WG 4 - TC 8/SC 8B/WG 4
TC 8/SC 8B/WG 4
General Information
Frequently Asked Questions
WG 4 is a Technical Committee within the International Electrotechnical Commission (IEC). It is named "TC 8/SC 8B/WG 4". This committee has published 460 standards.
WG 4 develops IEC standards in the area of Information technology. Currently, there are 460 published standards from this technical committee.
The International Electrotechnical Commission (IEC) is the world's leading organization for the preparation and publication of international standards for electrical, electronic, and related technologies. Founded in 1906, the IEC provides a global platform for companies, industries, and governments to meet, discuss, and develop the international standards they require.
A Technical Committee (TC) in IEC is a group of experts responsible for developing international standards in a specific technical area. TCs are composed of national member body delegates and work through consensus to create standards that meet global industry needs. Each TC may have subcommittees (SCs) and working groups (WGs) for specialized topics.
IEC TS 63189-2:2023 is applicable to virtual power plants (VPPs) that consist of distributed generation, controllable loads, and electrical energy storages.
This part of IEC 63189 is to provide VPPs use cases that capture the basic information, business roles, actors, scenarios, and processes.
- Technical specification72 pagesEnglish languagesale 15% off
IEC TS 63189-1:2023 covers the terms and definitions, system composition and control modes of virtual power plant (VPP). It defines the functional requirements for VPPs, including power generation forecasting, load forecasting, generation and consumption scheduling, control and management of energy storage devices and loads, coordinated optimization of distributed energy resources, status monitoring and communication, data collection and analysis, and market transactions.
Since a virtual power plant is a cluster of dispersed energy converting installations, which are aggregated, it uses additional systems to achieve its objectives (e.g. regional energy meteorology forecasting, site specific energy management systems, SCADA and other communication systems).
Local regulations, the electricity market model and the corresponding manner of organising the market related to the utilisation of controllable DER affect the management, control and operation of VPPs.
- Technical specification24 pagesEnglish languagesale 15% off