IEC 62271-100:2001/AMD1:2002/COR2:2003
(Amendment)Corrigendum 2 to Amendment 1 - High-voltage switchgear and controlgear - Part 100: High-voltage alternating-current circuit-breakers
Corrigendum 2 to Amendment 1 - High-voltage switchgear and controlgear - Part 100: High-voltage alternating-current circuit-breakers
Corrigendum 2 à l'amendement 1 - Appareillage à haute tension - Partie 100: Disjoncteurs à courant alternatif à haute tension
General Information
- Status
- Published
- Publication Date
- 16-Apr-2003
- Technical Committee
- SC 17A - Switching devices
- Current Stage
- DELPUB - Deleted Publication
- Start Date
- 21-Apr-2008
- Completion Date
- 14-Feb-2026
Relations
- Effective Date
- 05-Sep-2023
- Effective Date
- 05-Sep-2023
- Effective Date
- 05-Sep-2023
Get Certified
Connect with accredited certification bodies for this standard

Intertek Testing Services NA Inc.
Intertek certification services in North America.

UL Solutions
Global safety science company with testing, inspection and certification.

ANCE
Mexican certification and testing association.
Sponsored listings
Frequently Asked Questions
IEC 62271-100:2001/AMD1:2002/COR2:2003 is a standard published by the International Electrotechnical Commission (IEC). Its full title is "Corrigendum 2 to Amendment 1 - High-voltage switchgear and controlgear - Part 100: High-voltage alternating-current circuit-breakers". This standard covers: Corrigendum 2 to Amendment 1 - High-voltage switchgear and controlgear - Part 100: High-voltage alternating-current circuit-breakers
Corrigendum 2 to Amendment 1 - High-voltage switchgear and controlgear - Part 100: High-voltage alternating-current circuit-breakers
IEC 62271-100:2001/AMD1:2002/COR2:2003 is classified under the following ICS (International Classification for Standards) categories: 29.130.10 - High voltage switchgear and controlgear. The ICS classification helps identify the subject area and facilitates finding related standards.
IEC 62271-100:2001/AMD1:2002/COR2:2003 has the following relationships with other standards: It is inter standard links to IEC 62271-100:2001/AMD1:2002, IEC 62271-100:2001/AMD1:2002/COR1:2002, IEC 62271-100:2008. Understanding these relationships helps ensure you are using the most current and applicable version of the standard.
IEC 62271-100:2001/AMD1:2002/COR2:2003 is available in PDF format for immediate download after purchase. The document can be added to your cart and obtained through the secure checkout process. Digital delivery ensures instant access to the complete standard document.
Standards Content (Sample)
CEI 62271-100 IEC 62271-100
(Première édition – 2001) (First edition – 2001)
Amendement 1 (2002) Amendment 1 (2002)
Appareillage à haute tension – High-voltage switchgear and controlgear –
Partie 100: Disjoncteurs à courant alternatif Part 100: High-voltage alternating-current
à haute tension circuit-breakers
CORRIGENDUM 2
Avril 2003 April 2003
– 2 – 62271-100 corrigendum 2 CEI:2003
Page 2
Au lieu de:
t est déterminé à partir de u et de la vitesse d’accroissement spécifiée u /t = VATR;
1 1 1 1
lire:
t est déterminé à partir de u et de la vitesse d’accroissement spécifiée u /t = VATR;
1 1 1 1
t pour la discordance de phases = 2 × t (pour le défaut aux bornes)
1 1
Au lieu de:
t = 4t
2 1
lire:
t = 4t pour le défaut aux bornes et le défaut proche en ligne;
t pour la discordance de phases = entre t (pour le défaut aux bornes) et 2 × t (pour le
2 2 2
défaut aux bornes).
Page 4
Sous Pour des tensions assignées supérieures à 72,5 kV:
Au lieu du texte existant, lire:
t = 2 μs pour le défaut aux bornes;
d
t = 2 μs pour le côté alimentation du circuit de défaut proche en ligne;
d
t = 2 μs à 0,1 × t pour la discordance de phases;
d 1
u′ = u /2 et
t′ est déterminé à partir de u′, u / t (VATR) et t selon la figure 10, t′ = t + u′/VATR.
