Enterprise-control system integration — Part 4: Objects and attributes for manufacturing operations management integration

IEC 62264-4:2015 defines object models and attributes exchanged between Level 3 manufacturing operations management activities defined in IEC 62264-3.

Intégration des systèmes entrepose-contrôle — Partie 4: Attributs des modèles d'objets pour l'intégration de la gestion des opérations de fabrication

L'IEC 62264-4:2015 définit les modèles d'objets et les attributs échangés entre les activités de gestion des opérations de fabrication de Niveau 3 définies dans l'IEC 62264-3.

General Information

Status
Published
Publication Date
29-Mar-2016
Current Stage
9092 - International Standard to be revised
Start Date
15-Feb-2023
Completion Date
30-Oct-2025
Ref Project
Standard
IEC 62264-4:2016
English language
100 pages
sale 15% off
Preview
sale 15% off
Preview

Standards Content (Sample)


IEC 62264-4
Edition 1.0 2015-12
INTERNATIONAL
STANDARD
NORME
INTERNATIONALE
colour
inside
Enterprise-control system integration –
Part 4: Object model attributes for manufacturing operations management
integration
Intégration des systèmes entreprise-contrôle –
Partie 4: Attributs des modèles d'objets pour l'intégration de la gestion des
opérations de fabrication
All rights reserved. Unless otherwise specified, no part of this publication may be reproduced or utilized in any form
or by any means, electronic or mechanical, including photocopying and microfilm, without permission in writing from
either IEC or IEC's member National Committee in the country of the requester. If you have any questions about IEC
copyright or have an enquiry about obtaining additional rights to this publication, please contact the address below or
your local IEC member National Committee for further information.

Droits de reproduction réservés. Sauf indication contraire, aucune partie de cette publication ne peut être reproduite
ni utilisée sous quelque forme que ce soit et par aucun procédé, électronique ou mécanique, y compris la photocopie
et les microfilms, sans l'accord écrit de l'IEC ou du Comité national de l'IEC du pays du demandeur. Si vous avez des
questions sur le copyright de l'IEC ou si vous désirez obtenir des droits supplémentaires sur cette publication, utilisez
les coordonnées ci-après ou contactez le Comité national de l'IEC de votre pays de résidence.

IEC Central Office Tel.: +41 22 919 02 11
3, rue de Varembé Fax: +41 22 919 03 00
CH-1211 Geneva 20 info@iec.ch
Switzerland www.iec.ch
About the IEC
The International Electrotechnical Commission (IEC) is the leading global organization that prepares and publishes
International Standards for all electrical, electronic and related technologies.

About IEC publications
The technical content of IEC publications is kept under constant review by the IEC. Please make sure that you have the

latest edition, a corrigenda or an amendment might have been published.

IEC Catalogue - webstore.iec.ch/catalogue Electropedia - www.electropedia.org
The stand-alone application for consulting the entire The world's leading online dictionary of electronic and
bibliographical information on IEC International Standards, electrical terms containing more than 30 000 terms and
Technical Specifications, Technical Reports and other definitions in English and French, with equivalent terms in 15
documents. Available for PC, Mac OS, Android Tablets and additional languages. Also known as the International
iPad. Electrotechnical Vocabulary (IEV) online.

IEC publications search - www.iec.ch/searchpub IEC Glossary - std.iec.ch/glossary
The advanced search enables to find IEC publications by a More than 60 000 electrotechnical terminology entries in
variety of criteria (reference number, text, technical English and French extracted from the Terms and Definitions
committee,…). It also gives information on projects, replaced clause of IEC publications issued since 2002. Some entries
and withdrawn publications. have been collected from earlier publications of IEC TC 37,

77, 86 and CISPR.
IEC Just Published - webstore.iec.ch/justpublished

Stay up to date on all new IEC publications. Just Published IEC Customer Service Centre - webstore.iec.ch/csc
details all new publications released. Available online and If you wish to give us your feedback on this publication or
also once a month by email. need further assistance, please contact the Customer Service
Centre: csc@iec.ch.
A propos de l'IEC
La Commission Electrotechnique Internationale (IEC) est la première organisation mondiale qui élabore et publie des
Normes internationales pour tout ce qui a trait à l'électricité, à l'électronique et aux technologies apparentées.

