oSIST prEN IEC 61784-5-8:2022
(Main)Industrial communication networks - Profiles - Part 5-8: Installation of fieldbuses - Installation profiles for CPF 8
Industrial communication networks - Profiles - Part 5-8: Installation of fieldbuses - Installation profiles for CPF 8
Industrielle Kommunikationsnetze - Profile - Teil 5-8: Feldbusinstallation - Installationsprofile für die Kommunikationsprofilfamilie 8
Réseaux de communication industriels - Profils - Partie 5-8: Installation des bus de terrain - Profils d'installation pour CPF 8
Industrijska komunikacijska omrežja - Profili - 5-8. del: Inštalacija procesnih vodil - Inštalacijski profili za CPF 8
General Information
Relations
Standards Content (Sample)
SLOVENSKI STANDARD
oSIST prEN IEC 61784-5-8:2022
01-junij-2022
Industrijska komunikacijska omrežja - Profili - 5-8. del: Inštalacija procesnih vodil -
Inštalacijski profili za CPF 8
Industrial communication networks - Profiles - Part 5-8: Installation of fieldbuses -
Installation profiles for CPF 8
Industrielle Kommunikationsnetze - Profile - Teil 5-8: Feldbusinstallation -
Installationsprofile für die Kommunikationsprofilfamilie 8
Réseaux de communication industriels - Profils - Partie 5-8: Installation des bus de
terrain - Profils d'installation pour CPF 8
Ta slovenski standard je istoveten z: prEN IEC 61784-5-8:2022
ICS:
25.040.40 Merjenje in krmiljenje Industrial process
industrijskih postopkov measurement and control
35.100.40 Transportni sloj Transport layer
oSIST prEN IEC 61784-5-8:2022 en,fr,de
2003-01.Slovenski inštitut za standardizacijo. Razmnoževanje celote ali delov tega standarda ni dovoljeno.
---------------------- Page: 1 ----------------------
oSIST prEN IEC 61784-5-8:2022
---------------------- Page: 2 ----------------------
oSIST prEN IEC 61784-5-8:2022
65C/1160/CDV
COMMITTEE DRAFT FOR VOTE (CDV)
PROJECT NUMBER:
IEC 61784-5-8 ED3
DATE OF CIRCULATION: CLOSING DATE FOR VOTING:
2022-03-25 2022-06-17
SUPERSEDES DOCUMENTS:
65C/1060/CD, 65C/1074/CC
IEC SC 65C : INDUSTRIAL NETWORKS
SECRETARIAT: SECRETARY:
France Ms Valérie DEMASSIEUX
OF INTEREST TO THE FOLLOWING COMMITTEES: PROPOSED HORIZONTAL STANDARD:
SC 22G,TC 57,SC 121A
Other TC/SCs are requested to indicate their interest, if
any, in this CDV to the secretary.
FUNCTIONS CONCERNED:
EMC ENVIRONMENT QUALITY ASSURANCE SAFETY
SUBMITTED FOR CENELEC PARALLEL VOTING NOT SUBMITTED FOR CENELEC PARALLEL VOTING
Attention IEC-CENELEC parallel voting
The attention of IEC National Committees, members of
CENELEC, is drawn to the fact that this Committee Draft
for Vote (CDV) is submitted for parallel voting.
The CENELEC members are invited to vote through the
CENELEC online voting system.
This document is still under study and subject to change. It should not be used for reference purposes.
Recipients of this document are invited to submit, with their comments, notification of any relevant patent rights of
which they are aware and to provide supporting documentation.
TITLE:
Industrial communication networks - Profiles - Part 5-8: Installation of fieldbuses - Installation
profiles for CPF 8
PROPOSED STABILITY DATE: 2028
NOTE FROM TC/SC OFFICERS:
Copyright © 2022 International Electrotechnical Commission, IEC. All rights reserved. It is permitted to download this
electronic file, to make a copy and to print out the content for the sole purpose of preparing National Committee positions.
You may not copy or "mirror" the file or printed version of the document, or any part of it, for any other purpose without
permission in writing from IEC.
