Monitoring and alarm receiving centre - Part 3: Procedures and requirements for operation

This part of EN 50518 specifies the minimum procedures and requirements for the operation of an ARC. This part of EN 50518 is to be read in conjunction with Part 1 and Part 2, and cannot be used separately.

Alarmempfangsstelle (AES) - Teil 3: Abläufe und Anforderungen an den Betrieb

Centre de contrôle et de réception d’alarme - Partie 3: Procédures et exigences de fonctionnement

Nadzorni in sprejemni centri za alarme - 3. del: Postopki in zahteve za delovanje

Ta del standarda EN 50518 določa minimalne postopke in zahteve za delovanje sprejemnih centrov za alarme.

General Information

Status
Withdrawn
Publication Date
07-Nov-2013
Technical Committee
Current Stage
6060 - Document made available - Publishing
Due Date
07-Apr-2014
Completion Date
08-Nov-2013

Relations

Standard
EN 50518-3:2013
English language
10 pages
sale 10% off
Preview
sale 10% off
Preview
e-Library read for
1 day

Standards Content (Sample)


SLOVENSKI STANDARD
01-december-2013
1DGRPHãþD
SIST EN 50518-3:2011
Nadzorni in sprejemni centri za alarme - 3. del: Postopki in zahteve za delovanje
Monitoring and alarm receiving centre - Part 3: Procedures and requirements for
operation
Alarmempfangsstelle (AES) - Teil 3: Abläufe und Anforderungen an den Betrieb
Centre de contrôle et de réception d’alarme - Partie 3: Procédures et exigences de
fonctionnement
Ta slovenski standard je istoveten z: EN 50518-3:2013
ICS:
13.320 Alarmni in opozorilni sistemi Alarm and warning systems
2003-01.Slovenski inštitut za standardizacijo. Razmnoževanje celote ali delov tega standarda ni dovoljeno.

EUROPEAN STANDARD
EN 50518-3
NORME EUROPÉENNE
November 2013
EUROPÄISCHE NORM
ICS 13.320 Supersedes EN 50518-3:2011

English version
Monitoring and alarm receiving centre -
Part 3: Procedures and requirements for operation

Centre de contrôle et de réception Alarmempfangsstelle (AES) -
d’alarme - Teil 3: Abläufe und Anforderungen an den
Partie 3: Procédures et exigences de Betrieb
fonctionnement
This European Standard was approved by CENELEC on 2013-10-07. CENELEC members are bound to comply
with the CEN/CENELEC Internal Regulations which stipulate the conditions for giving this European Standard
the status of a national standard without any alteration.

Up-to-date lists and bibliographical references concerning such national standards may be obtained on
application to the CEN-CENELEC Management Centre or to any CENELEC member.

This European Standard exists in three official versions (English, French, German). A version in any other
language made by translation under the responsibility of a CENELEC member into its own language and notified
to the CEN-CENELEC Management Centre has the same status as the official versions.

CENELEC members are the national electrotechnical committees of Austria, Belgium, Bulgaria, Croatia, Cyprus,
the Czech Republic, Denmark, Estonia, Finland, Former Yugoslav Republic of Macedonia, France, Germany,
Greece, Hungary, Iceland, Ireland, Italy, Latvia, Lithuania, Luxembourg, Malta, the Netherlands, Norway, Poland,
Portugal, Romania, Slovakia, Slovenia, Spain, Sweden, Switzerland, Turkey and the United Kingdom.

CENELEC
European Committee for Electrotechnical Standardization
Comité Européen de Normalisation Electrotechnique
Europäisches Komitee für Elektrotechnische Normung

CEN-CENELEC Management Centre: Avenue Marnix 17, B - 1000 Brussels

© 2013 CENELEC - All rights of exploitation in any form and by any means reserved worldwide for CENELEC members.
Ref. No. EN 50518-3:2013 E
Contents Page
Foreword . 3
Introduction . 4
1 Scope . 5
2 Normative references . 5
3 Terms, definitions and abbreviations . 5
3.1 Terms and definitions . 5
3.2 Abbreviations . 5
4 Staffing . 6
4.1 General . 6
4.2 Security screening and vetting . 6
4.3 Training . 6
5 Operating procedures . 6
5.1 General . 6
5.2 Testing . 6
5.3 Entry to and exit from the ARC . 7
5.4 Database management . 7
5.5 Operational continuity and emergencies . 7
5.6 Evacuation procedures . 8
5.7 Signal handling . 8
6 Audit. 9
7 Complaints procedure . 9
8 Data . 9
8.1 General . 9
8.2 Client data . 9
8.3 Data storage . 9
8.4 Data disposal . 9
8.5 Logs . 9
Bibliography . 10

