound units are to be regarded as the standard. The SI units in parentheses are provided for information only.
1.3 This standard does not purport to address all of the safety problems, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate safety and health practices and determine the applicability of regulatory limitations prior to use.
- Standard5 pagesEnglish language
SCOPE
1.1 This practice applies to the sampling of bituminous materials at points of manufacture, storage, or delivery.
1.2 The values stated in inch-pound units are to be regarded as the standard. The SI units in parentheses are provided for information only.
1.3 This standard does not purport to address all of the safety problems, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate safety and health practices and determine the applicability of regulatory limitations prior to use.
- Standard5 pagesEnglish language
SCOPE
1.1 This practice describes a procedure for removal of a sample of compacted bituminous mixture from a pavement for laboratory testing.
1.2 The values given in inch-pound units are to be regarded as the standard. The SI units given in parentheses are for information only.
1.3 This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate safety and health practices and determine the applicability of regulatory limitations prior to use.
- Standard3 pagesEnglish language
SCOPE
1.1 This practice covers the determination of random locations (or timing) at which samples of construction materials can be taken. For the exact physical procedures for securing the sample, such as a description of the sampling tool, the number of increments needed for a sample, or the size of the sample, reference should be made to the appropriate standard method. The selection procedures in Section 4 utilize the table of three-digit numbers given in Table 1.
1.2 The values stated in inch-pound units are to be regarded as the standard. The SI units in parentheses are for information only.
1.3. This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate safety and health practices and determine the applicability of regulatory limitations prior to use.
- Standard5 pagesEnglish language
SCOPE
1.1 This practice covers sampling of coarse and fine aggregates for the following purposes:
1.1.1 Preliminary investigation of the potential source of supply,
1.1.2 Control of the product at the source of supply,
1.1.3 Control of the operations at the site of use, and
1.1.4 Acceptance or rejection of the materials. Note 1-Sampling plans and acceptance and control tests vary with the type of construction in which the material is used. Attention is directed to Practices E105 and D3665.
1.2 This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate safety and health practices and determine the applicability of regulatory limitations prior to use. >
- Standard4 pagesEnglish language
Frequently Asked Questions
D04.30 is a Technical Committee within ASTM International. It is named "Methods of Sampling". This committee has published 36 standards.
D04.30 develops ASTM standards in the area of Information technology. Currently, there are 36 published standards from this technical committee.
ASTM is a standardization organization that develops and publishes standards to support industry, commerce, and regulatory requirements.
A Technical Committee (TC) in ASTM is a group of experts responsible for developing international standards in a specific technical area. TCs are composed of national member body delegates and work through consensus to create standards that meet global industry needs. Each TC may have subcommittees (SCs) and working groups (WGs) for specialized topics.