Industrial communication networks - Profiles - Part 5-3: Installation of fieldbuses - Installation profiles for CPF 3

Superseded by EN 61784-5-3:2012

Industrielle Kommunikationsnetze - Profile - Teil 5-3: Feldbusinstallation - Installationsprofile für die Kommunikationsprofilfamilie 3

Réseaux de communication industriels - Profils - Partie 5-3: Installation des bus de terrain - Profils d'installation pour CPF 3

Industrijska komunikacijska omrežja - Profili - 5-3. del: Inštalacija procesnih vodil - Inštalacijski profili za CPF 3 (IEC 61784-5-3:2007)

General Information

Status
Withdrawn
Publication Date
12-Jun-2008
Withdrawal Date
30-Apr-2011
Drafting Committee
IEC/SC 65C - IEC_SC_65C
Parallel Committee
IEC/SC 65C - IEC_SC_65C
Current Stage
9960 - Withdrawal effective - Withdrawal
Start Date
19-Oct-2014
Completion Date
19-Oct-2014

Relations

Effective Date
29-Jan-2023
Standard

EN 61784-5-3:2008

English language
114 pages
Preview
Preview
e-Library read for
1 day

Get Certified

Connect with accredited certification bodies for this standard

BSI Group

BSI (British Standards Institution) is the business standards company that helps organizations make excellence a habit.

UKAS United Kingdom Verified

National Aerospace and Defense Contractors Accreditation Program (NADCAP)

Global cooperative program for special process quality in aerospace.

ANAB United States Verified

CARES (UK Certification Authority for Reinforcing Steels)

UK certification for reinforcing steels and construction.

UKAS United Kingdom Verified

Sponsored listings

Frequently Asked Questions

EN 61784-5-3:2008 is a standard published by CLC. Its full title is "Industrial communication networks - Profiles - Part 5-3: Installation of fieldbuses - Installation profiles for CPF 3". This standard covers: Superseded by EN 61784-5-3:2012

Superseded by EN 61784-5-3:2012

EN 61784-5-3:2008 is classified under the following ICS (International Classification for Standards) categories: 25.040.40 - Industrial process measurement and control; 35.100.05 - Multilayer applications. The ICS classification helps identify the subject area and facilitates finding related standards.

EN 61784-5-3:2008 has the following relationships with other standards: It is inter standard links to EN 61784-5-3:2012. Understanding these relationships helps ensure you are using the most current and applicable version of the standard.

EN 61784-5-3:2008 is available in PDF format for immediate download after purchase. The document can be added to your cart and obtained through the secure checkout process. Digital delivery ensures instant access to the complete standard document.

Standards Content (Sample)


SLOVENSKI STANDARD
01-september-2008
Industrijska komunikacijska omrežja - Profili - 5-3. del: Inštalacija procesnih vodil -
Inštalacijski profili za CPF 3 (IEC 61784-5-3:2007)
Industrial communication networks - Profiles - Part 5-3: Installation of fieldbuses -
Installation profiles for CPF 3
Industrielle Kommunikationsnetze - Profile - Teil 5-3: Feldbusinstallation -
Installationsprofile für die Kommunikationsprofilfamilie 3
Réseaux de communication industriels - Profils - Partie 5-3: Installation des bus de
terrain - Profils d'installation pour CPF 3
Ta slovenski standard je istoveten z: EN 61784-5-3:2008
ICS:
25.040.40 Merjenje in krmiljenje Industrial process
industrijskih postopkov measurement and control
35.100.05 9HþVORMQHXSRUDEQLãNH Multilayer applications
UHãLWYH
2003-01.Slovenski inštitut za standardizacijo. Razmnoževanje celote ali delov tega standarda ni dovoljeno.

EUROPEAN STANDARD
EN 61784-5-3
NORME EUROPÉENNE
June 2008
EUROPÄISCHE NORM
ICS 35.100.05; 25.040.40
English version
Industrial communication networks -
Profiles -
Part 5-3: Installation of fieldbuses -
Installation profiles for CPF 3
(IEC 61784-5-3:2007)
Réseaux de communication industriels -  Industrielle Kommunikationsnetze -
Profils - Profile -
Partie 5-3: Installation des bus de terrain - Teil 5-3: Feldbusinstallation -
Profils d'installation pour CPF 3 Installationsprofile
(CEI 61784-5-3:2007) für die Kommunikationsprofilfamilie 3
(IEC 61784-5-3:2007)
This European Standard was approved by CENELEC on 2008-05-01. CENELEC members are bound to comply
with the CEN/CENELEC Internal Regulations which stipulate the conditions for giving this European Standard
the status of a national standard without any alteration.