- 3 - EN 50518-3:2013
Foreword
This document (EN 50518-3:2013) has been prepared by CLC/TC 79 "Alarm systems".
The following dates are fixed:
(dop) 2014-10-07
• latest date by which this document has to be implemented
at national level by publication of an identical
national standard or by endorsement
(dow) 2016-10-07
• latest date by which the national standards conflicting with
this document have to be withdrawn
This document supersedes EN 50518-3:2011.
– There was no mandatory connection for certification between the three parts of the standard with the
result that it could be possible to certify only against one or two of the three parts of the standard, which is
clearly not the purpose of the WG. This is solved by adding a sentence “This part of EN 50518 is to be
read in conjunction with Part 1 and Part 2, and cannot be used separately.” to the foreword.
– The scope is limited to intruder and hold-up alarm systems.
– All normative references are updated.
EN 50518 consists of the following under the generic title “Monitoring and alarm receiving centre”:
 Part 1: Location and construction requirements;
 Part 2: Technical requirements;
 Part 3: Procedures and requirements for operation.
This part of EN 50518 is to be read in conjunction with Part 1 and Part 2, and cannot be used separately.
Attention is drawn to the possibility that some of the elements of this document may be the subject of patent
rights. CENELEC [and/or CEN] shall not be held responsible for identifying any or all such patent rights.

Introduction
This European Standard applies to all Monitoring and Alarm Receiving Centres (MARC’s) that monitor and/or
receive and/or process signals that require an emergency response.
In all existing EN 50131 series accomplished under CLC/TC 79 "Alarm systems", the abbreviation ARC is
used. To avoid confusion and to achieve consistency in terminology the abbreviation ARC will be used
throughout this European Standard, where MARC is equivalent for ARC.
It is noted that this European Standard cannot supersede any legislative requirements deemed necessary by
a National Government to control the security sector on a national basis. This European Standard cannot
interfere with items that are regulated by (inter)national regulations concerning external services (e.g. water,
wastewater, fuel supplies, gas, oil and mains power supplies).

- 5 - EN 50518-3:2013
1 Scope
This part of EN 50518 specifies the minimum procedures and requirements for the operation of an ARC.
2 Normative references
The following documents, in whole or in part, are normatively referenced in this document and are
indispensable for its application. For dated references, only the edition cited applies. For undated references,
the latest edition of the referenced document (including any amendments) applies.
EN 15713, Secure destruction of confidential material – Code of practice
EN 45011, General requirements for bodies operating product certification systems (ISO/IEC Guide 65)
EN 50518-1, Monitoring and alar
...

Questions, Comments and Discussion

Ask us and Technical Secretary will try to provide an answer. You can facilitate discussion about the standard in here.

Loading comments...

Frequently Asked Questions

EN 50518-3:2013 is a standard published by CLC. Its full title is "Monitoring and alarm receiving centre - Part 3: Procedures and requirements for operation". This standard covers: This part of EN 50518 specifies the minimum procedures and requirements for the operation of an ARC. This part of EN 50518 is to be read in conjunction with Part 1 and Part 2, and cannot be used separately.

This part of EN 50518 specifies the minimum procedures and requirements for the operation of an ARC. This part of EN 50518 is to be read in conjunction with Part 1 and Part 2, and cannot be used separately.

EN 50518-3:2013 is classified under the following ICS (International Classification for Standards) categories: 13.320 - Alarm and warning systems. The ICS classification helps identify the subject area and facilitates finding related standards.

EN 50518-3:2013 has the following relationships with other standards: It is inter standard links to EN 50518-3:2011. Understanding these relationships helps ensure you are using the most current and applicable version of the standard.

You can purchase EN 50518-3:2013 directly from iTeh Standards. The document is available in PDF format and is delivered instantly after payment. Add the standard to your cart and complete the secure checkout process. iTeh Standards is an authorized distributor of CLC standards.

