Abstract

This document specifies checks, measurement methods and procedures in order to verify the fitness for purpose of the installed ventilation systems and air conditioning systems according to design.
It establishes a procedure intended to technically support the handing over and inspection of these systems.
This document enables the choice between checks and measurements when sufficient, and additional measurements, when necessary.
This document applies to mechanical ventilation systems (including the mechanical part of hybrid systems) and full and (partial) air conditioning systems in non-residential (parts of) buildings.
This document does not apply to:
—   heat generating systems and their control;
—   refrigerating systems and their control;
—   distribution of heating and cooling medium to the air handling units;
—   compressed air supplying systems;
—   water conditioning systems;
—   central steam generating systems for air humidifying;
—   electric supply systems.
This document is not applicable to ventilation systems and air conditioning systems for industrial or other special process environments.

Status
Published
Publication Date
26-May-2026
Current Stage
6060 - Definitive text made available (DAV) - Publishing
Start Date
07-Oct-2026
Due Date
27-May-2026
Completion Date
27-May-2026

Buy Documents

EN 12599:2026 is a CEN standard for test procedures and measurement methods used to hand over ventilation and air conditioning systems in non-residential buildings. It specifies checks, measurements and reporting steps to verify that an installed system matches the design and is fit for purpose. The document applies to mechanical ventilation systems, including the mechanical part of hybrid systems, and to full or partial air conditioning systems.

What does EN 12599:2026 specify?

EN 12599:2026 specifies the procedure for checking, measuring and documenting installed ventilation and air conditioning systems before handover or inspection. It is intended to support technical acceptance of the installation, and it allows checks alone when they are sufficient, or extra measurements when needed.

The scope is limited to non-residential buildings or parts of buildings. It does not cover:

  • heat generating systems and their control
  • refrigerating systems and their control
  • distribution of heating and cooling medium to air handling units
  • compressed air supplying systems
  • water conditioning systems
  • central steam generating systems for air humidifying
  • electric supply systems

The document is also not applicable to industrial or other special process environments.

The body of the document runs from the scope and normative references through terms, the test and check procedure, administrative and completeness checks, functional checks, measurements, additional measurements, uncertainty, and test reports.

AnnexWhat it covers
Annex AAdministrative and completeness check, including a report example
Annex BFunctional checks for components and control functions
Annex CDetermination of the extent of functional checks or measurements
Annex DSurface area calculation of ductworks
Annex EAdditional measurements for pressure, temperature, humidity, indoor air quality and room conditions
Annex FTechnical specifications to agree before testing
Annex GExamples for determining the number of functional checks and measurements
Annex HExamples for measurement uncertainty
Annex ICalculations on airflow correction under reference conditions

What are the key requirements of EN 12599:2026?

EN 12599:2026 sets out a clear order for handover work: administrative checks, completeness checks, functional checks, measurements, additional measurements when required, and then a report. In practice, that means the team should first verify documents and installation completeness before spending time on detailed performance measurements.

Administrative checks and completeness checks

Clause 5 requires an administrative check before on-site measurement work starts. EN 12599:2026 expects the relevant specifications, inventory documents, operation and maintenance documents, balancing reports and any earlier measurement reports to be available. This matters because missing documentation can make later acceptance unclear or hard to defend.

Clause 6 requires a completeness check to confirm that the installation matches the specification and the relevant technical rules. Annex A expands this into checks on accessibility, cleanliness, fire protection, insulation, marking, damage, balancing and the condition of major components such as air handling units, fans, heat exchangers, filters, humidifiers, dampers and ductwork. For the reader, this means the physical installation is checked for completeness before performance is judged.

Functional checks

Clause 7 requires functional checks on all types of installed equipment. These checks verify that the system operates correctly in its relevant modes, including the response of control devices to changed sensor values where occupancy or demand control is used. Annex B lists component checks for air handling units, fans, heat exchangers, filters, humidifiers, dampers, fire and smoke dampers, ductwork, room air flow pattern and control cabinets. In practice, this confirms that the installed system actually reacts as designed, not just that it is present.

Sampling and extent of checks

Annex C sets the method for deciding how many similar locations need to be checked or measured. EN 12599:2026 uses sampling levels SL1 to SL5, with the default being SL5 if nothing else is agreed. The same annex explains how similar locations are identified and how sample size is calculated. This matters on larger projects because it allows a justified sample instead of testing every identical point.