A propos des publications IEC
Le contenu technique des publications IEC est constamment revu. Veuillez vous assurer que vous possédez l’édition la
plus récente, un corrigendum ou amendement peut avoir été publié.

Catalogue IEC - webstore.iec.ch/catalogue Electropedia - www.electropedia.org
Application autonome pour consulter tous les renseignements
Le premier dictionnaire en ligne de termes électroniques et
bibliographiques sur les Normes internationales,
électriques. Il contient plus de 30 000 termes et définitions en
Spécifications techniques, Rapports techniques et autres
anglais et en français, ainsi que les termes équivalents dans
documents de l'IEC. Disponible pour PC, Mac OS, tablettes
15 langues additionnelles. Egalement appelé Vocabulaire
Android et iPad.
Electrotechnique International (IEV) en ligne.

Recherche de publications IEC - www.iec.ch/searchpub
Glossaire IEC - std.iec.ch/glossary
La recherche avancée permet de trouver des publications IEC Plus de 60 000 entrées terminologiques électrotechniques, en
en utilisant différents critères (numéro de référence, texte, anglais et en français, extraites des articles Termes et
comité d’études,…). Elle donne aussi des informations sur les Définitions des publications IEC parues depuis 2002. Plus
projets et les publications remplacées ou retirées. certaines entrées antérieures extraites des publications des

CE 37, 77, 86 et CISPR de l'IEC.
IEC Just Published - webstore.iec.ch/justpublished

Service Clients - webstore.iec.ch/csc
Restez informé sur les nouvelles publications IEC. Just
Published détaille les nouvelles publications parues. Si vous désirez nous donner des commentaires sur cette
Disponible en ligne et aussi une fois par mois par email. publication ou si vous avez des questions contactez-nous:
csc@iec.ch.
IEC 62264-4
Edition 1.0 2015-12
INTERNATIONAL
STANDARD
NORME
INTERNATIONALE
colour
inside
Enterprise-control system integration –

Part 4: Object model attributes for manufacturing operations management

integration
Intégration des systèmes entreprise-contrôle –

Partie 4: Attributs des modèles d'objets pour l'intégration de la gestion des

opérations de fabrication
INTERNATIONAL
ELECTROTECHNICAL
COMMISSION
COMMISSION
ELECTROTECHNIQUE
INTERNATIONALE
ICS 25.040.99; 35.100.05; 35.200.50 ISBN 978-2-8322-3062-6

– 2 – IEC 62264-4:2015 © IEC 2015
CONTENTS
FOREWORD . 8
INTRODUCTION . 10
1 Scope . 11
2 Normative references. 11
3 Terms, definitions, abbreviations and conventions . 11
3.1 Terms and definitions . 11
3.2 Symbols and abbreviations . 13
3.3 Conventions . 14
4 Information exchange between manufacturing operations . 14
4.1 Activity information exchange network . 14
4.2 Information exchange models . 15
4.2.1 Overview . 15
4.2.2 Process segments and work masters . 15
4.2.3 Common resource definitions . 15
4.2.4 Work models . 15
5 Object model representation . 16
5.1 Minimum attribute sets . 16
5.2 Attribute extensibility . 16
5.3 Object model structure . 16
5.4 Conventions used in table of attributes . 17
5.4.1 Attribute table elements . 17
5.4.2 Object identification . 18
5.4.3 Data types of attributes . 18
5.4.4 Value types . 18
5.4.5 Presentation of examples . 18
5.4.6 References to resources . 19
6 Resource relationship network model . 19
6.1 Resource relationship network . 19
6.2 Resource relationship network attributes. 20
6.3 Resource network connection . 21
6.4 Resource network connection property . 22
6.5 From resource reference . 22
6.6 From resource reference property . 23
6.7 To resource reference . 23
6.8 To resource reference property. 24
6.9 Resource network connection type . 25
6.10 Resource network connection type property . 25
7 Work definition model . 25
7.1 Work definition . 25
7.2 Work master . 26
7.3 Work directive . 26
7.4 Work definition attributes . 27
7.5 Parameter specification . 28
7.6 Personnel specification . 28
7.7 Personnel specification property . 28

