ISO/IEC Guide 98-5:2026
(Main)Guide to the expression of uncertainty in measurement — Part 5: Examples
- Abstract
This document gives a number of examples, which are worked out in considerable detail to illustrate the principles presented in the Guide to the expression of uncertainty in measurement (GUM) for evaluating and reporting uncertainty in measurement. Together with the (shorter) examples included in the other parts of the GUM, they should enable users of the GUM to put these principles into practice in their own work
- Status
- Published
- Publication Date
- 26-Jul-2026
- Technical Committee
- ISO/TMBG - Technical Management Board - groups
- Drafting Committee
- ISO/TMBG - Technical Management Board - groups
- Current Stage
- 6060 - International Standard published - 60 Publication
- Start Date
- 27-Jul-2026
- Due Date
- 10-Dec-2027
- Completion Date
- 10-Dec-2027
ISO/IEC Guide 98-5:2026 is the first edition of the Guide to the expression of uncertainty in measurement (GUM) Part 5, published in the ISO/IEC metrology framework. It provides worked examples of how to evaluate and report measurement uncertainty, for people who apply the GUM in calibration, testing, chemistry, environmental work, conformity assessment and other measurement tasks.
What does ISO/IEC Guide 98-5:2026 specify?
ISO/IEC Guide 98-5:2026 specifies a set of detailed example cases that illustrate how the GUM principles are used in practice. The examples are simplified for teaching and comparison, and they are not presented as recipes for reproducing the measurements exactly.
The document is organized as a sequence of example clauses, from pH interpolation through chemical analysis, gas mixture preparation, greenhouse gas inventories, calibration problems, image-based measurement, homogeneity studies and decision-making cases. Annex A gives conventions and notation, Annex B gives a glossary of principal symbols, and Annex ZZ lists corresponding ISO/IEC Guides and JCGM guidance documents where equivalents are not given in the text.
In practice, this structure matters because a reader can go straight to the kind of problem they have: scalar or multivariate measurement, linear or nonlinear model, uncertainty propagation, or conformity assessment.
What are the key requirements of ISO/IEC Guide 98-5:2026?
The document is an example guide rather than a prescriptive requirements standard, but it repeatedly shows the methods a user is expected to apply when following the GUM.
- Clause 0 sets the overall use case: estimate the measurand from knowledge about the quantity, propagate uncertainty, and report the result in a way that can support a coverage interval, coverage region or conformity decision. In practice, this means the user should not stop at a point estimate.
- Clause 1 uses pH measurement to show two-point and multi-point linear interpolation, first with a calibration curve and then with temperature correction. The practical lesson is that the uncertainty in the calibration data must be carried through the interpolation, and temperature handling can require several linked interpolation steps.
- Clause 2 compares the JCGM 100:2008 uncertainty framework (GUF) with the Monte Carlo method (MCM) for benzo[a]pyrene determination. This matters when analytical data include calibration factors, internal standards and peak areas, because the output distribution may not be well described by a simple symmetric approximation.
- Clause 4 treats gravimetric gas-mixture preparation as a multivariate problem. The reader needs to track covariance between transferred masses, molar masses and component fractions, because the output composition depends on all of them at once.
- Clause 5 shows greenhouse gas emission inventories as sums of sector terms with scaling factors. The practical point is that inventory uncertainty is not just a root-sum-square exercise when correlations and shared activity data are present.
- Clauses 6 and 7 compare linear propagation and second-order effects. These clauses matter because they show when the law of propagation of uncertainty (LPU) is enough and when higher-order terms or MCM are needed to avoid misleading results.
- Clause 8 on gauge block calibration and Clause 13 on Celsius temperature measurement show how calibration certificates, thermal effects and correlated input quantities enter the final uncertainty budget. In practice, these examples are about turning calibration data into a usable uncertainty statement.
- Clauses 9, 10, 11, 12, 15 and 16 move from estimation to decision and model choice. They show weighted least squares and Bayesian inference for torque calibration, decision rules for conformity assessment, boundary-based image measurement, Bayesian homogeneity evaluation for reference materials, probability distributions for breaking force, and a case where MCM is preferred because the GUF gives unrealistic results.
Across the examples, the document repeatedly stresses four practical points: define the measurand clearly, build the measurement model explicitly, include correlations where they matter, and check whether the chosen propagation method matches the shape of the problem.