Up-to-date lists and bibliographical references concerning such national standards may be obtained on
application to the Central Secretariat or to any CENELEC member.

This European Standard exists in three official versions (English, French, German). A version in any other
language made by translation under the responsibility of a CENELEC member into its own language and notified
to the Central Secretariat has the same status as the official versions.

CENELEC members are the national electrotechnical committees of Austria, Belgium, Bulgaria, Cyprus, the
Czech Republic, Denmark, Estonia, Finland, France, Germany, Greece, Hungary, Iceland, Ireland, Italy, Latvia,
Lithuania, Luxembourg, Malta, the Netherlands, Norway, Poland, Portugal, Romania, Slovakia, Slovenia, Spain,
Sweden, Switzerland and the United Kingdom.

CENELEC
European Committee for Electrotechnical Standardization
Comité Européen de Normalisation Electrotechnique
Europäisches Komitee für Elektrotechnische Normung

Central Secretariat: rue de Stassart 35, B - 1050 Brussels

© 2008 CENELEC - All rights of exploitation in any form and by any means reserved worldwide for CENELEC members.
Ref. No. EN 61784-5-3:2008 E
Foreword
The text of document 65C/471/FDIS, future edition 1 of IEC 61784-5-3, prepared by SC 65C,
Industrial networks, of IEC TC 65, Industrial-process measurement, control and automation, was
submitted to the IEC-CENELEC parallel vote and was approved by CENELEC as EN 61784-5-3 on
2008-05-01.
This standard is to be used in conjunction with EN 61918:2008.
The following dates were fixed:
– latest date by which the EN has to be implemented
at national level by publication of an identical
national standard or by endorsement (dop) 2009-02-01
– latest date by which the national standards conflicting
with the EN have to be withdrawn (dow) 2011-05-01
Annex ZA has been added by CENELEC.
__________
Endorsement notice
The text of the International Standard IEC 61784-5-3:2007 was approved by CENELEC as a
European Standard without any modification.
__________
- 3 - EN 61784-5-3:2008
Annex ZA
(normative)
Normative references to international publications
with their corresponding European publications

The following referenced documents are indispensable for the application of this document. For dated
references, only the edition cited applies. For undated references, the latest edition of the referenced
document (including any amendments) applies.

NOTE  When an international publication has been modified by common modifications, indicated by (mod), the relevant EN/HD
applies.
Publication Year Title EN/HD Year

1)
- - Electrical apparatus for potentially EN 50020 -
explosive atmospheres - Intrinsic safety 'i'

IEC 60079-0 2004 Electrical apparatus for explosive gas EN 60079-0 2006
(mod) atmospheres -
Part 0: General requirements
IEC 60079-11 2006 Explosive atmospheres -
+ corr. December 2006 Part 11: Equipment protection by intrinsic EN 60079-11 2007
safety "i"
IEC 60079-27 2005 Electrical apparatus for explosive gas EN 60079-27 2006
atmospheres -
Part 27: Fieldbus intrinsically safe concept
(FISCO) and Fieldbus non-incendive
concept (FNICO)
IEC 60793-2-10 2007 Optical fibres - EN 60793-2-10 2007
Part 2-10: Product specifications -
Sectional specification for category A1
multimode fibres
IEC 60793-2-50 2004 Optical fibres - EN 60793-2-50 2004
Part 2-50: Product specifications - + corr. July 2004
Sectional specification for class B
single-mode fibres
IEC 61000-4-2 1995 Electromagnetic compatibility (EMC) - EN 61000-4-2 1995
A1 1998 Part 4-2: Testing and measurement A1 1998
A2 2000 techniques - Electrostatic discharge A2 2001
immunity test
IEC/PAS 61076-2-107
2007 Connectors for electronic equipment - - -
Product requirements -
Part 2-107: Detail specification for circular
hybrid connectors M12 with electrical and
fibre-optical contacts with screw-locking

