CLC/TC 213/WG 10 - Powertrack systems
Task: To mirror the work being undertaken by IEC/SC 23A/WG15 for Powertrack Systems. To prepare and maintain European standardisation documents for powertrack systems.
Powertrack systems
Task: To mirror the work being undertaken by IEC/SC 23A/WG15 for Powertrack Systems. To prepare and maintain European standardisation documents for powertrack systems.
General Information
Frequently Asked Questions
CLC/TC 213/WG 10 is a Working Group within CLC. It is named "Powertrack systems" and is responsible for: Task: To mirror the work being undertaken by IEC/SC 23A/WG15 for Powertrack Systems. To prepare and maintain European standardisation documents for powertrack systems. This committee has published 1 standards.
CLC/TC 213/WG 10 develops CLC standards in the area of W11 - ELECTRICAL ACCESSORIES - Information technology. The scope of work includes: Task: To mirror the work being undertaken by IEC/SC 23A/WG15 for Powertrack Systems. To prepare and maintain European standardisation documents for powertrack systems. Currently, there are 1 published standards from this working group.
CLC is a standardization organization that develops and publishes standards to support industry, commerce, and regulatory requirements.
A Working Group in CLC is a specialized group responsible for developing standards or technical work within a defined scope. These bodies bring together international experts to create consensus-based standards that support global trade, safety, and interoperability.
This document specifies general requirements and tests for powertrack (PT) systems with a rated voltage not exceeding 277 V a.c. single phase, or 480 V a.c. two or three phase 50 Hz/60 Hz with a rated current not exceeding 63 A. These systems are used for distributing electricity in household, commercial and industrial premises.
- Amendment7 pagesEnglish languagee-Library read for1 day