What terms does ISO/IEC Guide 98-5:2026 define?
- Guide to the expression of uncertainty in measurement (GUM) - the metrology guidance suite that this part belongs to, covering how measurement uncertainty is evaluated, reported and used.
- JCGM 100:2008 uncertainty framework (GUF) - the GUM-based propagation framework used throughout the examples, usually with a first-order Taylor approximation.
- Law of propagation of uncertainty (LPU) - the rule used to carry input standard uncertainties through a measurement model to an output uncertainty.
- Monte Carlo method (MCM) - a numerical propagation method that samples from input distributions and follows them through the model to obtain the output distribution.
- Measurand - the quantity intended to be measured, such as pH, activity, composition or temperature.
- Certified reference material (CRM) - a reference material with certified property values used for calibration or assigning values, as in the pH examples.
- Coverage interval - an interval reported with a stated coverage probability so the reader can judge where the measurand is expected to lie.
Who uses ISO/IEC Guide 98-5:2026?
ISO/IEC Guide 98-5:2026 is used by metrologists, calibration laboratories, testing laboratories, quality managers, buyers writing technical specifications, and anyone who has to explain an uncertainty statement to a customer or auditor. It is also relevant to analytical chemists, environmental laboratories, reference material producers, and conformity assessment specialists.
The example set reaches across several sectors: chemistry, air quality, greenhouse gas reporting, mechanical calibration, electrical calibration, imaging and medical-style measurement problems. That breadth matters because many users need to recognize their own case in a similar one before they can decide whether to use GUF, MCM or a Bayesian approach.
Which standards are used with ISO/IEC Guide 98-5:2026?
- JCGM 100:2008 - provides the core uncertainty framework and the law of propagation of uncertainty used in many clauses.
- JCGM 101:2008 - provides the Monte Carlo method and the reporting approach for coverage intervals used in the numerical examples.
- JCGM 102:2011 - extends propagation to multivariate cases, vector measurands and covariance matrices.
- JCGM 106:2012 - provides the conformity assessment approach used in the air particulate example, including decision rules and risks of false decisions.
- ISO/TS 28037 - is cited in the pH interpolation example for the straight-line calibration form used in the discussion of linear calibration.
What does the ISO/IEC Guide 98-5:2026 document contain?
ISO/IEC Guide 98-5:2026 contains 16 worked example clauses plus Annex A and Annex B, with Annex ZZ appended in the ISO/IEC edition. The examples include formulas, uncertainty budgets, covariance matrices, probability distributions, coverage intervals, decision-rule calculations and model-selection discussions.
Several chapters are especially practical: pH calibration and temperature correction, benzo[a]pyrene analysis, glucose relative molecular mass, gravimetric gas-mixture composition, greenhouse gas inventories, least-squares versus Bayesian calibration, reference-material homogeneity, Celsius temperature measurement, decay correction for radioactive sources, wire-rope breaking force, and microwave power-meter calibration. The figures and tables show how different methods change the result, the uncertainty and sometimes the decision itself.
The annexes support reading the examples rather than adding new case studies. Annex A fixes the notation, Annex B collects the main symbols and probability distributions, and Annex ZZ provides the correspondence list to related ISO/IEC Guides and JCGM guidance documents.
Get Certified
Connect with accredited certification bodies for this standard
BSMI (Bureau of Standards, Metrology and Inspection)
Taiwan's standards and inspection authority.
Sponsored listings
Frequently Asked Questions
ISO/IEC Guide 98-5:2026 is a guide published by the International Organization for Standardization (ISO). Its full title is "Guide to the expression of uncertainty in measurement — Part 5: Examples". This standard covers: This document gives a number of examples, which are worked out in considerable detail to illustrate the principles presented in the Guide to the expression of uncertainty in measurement (GUM) for evaluating and reporting uncertainty in measurement. Together with the (shorter) examples included in the other parts of the GUM, they should enable users of the GUM to put these principles into practice in their own work
This document gives a number of examples, which are worked out in considerable detail to illustrate the principles presented in the Guide to the expression of uncertainty in measurement (GUM) for evaluating and reporting uncertainty in measurement. Together with the (shorter) examples included in the other parts of the GUM, they should enable users of the GUM to put these principles into practice in their own work
ISO/IEC Guide 98-5:2026 is classified under the following ICS (International Classification for Standards) categories: 17.020 - Metrology and measurement in general. The ICS classification helps identify the subject area and facilitates finding related standards.