IEC 61156-5 2002 Multicore and symmetrical pair/quad - -
cables for digital communications -
Part 5: Symmetrical pair/quad cables with
transmission characteristics up to 600 MHz -
Horizontal floor wiring - Sectional
specification
1)
Undated reference.
Publication Year Title EN/HD Year

IEC 61508 Series Functional safety of EN 61508 Series
electrical/electronic/programmable electronic
safety-related systems
IEC 61918 (mod) 2007 Industrial communication networks - EN 61918 2008
Installation of communication networks in
industrial premises
1)
ANSI TIA/EIA-485-A - Electrical Characteristics of Generators - -
and Receivers for Use in Balanced Digital
Multipoint Systems
IEC 61784-5-3
Edition 1.0 2007-12
INTERNATIONAL
STANDARD
Industrial communication networks – Profiles –
Part 5-3: Installation of fieldbuses – Installation profiles for CPF 3

INTERNATIONAL
ELECTROTECHNICAL
COMMISSION
PRICE CODE
XE
ICS 35.100.05 25.040.40 ISBN 2-8318-9403-4

– 2 – 61784-5-3 © 2007:IEC(E)
CONTENTS
FOREWORD.7
INTRODUCTION.9
1 Scope.10
2 Normative references .10
3 Terms, definitions and abbreviated terms .10
4 CPF 3: Overview of installation profiles .10
5 Installation profile conventions .10
6 Conformance to installation profiles.11
Annex A (normative) CP 3/1 specific installation profile .12
A.1 Installation profile scope.12
A.2 Normative references .12
A.3 Installation profile terms, definitions, and abbreviated terms.12
A.3.1 Terms and definitions .12
A.3.2 Abbreviated terms .12
A.3.3 Conventions for installation profiles .13
A.4 Installation planning .13
A.4.1 Introduction .13
A.4.2 Planning requirements.13
A.4.3 Network capabilities .15
A.4.4 Selection and use of cabling components .18
A.4.5 Cabling planning documentation.28
A.4.6 Verification of cabling planning specification.28
A.5 Installation implementation .28
A.5.1 General requirements .28
A.5.2 Cable installation.28
A.5.3 Connector installation.31
A.5.4 Terminator installation .35
A.5.5 Device installation .35
A.5.6 Coding and labeling.35
A.5.7 Earthing and bonding of equipment and device and shielded cabling.35
A.5.8 As-implemented cabling documentation.36
A.6 Installation verification and installation acceptance test.36
A.6.1 Introduction .36
A.6.2 Installation verification.37
A.6.3 Installation acceptance test .38
A.7 Installation administration.44
A.8 Installation maintenance and installation troubleshooting .44
A.8.1 General .44
A.8.2 Maintenance.44
A.8.3 Troubleshooting.44
A.8.4 Specific requirements for maintenance and troubleshooting .44
Annex B (normative)  CP 3/2 (PROFIBUS) specific installation profile.46
B.1 Installation profile scope.46
B.2 Normative references .46
B.3 Installation profile terms, definitions, and abbreviated terms.46
B.3.1 Terms and definitions .46
B.3.2 Abbreviated terms .47