1 1 d d
62271-100 corrigendum 2 IEC:2003 – 3 –
Page 3
Instead of:
t is derived from u and the specified value of the rate of rise u /t = RRRV;
1 1 1 1
read:
t is derived from u and the specified value of the rate of rise u /t = RRRV;
1 1 1 1
t for out-of-phase = 2 × t (for terminal fault)
1 1
Instead of:
t = 4t
2 1
read:
t = 4t for terminal fault and short-line fault;
t for out-of-phase = between t (for terminal fault) and 2 × t (for terminal fault).
2 2 2
Page 5
Under For rated voltages higher than 72,5 kV:
Instead of existing text, read:
t = 2 μs for terminal fault;
d
t = 2 μs for the supply side circuit for short-line fault
d
t = 2 μs to 0,1 × t for out-of-phase;
d 1
u′ = u /2 and
t′ is derived from u′, u /t (RRRV) and t according to figure 10, t′ = t + u′/RRRV.
1 1 d d
– 4 – 62271-100 corrigendum 2 CEI:2003
Page 8
Au lieu du tableau existant 1b, lire:
b
Tension Sé- Facteur Facteur Première Temps Valeur Temps Retard Tension Temps VATR
assignée quence de d’ampli- tension de de crête
d’essais premier tude référence de la TTR
pôle
U K K U t u t t u' t' u /t
r pp af 1 1 c 2 d 1 1
kV p.u. p.u. kV μs kV μs μs kV μskV/μs
Défaut 1,3 1,40 80 40 149 160 2 40 22 2
aux
bornes
Défaut 1 1,40 61 31 114 124 2 31 17 2
100 proche
en ligne
Discor- 2 1,25 122 80 204 160-320 2-8 61 48 1,54
dance de
phases
Défaut 1,3 1,40 98 49 183 196 2 49 26 2
aux
bornes
Défaut 1 1,40 75 38 141 152 2 38 21 2
123 proche
en ligne
Discor- 2 1,25 151 98 251 196-392 2-10 75 59 1,54
dance de
phases
Défaut 1,3 1,40 115 58 215 232 2 58 31 2
aux
bornes
Défaut 1 1,40 89 44 166 176 2 44 24 2
145 proche
en ligne
Discor- 2 1,25 178 116 296 232-464 2-12 89 70 1,54
dance de
phases
Défaut 1,3 1,40 135 68 253 272 2 68 36 2
aux
bornes
Défaut 1 1,40 104 52 194 208 2 52 28 2
170 proche
en ligne
Discor- 2 1,25 208 136 347 272-544 2-14 104 81 1,54
dance de
phases
a
Dans le cas de défauts proches en ligne, la TTR et les temps sont ceux du circuit d’alimentation.
b
VATR = vitesse d’accroissement de la tension de rétablissement.
62271-100 corrigendum 2 IEC:2003 – 5 –
Page 9
Instead of the existing table 1b, read
b
Rated Test- First- Amplitude First Time TRV Time Time Voltage Time RRRV
voltage duty pole- factor reference peak delay
to- voltage value
clear
factor
U k k u t u t t u' t' u /t
r pp af 1 1 c 2 d 1 1
kV p.u. p.u. kV kV kV
μs μs μs μskV/μs
Terminal 1,3 1,40 80 40 149 160 2 40 22 2
fault
Short-line 1 1,40 61 31 114 124 2 31 17 2
fault
Out-of- 2 1,25 122 80 204 160-320 2-8 61 48 1,54
phase
Terminal 1,3 1,40 98 49 183 196 2 49 26 2
fault
Short-line 1 1,40 75 38 141 152 2 38 21 2
fault
Out-of- 2 1,25 151 98 251 196-392 2-10 75 59 1,54
phase
Terminal 1,3 1,40 115 58 215 232 2 58 31 2
fault
Short-line 1 1,40 89 44 166 176 2 44 24 2
fault
Out-of- 2 1,25 178 116 296 232-464 2-12 89 70 1,54
phase
Terminal 1,3 1,40 135 68 253 272 2 68 36 2
fault
Short-line 1 1,40 104 52 194 208 2 52 28 2
fault
Out-of- 2 1,25 208 136 347 272-544 2-14 104 81 1,54
phase
a
In case of short-line faults, transient recovery voltage and time quantities are those of the supply circuit.
b
RRRV = rate of rise of recovery voltage.
