Industrial communication networks - Profiles - Part 5-8: Installation of fieldbuses - Installation profiles for CPF 8

IEC 61784-5-8:2013 specifies installation profiles for CPF 8 (CC-Link). Each CP installation profile is specified in a separate part of this series of standards. The IEC 61784 series is produced to facilitate the use of communication networks in industrial control systems. This standard is to be used in conjunction with IEC 61918:2013.

Industrielle Kommunikationsnetze - Profile - Teil 5-8: Feldbusinstallation - Installationsprofile für die Kommunikationsprofilfamilie 8

Réseaux de communication industriels - Profils - Partie 5-8: Installation des bus de terrain - Profils d'installation pour CPF 8

La CEI 61784-5-8:2013 définit les profils d'installation pour la CPF 8 (CC-Link). Chaque profil d'installation de CP est spécifié dans une partie séparée de la présente série de normes. Cette norme fait partie d'une série élaborée pour faciliter l'utilisation des réseaux de communication dans des systèmes de contrôle-commande industriels. La présente norme doit être utilisée conjointement à la CEI 61918:2013.

Industrijska komunikacijska omrežja - Profili - 5-8. del: Inštalacija procesnih vodil - Inštalacijski profili za CPF 8 (IEC 61784-5-8:2013)

General Information

Status
Withdrawn
Publication Date
12-Dec-2013
Withdrawal Date
21-Oct-2016
Drafting Committee
IEC/SC 65C - IEC_SC_65C
Current Stage
9960 - Withdrawal effective - Withdrawal
Start Date
04-Oct-2021
Completion Date
04-Oct-2021

Relations

Effective Date
13-Nov-2018
Standard

EN 61784-5-8:2014 - BARVE

English language
77 pages
Preview
Preview
e-Library read for
1 day

Get Certified

Connect with accredited certification bodies for this standard

BSI Group

BSI (British Standards Institution) is the business standards company that helps organizations make excellence a habit.

UKAS United Kingdom Verified

National Aerospace and Defense Contractors Accreditation Program (NADCAP)

Global cooperative program for special process quality in aerospace.

ANAB United States Verified

CARES (UK Certification Authority for Reinforcing Steels)

UK certification for reinforcing steels and construction.

UKAS United Kingdom Verified

Sponsored listings

Frequently Asked Questions

EN 61784-5-8:2013 is a standard published by CLC. Its full title is "Industrial communication networks - Profiles - Part 5-8: Installation of fieldbuses - Installation profiles for CPF 8". This standard covers: IEC 61784-5-8:2013 specifies installation profiles for CPF 8 (CC-Link). Each CP installation profile is specified in a separate part of this series of standards. The IEC 61784 series is produced to facilitate the use of communication networks in industrial control systems. This standard is to be used in conjunction with IEC 61918:2013.

IEC 61784-5-8:2013 specifies installation profiles for CPF 8 (CC-Link). Each CP installation profile is specified in a separate part of this series of standards. The IEC 61784 series is produced to facilitate the use of communication networks in industrial control systems. This standard is to be used in conjunction with IEC 61918:2013.

EN 61784-5-8:2013 is classified under the following ICS (International Classification for Standards) categories: 25.040.40 - Industrial process measurement and control; 35.100.40 - Transport layer. The ICS classification helps identify the subject area and facilitates finding related standards.

EN 61784-5-8:2013 has the following relationships with other standards: It is inter standard links to EN IEC 61784-5-8:2018. Understanding these relationships helps ensure you are using the most current and applicable version of the standard.

EN 61784-5-8:2013 is available in PDF format for immediate download after purchase. The document can be added to your cart and obtained through the secure checkout process. Digital delivery ensures instant access to the complete standard document.

Standards Content (Sample)


SLOVENSKI STANDARD
01-april-2014
Industrijska komunikacijska omrežja - Profili - 5-8. del: Inštalacija procesnih vodil -
Inštalacijski profili za CPF 8 (IEC 61784-5-8:2013)
Industrial communication networks - Profiles -- Part 5-8: Installation of fieldbuses -
Installation profiles for CPF 8
Industrielle Kommunikationsnetze - Profile -- Teil 5-8: Feldbusinstallation -
Installationsprofile für die Kommunikationsprofilfamilie 8
Réseaux de communication industriels - Profils -- Partie 5-8: Installation des bus de
terrain - Profils d'installation pour CPF 8
Ta slovenski standard je istoveten z: EN 61784-5-8:2013
ICS:
25.040.40 Merjenje in krmiljenje Industrial process
industrijskih postopkov measurement and control
35.100.40 Transportni sloj Transport layer
2003-01.Slovenski inštitut za standardizacijo. Razmnoževanje celote ali delov tega standarda ni dovoljeno.