61784-5-3 © 2007:IEC(E) – 3 –
B.3.3 Conventions for installation profiles .47
B.4 Installation planning .48
B.4.1 Introduction .48
B.4.2 Planning requirements.49
B.4.3 Network capabilities .57
B.4.4 Selection and use of cabling components .62
B.4.5 Cabling planning documentation.77
B.4.6 Verification of cabling planning specification.77
B.5 Installation implementation .77
B.5.1 General requirements .78
B.5.2 Cable installation.78
B.5.3 Connector installation.79
B.5.4 Terminator installation .80
B.5.5 Device installation .80
B.5.6 Coding and labelling .80
B.5.7 Earthing and bonding of equipment and device and shielded cabling.80
B.5.8 As-implemented cabling documentation.80
B.6 Installation verification and installation acceptance test.80
B.6.1 Introduction .80
B.6.2 Installation verification.80
B.6.3 Installation acceptance test .81
B.7 Installation administration.82
B.8 Installation maintenance and installation troubleshooting .82
Annex C (normative) CP 3/3, CP 3/4, CP 3/5, CP 3/6 (PROFINET) specific installation
profile.83
C.1 Installation profile scope.83
C.2 Normative references .83
C.3 Installation profile terms, definitions, and abbreviated terms.83
C.3.1 Terms and definitions .83
C.3.2 Abbreviated terms .83
C.3.3 Conventions for installation profiles .83
C.4 Installation planning .83
C.4.1 Introduction .83
C.4.2 Planing requirements.84
C.4.3 Network capabilities .84
C.4.4 Selection and use of cabling components .88
C.4.5 Cabling planning documentation. 101
C.4.6 Verification of cabling planning specification.101
C.5 Installation implementation .101
C.5.1 General requirements .101
C.5.2 Cable installation.101
C.5.3 Connector Installation.104
C.5.4 Terminator installation .105
C.5.5 Device installation .105
C.5.6 Coding and labeling.105
C.5.7 Earthing and bonding of equipment and device and shielded cabling.105
C.5.8 As-implemented cabling documentation. 106
C.6 Installation verification and installation acceptance test. 106
C.6.1 Introduction .106
C.6.2 Installation verification.106

– 4 – 61784-5-3 © 2007:IEC(E)
C.6.3 Installation acceptance test .108
C.7 Installation administration.109
C.8 Installation maintenance and installation troubleshooting . 109
Bibliography.110

Table A.1 – Excerpt of MICE definition.15
Table A.2 – Basic network characteristics for balanced cabling not based on Ethernet
(ISO/IEC 8802-3) .16
Table A.3 – Network characteristics for optical fibre cabling.17
Table A.4 – Information relevant to copper cable: fixed cables.19
Table A.5 – Information relevant to optical fibre cables .20
Table A.6 – Connectors for copper cabling CPs not based on Ethernet.21
Table A.7 – Optical fibre connecting hardware .21
Table A.8 – Parameters for balanced cables.29
Table A.9 – Parameters for silica optical fibre cables .29
Table A.10 – Parameters for POF optical fibre cables .29
Table A.11 – Parameters for hard cladded silica optical fibre cables .30
Table A.12 – Use of 9 pin Sub-D connector pins (RS 485) .32
Table A.13 – Use of 9 pin Sub-D connector pins (RS 485-IS).33
Table A.14 – Use of M12 connecotor pins (RS 485) .34
Table A.15 – Use of M12 connector pins (RS 485-IS) .35
Table A.16 – Maximum fibre channel attenuation for CP 3/1 (PROFIBUS) .44
Table B.1 – Valid parameter range of the FISCO model for use as EEx ib IIC / IIB.54
Table B.2 – Valid parameter range of the FISCO model for use as EEx ia IIC .54
Table B.3 – Power supply (operational values) .60
Table B.4 – Minimum line lengths which can be achieved .60
Table B.5 – Limit values for distortion, reflection and signal delay.61
Table B.6 – Recommended maximum cable lengths including spurs .61
Table B.7 – Recommended length of the spurs .62
Table B.8 – Maximum length of the splices .62
Table B.9 – Information relevant to copper cable: fixed cables.63
Table B.10 – Safety limit values for the fieldbus cable .64
Table B.11 – Connectors for copper cabling CPs not based on Ethernet.65
Table B.12 – Mixing devices from different categories .67
Table B.13 – Electrical characteristics of fieldbus interfaces .68
Table B.14 – Recommended data sheet specifications for CP 3/2 devices .69
Table B.15 – Parameters for balanced cables .78
Table B.16 – Contact assignments for the external connector for harsh industrial
environments .79
Table C.1 – General transmission media selection information .85
Table C.2 – Network characteristics for balanced cabling based on Ethernet
(ISO/IEC 8802-3) .86
Table C.3 – Network characteristics for optical fibre cabling .87
Table C.4 – Information relevant to copper cable: CP 3/3, CP 3/4, CP 3/5 and CP 3/6
type A fixed cables .88

