Corrigendum 2 - High-voltage switchgear and controlgear - Part 211: Direct connection between power transformers and gas-insulated metal-enclosed switchgear for rated voltages above 52 kV

Corrigendum 2 - Appareillage à haute tension - Partie 211: Raccordements directs entre transformateurs de puissance et appareillage sous enveloppe métallique à isolation gazeuse de tensions assignées supérieures à 52 kV

General Information

Status
Published
Publication Date
16-Aug-2017
Technical Committee
SC 17C - Assemblies
Drafting Committee
MT 27 - TC 17/SC 17C/MT 27
Current Stage
DELPUB - Deleted Publication
Start Date
04-Sep-2024
Completion Date
14-Feb-2026

Relations

Effective Date
05-Sep-2023
Effective Date
05-Sep-2023
Effective Date
05-Sep-2023

Buy Documents

Standard

IEC 62271-211:2014/COR2:2017 - Corrigendum 2 - High-voltage switchgear and controlgear - Part 211: Direct connection between power transformers and gas-insulated metal-enclosed switchgear for rated voltages above 52 kV Released:8/17/2017

English and French language (3 pages)
sale 15% off
Preview
sale 15% off
Preview

Get Certified

Connect with accredited certification bodies for this standard

Intertek Testing Services NA Inc.

Intertek certification services in North America.

ANAB United States Verified

UL Solutions

Global safety science company with testing, inspection and certification.

ANAB United States Verified

ANCE

Mexican certification and testing association.

EMA Mexico Verified

Sponsored listings

Frequently Asked Questions

IEC 62271-211:2014/COR2:2017 is a standard published by the International Electrotechnical Commission (IEC). Its full title is "Corrigendum 2 - High-voltage switchgear and controlgear - Part 211: Direct connection between power transformers and gas-insulated metal-enclosed switchgear for rated voltages above 52 kV". This standard covers: Corrigendum 2 - High-voltage switchgear and controlgear - Part 211: Direct connection between power transformers and gas-insulated metal-enclosed switchgear for rated voltages above 52 kV

Corrigendum 2 - High-voltage switchgear and controlgear - Part 211: Direct connection between power transformers and gas-insulated metal-enclosed switchgear for rated voltages above 52 kV

IEC 62271-211:2014/COR2:2017 is classified under the following ICS (International Classification for Standards) categories: 29.130.10 - High voltage switchgear and controlgear. The ICS classification helps identify the subject area and facilitates finding related standards.

IEC 62271-211:2014/COR2:2017 has the following relationships with other standards: It is inter standard links to IEC 62271-211:2014/COR1:2015, IEC 62271-211:2014, IEC 62271-211:2024. Understanding these relationships helps ensure you are using the most current and applicable version of the standard.

IEC 62271-211:2014/COR2:2017 is available in PDF format for immediate download after purchase. The document can be added to your cart and obtained through the secure checkout process. Digital delivery ensures instant access to the complete standard document.

Standards Content (Sample)


 IEC 2017
INTERNATIONAL ELECTROTECHNICAL COMMISSION
COMMISSION ÉLECTROTECHNIQUE INTERNATIONALE
____________
IEC 62271-211 IEC 62271-211
Edition 1.0  2014-04 Édition 1.0  2014-04

High-voltage switchgear and controlgear – Appareillage à haute tension –

Part 211: Direct connection between power Partie 211: Raccordements directs entre
transformers and gas-insulated transformateurs de puissance et
metal-enclosed switchgear for rated voltages appareillage sous enveloppe métallique à
above 52 kV isolation gazeuse de tensions
assignées supérieures à 52 kV
CO RRI G E NDUM 2
Corrections to the French version appear after the English text.
Les corrections à la version française sont données après le texte anglais.

IEC 62271-211:2014-04/COR2:2017-06(en-fr)

– 2 – IEC 62271-211:2014/COR2:2017
 IEC 2017
Figure 1 – Typical direct connection between power transformer and gas-insulated
metal-enclosed switchgear
Replace the existing figure (including the table) by the following new f
...