EUROPEAN STANDARD
EN 61784-5-8
NORME EUROPÉENNE
December 2013
EUROPÄISCHE NORM
ICS 25.040.40; 35.100.40
English version
Industrial communication networks -
Profiles -
Part 5-8: Installation of fieldbuses -
Installation profiles for CPF 8
(IEC 61784-5-8:2013)
Réseaux de communication industriels -  Industrielle Kommunikationsnetze -
Profils - Profile -
Partie 5-8: Installation des bus de terrain - Teil 5-8: Feldbusinstallation -
Profils d'installation pour CPF 8 Installationsprofile für die
(CEI 61784-5-8:2013) Kommunikationsprofilfamilie 8
(IEC 61784-5-8:2013)
This European Standard was approved by CENELEC on 2013-10-22. CENELEC members are bound to comply
with the CEN/CENELEC Internal Regulations which stipulate the conditions for giving this European Standard
the status of a national standard without any alteration.

Up-to-date lists and bibliographical references concerning such national standards may be obtained on
application to the CEN-CENELEC Management Centre or to any CENELEC member.

This European Standard exists in three official versions (English, French, German). A version in any other
language made by translation under the responsibility of a CENELEC member into its own language and notified
to the CEN-CENELEC Management Centre has the same status as the official versions.

CENELEC members are the national electrotechnical committees of Austria, Belgium, Bulgaria, Croatia, Cyprus,
the Czech Republic, Denmark, Estonia, Finland, Former Yugoslav Republic of Macedonia, France, Germany,
Greece, Hungary, Iceland, Ireland, Italy, Latvia, Lithuania, Luxembourg, Malta, the Netherlands, Norway, Poland,
Portugal, Romania, Slovakia, Slovenia, Spain, Sweden, Switzerland, Turkey and the United Kingdom.

CENELEC
European Committee for Electrotechnical Standardization
Comité Européen de Normalisation Electrotechnique
Europäisches Komitee für Elektrotechnische Normung

CEN-CENELEC Management Centre: Avenue Marnix 17, B - 1000 Brussels

© 2013 CENELEC - All rights of exploitation in any form and by any means reserved worldwide for CENELEC members.
Ref. No. EN 61784-5-8:2013 E
Foreword
The text of document 65C/738/FDIS, future edition 1 of IEC 61784-5-8, prepared by
SC 65C "Industrial networks" of IEC/TC 65 "Industrial-process measurement, control and automation"
was submitted to the IEC-CENELEC parallel vote and approved by CENELEC as EN 61784-5-8:2013.

The following dates are fixed:
(dop) 2014-07-22
• latest date by which the document has to be
implemented at national level by
publication of an identical national
standard or by endorsement
• latest date by which the national (dow) 2016-10-22
standards conflicting with the
document have to be withdrawn
This standard is to be used in conjunction with EN 61918:2013.

Attention is drawn to the possibility that some of the elements of this document may be the subject of
patent rights. CENELEC [and/or CEN] shall not be held responsible for identifying any or all such
patent rights.
Endorsement notice
The text of the International Standard IEC 61784-5-8:2013 was approved by CENELEC as a
European Standard without any modification.

- 3 - EN 61784-5-8:2013
Annex ZA
(normative)
Normative references to international publications
with their corresponding European publications

The following documents, in whole or in part, are normatively referenced in this document and are
indispensable for its application. For dated references, only the edition cited applies. For undated
references, the latest edition of the referenced document (including any amendments) applies.