61784-5-3 © 2007:IEC(E) – 5 –
Table C.5 – Information relevant to copper cable: CP 3/3, CP 3/4, CP 3/5 and CP 3/6
type B fixed cables .89
Table C.6 – Information relevant to copper cable: CP 3/3, CP 3/4, CP 3/5 and CP 3/6
type C fixed cables .89
Table C.7 – Information relevant to optical fibre cables.90
Table C.8 – Requirements for plastic and polymer cladded optical fibre cables.91
Table C.9 – Requirements for glass multimode optical fibre cables .92
Table C.10 – Requirements for glass singlemode optical fibre cables .93
Table C.11 – Information relevant to hybrid cables .94
Table C.12 – Connectors for balanced cabling CPs based on Ethernet .95
Table C.13 – Optical fibre connecting hardware .95
Table C.14 – typical fibre channels common for industrial applications. .98
Table C.15 – Parameters for balanced cables.102
Table C.16 – Parameters for silica optical fibre cables.102
Table C.17 – Parameters for POF optical fibre cables.102
Table C.18 – Parameters for hard cladded silica optical fibre cables. 103
Table C.19 – colour coding for CP 3/3, CP 3/4, CP 3/5 and CP 3/6 connectors . 104
Table C.20 – Maximum fibre channel attenuation for CP 3/3, CP 3/4, CP 3/5 and
CP 3/6 (PROFINET).108

Figure 1 – Standards relationships.9
Figure A.1 – Recommended combination of shielding and earthing for CP 3/1 networks
with RS 485-IS.26
Figure A.2 – Sub-D connector pin numberings .32
Figure A.3 – 5-pin M-12 female socket.33
Figure A.4 – 5 pins M-12 male plug for CP 3/1.34
Figure A.5 – Test circuit A - resistance measurement of data line B and shield.39
Figure A.6 – Test circuit B - resistance measurement of data line A and shield.39
Figure A.7 – Test circuit C - resistance measurement of data line A, data line B, and
shield.40
Figure A.8 – Test circuit D - resistance measurement between data line A and B .40
Figure A.9 – Resistance measurement without 9-pin Sub-D plug .40
Figure A.10 – Loop core resistance (cable type A) .41
Figure A.11 – Action and resolution tree for measurement 1 (RS 485 and RS 485-IS) .42
Figure A.12 – Action and resolution tree for measurement 2 (RS 485 and RS 485-IS) .43
Figure A.13 – Action and resolution tree for measurement 3 (RS 485 and RS 485-IS) .43
Figure B.1 – Connection of CP 3/1 networks.49
Figure B.2 – Typical fieldbus architecture .52
Figure B.3 – Fieldbus with stations supplied by auxiliary power sources .52
Figure B.4 – Fieldbus model .56
Figure B.5 – Current modulation (Manchester II code) .56
Figure B.6 – CP 3/2 topology .57
Figure B.7 – Bus topology.58
Figure B.8 – Combination of the tree topology and the bus topology .58
Figure B.9 – Fieldbus extension.59
Figure B.10 – Recommended combination of shielding and earthing.72

– 6 – 61784-5-3 © 2007:IEC(E)
Figure B.11 – Ideal combination of shielding and earthing .73
Figure B.12 – Capacitive grounding .74
Figure B.13 – Galvanic isolated field device.76
Figure B.14 – Pin assignment of the male and female connectors IEC 60947-5-2 (A-
coding) .80
Figure C.1 – End-to-end link without interconnections.96
Figure C.2 – Assembled end-to-end link .96
Figure C.3 – Connectionless optical fibre link .97
Figure C.4 – Assembled optical fibre link .97
Figure C.5 – Shielded connectors for CP 3/3, CP 3/4, CP 3/5 and CP 3/6 fieldbus
networks .104
Figure C.6 – Pin-assignment for a straight cable.104

61784-5-3 © 2007:IEC(E) – 7 –
INTERNATIONAL ELECTROTECHNICAL COMMISSION
____________
INDUSTRIAL COMMUNICATION NETWORKS – PROFILES

