SIGNIFICANCE AND USE
4.1 This practice provides minimum recommendations for the installation of thick poured gypsum concrete floor underlayments suitable to receive resilient floor coverings. This practice establishes the proper preparation, installation and quality control for thick poured gypsum concrete floor underlayments.
4.2 Actual requirements for thick poured gypsum concrete underlayments are generally included as part of project plans or specifications and may vary from the recommendations set forth in this practice. Project plans or specifications, or both, shall supersede the recommendations set forth in this practice.
SCOPE
1.1 This practice covers the installation and preparation of the thick poured gypsum concrete underlayments over wood structural panel subfloors in commercial structures or over concrete floors in commercial structures and the preparation of the thick poured gypsum concrete underlayment surface prior to the installation of resilient flooring in commercial buildings.
1.2 This practice covers the factors that are required to be controlled while installing thick poured gypsum concrete underlayment as a base for resilient flooring.
1.3 This practice does not cover the structural adequacy of the wood structural panel subfloor or concrete subfloor. The structural integrity of assemblies is governed by local building codes.
1.4 This practice does not supersede in any manner the thick poured gypsum concrete underlayment manufacturers, adhesive manufacturer’s or resilient flooring manufacturer’s written instructions. Consult the individual manufacturer for specific recommendations.
1.5 Thick poured gypsum concrete underlayments are not suitable for use on concrete slabs on ground due to potential moisture problems arising from moisture intrusion, unless an adequate vapor retarder or vapor barrier is present directly beneath the concrete subfloor.
1.6 The values stated in inch-pound units are to be regarded as standard. The values stated in parentheses are approximate mathematical conversions to SI units, which are provided for information only.
1.7 This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate safety, health, and environmental practices and determine the applicability of regulatory limitations prior to use.
1.8 This international standard was developed in accordance with internationally recognized principles on standardization established in the Decision on Principles for the Development of International Standards, Guides and Recommendations issued by the World Trade Organization Technical Barriers to Trade (TBT) Committee.
General Information
- Status
- Published
- Publication Date
- 30-Sep-2021
- Technical Committee
- F06 - Resilient Floor Coverings
- Drafting Committee
- F06.40 - Practices
Relations
- Effective Date
- 01-Aug-2023
- Effective Date
- 01-Apr-2020
- Effective Date
- 15-Jan-2020
- Effective Date
- 01-Aug-2018
- Effective Date
- 01-Apr-2014
- Effective Date
- 01-May-2012
- Effective Date
- 01-Mar-2012
- Effective Date
- 01-Dec-2011
- Effective Date
- 01-Sep-2009
- Effective Date
- 01-May-2009
- Effective Date
- 01-Dec-2008
- Effective Date
- 01-Nov-2008
- Effective Date
- 01-Sep-2005
- Effective Date
- 01-Nov-2004
- Effective Date
- 01-May-2004
Overview
ASTM F2419-11(2021), Standard Practice for Installation of Thick Poured Gypsum Concrete Underlayments and Preparation of the Surface to Receive Resilient Flooring, provides comprehensive guidelines for the installation of thick poured gypsum concrete underlayments specifically intended for commercial projects. This standard defines best practices for preparing subfloors, installing gypsum concrete underlayments, and ensuring surfaces are ready to receive resilient floor coverings, such as vinyl, linoleum, or rubber flooring. The document emphasizes factors that impact installation quality and compatibility between underlayments and finished flooring, helping construction professionals deliver durable, high-performance floor systems.
Key Topics
- Subfloor Requirements: Covers installation over wood structural panels and concrete subfloors in commercial buildings. Structural integrity of the subfloor must comply with local building codes.
- Material Specifications: Details required product characteristics, including gypsum cement, Portland cement, sand, and strength requirements.
- Surface Preparation: Defines cleaning, leveling, drying, and repair tasks essential prior to underlayment installation.
- Installation Guidance: Recommends appropriate installation thickness, application methods, environment control, and quality control during placement.
- Moisture Control: Highlights the necessity for vapor retarders when installing over on-grade slabs to avoid moisture intrusion.
- Manufacturer’s Instructions: Stresses the importance of following the guidance of underlayment and flooring manufacturers for project-specific requirements.
- Final Surface Preparation: Outlines steps for preparing the gypsum concrete surface immediately before resilient floor covering installation, including cleaning and testing for moisture.
Applications
The practical value of ASTM F2419-11(2021) lies in ensuring successful installation of thick poured gypsum concrete underlayments for commercial buildings where resilient flooring will be installed. Applications include:
- Office and Retail Spaces: Provides smooth and stable substrates for resilient floor coverings in high-traffic environments.
- Educational and Healthcare Facilities: Ensures level floors with enhanced fire and sound ratings, creating comfortable and safe spaces.