– 6 – 62271-100 corrigendum 2 CEI:2003
Page 10
Au lieu du tableau existant 1c, lire:
b
Tension Sé- Facteur Facteur Première Temps Valeur Temps Retard Tension Temps VATR
assignée quence de d’ampli- tension de de crête
d’essais premier tude référence de la
pôle TTR
U k k u t u t t u' t' u /t
c 1 1
r pp af 1 1 2 d
kV p.u. p.u. kV μs kV μs μs kV μskV/μs
Défaut 1,5 1,40 92 46 171 184 2 46 25 2
aux
bornes
Défaut 1 1,40 61 31 114 124 2 31 17 2
100 proche
en ligne
Discor- 2,5 1,25 153 92 255 184-368 2-9 77 55 1,67
dance de
phases
Défaut 1,5 1,40 113 56 211 224 2 56 30 2
aux
bornes
Défaut 1 1,40 75 38 141 152 2 38 21 2
123 proche
en ligne
2,5 1,25 188 112 314 224-448 2-11 94 67 1,67
Discor-
dance de
phases
Défaut 1,5 1,40 133 67 249 268 2 67 35 2
aux
bornes
Défaut 1 1,40 89 44 166 176 2 44 24 2
145 proche
en ligne
Discor- 2,5 1,25 222 134 370 268-536 2-13 111 79 1,67
dance de
phases
Défaut 1,5 1,40 156 78 291 312 2 78 41 2
aux
bornes
Défaut 1 1,40 104 52 194 208 2 52 28 2
170 proche
en ligne
Discor- 2,5 1,25 260 156 434 312-624 2-16 130 94 1,67
dance de
phases
a
Dans le cas de défauts proches en ligne, la TTR et les temps sont ceux du circuit d’alimentation.
b
VATR = vitesse d’accroissement de la tension de rétablissement.
62271-100 corrigendum 2 IEC:2003 – 7 –
Page 11
Instead of the existing table 1c, read:
b
Rated Test- First- Amplitude First Time TRV Time Time Voltage Time RRRV
voltage duty pole- factor reference peak delay
to- voltage value
clear
factor
U k k u t u t t u' t' u /t
1 1
r pp af 1 1 c 2 d
kV p.u. p.u. kV kV kV
μs μs μs μskV/μs)
Terminal 1,5 1,40 92 46 171 184 2 46 25 2
fault
Short-line 1 1,40 61 31 114 124 2 31 17 2
fault
Out-of- 2,5 1,25 153 92 255 184-368 2-9 77 55 1,67
phase
Terminal 1,5 1,40 113 56 211 224 2 56 30 2
fault
Short-line 1 1,40 75 38 141 152 2 38 21 2
fault
Out-of- 2,5 1,25 188 112 314 224-448 2-11 94 67 1,67
phase
Terminal 1,5 1,40 133 67 249 268 2 67 35 2
fault
Short-line 1 1,40 89 44 166 176 2 44 24 2
fault
Out-of- 2,5 1,25 222 134 370 268-536 2-13 111 79 1,67
phase
Terminal 1,5 1,40 156 78 291 312 2 78 41 2
fault
Short-line 1 1,40 104 52 194 208 2 52 28 2
fault
Out-of- 2,5 1,25 260 156 434 312-624 2-16 130 94 1,67
phase
a
In case of short-line faults, transient recovery voltage and time quantities are those of the supply circuit.
b
RRRV = rate of rise of recovery voltage.