Part 5-3: Installation of fieldbuses – Installation profiles for CPF 3

FOREWORD
1) The International Electrotechnical Commission (IEC) is a worldwide organization for standardization comprising
all national electrotechnical committees (IEC National Committees). The object of IEC is to promote
international co-operation on all questions concerning standardization in the electrical and electronic fields. To
this end and in addition to other activities, IEC publishes International Standards, Technical Specifications,
Technical Reports, Publicly Available Specifications (PAS) and Guides (hereafter referred to as “IEC
Publication(s)”). Their preparation is entrusted to technical committees; any IEC National Committee interested
in the subject dealt with may participate in this preparatory work. International, governmental and non-
governmental organizations liaising with the IEC also participate in this preparation. IEC collaborates closely
with the International Organization for Standardization (ISO) in accordance with conditions determined by
agreement between the two organizations.
2) The formal decisions or agreements of IEC on technical matters express, as nearly as possible, an international
consensus of opinion on the relevant subjects since each technical committee has representation from all
interested IEC National Committees.
3) IEC Publications have the form of recommendations for international use and are accepted by IEC National
Committees in that sense. While all reasonable efforts are made to ensure that the technical content of IEC
Publications is accurate, IEC cannot be held responsible for the way in which they are used or for any
misinterpretation by any end user.
4) In order to promote international uniformity, IEC National Committees undertake to apply IEC Publications
transparently to the maximum extent possible in their national and regional publications. Any divergence
between any IEC Publication and the corresponding national or regional publication shall be clearly indicated in
the latter.
5) IEC provides no marking procedure to indicate its approval and cannot be rendered responsible for any
equipment declared to be in conformity with an IEC Publication.
6) All users should ensure that they have the latest edition of this publication.
7) No liability shall attach to IEC or its directors, employees, servants or agents including individual experts and
members of its technical committees and IEC National Committees for any personal injury, property damage or
other damage of any nature whatsoever, whether direct or indirect, or for costs (including legal fees) and
expenses arising out of the publication, use of, or reliance upon, this IEC Publication or any other IEC
Publications.
8) Attention is drawn to the Normative references cited in this publication. Use of the referenced publications is
indispensable for the correct application of this publication.
9) Attention is drawn to the possibility that some of the elements of this IEC Publication may be the subject of
patent rights. IEC shall not be held responsible for identifying any or all such patent rights.
International Standard IEC 61784-5-3 has been prepared by subcommittee 65C: Industrial
networks, of IEC technical committee 65: Industrial-process measurement, control and
automation.
This standard is to be used in conjunction with IEC 61918:2007.
The text of this standard is based on the following documents:
FDIS Report on voting
65C/471/FDIS 65C/482/RVD
Full information on the voting for the approval of this standard can be found in the report on
voting indicated in the above table.
This publication has been drafted in accordance with the ISO/IEC Directives, Part 2.

– 8 – 61784-5-3 © 2007:IEC(E)
A list of all parts of the IEC 61784-5 series, under the general title Industrial communication
networks – Profiles – Installation of fieldbuses, can be found on the IEC website.
The committee has decided that the contents of this publication will remain unchanged until
the maintenance result date indicated on the IEC web site under "http://webstore.iec.ch" in
the data related to the specific publication. At this date, the publication will be
• reconfirmed,
• withdrawn,
• replaced by a revised edition, or
• amended.
61784-5-3 © 2007:IEC(E) – 9 –
INTRODUCTION
This International Standard is one of a series produced to facilitate the use of communication
networks in industrial control systems.
IEC 61918:2007 (Ed. 1.0) provides the common requirements for the installation of
communication networks in industrial control systems. This installation profile standard
provides the installation profiles of the communication profiles (CP) of a specific
communication profile family (CPF) by stating which requirements of IEC 61918 fully apply
and, where necessary, by supplementing, modifying, or replacing the other requirements (see
Figure 1).
For general background on fieldbuses, their profiles, and relationship between the installation
profiles specified in this standard, see IEC/TR 61158-1.
Each CP installation profile is specified in a separate annex of this standard. Each annex is
structured exactly as the reference standard IEC 61918 for the benefit of the persons
representing the roles in the fieldbus installation process as defined in IEC 61918 (planner,
installer, verification personnel, validation personnel, maintenance personnel, administration
personnel). By reading the installation profile in conjunction with IEC 61918, these persons
immediately know which requirements are common for the installation of all CPs and which
are modified or replaced. The conventions used to draft this standard are defined in Clause 5.
The provision of the installation profiles in one standard for each CPF (for example
IEC 61784-5-3 for CPF 3), allows readers to work with standards of a convenient size.