Measurements and measurement quality

Clause 8 covers the measurements used to verify design conditions and set points. Table 2 in the document shows which measurements are relevant, required or optional for different system types and functions, and Clause 8 requires the measurement conditions to be recorded. Table 3 gives target expanded uncertainties for key measurands such as air flow rate, supply air temperature, relative humidity, air velocity, air temperature in the occupied zone and A-weighted sound pressure level. In practice, this tells the testing team what level of measurement quality to aim for and what to record with the result.

Air flow rate measurements are carried out according to EN 16211. EN 12599:2026 also covers ductwork airtightness testing, room air velocity, air temperature, air humidity, sound pressure level, fan electrical power and filter pressure difference. For the reader, these are the performance checks that show whether the system delivers the design air movement, comfort and operating conditions.

Ductwork airtightness

Clause 8.4.3 gives a full on-site method for testing air distribution system and ductwork tightness against the ATC classes in EN 16798-3. It explains the test section, the surface area basis, the test rig, the test pressure, the leakage factor calculation and the reporting of achieved class. Annex D supplies the duct surface area calculation needed for the leakage factor, and Annex I gives airflow correction under reference conditions. In practice, this is the part to use when duct leakage must be proven with a traceable on-site method.

Additional measurements and reporting

Clause 9 covers additional measurements when the standard measurements are not enough or when specific components need separate testing. It includes fans, filters, heat exchangers, humidifiers and control and switching systems. Clause 10 requires measurement uncertainty to be evaluated according to JCGM 100 and expressed as expanded uncertainty with k = 2.

Clause 11 defines the handing over report. It must bring together the general project information, the completeness check, the functional check, the measurement results, any additional measurements and a summary with corrective actions. That report is the formal record of acceptance and deviations.

What terms does EN 12599:2026 define?

  • Handover - the process of transferring responsibility for an installation to another person or organization.
  • Check - an examination carried out without measurements to confirm that something is correct or as it should be.
  • Administrative check - a check of the documentation and specifications of an installation.
  • Completeness check - a check of the completeness and arrangement of an installation.
  • Functional check - a check of the operation of a primary function of an installation.
  • Balancing - the adjustment of the flow rates in each circuit of an installation to meet the specifications.

Who uses EN 12599:2026?

EN 12599:2026 is used by the people who design, install, commission, inspect and accept ventilation and air conditioning systems in non-residential buildings. That includes HVAC contractors, commissioning engineers, test personnel, consultants, facility managers, quality managers and buyers who need a clear handover basis.

It is especially useful when a project needs documented proof that the installation matches the design, that the controls respond correctly, and that measured performance is recorded with an agreed level of uncertainty. It also supports later inspections and maintenance checks.

What changed in EN 12599:2026 from the previous edition?

EN 12599:2026 supersedes EN 12599:2012. The foreword states these significant changes:

  • the scope was changed so the document applies to non-residential buildings only
  • the wording was updated to show that the procedures support handover and inspections
  • the normative references were updated
  • air flow measurement methods were transferred to EN 16211
  • ductwork airtightness testing according to the ATC classes of EN 16798-3 was added
  • Annex C was revised with new sampling levels based on sampling errors
  • the ductwork surface area calculation was added as Annex D
  • “Special measurements” were renamed “Additional measurements”
  • the approach to measurement uncertainty was revised

Which standards are used with EN 12599:2026?

EN 12599:2026 cites four normative references:

  • EN 16211 - provides the site methods for measuring air flow rates
  • EN 16798-3 - provides non-residential ventilation performance requirements and the ATC airtightness classes used for ductwork testing
  • EN ISO 7730 - provides the PMV and PPD thermal comfort framework used when assessing room conditions
  • JCGM 100 - provides the general rules for expressing measurement uncertainty

The introduction also says that EN 12599:2026, together with EN 16211, is applicable within the energy inspection framework of EN 16798-17 and CEN/TR 16798-18.

What does the EN 12599:2026 document contain?

EN 12599:2026 contains checklists, test procedures, sampling rules, measurement methods, uncertainty guidance and report structures for handover work. Annex A and Annex B give practical component-level checks, while Annex C turns “how many locations?” into a sampling method.

