IEC 61347-2-8:2000/AMD1:2006/COR1:2012
(Amendment)Corrigendum 1 - Amendment 1 - Lamp controlgear - Part 2-8: Particular requirements for ballasts for fluorescent lamps
Corrigendum 1 - Amendment 1 - Lamp controlgear - Part 2-8: Particular requirements for ballasts for fluorescent lamps
Corrigendum 1 - Amendement 1 - Appareillages de lampes - Partie 2-8: Prescriptions particulières pour les ballasts pour lampes fluorescentes
General Information
- Status
- Published
- Publication Date
- 14-Aug-2012
- Technical Committee
- SC 34C - Auxiliaries for lamps
- Drafting Committee
- WG 1 - TC 34/SC 34C/WG 1
- Current Stage
- DELPUB - Deleted Publication
- Start Date
- 14-May-2024
- Completion Date
- 13-Feb-2026
Relations
- Effective Date
- 05-Sep-2023
- Effective Date
- 05-Sep-2023
Get Certified
Connect with accredited certification bodies for this standard

Intertek Testing Services NA Inc.
Intertek certification services in North America.

UL Solutions
Global safety science company with testing, inspection and certification.

ANCE
Mexican certification and testing association.
Sponsored listings
Frequently Asked Questions
IEC 61347-2-8:2000/AMD1:2006/COR1:2012 is a standard published by the International Electrotechnical Commission (IEC). Its full title is "Corrigendum 1 - Amendment 1 - Lamp controlgear - Part 2-8: Particular requirements for ballasts for fluorescent lamps". This standard covers: Corrigendum 1 - Amendment 1 - Lamp controlgear - Part 2-8: Particular requirements for ballasts for fluorescent lamps
Corrigendum 1 - Amendment 1 - Lamp controlgear - Part 2-8: Particular requirements for ballasts for fluorescent lamps
IEC 61347-2-8:2000/AMD1:2006/COR1:2012 is classified under the following ICS (International Classification for Standards) categories: 29.140.99 - Other standards related to lamps. The ICS classification helps identify the subject area and facilitates finding related standards.
IEC 61347-2-8:2000/AMD1:2006/COR1:2012 has the following relationships with other standards: It is inter standard links to IEC 61347-2-8:2000/AMD1:2006, IEC 61347-2-8:2024. Understanding these relationships helps ensure you are using the most current and applicable version of the standard.
IEC 61347-2-8:2000/AMD1:2006/COR1:2012 is available in PDF format for immediate download after purchase. The document can be added to your cart and obtained through the secure checkout process. Digital delivery ensures instant access to the complete standard document.
Standards Content (Sample)
IEC 61347-2-8
(First edition – 2000 / Amendment 1:2006)
Lamp controlgear –
Part 2-8: Particular requirements for ballasts for fluorescent lamps
CO RRI G E NDUM 1
CONTENTS
Replace the existing title of Figure I.1 by the following:
Figure I.1 – Test circuit for magnetic controlgear, for lamps with integral starting devices
Figure I.1 – Test circuit for ballasts, for lamps with internal starting devices
Replace existing Figure I.1 by the following:
Key
1 Ammeter for measuring the d.c. current
2 Electrostatic voltmeter with a self-capacitance not exceeding 30 pF for measuring the pulse voltage
3 Protection device for power supply
4 Supply for switch control: optional
C = 0,66 μF
C = 5 000 pF
C = 50 pF
D = Diode ZD22
D = Diode IN4004
D = Diode (6 pieces) BYV96E
P Test sample
R Adjustable resistor (approximately 100 Ω)
R Adjustable resistor: R2 ≥ Ballast x 20
S Vacuum switch
Va Varistors (for selection see Annex I)
Figure I.1 – Test circuit for magnetic controlgear, for lamps with
integral starting devices
August 2012
CEI 61347-2-8
(Première édition – 2000 / Amendement 1:2006)
Appareillages de lampes –
Part 2-8: Pr
...




Questions, Comments and Discussion
Ask us and Technical Secretary will try to provide an answer. You can facilitate discussion about the standard in here.
Loading comments...