NOTE  When an international publication has been modified by common modifications, indicated by (mod), the relevant EN/HD
applies.
Annex ZA of EN 61918:2013 applies, except as follows:

Publication Year Title EN/HD Year
Addition to Annex ZA of EN 61918:2013:
IEC 61918 2013 Industrial communication networks - EN 61918 2013
Installation of communication networks in
industrial premises
IEC 61784-5-8 ®
Edition 1.0 2013-09
INTERNATIONAL
STANDARD
NORME
INTERNATIONALE
colour
inside
Industrial communication networks – Profiles –

Part 5-8: Installation of fieldbuses – Installation profiles for CPF 8

Réseaux de communication industriels – Profils –

Partie 5-8: Installation des bus de terrain – Profils d'installation pour CPF 8

INTERNATIONAL
ELECTROTECHNICAL
COMMISSION
COMMISSION
ELECTROTECHNIQUE
PRICE CODE
INTERNATIONALE
CODE PRIX XC
ICS 25.040.40; 35.100.40 ISBN 978-2-8322-1066-6

– 2 – 61784-5-8 © IEC:2013
CONTENTS
FOREWORD . 12
INTRODUCTION . 14
1 Scope . 15
2 Normative references . 15
3 Terms, definitions and abbreviated terms . 15
4 CPF 8: Overview of installation profiles . 15
5 Installation profile conventions. 16
6 Conformance to installation profiles . 16
Annex A (normative) CP 8/1 and CP 8/2 (CC-Link/V1 and CC-Link/V2) specific
installation profile . 18
A.1 Installation profile scope . 18
A.2 Normative references . 18
A.3 Installation profile terms, definitions, and abbreviated terms . 18
A.3.1 Terms and definitions . 18
A.3.2 Abbreviated terms . 18
A.3.3 Conventions for installation profiles . 18
A.4 Installation planning. 18
A.4.1 General . 18
A.4.1.1 Objective . 18
A.4.1.2 Cabling in industrial premises . 18
A.4.1.3 The planning process . 18
A.4.1.4 Specific requirements for CPs. 18
A.4.1.5 Specific requirements for generic cabling in accordance with ISO/IEC
24702 . 19
A.4.2 Planning requirements . 19
A.4.2.1 Safety . 19
A.4.2.2 Security . 19
A.4.2.3 Environmental considerations and EMC . 19
A.4.2.4 Specific requirements for generic cabling in accordance with
ISO/IEC 24702 . 19
A.4.3 Network capabilities . 19
A.4.3.1 Network topology . 19
A.4.3.2 Network characteristics . 20
A.4.4 Selection and use of cabling components . 21
A.4.4.1 Cable selection . 21
A.4.4.2 Connecting hardware selection . 23
A.4.4.3 Connections within a channel/permanent link . 24
A.4.4.4 Terminators . 24
A.4.4.5 Device location and connection . 24
A.4.4.6 Coding and labelling . 25
A.4.4.7 Earthing and bonding of equipment and devices and shielded
cabling . 25
A.4.4.8 Storage and transportation of cables . 26
A.4.4.9 Routing of cables . 26
A.4.4.10 Separation of circuit . 26
A.4.4.11 Mechanical protection of cabling components . 26

61784-5-8 © IEC:2013 – 3 –
A.4.4.12 Installation in special areas . 26
A.4.5 Cabling planning documentation . 26
A.4.6 Verification of cabling planning specification. 26
A.5 Installation implementation . 26
A.5.1 General requirements . 26
A.5.1.1 Common description . 26
A.5.1.2 Installation of CPs . 26
A.5.1.3 Installation of generic cabling in industrial premises . 26
A.5.2 Cable installation . 26
A.5.2.1 General requirements for all cabling types . 26
A.5.2.2 Installation and routing . 27
A.5.2.3 Specific requirements for CPs. 27
A.5.2.4 Specific requirements for wireless installation . 27
A.5.2.5 Specific requirements for generic cabling in accordance with
ISO/IEC 24702 . 27
A.5.3 Connector installation . 27
A.5.3.1 Common description . 27
A.5.3.2 Shielded connectors . 28
A.5.3.3 Unshielded connectors . 28
A.5.3.4 Specific requirements for CPs. 28
A.5.3.5 Specific requirements for generic cabling in accordance with ISO/IEC
24702 . 28
A.5.4 Terminator installation . 28
A.5.4.1 Common description . 28
A.5.4.2 Specific requirements for CPs. 28
A.5.5 Device installation . 28
A.5.6 Coding and labelling . 28
A.5.6.1 Common description . 28
A.5.6.2 Specific requirements for CPs. 28
A.5.7 Earthing and bonding of equipment and devices and shield cabling . 28
A.5.7.1 Common description . 28
A.5.7.2 Bonding and earthing of enclosures and pathways. 28
A.5.7.3 Earthing methods . 28
A.5.7.4 Shield termination methods . 29
A.5.7.5 Specific requirements for CPs. 29
A.5.7.6 Specific requirements for generic cabling in accordance with ISO/IEC
24702 . 29
A.5.8 As-implemented cabling documentation . 29
A.6 Installation verification and installation acceptance test . 29
A.6.1 General . 29
A.6.2 Installation verification . 29
A.6.2.1 General . 29
A.6.2.2 Verification according to cabling planning documentation . 29
A.6.2.3 Verification of earthing and bonding . 29
A.6.2.4 Verification of shield earthing . 29
A.6.2.5 Verification of cabling system . 29
A.6.2.6 Cable selection verification . 29
A.6.2.7 Connector verification . 30
A.6.2.8 Connection verification . 30