The standard EN 50518-3:2013, titled "Monitoring and alarm receiving centre - Part 3: Procedures and requirements for operation," provides an essential framework for the operation of Alarm Receiving Centres (ARCs). Its scope is well-defined, specifying the minimum procedures and requirements necessary for ensuring effective and reliable operations within ARCs. This clarity assists organizations in establishing standardized operational protocols in line with industry best practices. One of the key strengths of EN 50518-3:2013 is its comprehensive detail, which necessitates that this part be read in conjunction with Parts 1 and 2 of the standard. This integrative approach ensures that operators consider the broader context of monitoring and alarm handling, fostering cohesive operations and improving alarm management efficiency. The interlinking of these documents enhances their relevance, promoting a consistent operational environment across different ARCs. Furthermore, the emphasis on rigorous procedures within this standard is crucial for risk management and compliance, ensuring that ARCs can respond to alarms effectively and efficiently. This meticulous focus on established operational guidelines empowers organizations to maintain high standards of service, ultimately contributing to enhanced security and public safety. Overall, EN 50518-3:2013 stands as a vital document for those operating within the alarm monitoring sector. Its applicability not only underscores its relevance but also reinforces the standardization of operational practices, fostering trust and reliability in alarm response systems across the industry.

SIST EN 50518-3:2013 표준은 모니터링 및 경보 수신 센터(ARC)의 운영을 위한 최소한의 절차 및 요구 사항을 명시하고 있습니다. 이 표준은 EN 50518 시리즈의 세 번째 부분으로, Part 1 및 Part 2와 함께 읽어야 하며 독립적으로 사용할 수 없습니다. 이 표준의 강점은 사고 발생 시 신속하고 효과적인 대응을 위한 체계적인 운영 절차를 제공한다는 점입니다. 이를 통해 경보 수신 센터는 고객의 안전을 극대화하고, 발생할 수 있는 위험 요소를 사전에 예방할 수 있습니다. 특히, 이 표준은 특정 요구 사항을 명확히 정의하고 있으므로, 관련 업체는 이를 통해 품질 관리 및 안전 기준을 개선할 수 있는 기회를 제공합니다. SIST EN 50518-3:2013의 적용 범위는 응급 상황에서의 신속한 대응뿐만 아니라, 일상적인 운영에서도 필요한 절차를 포함하여 전체적인 안정성을 강화하는 데 기여합니다. 기능적인 운영 요구 사항을 명시함으로써, 경고 시스템의 일관성과 신뢰성을 보장하는 데에도 중점을 두고 있습니다. 이러한 표준은 보안 산업 내에서 중요한 역할을 하며, 모니터링 및 경보 수신 센터의 운영 품질을 보증하는 기반을 마련합니다.

SIST EN 50518-3:2013は、監視および警報受信センターの運用に関する手順と要件を定めた非常に重要な規格です。この規格は、EN 50518の第1部および第2部と併せて読む必要があり、単独での使用は想定されていません。このことから、規格の相互関係が強調されており、全体的な運用効率を向上させるためのフレームワークを提供しています。 この規格の強みとしては、最低限の手順が詳細に明記されている点が挙げられます。これにより、監視および警報受信センター(ARC)が一貫して高水準のサービスを提供できるよう、標準化された運用方法を明確に理解できます。具体的には、緊急時対応手順、データ管理、通信の確保、そして技術の利用に関する要件が含まれており、信頼性の向上に寄与しています。 さらに、SIST EN 50518-3:2013は、監視システムの設計と運用における現代的なニーズに適応しているため、テクノロジーの進歩や脅威の変化に柔軟に対応可能です。これは、グローバルなセキュリティ市場において特に重要であり、規格に準拠することで、組織は顧客へのサービス提供の質を向上させることができます。また、運用上の効率性を高めるためのベストプラクティスが実践できるため、業務の最適化にもつながります。 全体として、SIST EN 50518-3:2013は、運用手順と要件を明確に定義し、監視および警報受信センターの業務遂行に不可欠な土台を築いた規格であると言えるでしょう。これにより、業界標準の確立と維持が可能になり、顧客に対する信頼性あるサービス提供をサポートします。