---------------------- Page: 3 ----------------------
oSIST prEN IEC 61784-5-8:2022
– 2 – IEC CDV 61784-5-8 © IEC 2022
1 CONTENTS
2
3 FOREWORD . 7
4 INTRODUCTION . 9
5 1 Scope . 10
6 2 Normative references . 10
7 3 Terms, definitions and abbreviated terms . 10
8 4 CPF 8: Overview of installation profiles . 11
9 5 Installation profile conventions . 11
10 6 Conformance to installation profiles . 12
11 Annex A (normative) CP 8/1 and CP 8/2 (CC-Link/V1 and CC-Link/V2) specific
12 installation profile . 13
13 A.1 Installation profile scope . 13
14 A.2 Normative references . 13
15 A.3 Installation profile terms, definitions, and abbreviated terms . 13
16 A.3.1 Terms and definitions . 13
17 A.3.2 Abbreviated terms . 13
18 A.3.3 Conventions for installation profiles . 13
19 A.4 Installation planning . 13
20 A.4.1 General . 13
21 A.4.2 Planning requirements . 14
22 A.4.3 Network capabilities. 14
23 A.4.4 Selection and use of cabling components . 16
24 A.4.5 Cabling planning documentation . 21
25 A.4.6 Verification of cabling planning specification . 21
26 A.5 Installation implementation . 21
27 A.5.1 General requirements . 21
28 A.5.2 Cable installation . 22
29 A.5.3 Connector installation . 23
30 A.5.4 Terminator installation . 23
31 A.5.5 Device installation . 24
32 A.5.6 Coding and labelling . 24
33 A.5.7 Earthing and bonding of equipment and devices and shield cabling . 24
34 A.5.8 As-implemented cabling documentation . 25
35 A.6 Installation verification and installation acceptance test . 25
36 A.6.1 General . 25
37 A.6.2 Installation verification . 25
38 A.6.3 Installation acceptance test . 26
39 A.7 Installation administration . 26
40 A.8 Installation maintenance and installation troubleshooting . 26
41 Annex B (normative) CP 8/3 (CC-Link/LT) specific installation profile . 27
42 B.1 Installation profile scope . 27
43 B.2 Normative references . 27
44 B.3 Installation profile terms, definitions, and abbreviated terms . 27
45 B.3.1 Terms and definitions . 27
46 B.3.2 Abbreviated terms . 27
---------------------- Page: 4 ----------------------
oSIST prEN IEC 61784-5-8:2022
IEC CDV 61784-5-8 © IEC 2022 – 3 –
47 B.3.3 Conventions for installation profiles . 27
48 B.4 Installation planning . 27
49 B.4.1 General . 27
50 B.4.2 Planning requirements . 28
51 B.4.3 Network capabilities. 28
52 B.4.4 Selection and use of cabling components . 31
53 B.4.5 Cabling planning documentation . 38
54 B.4.6 Verification of cabling planning specification . 38
55 B.5 Installation implementation . 38
56 B.5.1 General requirements . 38
57 B.5.2 Cable installation . 38
58 B.5.3 Connector installation . 39
59 B.5.4 Terminator installation . 40
60 B.5.5 Device installation . 40
61 B.5.6 Coding and labelling . 40
62 B.5.7 Earthing and bonding of equipment and devices and shield cabling . 40
63 B.5.8 As-implemented cabling documentation . 41
64 B.6 Installation verification and installation acceptance test . 41
65 B.6.1 General . 41
66 B.6.2 Installation verification . 41
67 B.6.3 Installation acceptance test . 42
68 B.7 Installation administration . 42
69 B.8 Installation maintenance and installation troubleshooting . 42
70 Annex C (normative) CP 8/4 (CC-Link IE Controller Network) specific installation
71 profile . 43
72 C.1 Installation profile scope . 43
73 C.2 Normative references . 43
74 C.3 Installation profile terms, definitions, and abbreviated terms . 43
75 C.3.1 Terms and definitions . 43
76 C.3.2 Abbreviated terms . 43
77 C.3.3 Conventions for installation profiles . 43
78 C.4 Installation planning . 43
79 C.4.1 General . 43
80 C.4.2 Planning requirements . 43
81 C.4.3 Network capabilities. 44
82 C.4.4 Selection and use of cabling components . 46
83 C.4.5 Cabling planning documentation . 51
84 C.4.6 Verification of cabling planning specification . 52
85 C.5 Installation implementation . 52
86 C.5.1 General requirements . 52
87 C.5.2 Cable installation . 52
88 C.5.3 Connector installation . 53
89 C.5.4 Terminator installation . 54
90 C.5.5 Device installation . 54
91 C.5.6 Coding and labelling . 54
92 C.5.7 Earthing and bonding of equipment and devices and shield cabling . 54
93 C.5.8 As-implemented cabling documentation . 55
94 C.6 Installation verification and installation acceptance test . 55