DEDEDEDESSSSIIIIGGGGNNNN PPLLAANNINNINGNG,, E ETTC.C.
GGEENENERIC RIC
OFOFFFIICCE PE PRREMEMISISESES
CACABBLLIINNGG
ISISOO/IE/IECC  1180111801
ISISOO/IE/IECC
14763-14763-22
BEBETWTWEEEENN
AUTAUTOOMMAATTIOIONN ISISOO/IE/IECC  2470224702
ISISLLAANDNDSS
BEBETWTWEEEENN
IEIEC 61784C 61784--5 5
AUTAUTOOMMAATTIOIONN
IEIEC 619C 6191818
ININDDUUSSTTRRIIAALL PR PREMEMISISESES IEC 6IEC 61158 1158
serseriesies
ISISLLAANDNDSS
serseriesies
InInststallatallatioionn
anandd
prprofofiilleess
((CoCommmmonon
WITWITHHININ
IEC 617IEC 61784-84-1,1, - -22 ((SSelelectectiion +on +
rreequiquirreemmeentntss))
AUTAUTOOMMAATTIOIONN
Add/Add/ReReplpl//MMod)od)
ISISLLAANDNDSS
CoCommmmon ston strruuctctururee
AAPPLPPLICICAATTIIOONN--SPSPECECIFIFICIC
CACABBLLIINNGG
Figure 1 – Standards relationships

– 10 – 61784-5-3 © 2007:IEC(E)
INDUSTRIAL COMMUNICATION NETWORKS – PROFILES

Part 5-3: Installation of fieldbuses – Installation profiles for CPF 3

1 Scope
This part of IEC 61784 specifies the installation profiles for CPF 3 (PROFIBUS/PROFINET) .
The installation profiles are specified in the annexes. These annexes are read in conjunction
with IEC 61918:2007.
2 Normative references
The following referenced documents are indispensable for the application of this document.
For dated references, only the edition cited applies. For undated references, the latest edition
of the referenced document (including any amendments) applies.
IEC 61918:2007, Industrial communication networks – Installation of communication networks
in industrial premises
The normative references of IEC 61918:2007, Clause 2, apply. For profile specific normative
A.2, B.2, and C.2.
references, see
3 Terms, definitions and abbreviated terms
For the purpose of this document, the terms, definitions and abbreviated terms of
IEC 61918:2007, Clause 3, apply. For profile specific terms, definitions and abbreviated terms
see A.3, B.3, and C.3.
4 CPF 3: Overview of installation profiles
CPF 3 consists of six CPs as specified in IEC 61784-1 and IEC 61784-2.
The installation requirements for CP 3/1 (PROFIBUS with physical layer according to RS 485,
RS 485-IS, and fibre) are specified in Annex A.
The installation requirements for CP 3/2 (PROFIBUS with physical layer according to MBP,
MBP-IS, MBP-LP) are specified in Annex B.
The installation requirements for CP 3/3, CP 3/4, CP 3/5, and CP 3/6 (PROFINET) are
specified in Annex C.
5 Installation profile conventions
The numbering of the clauses and subclauses in the annexes of this standard corresponds to
the numbering of IEC 61918:2007 main clauses and subclauses.

PROFIBUS and PROFINET are trade names of the non-profit organization PROFIBUS Nutzerorganisation e.V. (PNO). This
information is given for the convenience of users of this International Standard and does not constitute an endorsement by IEC
of the trade names holder or any of its products. Compliance to this profile does not require use of the trade names. Use of the
trade names PROFIBUS and PROFINET requires permission of the trade name holder.