7.8 Equipment specification. 29
7.9 Equipment specification property . 29
7.10 Physical asset specification . 29
7.11 Physical asset specification property . 29
7.12 Material specification . 29
7.13 Material specification property . 29
7.14 Workflow specification . 29
7.14.1 Workflow specification model . 29
7.14.2 Workflow specification attributes . 31
7.14.3 Workflow specification node . 32
7.14.4 Workflow specification node property . 32
7.14.5 Workflow specification connection . 32
7.14.6 Workflow specification connection property . 33
7.14.7 Workflow specification node type . 33
7.14.8 Workflow specification node type property . 33
7.14.9 Workflow specification connection type . 34
7.14.10 Workflow specification connection type property . 34
8 Work schedule and job list models . 35
8.1 Work schedule . 35
8.2 Work schedule attributes . 37
8.3 Work request attributes . 38
8.4 Job list definition . 39
8.5 Job list attributes . 40
8.6 Job order attributes . 40
8.7 Job order parameter . 42
8.8 Personnel requirement . 42
8.9 Personnel requirement property . 42
8.10 Equipment requirement . 42
8.11 Equipment requirement property . 42
8.12 Physical asset requirement . 42
8.13 Physical asset requirement property . 42
8.14 Material requirement . 42
8.15 Material requirement property . 42
8.16 Job order to work master relationship . 42
9 Work performance model . 43
9.1 Work performance . 43
9.2 Work performance attributes . 44
9.3 Work response . 45
9.4 Job response list . 46
9.5 Job response . 47
9.6 Job response data . 47
9.7 Personnel actual . 47
9.8 Personnel actual property . 48
9.9 Equipment actual . 48
9.10 Equipment actual property . 48
9.11 Physical asset actual . 48
9.12 Physical asset actual property . 48
9.13 Material actual . 48
9.14 Material actual property . 48

– 4 – IEC 62264-4:2015 © IEC 2015
10 Work capability model . 48
10.1 Work capability . 48
10.2 Work capability attributes . 49
10.3 Personnel capability . 50
10.4 Personnel capability property . 50
10.5 Equipment capability . 50
10.6 Equipment capability property . 51
10.7 Physical asset capability . 51
10.8 Physical asset capability property . 51
10.9 Material capability . 51
10.10 Material capability property . 51
11 Work master capability model . 51
11.1 Work master capability . 51
11.2 Work master capability attributes . 52
11.3 Personnel capability . 53
11.4 Personnel capability property . 53
11.5 Equipment capability . 53
11.6 Equipment capability property . 54
11.7 Physical asset capability . 54
11.8 Physical asset capability property . 54
11.9 Material capability . 54
11.10 Material capability property . 54
12 Work KPI model . 54
13 Work alert model . 54
13.1 Work alert . 54
13.2 Work alert definition . 55
13.3 Work alert definition property . 55
13.4 Work alert attributes . 56
13.5 Work alert property. 57
14 Work calendar model . 57
14.1 Work calendar definition and work calendar . 57
14.2 Work calendar definition . 58
14.3 Work calendar definition entry . 59
14.4 Work calendar definition entry property . 60
14.5 Work calendar . 60
14.6 Work calendar entry . 60
14.7 Work calendar entry property . 61
15 Work documents . 61
16 Work record model . 62
16.1 Work record definition . 62
16.2 Work record . 63
16.3 Work record extensions . 63
16.4 Work record model . 65
16.5 Work record entry . 66
16.6 Work record container objects . 67
16.7 Event types and subtypes . 67
17 Object lists and relationships . 68
18 Compliance . 71

