ISO 12576-2:2008
(Main)Thermal insulation products — Conformity control systems — Part 2: In-situ products
Thermal insulation products — Conformity control systems — Part 2: In-situ products
ISO 12576-2:2008 establishes three systems for the conformity control of thermal insulating products that are manufactured on-site from components produced in a factory and provides the minimum requirements for each system. Examples of these types of products are loose fill and spray-applied insulations. The purpose of ISO 12576-2:2008 is to provide uniform methods to determine whether the production of a thermal-insulating product is acceptable as conforming to the relevant specification requirements once it is installed on site.
Produits isolants thermiques — Systèmes de contrôle de la conformité — Partie 2: Produits fabriqués sur place
General Information
Standards Content (Sample)
INTERNATIONAL ISO
STANDARD 12576-2
First edition
2008-07-01
Thermal insulation products —
Conformity control systems —
Part 2:
In-situ products
Produits isolants thermiques — Systèmes de contrôle de la
conformité —
Partie 2: Produits fabriqués sur place
Reference number
ISO 12576-2:2008(E)
©
ISO 2008
---------------------- Page: 1 ----------------------
ISO 12576-2:2008(E)
PDF disclaimer
This PDF file may contain embedded typefaces. In accordance with Adobe's licensing policy, this file may be printed or viewed but
shall not be edited unless the typefaces which are embedded are licensed to and installed on the computer performing the editing. In
downloading this file, parties accept therein the responsibility of not infringing Adobe's licensing policy. The ISO Central Secretariat
accepts no liability in this area.
Adobe is a trademark of Adobe Systems Incorporated.
Details of the software products used to create this PDF file can be found in the General Info relative to the file; the PDF-creation
parameters were optimized for printing. Every care has been taken to ensure that the file is suitable for use by ISO member bodies. In
the unlikely event that a problem relating to it is found, please inform the Central Secretariat at the address given below.
COPYRIGHT PROTECTED DOCUMENT
© ISO 2008
All rights reserved. Unless otherwise specified, no part of this publication may be reproduced or utilized in any form or by any means,
electronic or mechanical, including photocopying and microfilm, without permission in writing from either ISO at the address below or
ISO's member body in the country of the requester.
ISO copyright office
Case postale 56 • CH-1211 Geneva 20
Tel. + 41 22 749 01 11
Fax + 41 22 749 09 47
E-mail copyright@iso.org
Web www.iso.org
Published in Switzerland
ii © ISO 2008 – All rights reserved
---------------------- Page: 2 ----------------------
ISO 12576-2:2008(E)
Contents Page
Foreword. iv
1 Scope .1
2 Normative references .1
3 Terms and definitions .2
4 Conformity systems, their elements and recommended application of the systems.3
5 Factory production control.6
6 Site installation control .6
7 Certification of factory production control and of site quality control .8
8 Sampling.12
Bibliography .13
© ISO 2008 – All rights reserved iii
---------------------- Page: 3 ----------------------
ISO 12576-2:2008(E)
Foreword
ISO (the International Organization for Standardization) is a worldwide federation of national standards bodies
(ISO member bodies). The work of preparing International Standards is normally carried out through ISO
technical committees. Each member body interested in a subject for which a technical committee has been
established has the right to be represented on that committee. International organizations, governmental and
non-governmental, in liaison with ISO, also take part in the work. ISO collaborates closely with the
International Electrotechnical Commission (IEC) on all matters of electrotechnical standardization.
International Standards are drafted in accordance with the rules given in the ISO/IEC Directives, Part 2.
The main task of technical committees is to prepare International Standards. Draft International Standards
adopted by the technical committees are circulated to the member bodies for voting. Publication as an
International Standard requires approval by at least 75 % of the member bodies casting a vote.
Attention is drawn to the possibility that some of the elements of this document may be the subject of patent
rights. ISO shall not be held responsible for identifying any or all such patent rights.
ISO 12576-2 was prepared by Technical Committee ISO/TC 163, Thermal performance and energy use in the
built environment, Subcommittee SC 3, Thermal insula
...
Questions, Comments and Discussion
Ask us and Technical Secretary will try to provide an answer. You can facilitate discussion about the standard in here.