IEC 61284:1997/COR1:1998
(Corrigendum)Corrigendum 1 - Overhead lines - Requirements and tests for fittings
Corrigendum 1 - Overhead lines - Requirements and tests for fittings
Corrigendum 1 - Lignes aériennes - Exigences et essais pour le matériel d'équipement
General Information
- Status
- Published
- Publication Date
- 29-Sep-1998
- Technical Committee
- TC 11 - Overhead lines
- Current Stage
- PPUB - Publication issued
- Start Date
- 30-Sep-1998
- Completion Date
- 10-Sep-1998
Relations
- Effective Date
- 05-Sep-2023
Frequently Asked Questions
IEC 61284:1997/COR1:1998 is a standard published by the International Electrotechnical Commission (IEC). Its full title is "Corrigendum 1 - Overhead lines - Requirements and tests for fittings". This standard covers: Corrigendum 1 - Overhead lines - Requirements and tests for fittings
Corrigendum 1 - Overhead lines - Requirements and tests for fittings
IEC 61284:1997/COR1:1998 is classified under the following ICS (International Classification for Standards) categories: 29.240.20 - Power transmission and distribution lines. The ICS classification helps identify the subject area and facilitates finding related standards.
IEC 61284:1997/COR1:1998 has the following relationships with other standards: It is inter standard links to IEC 61284:1997. Understanding these relationships helps ensure you are using the most current and applicable version of the standard.
IEC 61284:1997/COR1:1998 is available in PDF format for immediate download after purchase. The document can be added to your cart and obtained through the secure checkout process. Digital delivery ensures instant access to the complete standard document.
Standards Content (Sample)
Publication 61284 de la CEI
IEC Publication 61284
e
(2 édition – 1997)
(2nd edition – 1997)
Lignes aériennes –
Overhead lines –
Exigences et essais pour
Requirements and tests
le matériel d’équipement
for fittings
CORRIGENDUM 1
Page 86 Page 87
14.4 Circuit d’essai et instrumentation 14.4 Test circuits and instruments
Dans la note après le troisième alinéa,
In the note after the third paragraph,
au lieu de
instead of
...jumelles –7 × 50 (min.)...
...field glasses –7 × 50 (min.)...
lire
read
...jumelles 7 × 50 (min.)...
...field glasses 7 × 50 (min.)...
Page 110
Page 111
Figure D.2 – Détail de la séquence
Figure D.2 – Detail of 0,1 N or 0,05 N
du cycle 0,1 N ou 0,05 N
cycle sequence
Remplacer le schéma existant
Replace the existing diagram
par le schéma amendé suivant:
by the following amended diagram:
(voir au verso)
(see overleaf)
Septembre 1998 September 1998
...




Questions, Comments and Discussion
Ask us and Technical Secretary will try to provide an answer. You can facilitate discussion about the standard in here.
Loading comments...