Annex A (informative) Questions and answers about object use . 72
A.1 How are dependencies in the work schedule and work response handled? . 72
A.2 What are examples of resource relationships? . 72
Annex B (informative) Related standards . 75
Annex C (informative) Representing a workflow specification in BPMN . 77
Annex D (informative) Representing a workflow specification in flowchart notation . 81
Annex E (informative) Example of work calendars . 83
E.1 Four-day 24-hour shift pattern . 83
E.2 Example of ISO 8601 format strings . 85
E.3 Bank holiday work calendar . 85
Bibliography . 87

Figure 1 – Information exchange models for manufacturing operations management . 14
Figure 2 – Resource relationship network model . 20
Figure 3 – Work definition model . 26
Figure 4 – Relationship of work master to work directive . 27
Figure 5 – Workflow specification model . 30
Figure 6 – Example of a workflow specification in BPMN format . 30
Figure 7 – Example of a workflow specification in flowchart format . 31
Figure 8 – Work schedule model . 35
Figure 9 – Operations schedule for a site . 36
Figure 10 – Work schedule for an area . 36
Figure 11 – Work request, job order, job list . 37
Figure 12 – Work request example for continuous processing . 37
Figure 13 – Example of job orders and work master relationships . 43
Figure 14 – Work performance model . 44
Figure 15 – Work capability model . 49
Figure 16 – Work master capability object model . 52
Figure 17 – Work alert model . 55
Figure 18 – Work calendar model . 58
Figure 19 – Work record environment . 63
Figure 20 – Work record container example . 64
Figure 21 – Work record element reference example . 65
Figure 22 – Work record model . 66
Figure 23 – Relationship between models . 69
Figure A.1 – Equipment resources . 73
Figure A.2 – Routing relationship network . 73
Figure A.3 – Gas main relationship network . 74
Figure A.4 – “Usable in” relationship network . 74
Figure B.1 – Relationship to IEC 62264-2 and IEC 61512 standards . 76
Figure C.1 – Example of a workflow specification in BPMN notation . 79
Figure C.2 – Example workflow process in the workflow specification model . 80
Figure D.1 – Example of a workflow specification in flowchart notation . 81
Figure D.2 – Example workflow process in the workflow specification model . 82

– 6 – IEC 62264-4:2015 © IEC 2015

Table 1 – UML notation used . 17
Table 2 – Example table . 18
Table 3 – Resource relationship network attributes . 21
Table 4 – Resource network connection attributes . 21
Table 5 – Resource network connection property attributes . 22
Table 6 – From resource reference attributes . 23
Table 7 – From resource reference property attributes . 23
Table 8 – To resource reference attributes . 24
Table 9 – To resource reference property attributes . 24
Table 10 – Resource network connection type attributes . 25
Table 11 – Resource network connection type property attributes . 25
Table 12 – Additional attributes of material specification . 27
Table 13 – Work definition attributes . 28
Table 14 – Workflow specification attributes . 31
Table 15 – Workflow specification node attributes . 32
Table 16 – Workflow specification node property attributes . 32
Table 17 – Workflow specification connection attributes . 33
Table 18 – Workflow specification connection property attributes . 33
Table 19 – Workflow specification node type attributes . 33
Table 20 – Workflow specification node type property attributes . 34
Table 21 – Workflow specification connection type attributes . 34
Table 22 – Workflow specification connection property attributes . 34
Table 23 – Work schedule attributes . 38
Table 24 – Work request attributes . 39
Table 25 – Job list attributes . 40
Table 26 – Job order attributes. 41
Table 27 – Work performance attributes . 45
Table 28 – Work response attributes . 46
Table 29 – Job response list attributes . 46
Table 30 – Job response attributes . 47
Table 31 – Work capability attributes . 50
Table 32 – Work master capability attributes . 53
Table 33 – Work alert definition attributes . 55
Table 34 – Work alert definition property attributes . 56
Table 35 – Examples of work alert properties . 56
Table 36 – Work alert attributes . 57
Table 37 – Work alert property attributes . 57
Table 38 – Work calendar definition attributes . 59
Table 39 – Work calendar definition entry attributes . 59
Table 40 – Work calendar definition entry property attributes . 60
Table 41 – Work calendar attributes . 60
Table 42 – Work calendar entry attributes . 61