– 4 – 61784-5-8 © IEC:2013
A.6.2.9 Terminators verification . 30
A.6.2.10 Coding and labelling verification . 30
A.6.2.11 Verification report . 30
A.6.3 Installation acceptance test . 30
A.6.3.1 General . 30
A.6.3.2 Acceptance test of Ethernet-based cabling . 30
A.6.3.3 Acceptance test of non-Ethernet-based cabling . 30
A.6.3.4 Specific requirements for wireless installation . 30
A.6.3.5 Acceptance test report . 30
A.7 Installation administration . 31
A.8 Installation maintenance and installation troubleshooting . 31
Annex B (normative) CP 8/3 (CC-Link/LT) specific installation profile . 32
B.1 Installation profile scope . 32
B.2 Normative references . 32
B.3 Installation profile terms, definitions, and abbreviated terms . 32
B.3.1 Terms and definitions . 32
B.3.2 Abbreviated terms . 32
B.3.3 Conventions for installation profiles . 32
B.4 Installation planning. 32
B.4.1 General . 32
B.4.1.1 Objective . 32
B.4.1.2 Cabling in industrial premises . 32
B.4.1.3 The planning process . 32
B.4.1.4 Specific requirements for CPs. 32
B.4.1.5 Specific requirements for generic cabling in accordance with ISO/IEC
24702 . 33
B.4.2 Planning requirements . 33
B.4.2.1 Safety . 33
B.4.2.2 Security . 33
B.4.2.3 Environmental considerations and EMC . 33
B.4.2.4 Specific requirements for generic cabling in accordance with
ISO/IEC 24702 . 33
B.4.3 Network capabilities . 33
B.4.3.1 Network topology . 33
B.4.3.2 Network characteristics . 34
B.4.4 Selection and use of cabling components . 36
B.4.4.1 Cable selection . 36
B.4.4.2 Connecting hardware selection . 38
B.4.4.3 Connections within a channel/permanent link . 40
B.4.4.4 Terminators . 41
B.4.4.5 Device location and connection . 41
B.4.4.6 Coding and labelling . 41
B.4.4.7 Earthing and bonding of equipment and devices and shielded
cabling . 41
B.4.4.8 Storage and transportation of cables . 42
B.4.4.9 Routing of cables . 42
B.4.4.10 Separation of circuit . 42
B.4.4.11 Mechanical protection of cabling components . 42
B.4.4.12 Installation in special areas . 42