- Multi-Family Dwellings and Hotels: Supports noise reduction when used in conjunction with sound mats and contributes to code-mandated performance.
- Renovation Projects: Guides retrofitting of existing concrete or wood panel floors to receive modern resilient flooring options.
By adhering to this standard, installers and general contractors can minimize failures such as cracking, delamination, moisture damage, and resilient flooring incompatibility, increasing the lifespan and performance of the flooring system.
Related Standards
Compliance and best practices for thick poured gypsum concrete underlayments often require referencing additional ASTM standards and guides. Commonly cited standards include:
- ASTM C472: Test Methods for Physical Testing of Gypsum, Gypsum Plasters, and Gypsum Concrete
- ASTM D4263: Test Method for Indicating Moisture in Concrete by the Plastic Sheet Method
- ASTM F141: Terminology Relating to Resilient Floor Coverings
- ASTM F1482: Practice for Installation and Preparation of Panel Type Underlayments to Receive Resilient Flooring
For optimal results, always consult both project specifications and current manufacturer recommendations alongside ASTM F2419-11(2021).
Keywords: gypsum concrete underlayment, resilient flooring installation, subfloor preparation, ASTM F2419, commercial floor systems, poured gypsum, flooring standards, underlayment practices, moisture control, resilient floor compatibility
Buy Documents
ASTM F2419-11(2021) - Standard Practice for Installation of Thick Poured Gypsum Concrete Underlayments and Preparation of the Surface to Receive Resilient Flooring
Get Certified
Connect with accredited certification bodies for this standard

ICC Evaluation Service
Building products evaluation and certification.

QAI Laboratories
Building and construction product testing and certification.

Aboma Certification B.V.
Specialized in construction, metal, and transport sectors.
Sponsored listings
Frequently Asked Questions
ASTM F2419-11(2021) is a standard published by ASTM International. Its full title is "Standard Practice for Installation of Thick Poured Gypsum Concrete Underlayments and Preparation of the Surface to Receive Resilient Flooring". This standard covers: SIGNIFICANCE AND USE 4.1 This practice provides minimum recommendations for the installation of thick poured gypsum concrete floor underlayments suitable to receive resilient floor coverings. This practice establishes the proper preparation, installation and quality control for thick poured gypsum concrete floor underlayments. 4.2 Actual requirements for thick poured gypsum concrete underlayments are generally included as part of project plans or specifications and may vary from the recommendations set forth in this practice. Project plans or specifications, or both, shall supersede the recommendations set forth in this practice. SCOPE 1.1 This practice covers the installation and preparation of the thick poured gypsum concrete underlayments over wood structural panel subfloors in commercial structures or over concrete floors in commercial structures and the preparation of the thick poured gypsum concrete underlayment surface prior to the installation of resilient flooring in commercial buildings. 1.2 This practice covers the factors that are required to be controlled while installing thick poured gypsum concrete underlayment as a base for resilient flooring. 1.3 This practice does not cover the structural adequacy of the wood structural panel subfloor or concrete subfloor. The structural integrity of assemblies is governed by local building codes. 1.4 This practice does not supersede in any manner the thick poured gypsum concrete underlayment manufacturers, adhesive manufacturer’s or resilient flooring manufacturer’s written instructions. Consult the individual manufacturer for specific recommendations. 1.5 Thick poured gypsum concrete underlayments are not suitable for use on concrete slabs on ground due to potential moisture problems arising from moisture intrusion, unless an adequate vapor retarder or vapor barrier is present directly beneath the concrete subfloor. 1.6 The values stated in inch-pound units are to be regarded as standard. The values stated in parentheses are approximate mathematical conversions to SI units, which are provided for information only. 1.7 This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate safety, health, and environmental practices and determine the applicability of regulatory limitations prior to use. 1.8 This international standard was developed in accordance with internationally recognized principles on standardization established in the Decision on Principles for the Development of International Standards, Guides and Recommendations issued by the World Trade Organization Technical Barriers to Trade (TBT) Committee.