The document also includes formulas and examples for ductwork surface area, airtightness testing and airflow correction under reference conditions. Annex E covers pressure, temperature, humidity, indoor air quality and room measurements, and Annex H explains how to build measurement uncertainty from instrument, method and calculation contributions. In practice, the document is a commissioning and acceptance framework, not just a list of test points.

Relations

Effective Date
19-Jan-2023
Effective Date
21-Oct-2026
Effective Date
21-Oct-2026
Effective Date
14-Oct-2026
Effective Date
14-Oct-2026
Effective Date
14-Oct-2026
Effective Date
14-Oct-2026
Effective Date
14-Oct-2026

Buy Documents

Get Certified

Connect with accredited certification bodies for this standard

DIBt (Deutsches Institut für Bautechnik)

German Institute for Building Technology.

DAKKS Germany Verified

DIN CERTCO

DIN Group product certification.

DAKKS Germany Verified

Aboma Certification B.V.

Specialized in construction, metal, and transport sectors.

RVA Netherlands Verified

Sponsored listings

Frequently Asked Questions

EN 12599:2026 is a standard published by the European Committee for Standardization (CEN). Its full title is "Ventilation for buildings - Test procedures and measurement methods to hand over air conditioning and ventilation systems for non-residential buildings". This standard covers: This document specifies checks, measurement methods and procedures in order to verify the fitness for purpose of the installed ventilation systems and air conditioning systems according to design. It establishes a procedure intended to technically support the handing over and inspection of these systems. This document enables the choice between checks and measurements when sufficient, and additional measurements, when necessary. This document applies to mechanical ventilation systems (including the mechanical part of hybrid systems) and full and (partial) air conditioning systems in non-residential (parts of) buildings. This document does not apply to: — heat generating systems and their control; — refrigerating systems and their control; — distribution of heating and cooling medium to the air handling units; — compressed air supplying systems; — water conditioning systems; — central steam generating systems for air humidifying; — electric supply systems. This document is not applicable to ventilation systems and air conditioning systems for industrial or other special process environments.

This document specifies checks, measurement methods and procedures in order to verify the fitness for purpose of the installed ventilation systems and air conditioning systems according to design. It establishes a procedure intended to technically support the handing over and inspection of these systems. This document enables the choice between checks and measurements when sufficient, and additional measurements, when necessary. This document applies to mechanical ventilation systems (including the mechanical part of hybrid systems) and full and (partial) air conditioning systems in non-residential (parts of) buildings. This document does not apply to: — heat generating systems and their control; — refrigerating systems and their control; — distribution of heating and cooling medium to the air handling units; — compressed air supplying systems; — water conditioning systems; — central steam generating systems for air humidifying; — electric supply systems. This document is not applicable to ventilation systems and air conditioning systems for industrial or other special process environments.

EN 12599:2026 is classified under the following ICS (International Classification for Standards) categories: 91.140.30 - Ventilation and air-conditioning systems. The ICS classification helps identify the subject area and facilitates finding related standards.

EN 12599:2026 has the following relationships with other standards: It is inter standard links to EN 12599:2012, EN 16211:2024, EN 16798-3:2025, EN 16798-17:2017, EN 16282-5:2017, EN 15726:2011, EN 15251:2007, EN 15780:2011. Understanding these relationships helps ensure you are using the most current and applicable version of the standard.

EN 12599:2026 is available in PDF format for immediate download after purchase. The document can be added to your cart and obtained through the secure checkout process. Digital delivery ensures instant access to the complete standard document.

Standards Content (Sample)

Contents

  • Introduction
  • 1 Scope
  • 2 Normative references
  • 3 Terms and definitions
  • 3.1 handover
  • 3.2 check
  • 3.3 administrative check
  • 3.4 completeness check
  • 3.5 functional check
  • 3.6 balancing
  • 4 Test and check procedure
  • 1. Specifications
  • 2. Inventory
  • 3. Operation and maintenance
  • 4. Measurement reports
  • 1. Comparison of equipment
  • 2. Compliance with technical
  • 3. Balancing
  • 1. Put system into use Annex C
  • 2. Operation of components and Determination of
  • 3. Accessibility Annex B
  • 4. Cleanliness Functional checks
  • 1. Determine which
  • Annex C
  • 4. Accompanying
  • 5. Air tightness
  • 1. Determine which
  • Annex E
  • 3. Measurements
  • Annex A
  • 2. Handing over the report completeness check
  • 5 Administrative check
  • 6 Completeness check
  • 7 Functional checks
  • 8 Measurements
  • 8.1 General
  • 8.2 Range of measurements
  • 8.3 Procedure
  • 8.4 Measuring methods and measuring instruments
  • 4 Adaptor
  • 8.5 Accompanying measurements
  • 9 Additional measurements
  • 9.1 General
  • 9.2 Measurements of components
  • 9.3 Check of regulating, control and switching systems
  • 10 Uncertainty of measurements
  • 11 Test reports
  • 11.1 General
  • 11.2 Handing over report
  • 11.3 Inspection report on the completeness check
  • 11.4 Inspection report on the functional check
  • 11.5 Test report on the measurements
  • 11.6 Test report on the additional measurements
  • Annex A
  • Annex B
  • Annex C
  • Annex D
  • Annex E
  • Annex F
  • Annex G
  • Annex H
  • Annex I
  • Bibliography

