EN 14093:2002
(Main)Space project management - Organization and conduct of reviews
Space project management - Organization and conduct of reviews
This European Standard provides means for identifying and structuring all of the activities and information required in a project review. It identifies the information outputs and followup activities necessary to complete the review process. It also provides a checklist of activities and information required for each of the major project reviews identified in the European space management standards.
This standard does not prescribe a particular review procedure or organizational structure to be applied, in order to respect the customer's own rules and regulations.
When viewed from the perspective of a specific project context, the requirements defined in this standard should be tailored to match the genuine requirements of a particular profile and circumstances of a project.
NOTE Tailoring is a process by which individual requirements of specifications, standards and related documents are evaluated and made applicable to a specific project by selection, and in some exceptional cases, modification of existing or addition of new requirements.
Raumfahrtprojektmanagement - Organisation und Durchführung von Reviews
Diese Norm liefert die Mittel zur Bestimmung und Strukturierung der Informationen und Tätigkeiten, die bei einem Projektreview erforderlich sind. Sie legt die Ziele der Information und Tätigkeiten fest, die für die Durchführung des Reviews erforderlich sind. Weiterhin gibt sie in Form einer Checkliste die Informationen und Tätigkeiten an, die für die bei den ECSS-Normen zum Projektmanagement genannten wichtigen Reviews erforderlich sind.
Diese Norm schreibt kein bestimmtes Verfahren für die Durchführung von Reviews oder die entsprechende Organisationsstruktur vor, soweit die internen Richtlinien und Vorschriften des Kunden betroffen sind.
Unter projektspezifischen Gesichtspunkten sollten die in dieser Norm definierten Anforderungen angepasst werden, um dem jeweiligen Projektprofil und Projektumständen Rechnung zu tragen.
ANMERKUNG Anpassung ist ein Prozess, in dem einzelne Anforderungen oder Spezifikationen, Normen und ähnliche Dokumente nach Bewertung für ein bestimmtes Projekt ausgewählt werden. Die einzelnen Vertragsbedingungen können eine Streichung, Ergänzung oder Modifikation der Anforderungen dieser Norm erforderlich machen.
Management des projets spatiaux - Organisation et conduite de revues
La présente Norme européenne donne les moyens d'identifier et de structurer toutes les activités et informations indispensables aux revues de projet. Elle identifie les informations à produire et les activités de suivi nécessaires pour compléter le processus de revue. Elle fournit également une liste de vérification des activités et informations requises pour chacune des principales revues de projet identifiées dans les normes de management de l'ECSS.
La présente norme ne prescrit aucune procédure de revue ou structure organisationnelle particulière afin de respecter les règles et réglementations propres au client.
Dans le contexte d'un projet donné, il convient d'adapter les exigences définies dans la présente norme pour qu'elles correspondent aux exigences initiales d'un profil particulier et des circonstances d'un projet.
NOTE L'adaptation est un processus par lequel des exigences individuelles relatives aux spécifications, normes et documents associés sont évaluées et rendues applicables à un projet spécifique par sélection et, dans des cas exceptionnels, par modification de l'existant ou ajout de nouvelles exigences.
Space project management - Organization and conduct of reviews
General Information
- Status
- Withdrawn
- Publication Date
- 19-Feb-2002
- Withdrawal Date
- 20-Jan-2026
- Technical Committee
- CEN/SS T02 - Aerospace
- Drafting Committee
- CEN/SS T02 - Aerospace
- Current Stage
- 9960 - Withdrawal effective - Withdrawal
- Start Date
- 20-Aug-2014
- Completion Date
- 21-Jan-2026
Relations
- Replaced By
EN 16601-10-01:2014 - Space project management - Part 10-01: Organization and conduct of reviews - Effective Date
- 29-May-2013
- Effective Date
- 28-Jan-2026
Get Certified
Connect with accredited certification bodies for this standard
National Aerospace and Defense Contractors Accreditation Program (NADCAP)
Global cooperative program for special process quality in aerospace.

NSF-ISR
NSF International Strategic Registrations.
Orion Registrar Inc.
US-based certification body for management systems.
Sponsored listings
Frequently Asked Questions
EN 14093:2002 is a standard published by the European Committee for Standardization (CEN). Its full title is "Space project management - Organization and conduct of reviews". This standard covers: This European Standard provides means for identifying and structuring all of the activities and information required in a project review. It identifies the information outputs and followup activities necessary to complete the review process. It also provides a checklist of activities and information required for each of the major project reviews identified in the European space management standards. This standard does not prescribe a particular review procedure or organizational structure to be applied, in order to respect the customer's own rules and regulations. When viewed from the perspective of a specific project context, the requirements defined in this standard should be tailored to match the genuine requirements of a particular profile and circumstances of a project. NOTE Tailoring is a process by which individual requirements of specifications, standards and related documents are evaluated and made applicable to a specific project by selection, and in some exceptional cases, modification of existing or addition of new requirements.
This European Standard provides means for identifying and structuring all of the activities and information required in a project review. It identifies the information outputs and followup activities necessary to complete the review process. It also provides a checklist of activities and information required for each of the major project reviews identified in the European space management standards. This standard does not prescribe a particular review procedure or organizational structure to be applied, in order to respect the customer's own rules and regulations. When viewed from the perspective of a specific project context, the requirements defined in this standard should be tailored to match the genuine requirements of a particular profile and circumstances of a project. NOTE Tailoring is a process by which individual requirements of specifications, standards and related documents are evaluated and made applicable to a specific project by selection, and in some exceptional cases, modification of existing or addition of new requirements.