ISO/IEC Guide 98-5:2026 is available in PDF format for immediate download after purchase. The document can be added to your cart and obtained through the secure checkout process. Digital delivery ensures instant access to the complete standard document.
Standards Content (Sample)
Contents
- Introduction
- 0 Scope
- 0.1 This document gives a number of examples, which are worked out in considerable
- 0.2 Because the examples are for illustrative purposes, they have by necessity been sim-
- 0.4 An overview of the parts of the GUM suite is given in[14]. The conventions and no-
- 1 Measurement of pH: linear interpolation
- 1.1 Preamble
- 1.3 Specification of the measurand
- 1.4 Measurement model
- 1 X 2 X
- 1 X 2 X
- 1. Interpolate between the points E , pH and E , pH to give the pH value
- 2. Interpolate between the points E , pH and E , pH to give the pH value
- 3. Interpolate between the points T , pH and T , pH so obtained to give
- 1.7 Uncertainty propagation
- 1 X,T 2 X,T
- 1.10 Interpretation of results
- 2 Determination of benzo[a]pyrene
- 2.1 Preamble
- 2.2 Specification of the measurand
- 2.3 Measurement model
- 2.4 Uncertainty propagation
- 2.5 Reporting the result
- 2.6 Interpretation of results
- 3 Relative molecular mass of glucose
- 3.1 Preamble
- 3.2 Measurement model
- 3.3 Calculation and uncertainty evaluation
- 3.4 Discussion
- 4 Gravimetric mixture preparation and calculation of composi-
- 4.1 Preamble
- 4.2 Measurement model
- 4.3 Uncertainty evaluation
- 4.4 Discussion
- 5 Greenhouse gas emission inventories
- 5.1 Preamble
- 5.2 Specification of the measurand
- 5.3 Measurement model
- 5.4 Uncertainty propagation
- 5.5 Interpretation of results
- 5.6 Uncertainty guidance promoted by the IPCC and the JCGM
- 6 Simple linear measurement models
- 6.1 Preamble
- 6.2 Normally distributed input quantities
- 6.3 Rectangularly distributed input quantities with the same width
- 6.4 Rectangularly distributed input quantities with different widths
- 7 Second-order effects in a nonlinear measurement model: cal-
- 7.1 Preamble
- 7.2 Measurement model
- 7.3 Measurand estimate and associated uncertainty
- 7.4 Uncertainty budget
- 8 Gauge block calibration
- 8.1 Preamble
- 8.2 Measurement model
- 8.3 GUF
- 8.4 MCM
- 8.5 Results
- 9 GUM uncertainty evaluation for least-squares versus Bayesian
- 9.1 Preamble
- 9.2 Experimental
- 9.3 Specification of the measurand
- 9.4 Measurement model
- 9.5 Uncertainty evaluation
- 9.6 Reporting the result
- 9.7 Discussion
- 10 Conformity assessment of mass concentration of total sus-
- 10.1 Preamble
- 10.2 Objective and data
- 10.3 Specification of the measurand
- 10.4 Measured values and associated measurement uncertainty
- 10.5 Tolerance limits
- 10.6 Decision rule and conformity assessment
- 10.7 Interpretation of results
- 11 Effect of considering a 2D image as a set of pixels on a com-
- 11.1 Preamble
- 11.2 Estimation of organ or tumour mass
- 11.3 Measurement model
- 11.4 Model selection
- 11.5 Area estimation and associated uncertainty evaluation
- 11.6 Reporting the result
Introduction
The GUM suite of documents (parts overview in[14]) is concerned with the evaluation of uncertainty in measurement and how uncertainty is reported and used. Compact examples are given throughout the GUM suite that relate to specific areas of application and are intended to illustrate particular concepts. This document contains larger examples and case studies intended to illustrate the principles presented in the GUM suite for evaluating and reporting measurement uncertainty.
The examples are chosen to illustrate good practice in the evaluation of measurement uncertainty using the methods in the GUM, such as the JCGM 100:2008 uncertainty framework (GUF)[17, Definition 3.18] or the Monte Carlo method (MCM)[12,17] or alternative methods not (yet) covered by the guidance in the suite. In some examples, methods for uncertainty evaluation are compared to highlight aspects of their suitability for the presented case.