61784-5-3 © 2007:IEC(E) – 11 –

The annex clauses and subclauses of this standard supplement, modify, or replace the
respective clauses and subclauses in IEC 61918:2007.
Where there is no corresponding subclause of IEC 61918:2007 in the normative annexes in
this standard, the subclause of IEC 61918:2007 applies without modification.
The annex heading letter represents the installation profile assigned in Clause 4. The annex
heading number shall represent the corresponding numbering of IEC 61918:2007.
EXAMPLE  “Annex B.4.4” in IEC 61784-5-3 means that CP 3/2 specifies the Subclause 4.4 of IEC 61918:2007.
All main clauses of IEC 61918:2007 are cited and apply in full unless otherwise stated in each
normative installation profile annex.
If all subclauses of a (sub)clause are omitted, then the corresponding IEC 61918 (sub)clause
applies.
If in a (sub)clause it is written “Not applicable”, then the corresponding IEC 61918 (sub)clause
does not apply.
If in a (sub)clause it is written “Addition”, then the corresponding IEC 61918 (sub)clause
applies with the additions written in the profile.
If in a (sub)clause it is written “Replacement”, then the text provided in the profile replaces the
text of the corresponding IEC 61918 (sub)clause.
NOTE  A replacement can also comprise additions.
If in a (sub)clause it is written “Modification”, then the corresponding IEC 61918 (sub)clause
applies with the modifications written in the profile.
If all (sub)clauses of a (sub)clause are omitted but in this (sub)clause it is written “(sub)clause
x has “Addition” (or “Replacement”) or is “Not applicable”, then (sub)clause x becomes valid
as declared and all the other corresponding IEC 61918 (sub)clauses apply.
6 Conformance to installation profiles
Each installation profile within this standard includes part of IEC 61918:2007. It may also
include defined additional specifications.
A statement of compliance to an installation profile of this standard shall be stated as either
Compliance to IEC 61784-5-3:2007 for CP 3/n or
Compliance to IEC 61784-5-3 (Ed.1.0) for CP 3/n
where the name within the angle brackets < > is optional and the angle brackets are not to be
included. The n within CP 3/n shall be replaced by the profile number 1 to 6.
NOTE  The name may be the name of the profile, for example PROFIBUS or PROFINET.
If the name is a trade name then the permission of the trade name holder shall be required.
Product standards shall not include any conformity assessment aspects (including quality
management provisions), neither normative nor informative, other than provisions for product
testing (evaluation and examination).

In accordance with ISO/IEC Directives
The date should not be used when the edition number is used.

– 12 – 61784-5-3 © 2007:IEC(E)
Annex A
(normative)
CP 3/1 specific installation profile
A.1 Installation profile scope
Addition:
This standard specifies the installation profile for Communication Profile CP 3/1 (PROFIBUS
with a physical layer according to RS 485, RS 485-IS, and fibre). The CP 3/1 is specified in
IEC 61784-1.
A.2 Normative references
Addition:
IEC 61508 (all parts), Functional safety of electrical/electronic/programmable electronic
safety-related systems
ANSI TIA/EIA-485-A, Electrical Characteristics of Generators and Receivers for Use in
Balanced Digital Multipoint Systems
A.3 Installation profile terms, definitions, and abbreviated terms
A.3.1 Terms and definitions
Addition:
A.3.1.1
hazard
potential source of harm
NOTE  The term includes danger to persons arising within a short time scale (for example fire and explosion) and
also those that have a long term effect on a person’s health (for example release of a toxic substance).
[IEC 61508-4:1998, 3.1.2]
A.3.1.2
intrinsic safety “i”
type of protection based on the restriction of electrical energy within apparatus and of
interconnecting wiring exposed to the potentially explosive atmosphere to a level below that
which can cause ignition by either sparking or heating effects
[IEC 60079-11:2006, 3.1.1]
NOTE  No single device or wiring is intrinsically safe by itself (except for battery-operated self-contained
apparatus such as portable pagers, transceivers, gas detectors, etc., which are specifically designed as
intrinsically safe self-contained devices) but is intrinsically safe only when employed as part of a properly designed
intrinsically safe system.
A.3.2 Abbreviated terms
Addition:
61784-5-3 © 2007:IEC(E) – 13 –

AC Alternating current
MAU Medium attachment unit
PELV Protective Extra Low Voltage
PNO PROFIBUS Nutzer Organisation (a non profit user organisation)
RS 485 MAU according to ANSI TIA/
...

Questions, Comments and Discussion

Ask us and Technical Secretary will try to provide an answer. You can facilitate discussion about the standard in here.

Loading comments...