EN 14093:2002 is classified under the following ICS (International Classification for Standards) categories: 49.140 - Space systems and operations. The ICS classification helps identify the subject area and facilitates finding related standards.
EN 14093:2002 has the following relationships with other standards: It is inter standard links to EN 16601-10-01:2014, EN 14607-6:2004. Understanding these relationships helps ensure you are using the most current and applicable version of the standard.
EN 14093:2002 is associated with the following European legislation: Standardization Mandates: M/237. When a standard is cited in the Official Journal of the European Union, products manufactured in conformity with it benefit from a presumption of conformity with the essential requirements of the corresponding EU directive or regulation.
EN 14093:2002 is available in PDF format for immediate download after purchase. The document can be added to your cart and obtained through the secure checkout process. Digital delivery ensures instant access to the complete standard document.
Standards Content (Sample)
2003-01.Slovenski inštitut za standardizacijo. Razmnoževanje celote ali delov tega standarda ni dovoljeno.Space project management - Organization and conduct of reviewsRaumfahrtprojektmanagement - Organisation und Durchführung von ReviewsManagement des projets spatiaux - Organisation et conduite de revuesSpace project management - Organization and conduct of reviews49.140Vesoljski sistemi in operacijeSpace systems and operationsICS:Ta slovenski standard je istoveten z:EN 14093:2002SIST EN 14093:2004en01-maj-2004SIST EN 14093:2004SLOVENSKI
STANDARD
EUROPEAN STANDARDNORME EUROPÉENNEEUROPÄISCHE NORMEN 14093February 2002ICS 49.140English versionSpace project management - Organization and conduct ofreviewsManagement des projets spatiaux - Organisation etconduite de revuesRaumfahrtprojektmanagement - Organisation undDurchführung von ReviewsThis European Standard was approved by CEN on 22 December 2001.CEN members are bound to comply with the CEN/CENELEC Internal Regulations which stipulate the conditions for giving this EuropeanStandard the status of a national standard without any alteration. Up-to-date lists and bibliographical references concerning such nationalstandards may be obtained on application to the Management Centre or to any CEN member.This European Standard exists in three official versions (English, French, German). A version in any other language made by translationunder the responsibility of a CEN member into its own language and notified to the Management Centre has the same status as the officialversions.CEN members are the national standards bodies of Austria, Belgium, Czech Republic, Denmark, Finland, France, Germany, Greece,Iceland, Ireland, Italy, Luxembourg, Malta, Netherlands, Norway, Portugal, Spain, Sweden, Switzerland and United Kingdom.EUROPEAN COMMITTEE FOR STANDARDIZATIONCOMITÉ EUROPÉEN DE NORMALISATIONEUROPÄISCHES KOMITEE FÜR NORMUNGManagement Centre: rue de Stassart, 36
B-1050 Brussels© 2002 CENAll rights of exploitation in any form and by any means reservedworldwide for CEN national Members.Ref. No. EN 14093:2002 ESIST EN 14093:2004
Review tools.20A.1General.20A.2Template for review plan.20A.3Supporting documentation.21A.3.1General.21A.3.2Mission definition review.21A.3.3Preliminary requirements review.22A.3.4System requirements review.22A.3.5Preliminary design review.22A.3.6Critical design review.22A.3.7Qualification review.23A.3.8Acceptance review.23A.3.9Flight readiness review.23A.3.10Operational readiness review.24A.3.11Launch readiness review.24A.3.12Flight qualification review.24A.3.13End-of-life review.24A.4Review item discrepancy (RID).24 FiguresFigure 1 — Schematic presentation of interfaces and interactions between review participants.13Figure 2 — Logic diagram for RID processing.18 TablesTable 1 — Stage of achievement versus review reference - Progressive definition of requirements.9Table 2 — Stage of achievement versus review reference - Progressive verification.10Table 3 — Stage of achievement versus review reference - Progressive readiness and utilization.11SIST EN 14093:2004
1 ECSS-M-30-01ASIST EN 14093:2004
name(system level)Output for the systemOutput forsubsystemsOutput forequipmentIdentification of userrequirements and initialconcepts.Mission definitionreviewMDRaConfirmation of the mission requirements.N/AN/AInitial mission or userrequirementsconverted into overallsystem requirements,i.e. mission feasibilityand validation ofsystem architecture.Preliminaryrequirements reviewPRRbConfirmation of system feasibility and functional specificationreleased.Requirements on system interfaces established by the firstlevel customer.Allocation ofsubsystem functionalrequirements.N/ASystem technicalspecificationestablished.System requirementsreviewSRRcAssessment of preliminary performance based on conformancewith system functional requirements. Evaluation of major plans,(such as D&D, AIV, PA/S). Controlled configuration. Systemtechnical specification released, with inclusion of externalinterfaces.Allocation of technicalrequirements on eachsubsystem.Identification oftechnicalrequirements forcritical technologies.Preliminary designestablished.Preliminary designreviewPDRAssessment of performance based on analysis results,establishment of technological readiness and compatibilitybetween design and customer requirements, approval ofproject plans (such as qualification plan, verification and testplan) and standards. Compatibility between design andcustomer requirements, confirmation of verification approach,special models design. Internal interfaces established.Controlledconfiguration. Test andverification methodsdefined. Release oftechnical subsystemspecifications.Allocation oftechnicalrequirements oneach equipment.Test and verificationmethods defined.aGenerally an internal consumer/customer review.bGenerally internal customer review to confirm feasibility.cThe system level SRR should be the baseline from which the first level supplier conducts his subsystem SRRs.SIST EN 14093:2004
...




Questions, Comments and Discussion
Ask us and Technical Secretary will try to provide an answer. You can facilitate discussion about the standard in here.
Loading comments...