The context and measurement in the examples are described to the extent relevant; simplifications can have been made in the interest of presenting a concise case. The data used in the examples is, where possible, taken from real measurements. These data are not necessarily the best, representing the state-of-the-art or in any other way to be interpreted as such. Measurement procedures and practices are presented in a concise format and not intended to enable reproducing the measurement. Where appropriate, references are provided to documents describing these procedures or practices. All examples were edited prior to inclusion in this document.
Results are generally reported in the manner described in JCGM 101:2008[17]. However, more than the recommended one or two significant digits are often given here to facilitate comparison of the results obtained from the various approaches.
ISO/IEC Guide 98-5:2026(en) JCGM GUM-5:2026 1 Guide to the expression of uncertainty in measurement — Part 5: Examples
0 Scope
0.1 This document gives a number of examples, which are worked out in considerable
detail to illustrate the principles presented in the Guide to the expression of uncertainty in measurement (GUM) for evaluating and reporting uncertainty in measurement. Together with the (shorter) examples included in the other parts of the GUM, they should enable users of the GUM to put these principles into practice in their own work.
0.2 Because the examples are for illustrative purposes, they have by necessity been sim-
plified (but not over-simplified). Moreover, because they and the numerical data used in them have been chosen mainly to demonstrate the principles of the GUM, neither they nor the data should necessarily be interpreted as describing real measurements, let alone the state of the art for a particular measurement. Although the data were used as provided, all calculations retained the full computational precision of the systems employed. Final and intermediate results have been rounded appropriately to suit the intended applications. 0.3 The examples are used to demonstrate, among other:
- Using knowledge about a quantity to obtain an estimate of the quantity and its associated uncertainty;
- Propagation of uncertainty using the law of propagation of uncertainty (LPU) as in JCGM 100:2008 and JCGM 102:2011;
- Propagation of distributions using analytical and numerical methods, including the Monte Carlo method (MCM), as in JCGM 101:2008 and JCGM 102:2011;
- Applying law of propagation of uncertainty (LPU) and MCM for a univariate (scalar) and multivariate (vector) measurand;
- Applying LPU and MCM for independent and dependent input quantities;
- Using MCM to validate the results provided by LPU;
- Determining a coverage interval or a coverage region;
- Using measurement uncertainty in conformity assessment as in JCGM 106:2012;
- Reporting measurement results.
0.4 An overview of the parts of the GUM suite is given in[14]. The conventions and no-
tation applied in this document are summarised in Annex A. The symbols used throughout the document are explained in the text and in Annex B.
ISO/IEC Guide 98-5:2026(en) 2 JCGM GUM-5:2026
1 Measurement of pH: linear interpolation
1.1 Preamble
1.1.1 This example is taken from a compendium of examples[1].
1.1.2 A generic treatment of two-point and multi-point interpolation of calibration data
is given with uncertainties associated with the data propagated using the law of propagation of uncertainty (LPU) and its generalization to vector measurands. The approach is applied to the measurement of hydrogen ion activity (pH). Such measurement is one of the most common in chemistry, although correlations associated with the input quantities in the measurement model are rarely taken into account. The treatment given follows common practice, which tends to give an optimistically small evaluation of the uncertainty associated with an estimated hydrogen ion activity (pH) value. A way of taking correlation into account in one typical instance is given but its implementation is problematical because of the difficulty in quantifying the correlation.
1.1.3 The VIM concept of calibration [16, Definition 2.39] as constituting two stages
is used. The first stage involves fitting to measured data a function that describes the relationship of a response (dependent) variable Y to a stimulus (independent) variable X. The second stage involves using this relationship to determine the value y of the response given a value x of the stimulus. Uncertainties in both the stimulus and response variables are handled in both stages and propagated using the LPU in JCGM 100:2008[10] and its generalization to vector measurands in JCGM 102:2011[12].
1.1.4 The considerations of 1.1.3 are applied to pH measurement in which up to three
two-point interpolations are required and uncertainties are tracked through the calculation. 1.2 pH of a test solution 1.2.1 pH, the negative logarithm to base 10 of the activity of hydrogen ion in a solution, is arguably the most measured quantity in chemistry [25]. The pH is a measure of the acidity of a solution. The pH of a solution is generally measured using a pH-sensitive glass electrode and a silver chloride (AgCl) reference electrode. The potential difference of such an electrode system is proportional to pH and forms the basis of pH measurement[28].