61784-5-8 © IEC:2013 – 5 –
B.4.5 Cabling planning documentation . 43
B.4.6 Verification of cabling planning specification. 43
B.5 Installation implementation . 43
B.5.1 General requirements . 43
B.5.1.1 Common description . 43
B.5.1.2 Installation of CPs . 43
B.5.1.3 Installation of generic cabling in industrial premises . 43
B.5.2 Cable installation . 43
B.5.2.1 General requirements for all cabling types . 43
B.5.2.2 Installation and routing . 44
B.5.2.3 Specific requirements for CPs. 44
B.5.2.4 Specific requirements for wireless installation . 44
B.5.2.5 Specific requirements for generic cabling in accordance with
ISO/IEC 24702 . 44
B.5.3 Connector installation . 44
B.5.3.1 Common description . 44
B.5.3.2 Shielded connectors . 44
B.5.3.3 Unshielded connectors . 45
B.5.3.4 Specific requirements for CPs. 45
B.5.3.5 Specific requirements for generic cabling in accordance with ISO/IEC
24702 . 45
B.5.4 Terminator installation . 45
B.5.4.1 Common description . 45
B.5.4.2 Specific requirements for CPs. 45
B.5.5 Device installation . 45
B.5.6 Coding and labelling . 45
B.5.7 Earthing and bonding of equipment and devices and shield cabling . 45
B.5.7.1 Common description . 45
B.5.7.2 Bonding and earthing of enclosures and pathways. 45
B.5.7.3 Earthing methods . 45
B.5.7.4 Shield termination methods . 45
B.5.7.5 Specific requirements for CPs. 45
B.5.7.6 Specific requirements for generic cabling in accordance with ISO/IEC
24702 . 46
B.5.8 As-implemented cabling documentation . 46
B.6 Installation verification and installation acceptance test . 46
B.6.1 General . 46
B.6.2 Installation verification . 46
B.6.2.1 General . 46
B.6.2.2 Verification according to cabling planning documentation . 46
B.6.2.3 Verification of earthing and bonding . 46
B.6.2.4 Verification of shield earthing . 46
B.6.2.5 Verification of cabling system . 46
B.6.2.6 Cable selection verification . 46
B.6.2.7 Connector verification . 46
B.6.2.8 Connection verification . 46
B.6.2.9 Terminators verification . 47
B.6.2.10 Coding and labelling verification . 47
B.6.2.11 Verification report . 47

– 6 – 61784-5-8 © IEC:2013
B.6.3 Installation acceptance test . 47
B.6.3.1 General . 47
B.6.3.2 Acceptance test of Ethernet-based cabling . 47
B.6.3.3 Acceptance test of non-Ethernet-based cabling . 47
B.6.3.4 Specific requirements for wireless installation . 47
B.6.3.5 Acceptance test report . 47
B.7 Installation administration . 47
B.8 Installation maintenance and installation troubleshooting . 47
Annex C (normative) CP 8/4 (CC-Link IE Controller Network) specific installation
profile . 48
C.1 Installation profile scope . 48
C.2 Normative references . 48
C.3 Installation profile terms, definitions, and abbreviated terms . 48
C.3.1 Terms and definitions . 48
C.3.2 Abbreviated terms . 48
C.3.3 Conventions for installation profiles . 48
C.4 Installation planning. 48
C.4.1 General . 48
C.4.1.1 Objective . 48
C.4.1.2 Cabling in industrial premises . 48
C.4.1.3 The planning process . 48
C.4.1.4 Specific requirements for CPs. 48
C.4.1.5 Specific requirements for generic cabling in accordance with ISO/IEC
24702 . 48
C.4.2 Planning requirements . 48
C.4.2.1 Safety . 48
C.4.2.2 Security . 49
C.4.2.3 Environmental considerations and EMC . 49
C.4.2.4 Specific requirements for generic cabling in accordance with
ISO/IEC 24702 . 49
C.4.3 Network capabilities . 49
C.4.3.1 Network topology . 49
C.4.3.2 Network characteristics . 49
C.4.4 Selection and use of cabling components . 50
C.4.4.1 Cable selection . 50
C.4.4.2 Connecting hardware selection . 51
C.4.4.3 Connections within a channel/permanent link . 52
C.4.4.4 Terminators . 53
C.4.4.5 Device location and connection . 53
C.4.4.6 Coding and labelling . 53
C.4.4.7 Earthing and bonding of equipment and devices and shielded
cabling . 53
C.4.4.8 Storage and transportation of cables . 54
C.4.4.9 Routing of cables . 54
C.4.4.10 Separation of circuit . 54
C.4.4.11 Mechanical protection of cabling components . 54
C.4.4.12 Installation in special areas . 55
C.4.5 Cabling planning documentation . 55
C.4.5.1 Common description . 55