Table 43 – Work calendar entry property attributes . 61
Table 44 – Work record entry attributes . 67
Table 45 – Additional event types and subtypes . 68
Table 46 – Objects and models . 70
Table E.1 – Four-day 24-hour shift pattern example . 83
Table E.2 – Work calendar definition for 4-day 24–hour shift entry examples . 83
Table E.3 – Work calendar definition entry for 4-day 24–hour shift example . 84
Table E.4 – Work calendar entries for 2014 shift calendar. 85
Table E.5 – Work calendar definition for 2014 England bank holidays . 85
Table E.6 – Work calendar definition entries for 2014 England bank holidays . 86

– 8 – IEC 62264-4:2015 © IEC 2015
INTERNATIONAL ELECTROTECHNICAL COMMISSION
____________
ENTERPRISE-CONTROL SYSTEM INTEGRATION –

Part 4: Object model attributes for manufacturing
operations management integration

FOREWORD
1) The International Electrotechnical Commission (IEC) is a worldwide organization for standardization comprising
all national electrotechnical committees (IEC National Committees). The object of IEC is to promote
international co-operation on all questions concerning standardization in the electrical and electronic fields. To
this end and in addition to other activities, IEC publishes International Standards, Technical Specifications,
Technical Reports, Publicly Available Specifications (PAS) and Guides (hereafter referred to as “IEC
Publication(s)”). Their preparation is entrusted to technical committees; any IEC National Committee interested
in the subject dealt with may participate in this preparatory work. International, governmental and non-
governmental organizations liaising with the IEC also participate in this preparation. IEC collaborates closely
with the International Organization for Standardization (ISO) in accordance with conditions determined by
agreement between the two organizations.
2) The formal decisions or agreements of IEC on technical matters express, as nearly as possible, an international
consensus of opinion on the relevant subjects since each technical committee has representation from all
interested IEC National Committees.
3) IEC Publications have the form of recommendations for international use and are accepted by IEC National
Committees in that sense. While all reasonable efforts are made to ensure that the technical content of IEC
Publications is accurate, IEC cannot be held responsible for the way in which they are used or for any
misinterpretation by any end user.
4) In order to promote international uniformity, IEC National Committees undertake to apply IEC Publications
transparently to the maximum extent possible in their national and regional publications. Any divergence
between any IEC Publication and the corresponding national or regional publication shall be clearly indicated in
the latter.
5) IEC itself does not provide any attestation of conformity. Independent certification bodies provide conformity
assessment services and, in some areas, access to IEC marks of conformity. IEC is not responsible for any
services carried out by independent certification bodies.
6) All users should ensure that they have the latest edition of this publication.
7) No liability shall attach to IEC or its directors, employees, servants or agents including individual experts and
members of its technical committees and IEC National Committees for any personal injury, property damage or
other damage of any nature whatsoever, whether direct or indirect, or for costs (including legal fees) and
expenses arising out of the publication, use of, or reliance upon, this IEC Publication or any other IEC
Publications.
8) Attention is drawn to the Normative references cited in this publication. Use of the referenced publications is
indispensable for the correct application of this publication.
9) Attention is drawn to the possibility that some of the elements of this IEC Publication may be the subject of
patent rights. IEC shall not be held responsible for identifying any or all such patent rights.
International Standard IEC 62264-4 has been prepared by subcommittee 65E: Devices and
integration in enterprise systems, of IEC technical committee 65: Industrial-process
measurement, control and automation, in co-operation with ISO technical committee 184/SC5:
Interoperability, integration and architectures for enterprise systems and automation
applications.
It is published as a double logo standard.
The text of this standard is based on the following documents:
FDIS Report on voting
65E/479/FDIS 65E/488/RVD
Full information on the voting for the approval of this standard can be found in the report on