Introduction

The measurement methods and procedures presented in this document are specified in such a way that they are particularly suitable for the handover of ventilation and air conditioning systems. Due to the accessibility, for some measurements it might be of advantage to perform them during installation (e.g. air tightness).

The measurement methods can be useful for verification of the fitness for purpose of the installed ventilation in different stages of the life cycle of ventilation systems. The measuring methods in this document in connection with EN 16211 are applicable in the frame of the energy inspection of air-conditioning systems according to EN 16798-17 and CEN/TR 16798-18.

SIST EN 12599:2026 EN 12599:2026 (E)

1 Scope

This document specifies checks, measurement methods and procedures in order to verify the fitness for purpose of the installed ventilation systems and air conditioning systems according to design. It establishes a procedure intended to technically support the handing over and inspection of these systems.

This document enables the choice between checks and measurements when sufficient, and additional measurements, when necessary.

This document applies to mechanical ventilation systems (including the mechanical part of hybrid systems) and full (or partial) air conditioning systems in non-residential (parts of) buildings. This document does not apply to:

  • heat generating systems and their control;
  • refrigerating systems and their control;
  • distribution of heating and cooling medium to the air handling units;
  • compressed air supplying systems;
  • water conditioning systems;
  • central steam generating systems for air humidifying;
  • electric supply systems.

This document is not applicable to ventilation systems and air conditioning systems for industrial or other special process environments.

2 Normative references

The following documents are referred to in the text in such a way that some or all of their content constitutes requirements of this document. For dated references, only the edition cited applies. For undated references, the latest edition of the referenced document (including any amendments) applies. EN 16211, Ventilation for buildings — Measurement of air flows on site — Methods EN 16798-3, Energy performance of buildings - Ventilation for buildings - Part 3: For non-residential buildings - Performance requirements for ventilation and room-conditioning systems (Modules M5-1, M5-4) JCGM 100, Evaluation of measurement data — Guide to the expression of uncertainty in measurement

SIST EN 12599:2026 EN 12599:2026 (E)

3 Terms and definitions

For the purposes of this document, the following terms and definitions apply. ISO and IEC maintain terminology databases for use in standardization at the following addresses:

  • ISO Online browsing platform: available at https://www.iso.org/obp
  • IEC Electropedia: available at https://www.electropedia.org/

3.1 handover

process of transferring responsibility for an installation to another person or organization

3.2 check

examination of something, without resorting to measurements, in order to make certain that it is correct or the way it should be

3.3 administrative check

check of documentation and specifications of an installation

3.4 completeness check

check of the completeness and the arrangement of an installation

3.5 functional check

check of the operation of a primary function of an installation Note 1 to entry: An example of primary function of a ventilation installation is to provide air flow rate.

3.6 balancing

process of adjusting the flow rates in each circuit of an installation to meet the specifications

4 Test and check procedure

To verify the fitness of purpose of an installed system by checks and measurements it is necessary to give specifications for checks and measurements (e.g. maximal permissible errors, sample selection) as well as for the installation (e.g. tolerances). Annex F gives a list of such specifications. The following steps shall be carried out in the given order:

a) administrative check; b) completeness checks; c) functional checks; d) measurements; e) additional measurements; f) report.

SIST EN 12599:2026 EN 12599:2026 (E) In general, functional checks and measurements on the system are performed for each component of the system. For same kind of components at comparable locations and operation conditions the functional checks and measurements may be performed on a sample selection. The extent of functional checks and measurements shall be determined in accordance with Annex C.