– 8 – 62271-100 corrigendum 2 CEI:2003
Page 12
Au lieu du tableau existant 1d, lire:
b
Tension Sé- Facteur Facteur Première Temps Valeur Temps Retard Tension Temps VATR
assignée quence de d’ampli- tension de de crête
d’essais premier tude référence de la
pôle TTR
U k k u t u t t u' t' u /t
r pp af 1 1 c 2 d 1 1
kV p.u. p.u. kV kV kV
μs μs μs μskV/μs
Défaut 1,3 1,40 195 98 364 392 2 98 51 2
aux
bornes
Défaut 1 1,40 150 75 280 300 2 75 40 2
245 proche
en ligne
Discor- 2 1,25 300 196 500 392-784 2-20 150 117 1,54
dance de
phases
Défaut 1,3 1,40 239 119 446 476 2 119 62 2
aux
bornes
Défaut 1 1,40 184 92 343 368 2 92 48 2
300 proche
en ligne
Discor- 2 1,25 367 238 612 476-952 2-24 184 143 1,54
dance de
phases
Défaut 1,3 1,40 288 144 538 576 2 144 74 2
aux
bornes
Défaut 1 1,40 222 111 414 444 2 111 57 2
362 proche
en ligne
Discor- 2 1,25 443 288 739 576-1152 2-29 222 173 1,54
dance de
phases
Défaut 1,3 1,40 334 167 624 668 2 167 86 2
aux
bornes
Défaut 1 1,40 257 129 480 516 2 129 66 2
420 proche
en ligne
Discor- 2 1,25 514 334 857 668-1336 2-33 257 202 1,54
dance de
phases
Défaut 1,3 1,40 438 219 817 876 2 219 111 2
aux
bornes
Défaut 1 1,40 337 168 629 672 2 168 86 2
550 proche
en ligne
Discor- 2 1,25 674 438 1 123 876-1752 2-44 337 263 1,54
dance de
phases
Défaut 1,3 1,40 637 318 1 189 1 272 2 318 161 2
aux
bornes
Défaut 1 1,40 490 245 914 980 2 245 124 2
800 proche
en ligne
Discor- 2 1,25 980 636 1 633 1272-2544 2-64 490 382 1,54
dance de
phases
a
Dans le cas de défauts proches en ligne, la TTR et les temps sont ceux du circuit d’alimentation.
b
VATR = vitesse d’accroissement de la tension de rétablissement.
62271-100 corrigendum 2 IEC:2003 – 9 –
Page 13
Instead of the existing table 1d, read:
b
Rated Test- First- Amplitude First Time TRV Time Time Voltage Time RRRV
voltage duty pole- factor reference peak delay
to- voltage value
clear
factor
U k k u t u t t u' t' u /t
r pp af 2 d 1 1
1 1 c
kV p.u. p.u. kV KV kV
μs μs μs μskV/μs
Terminal 1,3 1,40 195 98 364 392 2 98 51 2
fault
Short-line 1 1,40 150 75 280 300 2 75 40 2
fault
Out-of- 2 1,25 300 196 500 392-784 2-20 150 117 1,54
phase
Terminal 1,3 1,40 239 119 446 476 2 119 62 2
fault
Short-line 1 1,40 184 92 343 368 2 92 48 2
fault
Out-of- 2 1,25 367 238 612 476-952 2-24 184 143 1,54
phase
Terminal 1,3 1,40 288 144 538 576 2 144 74 2
fault
Short-line 1 1,40 222 111 414 444 2 111 57 2
fault
Out-of- 2 1,25 443 288 739 576-1152 2-29 222 173 1,54
phase
Terminal 1,3 1,40 334 167 624 668 2 167 86 2
fault
Short-line 1 1,40 257 129 480 516 2 129 66 2
fault
Out-of- 2 1,25 514 334 857 668-1336 2-33 257 202 1,54
phase
Terminal 1,3 1,40 438 219 817 876 2 219 111 2
fault
Short-line 1 1,40 337 168 629 672 2 168 86 2
fault
Out-of- 2 1,25 674 438 1 123 876-1752 2-44 337 263 1,54
phase
Terminal 1,3 1,40 637 318 1 189 1 272 2 318 161 2
fault
Short-line 1 1,40 490 245 914 980 2 245 124 2
fault
Out-of- 2 1,25 980 636 1 633 1272-2544 2-64 490 382 1,54
phase
a
In case of short-line faults, transient recovery voltage and time quantities are those of the supply circuit.
b
RRRV = rate of rise of recovery voltage.
– 10 – 62271-100 corrigendum 2 CEI:2003
Page 14
Ajouter, après le tableau 2 existant:
Page 90
4.106 Pouvoir de fermeture et pouvoir de coupure assignés en discordance de phases
Remplacer le point b) par ce qui suit :
b) la tension transitoire de rétablissement doit être conforme au:
– tableau 1a, pour les disjoncteurs de tensions assignées inférieures à 100 kV;
– tableau 1b, pour les disjoncteurs de tensions assignées de 100 kV à 170 kV inclus
pour réseaux à neutre directement à la terre;
– tableau 1c, pour les disjoncteurs de tensions assignées de 100 kV à 170 kV inclus
pour réseaux à neutre non directement à la terre;
– tableau 1d, pour les disjoncteurs de tensions assignées supérieures ou égales à 245 kV.