voting indicated in the above table. In ISO, the standard has been approved In ISO, the standard
has been approved by 10 P members out of 10 having cast a vote.
This publication has been drafted in accordance with the ISO/IEC Directives, Part 2.
A list of all parts in the IEC 62264 series, published under the general title Enterprise-control
system integration, can be found on the IEC website.
The committee has decided that the contents of this publication will remain unchanged until
the stability date indicated on the IEC website under "http://webstore.iec.ch" in the data
related to the specific publication. At this date, the publication will be
• reconfirmed,
• withdrawn,
• replaced by a revised edition, or
• amended.
IMPORTANT – The 'colour inside' logo on the cover page of this publication indicates
that it contains colours which are considered to be useful for the correct
understanding of its contents. Users should therefore print this document using a
colour printer.
– 10 – IEC 62264-4:2015 © IEC 2015
INTRODUCTION
This part of IEC 62264 defines the interfaces between enterprise activities and control
activities and is to be used in conjunction with IEC 62264-3.
The scope of this part of IEC 62264 is limited to defining the details of the information content
of interfaces within manufacturing operations management. The scope is limited to the
definition of object models and attributes for the information defined in IEC 62264-3. The goal
is to reduce the effort, cost, and errors associated with implementing these interfaces.
The standard may be used to reduce the effort associated with implementing new product
offerings. The goal is to have enterprise systems and control systems that interoperate and
easily integrate.
This part of IEC 62264 further defines the object models and attributes involved in data
exchange between activities of manufacturing operations management defined in 62264-3.
The models and terminology defined in IEC 62264-3 and this part of IEC 6226
a) emphasize good manufacturing operations management integration practices during the
entire life cycle of the systems;
b) can be used to improve existing integration capability of manufacturing operations
management systems; and
c) can be applied regardless of the degree of automation.
Specifically, IEC 62264-3 and this part of IEC 62264 provide a standard terminology and a
consistent set of concepts and models for integrating manufacturing operations management
systems that will improve communications between all parties involved. Benefits produced will
d) reduce the user’s time to reach full production levels for new products;
e) enable vendors to supply appropriate tools for implementing integration of manufacturing
operations management systems;
f) enable users to better identify their needs;
g) reduce the cost of automating manufacturing processes;
h) optimize supply chains; and
i) reduce life-cycle engineering efforts.
IEC 62264-3 and this part of IEC 62264 may be used to reduce the effort associated with
implementing new product offerings. The goal is to have manufacturing operations
management systems that interoperate and easily integrate.
It is not the intent of the standards to
1) suggest that there is only one way of implementing integration of manufacturing
operations management systems;
2) force users to abandon their current way of handling integration; or
3) restrict development in the area of integration of manufacturing operations management
systems.
ENTERPRISE-CONTROL SYSTEM INTEGRATION –

Part 4: Object model attributes for manufacturing
operations management integration

1 Scope
This part defines object models and attributes exchanged between Level 3 manufacturing
operations management activities defined in IEC 62264-3.
2 Normative references
The following documents, in whole or in part, are normatively referenced in this document and
are indispensable for its application. For dated references, only the edition cited applies. For
undated references, the latest edition of the referenced document (including any
amendments) applies.
IEC 62264-1:2013, Enterprise-control system integration – Part 1: Models and terminology
IEC 62264-2:2013, Enterprise-control system integration – Part 2: Object and attributes for
enterprise-control system integration
IEC 62264-3, Enterprise-control system integration – Part 3: Activity models of manufacturing
operations management
IEC 61512-1, Batch control – Part 1: Models and terminology
IEC 61512-4:2009, Batch control – Part 4: Batch production records
IEC 62682, Management of alarm systems for the process industries
ISO/IEC 19501, Information technology – Open Distributed Processing – Unified Modeling
Language (UML) Version 1.4.2
ISO/IEC 19505-1, Information technology – Object Management Group Unified Modeling
Language (OMG UML) – Part 1: Infrastructure
ISO/IEC 19505-2, Information technology – Object Management Group Unified Modeling
Language (OMG UML) – Part 2: Superstructure
ISO 8601, Data elements and interchange for
...

Questions, Comments and Discussion

Ask us and Technical Secretary will try to provide an answer. You can facilitate discussion about the standard in here.

Loading comments...