Ensure the system is set up at disventing conditions.

The additional measurements in accordance with Clause 9 and Annex E shall be carried out only when required and especially agreed.

The steps of the checks, measurements and report are shown in Table 1. Table 1 — List of checks, measurements and report to verify the quality of the systems Required steps Purpose Activities Annexes Check the Completeness of documents Verify that the

1. Specifications

Administrative check documentation of the Annex A

2. Inventory

installation is complete

3. Operation and maintenance

4. Measurement reports

1. Comparison of equipment

Ensure that the ventilation with the design system or air conditioning

2. Compliance with technical

Completeness checks system has been installed Annex A rules (contract and official) entirely in accordance

3. Balancing

with contract

1. Put system into use Annex C

2. Operation of components and Determination of

Verify the operation of the system extent Functional checks system

3. Accessibility Annex B

4. Cleanliness Functional checks

1. Determine which

measurements and recordings are necessary 2. Extent of measurements, Verify on a statistical basis

Annex C

specified by means the that the system achieves Measurements Determination of sampling level SL the values according to extent design 3. Measurements

4. Accompanying

measurements (see 8.5)

5. Air tightness

1. Determine which

In case of doubts measurements and recordings concerning the quality of

Annex E

are necessary Additional measurements the system or parts of the Additional system additional 2. Determine uncertainty of the (if necessary) measurements measurements can be measurements applicable

3. Measurements

SIST EN 12599:2026 EN 12599:2026 (E) Required steps Purpose Activities Annexes

Annex A

Report 1. Report Example of

2. Handing over the report completeness check

report

5 Administrative check

Prior to on site inspection, the administrative check of the available documents shall be done. It shall be checked whether all relevant documents are available, including:

  • a list of all specifications;
  • all inventory documents;
  • all documents necessary for operation and maintenance;
  • the balancing reports;
  • the existing reports of measurements (e.g. the air tightness test) if any. Details of the administrative check are included in Annex A.

6 Completeness check

The completeness check is intended to ensure that installation is done according to specification and in compliance with the relevant technical rules.

The following checks are included:

  • comparison of the delivered system with the specification, with regard to amount, number of pieces and material and, if necessary, also with regard to characteristics and spare parts;
  • comparison of the delivered system with the specification, with regard to location of components;
  • comparison of the delivered system with the specification, with regard to arrangement of the installation; Check that the balancing has been done in accordance with the report. An example description of the completeness check is included in Annex A.

7 Functional checks

The purpose of the functional checks is to verify the operation of the installation in different operational conditions in compliance with the relevant technical rules and the specification. The checks show whether the particular elements of the system such as filters, fans, heat exchangers, coolers, humidifiers have been properly installed.

In the case of occupancy control or demand control it should be checked if the reaction of the system to changes of sensor values is in accordance with the design requirements. Functional checks shall be carried out on all types of installed equipment. Before starting the checks, a checklist should be drawn up.

SIST EN 12599:2026 EN 12599:2026 (E) The extent of functional checks is specified in Annex C.

The locations for the checks should be specified.

Instruction for the procedure and a list of functional checks are given in Annex B.

8 Measurements

8.1 General

The purpose of the measurements is to verify that the system achieves the design conditions and set points as specified.

Together with the measurement results, the measurement conditions shall be recorded in accordance with the measurement procedures in 8.4.

When measurements take place at other conditions than design conditions they may be converted into temperature and pressure design conditions.

If some of the tests are already done prior to the handing over the documentation should be verified in the administrative check.

8.2 Range of measurements

Table 2 indicates which measurements are necessary for each type of ventilation and air conditioning system.

The extent of measurements is specified in Annex C.

Table 2 — Measurements Total Central Ductw Room system system/appliance ork Type of systems/Functions Z 2 2 1 0 1 2 1 1 0 0 2 2 H 2 2 1 1 1 2 1 1 2 0 2 2 Ventilation system C 2 2 1 1 1 2 1 1 2 2 2 2 M/D 2 2 1 1 1 2 1 1 2 1 2 2 HC 2 2 1 1 1 2 1 1 1 2 2 2 HM/HD/ 2 2 1 1 1 2 1 1 1 1 2 2 Partial air CM/CD conditioning MD 2 2 1 1 1 2 1 1 2 1 2 2 system HCM/MCD/ 2 2 1 1 1 2 1 1 1 1 2 2 CHD/HMD

