WG 30 - TC 4/WG 30
TC 4/WG 30
General Information
Frequently Asked Questions
WG 30 is a Technical Committee within the International Electrotechnical Commission (IEC). It is named "TC 4/WG 30". This committee has published 16 standards.
WG 30 develops IEC standards in the area of Information technology. Currently, there are 16 published standards from this technical committee.
The International Electrotechnical Commission (IEC) is the world's leading organization for the preparation and publication of international standards for electrical, electronic, and related technologies. Founded in 1906, the IEC provides a global platform for companies, industries, and governments to meet, discuss, and develop the international standards they require.
A Technical Committee (TC) in IEC is a group of experts responsible for developing international standards in a specific technical area. TCs are composed of national member body delegates and work through consensus to create standards that meet global industry needs. Each TC may have subcommittees (SCs) and working groups (WGs) for specialized topics.
IEC 63132-6:2023 is to establish, in a general way, suitable procedures and tolerances for the installation of Pelton vertical turbines. This document presents a typical assembly and whenever the word "turbine" is used in this document, it refers to a vertical Pelton turbine. There are many possible ways to assemble a unit. The size of the machine, the design of the machine, the layout of the powerhouse or the delivery schedule of the components are some of the elements that could result in additional steps, or the elimination of some steps and/or assembly sequences.
- Standard53 pagesEnglish and French languagesale 15% off
IEC 63132-5:2023 to establish, in a general way, suitable procedures and tolerances for the installation of hydroelectric turbines and generators. This guide presents a typical assembly. It should be recognized that there are many possible ways to assemble a unit. The size of the machines, design of the machines, layout of the powerhouse and delivery schedule of the components are some of the elements that could result in additional steps, the elimination of some steps and/or assembly sequences.
- Standard71 pagesEnglish and French languagesale 15% off
The purpose of IEC 63132-4:2020 is to establish, in a general way, suitable procedures and tolerances for the installation of a vertical Kaplan or propeller turbine. This document presents a typical assembly and whenever the word “turbine” is used in this document, it refers to a vertical Kaplan or propeller turbine. There are many possible ways to assemble a unit. The size of the machine, design of the machine, layout of the powerhouse or delivery schedule of the components are some of the elements that could result in additional steps, the elimination of some steps and/or assembly sequences. It is understood that a publication of this type will be binding only if, and to the extent that, both contracting parties have agreed upon it. This document excludes matters of purely commercial interest, except those inextricably bound up with the conduct of installation. The tolerances in this document have been established upon best practices and experience, although it is recognized that other standards specify different tolerances. Wherever this document specifies that documents, drawings or information is supplied by a manufacturer (or by manufacturers), each individual manufacturer will furnish the appropriate information for their own supply only.
- Standard74 pagesEnglish and French languagesale 15% off
The purpose of IEC 63132-3:2020 is to establish, in a general way, suitable procedures and tolerances for the installation of a vertical Francis turbine or pump-turbine. This document presents a typical assembly and whenever the word “turbine” is used in this document, it refers to a vertical Francis turbine or a pump-turbine. There are many possible ways to assemble a unit. The size of the machine, design of the machine, layout of the powerhouse or delivery schedule of the components are some of the elements that could result in additional steps, the elimination of some steps and/or assembly sequences. It is understood that a publication of this type will be binding only if, and to the extent that, both contracting parties have agreed upon it. This document excludes matters of purely commercial interest, except those inextricably bound up with the conduct of installation. The tolerances in this document have been established upon best practices and experience, although it is recognized that other standards specify different tolerances. Wherever this document specifies that documents, drawings or information is supplied by a manufacturer (or by manufacturers), each individual manufacturer will furnish the appropriate information for their own supply only.
- Standard71 pagesEnglish and French languagesale 15% off
The purpose of IEC 63132-2:2020 is to establish, in a general way, suitable procedures and tolerances for installation of generator. This document presents a typical assembly. There are many possible ways to assemble a unit. The size of the machines, design of the machines, layout of the powerhouse or delivery schedule of the components are some of the elements that could result in additional steps, the elimination of some steps and/or assembly sequences. It is understood that a publication of this type will be binding only if, and to the extent that, both contracting parties have agreed upon it. This document excludes matters of purely commercial interest, except those inextricably bound up with the conduct of installation. This document applies to vertical generators according to IEC 60034-7. The tolerances in this document have been established upon best practices and experience, although it is recognized that other standards specify different tolerances. Brushless excitation system is not included in this document. Wherever this document specifies that documents, drawings or information is supplied by a manufacturer (or by manufacturers), each individual manufacturer will furnish the appropriate information for their own supply only.
- Standard42 pagesEnglish and French languagesale 15% off
The purpose of IEC 63132-1:2020 is to establish, in a general way, suitable procedures and tolerances for the installation of hydroelectric turbines and generators. This document presents a typical assembly. There are many possible ways to assemble a unit. The size of the machines, design of the machines, layout of the powerhouse and delivery schedule of the components are some of the elements that could result in additional steps, the elimination of some steps and/or assembly sequences. It is understood that a publication of this type will be binding only if, and to the extent that, both contracting parties have agreed upon it. Installations for refurbishment projects or for small hydro projects are not in the scope of this document. An agreement between all parties is necessary. This document excludes matters of purely commercial interest, except those inextricably bound up with the conduct of installation. The tolerances in this document have been established upon best practices and experience, although it is recognized that other standards specify different tolerances. Wherever this document specifies that documents, drawings or information is supplied by a manufacturer (or manufacturers), each individual manufacturer will furnish the appropriate information for their own supply only.
- Standard53 pagesEnglish and French languagesale 15% off