61784-5-8 © IEC:2013 – 7 –
C.4.5.2 Cabling planning documentation for CPs . 55
C.4.5.3 Network certification documentation . 55
C.4.5.4 Cabling planning documentation for generic cabling in accordance
with ISO/IEC 24702 . 55
C.4.6 Verification of cabling planning specification. 55
C.5 Installation implementation . 55
C.5.1 General requirements . 55
C.5.1.1 Common description . 55
C.5.1.2 Installation of CPs . 55
C.5.1.3 Installation of generic cabling in industrial premises . 55
C.5.2 Cable installation . 55
C.5.2.1 General requirements for all cabling types . 55
C.5.2.2 Installation and routing . 56
C.5.2.3 Specific requirements for CPs. 56
C.5.2.4 Specific requirements for wireless installation . 56
C.5.2.5 Specific requirements for generic cabling in accordance with
ISO/IEC 24702 . 57
C.5.3 Connector installation . 57
C.5.3.1 Common description . 57
C.5.3.2 Shielded connectors . 57
C.5.3.3 Unshielded connectors . 57
C.5.3.4 Specific requirements for CPs. 57
C.5.3.5 Specific requirements for wireless installation . 57
C.5.4 Terminator installation . 57
C.5.5 Device installation . 57
C.5.5.1 Common description . 57
C.5.5.2 Specific requirements for CPs. 57
C.5.6 Coding and labelling . 57
C.5.6.1 Common description . 57
C.5.6.2 Specific requirements for CPs. 57
C.5.7 Earthing and bonding of equipment and devices and shield cabling . 57
C.5.7.1 Common description . 57
C.5.7.2 Bonding and earthing of enclosures and pathways. 57
C.5.7.3 Earthing methods . 57
C.5.7.4 Shield termination methods . 58
C.5.7.5 Specific requirements for CPs. 58
C.5.7.6 Specific requirements for generic cabling in accordance with ISO/IEC
24702 . 58
C.5.8 As-implemented cabling documentation . 58
C.6 Installation verification and installation acceptance test . 58
C.6.1 General . 58
C.6.2 Installation verification . 58
C.6.2.1 General . 58
C.6.2.2 Verification according to cabling planning documentation . 58
C.6.2.3 Verification of earthing and bonding . 58
C.6.2.4 Verification of shield earthing . 58
C.6.2.5 Verification of cabling system . 58
C.6.2.6 Cable selection verification . 58
C.6.2.7 Connector verification . 59

– 8 – 61784-5-8 © IEC:2013
C.6.2.8 Connection verification . 59
C.6.2.9 Terminators verification . 59
C.6.2.10 Coding and labelling verification . 59
C.6.2.11 Verification report . 59
C.6.3 Installation acceptance test . 59
C.6.3.1 General . 59
C.6.3.2 Acceptance test of Ethernet based cabling . 59
C.6.3.3 Acceptance test of non Ethernet based cabling . 59
C.6.3.4 Specific requirements for wireless installation . 59
C.6.3.5 Acceptance test report . 60
C.7 Installation administration . 60
C.8 Installation maintenance and installation troubleshooting . 60
Annex D (normative) CP 8/5 (CC-Link IE Field Network) specific installation profile . 61
D.1 Installation profile scope . 61
D.2 Normative references . 61
D.3 Installation profile terms, definitions, and abbreviated terms . 61
D.3.1 Terms and definitions . 61
D.3.2 Abbreviated terms . 61
D.3.3 Conventions for installation profiles . 61
D.4 Installation planning. 61
D.4.1 General . 61
D.4.1.1 Objective . 61
D.4.1.2 Cabling in industrial premises . 61
D.4.1.3 The planning process . 61
D.4.1.4 Specific requirements for CPs. 61
D.4.1.5 Specific requirements for generic cabling in accordance with ISO/IEC
24702 . 61
D.4.2 Planning requirements . 61
D.4.2.1 Safety . 61
D.4.2.2 Security . 62
D.4.2.3 Environmental considerations and EMC . 62
D.4.2.4 Specific requirements for generic cabling in accordance with
ISO/IEC 24702 . 62
D.4.3 Network capabilities . 62
D.4.3.1 Network topology . 62
D.4.3.2 Network characteristics . 62
D.4.4 Selection and use of cabling components . 63
D.4.4.1 Cable selection . 63
D.4.4.2 Connecting hardware selection . 64
D.4.4.3 Connections within a channel/permanent link . 65
D.4.4.4 Terminators . 66
D.4.4.5 Device location and connection . 66
D.4.4.6 Coding and labelling . 66
D.4.4.7 Earthing and bonding of equipment and devices and shielded
ca
...

Questions, Comments and Discussion

Ask us and Technical Secretary will try to provide an answer. You can facilitate discussion about the standard in here.

Loading comments...