62271-100 corrigendum 2 IEC:2003 – 11 –
Page 15
Add, after the existing table 2:
Page 91
4.106 Rated out-of-phase making and breaking current
Replace item b) by the following:
b) the transient recovery voltage shall be in accordance with:
– table 1a, for circuit-breakers with rated voltages below 100 kV;
– table 1b, for circuit-breakers with rated voltages of 100 kV up to and including 170 kV
for solidly earthed systems;
– table 1c, for circuit-breakers with rated voltages of 100 kV up to and including 170 kV
for non-solidly earthed systems;
– table 1d, for circuit-breakers with rated voltages of 245 kV and above.
– 12 – 62271-100 corrigendum 2 CEI:2003
Page 16
6.104.5.1
Cinquième alinéa, dernière phrase
Au lieu de:
…dont le neutre est mis non directement à la terre…
lire:
…dont le neutre est mis non directement à la terre ou compensé par bobine d’extinction,…
Page 18
Point b)
Troisième tiret
Au lieu de:
…1,54 pour la séquence T30, 1,7 pour la séquence T10,.
lire:
…1,54 pour la séquence T30, 0,9 × 1,7 pour la séquence T10,.
Quatrième tiret
Au lieu de :
– Le temps t est égal à 4t pour la séquence T100 et pour le circuit d’alimentation du défaut
proche en ligne, entre 2t et 4t pour la coupure en discordance de phases. Le temps t est
1 1
égal à 6t pour la séquence T60.
lire:
– Le temps t est égal à 4t pour la séquence T100 et pour le circuit d’alimentation du défaut
proche en ligne et entre t (pour T100) et 2t (pour T100) pour la coupure en discordance
2 2
de phases. Le temps t est égal à 6t pour la séquence T60.
Page 22
6.104.5.6, premier alinéa
Au lieu de:
…sont indiqués dans le tableau 13.
lire:
…sont indiqués dans le tableau 1a.
62271-100 corrigendum 2 IEC:2003 – 13 –
Page 17
6.104.5.1
Fifth paragraph, last sentence
Instead of:
For isolated earthed or resonant earthed systems from …
read:
For non-solidly earthed or resonant earthed systems from…
Page 19
Item b)
Third dash
Instead of:
…1,54 for test-duty T30, 1,7 for test-duty T10,…
read:
…1,54 for test-duty T30, 0,9 × 1,7 for test-duty T10,…
Fourth dash
Instead of:
– Time t is equal to 4t for test-duty T100 and for the supply side circuit for short-line fault,
between 2t and 4t for out-of-phase breaking. Time t is equal to 6t for T60.
1 1 1
read:
– Time t is equal to 4t for test-duty T100 and for the supply side circuit for short-line fault
and between t (for T100) and 2t (for T100) for out-of-phase breaking. Time t is equal to 6t
2 2 2
for T60.
Page 23
6.104.5.6, first paragraph
Instead of:
…are given in table 13.
read:
…are given in table 1a.
– 14 – 62271-100 corrigendum 2 CEI:2003
Page 24
Au lieu du tableau 14a existant, lire:
Tension Sé- Facteur Facteur Première Temps Valeur de Temps Retard Tension Temps Vitesse
assignée quence de d’ampli- tension crête de la d'ac-
d’essais premier tude de TTR croisse-
pôle référence ment
U k K u t u t ou t t u' t' u /t
r pp af 1 1 c 2 3 d 1 1
u /t
c 3
kV p.u. p.u. kV μs kV μs μs kV μskV/μs
T100 1,3 1,40 80 40 149 160 2-(11) 40 22-31 2
T60 1,3 1,50 80 27 159 162 2-8 40 15-21 3
T30 1,3 1,54 - - 163 33 5 54 16 5
T10 1,3 0,9×1,7 - - 162 23 3 54 11 7
OP1- 2 1,25 122 80 204 160-320 2-8 61 42-48 1,54
OP2
T100 1,3 1,40 98 49 183 196 2
...




Questions, Comments and Discussion
Ask us and Technical Secretary will try to provide an answer. You can facilitate discussion about the standard in here.
Loading comments...