Additional cleanliness test Current drawn and power by the motor a Air flow a Air temperature Pressure drop across filter Ductwork leakage test Supply air flow (mechanical) Extract air flow (mechanical) b Supply air temperature Supply air humidity Sound pressure level Indoor air velocity

SIST EN 12599:2026 EN 12599:2026 (E) Total Central Ductw Room system system/appliance ork Type of systems/Functions Full air conditioning HCMD 2 2 1 1 1 2 1 1 1 1 2 2 system Explanations Figures 0 to 2 indicate the relevance of a measurement in order to verify the fitness of purpose of the system. 0 measurement not relevant 1 required measurement 2 optional measurement C cooling D dehumidification H heating M humidification (moisture) Z without any thermodynamic functions (zero) a Outdoor air, supply air and exhaust air b Depending on control principles, if relevant

8.3 Procedure

Before starting the measurement, the measuring locations shall be specified and the procedures and measuring instruments shall be agreed upon and given in the technical documents. The number of measuring points in a room should take into account the floor area and the measured

parameters. At least one measuring position is required for measurements in rooms of area up to 20 m ; larger rooms should be subdivided accordingly. For the measurements in the room, the measuring positions in the occupied zone shall be agreed on between the parties concerned, preferably at positions intended for intensive occupancy.

With regard to the selection of the measuring instruments the overall uncertainty shall be taken into account.

The indoor climate factors and air flow rates, heating, cooling and humidifying performances, electrical characteristics and other design data shall be measured at the ventilation system design air flow rate. The maximum expanded measurement uncertainty (k = 2) of the measured values is given in Table 3. Accuracy classes for electric measuring instruments are given in Table 7.

Additional cleanliness test Current drawn and power by the motor a

Air flow a Air temperature Pressure drop across filter Ductwork leakage test Supply air flow (mechanical) Extract air flow (mechanical) b Supply air temperature Supply air humidity Sound pressure level Indoor air velocity

SIST EN 12599:2026 EN 12599:2026 (E) Table 3 — Expanded measurement uncertainty U of measurands Measurand Expanded measurement uncertainty a U Air flow rate, each individual room 15 % Air flow rate, each system 10 % Air temperature in duct 2 °C Relative humidity [RH] 15 % RH Air velocity in occupied zone 0,05 m/s Air temperature in occupied zone 1,5 °C A-weighted sound pressure level in the room 3 dB a This document does not specify tolerances for the design values itself. Lower expanded measurement uncertainties can be required. This should be specified in the documentation of the system.

8.4 Measuring methods and measuring instruments

8.4.1 General

In the case of measurements in ducts and in air handling units with negative pressure, measurement error due to an air infiltration by the opening made for the insertion of the measuring device should be avoided.

In any case, the openings in the ducts shall be sealed after measuring. Take into account that weather conditions can influence the measurement and measurement uncertainty.

8.4.2 Measurement of the air flow rate

The air flow rate can be evaluated by different methods in accordance with EN 16211. The air flow rate of the ventilation system is measured in the duct or system and the following methods can be used:

  • fixed devices for air flow rate measurement; or
  • multi-point measurement in the duct cross-section with or without measurement plane criteria. If ventilation systems are equipped with fixed devices to measure the air flow rate (e.g. pressure ports at the inlet cone of a fan with a corresponding characteristic), these should be preferably used for the purpose of handing over.

To measure the total air flow rate in larger ventilation systems with the multi-point measurement method the necessary undisturbed straight flow sections are often not given and the method without measurement plane criteria is recommended.

Measurements at the outdoor air intake or the exhaust vent determining the total air flow rate of a ventilation system are only recommended if no measurement can be done inside the system or duct.

SIST EN 12599:2026 EN 12599:2026 (E) The air flow rate at air terminal devices can be measured by the following measurement equipment:

  • fixed devices, e.g. to measure the reference pressure at the plenum box;
  • tight bag (only for supply terminals); or
  • flow hoods.
8.4.3 Measurement of the ductwork airtightness
8.4.3.1 Principle

The objective of the ductwork airtightness test is to verify the belonging to a specified by design tightness class.

This document provides procedures to test on site the air distributions system tightness (classified with ) and the ductwork tightness (classified with ATC ) according to the classification of ATCDistribution Ductwork EN 16798-3.