SIGNIFICANCE AND USE 4.1 This practice provides minimum recommendations for the installation of thick poured gypsum concrete floor underlayments suitable to receive resilient floor coverings. This practice establishes the proper preparation, installation and quality control for thick poured gypsum concrete floor underlayments. 4.2 Actual requirements for thick poured gypsum concrete underlayments are generally included as part of project plans or specifications and may vary from the recommendations set forth in this practice. Project plans or specifications, or both, shall supersede the recommendations set forth in this practice. SCOPE 1.1 This practice covers the installation and preparation of the thick poured gypsum concrete underlayments over wood structural panel subfloors in commercial structures or over concrete floors in commercial structures and the preparation of the thick poured gypsum concrete underlayment surface prior to the installation of resilient flooring in commercial buildings. 1.2 This practice covers the factors that are required to be controlled while installing thick poured gypsum concrete underlayment as a base for resilient flooring. 1.3 This practice does not cover the structural adequacy of the wood structural panel subfloor or concrete subfloor. The structural integrity of assemblies is governed by local building codes. 1.4 This practice does not supersede in any manner the thick poured gypsum concrete underlayment manufacturers, adhesive manufacturer’s or resilient flooring manufacturer’s written instructions. Consult the individual manufacturer for specific recommendations. 1.5 Thick poured gypsum concrete underlayments are not suitable for use on concrete slabs on ground due to potential moisture problems arising from moisture intrusion, unless an adequate vapor retarder or vapor barrier is present directly beneath the concrete subfloor. 1.6 The values stated in inch-pound units are to be regarded as standard. The values stated in parentheses are approximate mathematical conversions to SI units, which are provided for information only. 1.7 This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate safety, health, and environmental practices and determine the applicability of regulatory limitations prior to use. 1.8 This international standard was developed in accordance with internationally recognized principles on standardization established in the Decision on Principles for the Development of International Standards, Guides and Recommendations issued by the World Trade Organization Technical Barriers to Trade (TBT) Committee.
ASTM F2419-11(2021) is classified under the following ICS (International Classification for Standards) categories: 91.180 - Interior finishing. The ICS classification helps identify the subject area and facilitates finding related standards.
ASTM F2419-11(2021) has the following relationships with other standards: It is inter standard links to ASTM F141-23, ASTM C472-20, ASTM F141-12(2020), ASTM D4263-83(2018), ASTM C472-99(2014), ASTM D4263-83(2012), ASTM F141-12, ASTM F141-11, ASTM C472-99(2009), ASTM F1482-04(2009)e1, ASTM F141-08a, ASTM F141-08, ASTM D4263-83(2005), ASTM F141-04, ASTM C472-99(2004). Understanding these relationships helps ensure you are using the most current and applicable version of the standard.
ASTM F2419-11(2021) is available in PDF format for immediate download after purchase. The document can be added to your cart and obtained through the secure checkout process. Digital delivery ensures instant access to the complete standard document.
Standards Content (Sample)
This international standard was developed in accordance with internationally recognized principles on standardization established in the Decision on Principles for the
Development of International Standards, Guides and Recommendations issued by the World Trade Organization Technical Barriers to Trade (TBT) Committee.
Designation: F2419 − 11 (Reapproved 2021)
Standard Practice for
Installation of Thick Poured Gypsum Concrete
Underlayments and Preparation of the Surface to Receive
Resilient Flooring
This standard is issued under the fixed designation F2419; the number immediately following the designation indicates the year of
original adoption or, in the case of revision, the year of last revision. A number in parentheses indicates the year of last reapproval. A
superscript epsilon (´) indicates an editorial change since the last revision or reapproval.
1. Scope 1.8 This international standard was developed in accor-
dance with internationally recognized principles on standard-
1.1 This practice covers the installation and preparation of
ization established in the Decision on Principles for the
the thick poured gypsum concrete underlayments over wood
Development of International Standards, Guides and Recom-
structural panel subfloors in commercial structures or over
mendations issued by the World Trade Organization Technical
concrete floors in commercial structures and the preparation of
Barriers to Trade (TBT) Committee.
the thick poured gypsum concrete underlayment surface prior
to the installation of resilient flooring in commercial buildings.
2. Referenced Documents
1.2 This practice covers the factors that are required to be
2.1 ASTM Standards:
controlled while installing thick poured gypsum concrete
C472 Test Methods for Physical Testing of Gypsum, Gyp-
underlayment as a base for resilient flooring.
sum Plasters, and Gypsum Concrete
1.3 This practice does not cover the structural adequacy of
D4263 Test Method for Indicating Moisture in Concrete by
the wood structural panel subfloor or concrete subfloor. The
the Plastic Sheet Method
structural integrity of assemblies is governed by local building
F141 Terminology Relating to Resilient Floor Coverings
codes.
F1482 Practice for Installation and Preparation of Panel
Type Underlayments to Receive Resilient Flooring
1.4 This practice does not supersede in any manner the thick
poured gypsum concrete underlayment manufacturers, adhe-
3. Terminology
sive manufacturer’s or resilient flooring manufacturer’s written
3.1 Definitions—Definitions used in this practice shall be in
instructions. Consult the individual manufacturer for specific
recommendations. accordance with Terminology F141.
3.2 Definitions of Terms Specific to This Standard:
1.5 Thick poured gypsum concrete underlayments are not
suitable for use on concrete slabs on ground due to potential 3.2.1 fully adhered flooring, n—resilient flooring which has
adhesive under the entire product, bonding it to the underlay-
moisture problems arising from moisture intrusion, unless an
adequate vapor retarder or vapor barrier is present directly ment surface. F1482
beneath the concrete subfloor.