1.2.2 In 2002, the International Union of Pure and Applied Chemistry (IUPAC) issued a
recommendation for revision of the pH scale based on the concept of a primary reference measurement procedure for pH[21]. The use of an electrochemical (Harned) cell fulfils the criteria for a primary reference measurement procedure so that a pH value thus obtained is traceable to the International System of Units (SI), here the SI measurement unit 1.
1.2.3 A solution, the pH of which is measured by such a cell at the highest metrolog-
ical level, may be classified as a primary measurement standard and can be used to assign pH values to other solutions. Standard solutions are sold as certified reference materials (CRMs) to calibrate pH meters for routine use.
ISO/IEC Guide 98-5:2026(en) JCGM GUM-5:2026 3 1.2.4 There are several approaches to pH measurement including the use of 1-point, 2-point and multi-point calibration, least-squares regression, and with or without temperature correction. Here the 2-point calibration approach, with and without temperature correction, is used. Two topics are considered: (a) when the temperature of the test solution matches that of the standard (reference) solutions and (b) when this is not the case.
1.3 Specification of the measurand
The measurand is the pH of a solution being calibrated. More generally, the measurand is the interpolated independent or dependent variable obtained from a relationship between those variables derived from data representing values of the variables. Intermediate measurands, when required, are the parameters describing the relationship.
1.4 Measurement model
1.4.1 General
There are two stages involved in calibration[16, definition 2.39]: (i) determine a calibration curve from calibration data and (ii) use that calibration curve. Because of the relative simplicity of two-point and multi-point interpolation as considered here, it may be preferable when circumstances permit to combine the stages into a single-stage model. Such a model avoids having to deal with intermediate correlation associated with the calibration curve parameters that are estimated in the first stage and used in the second. Operating in two stages corresponds to the use of a multi-stage model[15, Clause 8.4] and is necessary when the construction and use of the calibration model are carried out by different parties.
1.4.2 Generic approach to two-point calibration
1.4.2.1 Two calibration points(X ,Y ) and(X ,Y ) are given that bracketX , anX-value
1 1 2 2 0 for whichY , the correspondingY -value, is required under the assumption that theY -value
lies on the straight line joining the calibration points (see figure 1.1). Y
Y
Y
X X X 1 0 2 0 2 4 6 8 10 X Figure 1.1: Two-point calibration using a linear interpolation function
Y 0 2 4 6 8 10
ISO/IEC Guide 98-5:2026(en) 4 JCGM GUM-5:2026 1.4.2.2 By similar triangles, with δX =X −X and δY =Y −Y , 2 1 2 1 Y−Y Y −Y δY 1 2 1 = = . (1.1) X−X X −X δX 1 2 1 A common representation of a straight-line calibration function, which is used here, is Y =a+bX, (1.2) where a is the intercept on the Y -axis and b is the slope[74]. NOTE The form (1.2) is used in the straight-line calibration standard ISO/TS 28037[74] and will be familiar to many end users.
1.4.2.3 In thesingle-stagemodel, a single party has estimates of(X ,Y ),(X ,Y ) andX , 1 1 2 2 0 and obtains an estimate of Y , the Y -value on the line corresponding to X (figure 1.1). In 0 0 doing so, the party may or may not determine a and b explicitly. The measurement model is specified by the description of the provision of Y .
1.4.2.4 In thetwo-stagemodel, however, one party has estimates of(X ,Y ) and(X ,Y ), 1 1 2 2 and provides estimates of a and b (intermediate measurands) to the second party using the straightforwardly verified Y −Y 2 1 b= , (1.3) X −X 2 1 a=Y −bX . (1.4) 1 1 The second party (possibly identical to the first party) has estimates of a, b and X , and
obtains the estimate of Y using the expression
Y =a+bX . (1.5) 0 0 The measurement model is again described by the process to provide Y . The resulting
expression Y =Y +b(X −X ), (1.6) 0 1 0 1 and formula (1.3) constitute the measurement model with Y as the measurand.