The duct's component tightness (classified with ATC ) cannot be tested on site. Component NOTE 1 Component tightness testing are covered for duct systems in EN 1507, EN 12237 and EN 17192 and for technical ductwork products in EN 15727 and EN 1751.

The air tightness classes shall be specified in accordance with EN 16798-3 as in Table 4. or ATC is According to the representativity of the sample tested (see 8.4.3.2) either ATCDistribution Ductwork measurable as specified in EN 16798-3:

  • ATC represents the air distribution system leakage, it includes the whole installed air Distribution distribution system including all components but not including the air handling unit (AHU) and heat recovery (relevant for system performance);
  • ATC represents the ductwork leakage, i.e. the leakage of ducts, fittings, sound attenuators and Ductwork dampers measured in a real assembly or section on site.

Table 4 — Classification of system air tightness class Air leakage limit f Air tightness class max 3 −1 −2

m ⋅ s ⋅ m ATC 7 not classified 0,65 −3 ATC 6 0,067 5 ⋅ p ⋅ 10 test 0,65 −3 ATC 5 0,027 ⋅ p ⋅ 10 test 0,65 −3 ATC 4 0,009 ⋅ p ⋅ 10 test 0,65 −3 ATC 3 0,003 ⋅ p ⋅ 10 test 0,65 −3 ATC 2 0,001 ⋅ p ⋅ 10 test 0,65 −3 ATC 1 0,000 33 ⋅ p ⋅ 10 test NOTE ptest is the test pressure in Pa.

SIST EN 12599:2026 EN 12599:2026 (E) The classification ATC represents the airtightness of the whole installed system. This value can Distribution be used as an input for the energy performance calculation. To obtain the classification ATC the Distribution airtightness of the full ductwork shall be measured or in large and complex ductwork systems, the airtightness shall be measured in a representative part of the system. As described in 8.4.3.2, it is recommended to test at least 10 % of the duct surface including all duct types and a variety of sizes and components. The testing may be performed in several continuous sections. The classification ATC represent the airtightness of part of the installed ductwork. The sample to Ductwork be tested shall be selected consistently with the test objective and it is recommended to follow 8.4.3.2. NOTE 2 This measurement can be used, for example, to check the quality of the work of a craftsman during the construction, or to check the tightness of a complex junction. The airtightness measurement should be performed when the concerned part of the ductwork is installed and still accessible.

After the start of operation a second tightness test can be necessary, for example if an irregularity happens during the start up. (In the case of a malfunction e.g. of fire dampers, the pressure can exceed the allowed pressure and damage the ductwork.) NOTE 3 Airtight duct equipment and fittings (low ATC class) are necessary to implement an airtight Component ductwork but are not sufficient to guarantee an airtight ductwork.

8.4.3.2 Tested duct section

8.4.3.2.1 Sample for testing a specific installation in situ The following paragraph apply to estimate ATC . The test sample to estimate ATC depends Distribution Ductwork on the purpose of the test.

The section to be tested shall be sealed off from the rest of the system before commencing the test. The test sample shall contain all kind of duct (dimensions, shape, material, etc.), duct mounted equipment and fittings, including the connection to the air handling unit or ventilation unit of the duct section under investigation.

The air tightness measurements can be performed by dividing the ductwork into several sections which are tested separately. The leakage factor is calculated using the total leakage flow rate and the total surface area.

If an air tightness test is performed at deviating conditions this shall be reported with the measurement results.

8.4.3.2.2 Ductwork surface area The ductwork surface area of the section shall be at least 10 % of the total ductwork surface area, and if

possible, at least 10 m . The ductwork surface shall be calculated in accordance with Annex D. The normal ratio between the total joint length and ductwork surface area is given by Formula (1). L −1 1≤ ≤ 1,5 in m (1) A j where L is the total joint length, in m; A 2 j is the ductwork surface area, in m .

SIST EN 12599:2026 EN 12599:2026 (E) 8.4.3.2.3 Number of ductwork to test If there are several ventilation units and air handling units, the number of ductworks to be tested can be reduced in accordance with Annex C.

8.4.3.2.4 Specific devices The test report shall specify whether flexible sleeve, plenum boxes and chilled beam are included or not in the tested sample (see Figure 1 and Figure 2).

Key 1 exhaust or supply unit or chilled beams 2 sealing instead of unit 3 plenum box Figure 1 — Testing with device included

...