JWG 17 - TC 65/JWG 17
TC 65/JWG 17
General Information
Frequently Asked Questions
JWG 17 is a Technical Committee within the International Electrotechnical Commission (IEC). It is named "TC 65/JWG 17". This committee has published 8 standards.
JWG 17 develops IEC standards in the area of Information technology. Currently, there are 8 published standards from this technical committee.
The International Electrotechnical Commission (IEC) is the world's leading organization for the preparation and publication of international standards for electrical, electronic, and related technologies. Founded in 1906, the IEC provides a global platform for companies, industries, and governments to meet, discuss, and develop the international standards they require.
A Technical Committee (TC) in IEC is a group of experts responsible for developing international standards in a specific technical area. TCs are composed of national member body delegates and work through consensus to create standards that meet global industry needs. Each TC may have subcommittees (SCs) and working groups (WGs) for specialized topics.
IEC 62872-2:2022 presents an IoT application framework for industrial facility demand response energy management (FDREM) for the smart grid, enabling efficient information exchange between industrial facilities using IoT related communication technologies. This document specifies:
- an overview of the price-based demand response program that serves as basic knowledge backbone of the IoT application framework;
- a IoT-based energy management framework which describes involved functional components, as well as their relationships;
- detailed information exchange flows that are indispensable between functional components;
- existing IoT protocols that need to be identified for each protocol layer to support this kind of information exchange;
- communication requirements that guarantee reliable data exchange services for the application framework.
- Standard108 pagesEnglish and French languagesale 15% off
IEC 62872-1:2019(E) defines the interface, in terms of information flow, between industrial facilities and the “smart grid”. It identifies, profiles and extends where required, the standards needed to allow the exchange of the information needed to support the planning, management and control of electric energy flow between the industrial facility and the smart grid.
The scope of this document specifically excludes the protocols needed for the direct control of energy resources within a facility where the control and ultimate liability for such control is delegated by the industrial facility to the external entity (e.g. distributed energy resource (DER) control by the electrical grid operator).
- Technical specification101 pagesEnglish languagesale 15% off
IEC TS 62872:2015(E) defines the interface, in terms of information flow, between industrial facilities and the "smart grid". It identifies profiles and extends where required, the standards needed to allow the exchange of the information needed to support the planning, management and control of electric energy flow between the industrial facility and the smart grid.
- Technical specification63 pagesEnglish languagesale 15% off