NOTE When X and X are far from the origin, that is,|X −X |≪ max(|X |, |X |), an alternative 1 2 2 1 1 2 form may be numerically more stable. One such form is given by working with a transformed X-variable
X =X−X .
Using expressions (1.2) and (1.4), the calibration function can then be expressed as
Y =Y +bX,
which is evaluated at the value X of the independent variable.
The form of interpolation considered here is forward interpolation. Inverse interpolation, when the stimulus value X corresponding to a response value Y is required, can also be 0 0 carried out (for treatments see[74,75]) but is not required here. The roles of X andY can be interchanged when permitted by the context.
ISO/IEC Guide 98-5:2026(en) JCGM GUM-5:2026 5
1.4.3 Generic approach to multi-point calibration
1.4.3.1 Multi-point calibration is the treatment in clauses 1.4.2 and 1.4.2.3 extended to
an arbitrary number of points. In these clauses, a straight-line segment joining two of the calibration points serves as the calibration function. When there are m calibration points (m≥ 2), with strictly increasing stimulus values, the points are joined pairwise by successive straight-line segments, the overall construction being a piecewise-linear function or first-degree spline[34], acting as the calibration function. For each interval between pairs of successive points, the treatment of clauses 1.4.2 and 1.4.2.3 can be applied directly to the appropriate segment of the piecewise-linear function.
NOTE When m = 2 the calibration function is a single straight-line segment and is naturally monotonic, a necessary condition. For m > 2, the ordered points may not form a monotonic sequence, a situation not considered here[75].
1.4.3.2 Alternatively, straight-line fitting by least squares can be used taking reported
uncertainties associated with the calibration data into consideration[74]. Polynomial interpolation or polynomial regression can also be used[75]. See 1.10.1.
1.4.4 Metrological extension
The measurement model implied by two-point calibration is the algorithm to provide Y
given X . The data will generally have associated uncertainties arising from a Type A
evaluation of uncertainty[10, clause 4.2] especially following an analysis of repeated observations. Often there will also be uncertainties obtained from a Type B evaluation and associated covariances arising from common measurement effects[10, clause 4.3]. Such covariances should be handled also to avoid producing invalid statements of uncertainty associated with predicted Y -values. The calibration data considered here are assumed to have independent errors.
1.5 pH measured at a stipulated temperature
1.5.1 When the cell potential is measured at one of the stipulated temperatures on a
reference material certificate for standard solutions, the following process is applicable. A correction approach is used to provide the pH of a test solution [134] in which pH , X the pH of a test solution X, is given by using a cell twice to measure potential E in X and X potential E in a standard solution S:
S E −E X S pH = pH + . (1.7) X S k In expression (1.7), pH is the pH of S, and S RT ln 10 k= , F where R is the gas constant, T the temperature in kelvin and F the Faraday constant.
1.5.2 Bracketing methods are used here since they are generally more accurate. Use is
made of reference material certificates for the standard solutions, which give pH values and associated standard uncertainties at stipulated temperatures. It is assumed the spe-
cific temperature lies within the interval (here, 5 C to 50 C) covered by the certificates for the CRMs used here, namely, potassium dihydrogen phosphate (NIST SRM 186-I-g)
ISO/IEC Guide 98-5:2026(en) 6 JCGM GUM-5:2026 and disodium dihydrogen phosphate (NIST SRM 186-II-g)[95]. Those certificates, issued by the National Institute of Standards and Technology (NIST), contain tables of pH val-
ues and associated uncertainties for temperatures from 5 C to 50 C at a spacing of 5 C.
(Temperatures are given here in C as is common practice in pH measurement.) These temperatures are reference values with no assigned uncertainty.
1.5.3 The potential E of the test solution X is measured at temperature T , one of the
X X stipulated temperatures in clause 1.5.2. Likewise, the potentials E and E are mea- S S 1 2 sured of two cells with standard solutions S and S such that the values of E and E 1 2 S S 1 2 bracket E and are as near as possible to it[31]. The pH of S and S at temperature T , X 1 2 X namely, pH and pH , are taken from reference material certificates. S ,T S ,T
1 X 2 X
1.5.4 Assuming linearity between the points (E , pH ) and (E , pH ), linear in-
S S ,T S S ,T 1 1 X 2 2 X terpolation is applied to estimate the pH value pH corresponding to the potential E . The X X output quantity, the measurand, generically Y , is pH , the pH of the test solution. The 0 X input quantities in the measurement model are E , E , pH , pH and E , corre- S S S ,T S ,T X 1 2
1 X 2 X
sponding respectively to X , X , Y , Y and X in the generic approach. 1 2 1 2 0
1.5.5 In an extended measurement model[15, clause 9], account is taken of further influ-
ences. In this case, main effects are pH instrument calibration, instrument resolution and interpolation model. The uncertainties associated with the first two effects are provided by the instrument manual and inspection of the output display. Incorporating correction terms to account for these effects, E = E +δE +δE , X,corr X res,X cal E = E +δE +δE , (1.8) S1,corr S1 res,S cal
E = E +δE +δE .