3.2.2 non-fully adhered flooring, n—resilient flooring that
may be loose laid, in which no adhesive is utilized, or partially
1.6 The values stated in inch-pound units are to be regarded
bonded to the surface of the underlayment, typically at seams
as standard. The values stated in parentheses are approximate
and the surrounding perimeter of the product. F1482
mathematical conversions to SI units, which are provided for
information only.
3.2.3 subfloor, n—that wood or concrete structural layer
intendedtoprovidesupportfordesignloadswhichmayreceive
1.7 This standard does not purport to address all of the
resilient floor coverings directly if the surface is appropriate or
safety concerns, if any, associated with its use. It is the
indirectly via an underlayment if its surface is not suitable or if
responsibility of the user of this standard to establish appro-
underlayment is required by appropriate code authorities.
priate safety, health, and environmental practices and deter-
mine the applicability of regulatory limitations prior to use.
3.2.4 gypsum concrete underlayment, n—that layer of
material, with binder content composed primarily of gypsum
This practice is under the jurisdiction of ASTM Committee F06 on Resilient
Floor Coverings and is the direct responsibility of Subcommittee F06.40 on
Practices. For referenced ASTM standards, visit the ASTM website, www.astm.org, or
Current edition approved Oct. 1, 2021. Published October 2021. Originally contact ASTM Customer Service at service@astm.org. For Annual Book of ASTM
approved in 2005. Last previous edition approved in 2017 as F2419-11 (2017). DOI: Standards volume information, refer to the standard’s Document Summary page on
10.1520/F2419-11R21. the ASTM website.
Copyright © ASTM International, 100 Barr Harbor Drive, PO Box C700, West Conshohocken, PA 19428-2959. United States
F2419 − 11 (2021)
cement and Portland cement that is mixed with sand and water, 7. General Guidelines
then pumped and poured in a liquid state to be installed on or
7.1 Recommended thickness of thick poured gypsum con-
over a subfloor to provide a monolithic surface suitable to
crete over structurally sound wood is ⁄4 in. (19 mm) minimum.
receive resilient floor coverings.
Recommended minimum thickness over structurally sound
3.2.5 thick poured gypsum concrete underlayment,
concrete or precast concrete is ⁄2 in. (13 mm). Minimum
n—products which are installed in a liquid state over a
thickness over a floor ceiling assembly which contains a sound
structurallysoundconcreteorprecastsubfloorataminimumof
mat shall be 1 in. (25 mm). Subfloor must support design loads
⁄2 in. (13 mm) or a structurally sound wood subfloor at a
with maximum L360 deflection.
minimum of ⁄4 in. (19 mm) which when dry form an integral
7.2 Wood and concrete subfloors shall be structurally sound,
part of the floor ceiling assembly for fire resistance and sound
clean and dry so as to support both the design live and dead
ratings, satisfy building codes for thick poured gypsum con-
loads in compliance with the local building code and the
crete underlayments, and provide a suitable floor surface for
resilient flooring manufacturers installation requirements.
the installation of resilient floor coverings.
7.3 The finished surfaces of the wood or concrete subfloor
3.2.6 sound mat, n—a membrane installed between a struc-
shall be properly prepared, clean, dry, smooth, and free of
turally sound subfloor and a thick poured gypsum concrete
construction wastes such as acoustic and wall texture,
underlayment to increase sound reduction in the floor ceiling
overspray, dirt, solvents, oil, grease, residual construction
assembly.
adhesives, adhesive removers, and other foreign materials.
Concrete subfloors shall be fully cured and 28 days or older.
4. Significance and Use
7.4 Before, during and after installation of thick poured
4.1 This practice provides minimum recommendations for
gypsum concrete underlayment, the general contractor shall be
the installation of thick poured gypsum concrete floor under-
responsible for ensuring that the building shall be ventilated
layments suitable to receive resilient floor coverings. This
and heated to a minimum of 50°F (10°C) until subfloor and
practice establishes the proper preparation, installation and
ambient temperatures have stabilized. Temperature during and
quality control for thick poured gypsum concrete floor under-
after installation shall be maintained until material has com-
layments.
pletely cured. The general contractor shall provide heat and
4.2 Actual requirements for thick poured gypsum concrete
ventilation as necessary to dry the thick poured gypsum
underlaymentsaregenerallyincludedaspartofprojectplansor 3
concrete underlayment.
specifications and may vary from the recommendations set
7.5 Installation of thick poured gypsum concrete underlay-
forth in this practice. Project plans or specifications, or both,
ment shall not begin until the building is enclosed, including
shall supersede the recommendations s
...




Questions, Comments and Discussion
Ask us and Technical Secretary will try to provide an answer. You can facilitate discussion about the standard in here.
Loading comments...