95 C.6.1 General . 55
---------------------- Page: 5 ----------------------
oSIST prEN IEC 61784-5-8:2022
– 4 – IEC CDV 61784-5-8 © IEC 2022
96 C.6.2 Installation verification . 55
97 C.6.3 Installation acceptance test . 56
98 C.7 Installation administration . 56
99 C.8 Installation maintenance and installation troubleshooting . 57
100 Annex D (normative) CP 8/5 (CC-Link IE Field Network) specific installation profile . 58
101 D.1 Installation profile scope . 58
102 D.2 Normative references . 58
103 D.3 Installation profile terms, definitions, and abbreviated terms . 58
104 D.3.1 Terms and definitions . 58
105 D.3.2 Abbreviated terms . 58
106 D.3.3 Conventions for installation profiles . 58
107 D.4 Installation planning . 58
108 D.4.1 General . 58
109 D.4.2 Planning requirements . 58
110 D.4.3 Network capabilities. 59
111 D.4.4 Selection and use of cabling components . 60
112 D.4.5 Cabling planning documentation . 65
113 D.4.6 Verification of cabling planning specification . 66
114 D.5 Installation implementation . 66
115 D.5.1 General requirements . 66
116 D.5.2 Cable installation . 66
117 D.5.3 Connector installation . 67
118 D.5.4 Terminator installation . 67
119 D.5.5 Device installation . 68
120 D.5.6 Coding and labelling . 68
121 D.5.7 Earthing and bonding of equipment and devices and shield cabling . 68
122 D.5.8 As-implemented cabling documentation . 69
123 D.6 Installation verification and installation acceptance test . 69
124 D.6.1 General . 69
125 D.6.2 Installation verification . 69
126 D.6.3 Installation acceptance test . 70
127 D.7 Installation administration . 70
128 D.8 Installation maintenance and installation troubleshooting . 70
129 Annex E (normative) CP 8/6 (CC-Link IE TSN) specific installation profile . 71
130 E.1 Installation profile scope . 71
131 E.2 Normative references . 71
132 E.3 Installation profile terms, definitions, and abbreviated terms . 71
133 E.3.1 Terms and definitions . 71
134 E.3.2 Abbreviated terms . 71
135 E.3.3 Conventions for installation profiles . 71
136 E.4 Installation planning . 71
137 E.4.1 General . 71
138 E.4.2 Planning requirements . 71
139 E.4.3 Network capabilities. 72
140 E.4.4 Selection and use of cabling components . 75
141 E.4.5 Cabling planning documentation . 80
142 E.4.6 Verification of cabling planning specification . 81
143 E.5 Installation implementation . 81
144 E.5.1 General requirements . 81
---------------------- Page: 6 ----------------------
oSIST prEN IEC 61784-5-8:2022
IEC CDV 61784-5-8 © IEC 2022 – 5 –
145 E.5.2 Cable installation . 81
146 E.5.3 Connector installation . 82
147 E.5.4 Terminator installation . 83
148 E.5.5 Device installation . 83
149 E.5.6 Coding and labelling . 83
150 E.5.7 Earthing and bonding of equipment and devices and shield cabling . 83
151 E.5.8 As-implemented cabling documentation . 84
152 E.6 Installation verification and installation acceptance test . 84
153 E.6.1 General . 84
154 E.6.2 Installation verification . 84
155 E.6.3 Installation acceptance test . 85
156 E.7 Installation administration . 85
157 E.8 Installation maintenance and installation troubleshooting . 86
158 Bibliography . 87
159
160 Figure 1 – Standards relationships . 9
161 Figure A.1 – Pass-through connector configuration . 15
162 Figure A.2 – Bus t-branch topology . 15
163 Figure A.3 – Wiring . 18
164 Figure B.1 – Powered network topology . 29
165 Figure B.2 – Bus t-branch topology . 29
166 Figure B.3 – Flat cable cross section – with key . 32
167 Figure B.4 – Flat cable cross section – without key . 32
168 Figure B.5 – Flat cable polarity marking . 32
169 Figure B.6 – Wiring . 33
170 Figure B.7 – Flat cable connector and terminal cover . 34
171
172 Table A.1 – Basic network characteristics for balanced cabling not based on Ethernet . 16
173 Table A.2 – Bus t-branch network characteristics . 16
174 Table A.3 – Information relevant to copper cable: fixed cables . 17
175 Table A.4 – Connectors for copper cabling CPs not based on Ethernet . 18
176 Table A.5 – Parameters for balanced cables . 22
177 Table A.6 – Cable conductor assignments . 23
178 Table B.1 – Basic network characteristics for balanced cabling not based on Ethernet . 30
179 Table B.2 – CP 8/3 additional topology length limits . 30