S2,corr S2 res,S cal
Interpolated pH and correction quantities in expressions (1.8) relating to cell potential are assumed independent as in common practice[21]. Clause 1.10.1 contains a discussion of possible correlation in these quantities.
1.6 pH measurement accounting for temperature When the cell potential is not measured at one of the temperatures specified on a reference material certificate for standard solutions, the procedure in clause 1.5 can be extended as follows. A bracketing approach as in clause 1.5 is used in which three linear interpolations are carried out to estimate pH for solution X and can be described by the following procedure, which constitutes an algorithmic description of the measurand model. Measure the temperature T of the test solution X.
X Determine the closest bracketing temperatures T and T in the Standard reference mate- 1 2 rial (SRM) certificates such that T ∈[T , T ].
X 1 2 Measure the potential E in solution X and potentials E and E in standard solutions S X S S 1 1 2 and S .
Obtain the certified pH value pH at temperature T for standard solution S from the S ,T 1 1 1 1 certificate for S . Likewise, obtain the certified pH value pH at temperature T for 1 S ,T 1 2 1 standard solution S from the certificate for S .
2 2
ISO/IEC Guide 98-5:2026(en) JCGM GUM-5:2026 7 Repeat this process for temperature T , that is, obtain the pH value pH for solution S , 2 S ,T 1 1 2 and the pH value pH for solution S .
S ,T 2 2 2 Apply three steps of linear interpolation:
1. Interpolate between the points E , pH and E , pH to give the pH value
S S ,T S S ,T 1 1 1 2 2 1 pH at temperature T corresponding to potential E .
1 X X,T
2. Interpolate between the points E , pH and E , pH to give the pH value
S S ,T S S ,T 1 1 2 2 2 2 pH at temperature T corresponding to potential E .
X,T 2 X
3. Interpolate between the points T , pH and T , pH so obtained to give
1 2 X,T X,T 1 2 the pH value pH at temperature T corresponding to potential E . X,T X X X The generic treatment in clause 1.4.2 is thus applied three times to implement these three stages of two-point interpolation.
The measurement model is specified by the above algorithmic description where the input quantities in the model are T , E , E , E , pH , pH , pH and pH . X X S S S ,T S ,T S ,T S ,T 1 2 1 1 2 1 1 2 2 2
1.7 Uncertainty propagation
1.7.1 Uncertainty propagation in this clause is based on the assumption that the input
quantities T , E , E , E , pH , pH , pH and pH , that is, the measured po- X X S S S ,T S ,T S ,T S ,T 1 2 1 1 2 1 1 2 2 2 tentials and the pH values for the standard solutions, to the procedure in clause 1.6 are independent. This assumption is consistent with IUPAC recommendations for pH measurement[21]. There, procedures are given for accounting for input standard uncertainties based on the correlation-free variant of the law of propagation of uncertainty in[10, clause 5.1]. In practice, input quantities are likely to be correlated and account should be taken of that fact. See the discussion in clause 1.10.3.
1.7.2 Consider first thetwo-stagemodel. For the first stage, the inputs are the calibration
data x , y , x and y and their associated standard uncertainties. The outputs are the 1 1 2 2
calibration parameters a� and b and their associated covariance matrix U . The model
[a�,b] is bivariate (two output quantities):
Y −Y δY 2 1 b= = , a=Y −bX . (1.9) 1 1 X −X δX 2 1 For the uncertainty propagation,[12, clause 6.2.1.3, formula (3)] is applied to obtain the output covariance matrix for the model parameters a and b:
u (a�) u(a�,b)
U = =C U C . (1.10) � 1 in
[a�,b] 1
...