180 Table B.3 – Information relevant to copper cable: cords . 32
181 Table B.4 – Connectors for copper cabling CPs not based on Ethernet . 35
182 Table B.5 – Parameters for balanced cables . 38
183 Table B.6 – Flat cable conductor assignments . 39
184 Table C.1 – Network characteristics for balanced cabling based on Ethernet . 45
185 Table C.2 – Network characteristics for optical fibre cabling . 45
186 Table C.3 – Information relevant to copper cable: fixed cables. 46
187 Table C.4 – Information relevant to optical fibre cables . 47
188 Table C.5 – Connectors for balanced cabling CPs based on Ethernet . 47
189 Table C.6 – Optical fibre connecting hardware . 48
---------------------- Page: 7 ----------------------
oSIST prEN IEC 61784-5-8:2022
– 6 – IEC CDV 61784-5-8 © IEC 2022
190 Table C.7 – Relationship between FOC and fibre types (CP 8/4) . 48
191 Table C.8 – Parameters for balanced cables . 52
192 Table C.9 – Parameters for silica optical fibre cables . 52
193 Table D.1 – Network characteristics for balanced cabling based on Ethernet . 60
194 Table D.2 – Information relevant to copper cable: fixed cables. 61
195 Table D.3 – Connectors for balanced cabling CPs based on Ethernet . 62
196 Table D.4 – Parameters for balanced cables . 66
197 Table E.1 – Network characteristics for balanced cabling based on Ethernet . 73
198 Table E.2 – Network characteristics for optical fibre cabling . 74
199 Table E.3 – Information relevant to copper cable: fixed cables . 75
200 Table E.4 – Information relevant to optical fibre cables . 76
201 Table E.5 – Connectors for balanced cabling CPs based on Ethernet . 77
202 Table E.6 – Optical fibre connecting hardware . 77
203 Table E.7 – Relationship between FOC and fibre types (CP 8/6) . 77
204 Table E.8 – Parameters for balanced cables . 81
205 Table E.9 – Parameters for silica optical fibre cables . 81
206
207
---------------------- Page: 8 ----------------------
oSIST prEN IEC 61784-5-8:2022
IEC CDV 61784-5-8 © IEC 2022 – 7 –
208 INTERNATIONAL ELECTROTECHNICAL COMMISSION
209 ____________
210
211 INDUSTRIAL COMMUNICATION NETWORKS –
212 PROFILES –
213
214 Part 5-8: Installation of fieldbuses –
215 Installation profiles for CPF 8
216
217 FOREWORD
218 1) The International Electrotechnical Commission (IEC) is a worldwide organization for standardization comprising
219 all national electrotechnical committees (IEC National Committees). The object of IEC is to promote international
220 co-operation on all questions concerning standardization in the electrical and electronic fields. To this end and
221 in addition to other activities, IEC publishes International Standards, Technical Specifications, Technical Reports,
222 Publicly Available Specifications (PAS) and Guides (hereafter referred to as "IEC Publication(s)"). Their
223 preparation is entrusted to technical committees; any IEC National Committee interested in the subject dealt with
224 may participate in this preparatory work. International, governmental and non-governmental organizations liaising
225 with the IEC also participate in this preparation. IEC collaborates closely with the International Organization for
226 Standardization (ISO) in accordance with conditions determined by agreement between the two organizations.
227 2) The formal decisions or agreements of IEC on technical matters express, as nearly as possible, an international
228 consensus of opinion on the relevant subjects since each technical committee has representation from all
229 interested IEC National Committees.
230 3) IEC Publications have the form of recommendations for international use and are accepted by IEC National
231 Committees in that sense. While all reasonable efforts are made to ensure that the technical content of IEC
232 Publications is accurate, IEC cannot be held responsible for the way in which they are used or for any
233 misinterpretation by any end user.
234 4) In order to promote international uniformity, IEC National Committees undertake to apply IEC Publications
235 transparently to the maximum extent possible in their national and regional publications. Any divergence between
236 any IEC Publication and the corresponding national or regional publication shall be clearly indicated in the latter.
237 5) IEC itsel
...