IEC/TC 122 - UHV AC transmission systems
Standardization in the field of AC transmission technology for highest voltage of the system exceeding 800 kV, particularly the preparation of systems-oriented specifications such as those for planning, design, technical requirements, construction, commissioning, reliability, availability, operation and maintenance. Development of processes for specifying requirements and demonstrating whether the required performance of UHV systems is assured. Responsibility for equipment standards remains with product TCs, except for specific equipment which is not within the scope of an existing TC but is nevertheless essential for the UHV transmission system. The UHV AC Transmission TC will consult and coordinate with the product TCs in all systems-related aspects of equipment standards.
UHV AC transmission systems
Standardization in the field of AC transmission technology for highest voltage of the system exceeding 800 kV, particularly the preparation of systems-oriented specifications such as those for planning, design, technical requirements, construction, commissioning, reliability, availability, operation and maintenance. Development of processes for specifying requirements and demonstrating whether the required performance of UHV systems is assured. Responsibility for equipment standards remains with product TCs, except for specific equipment which is not within the scope of an existing TC but is nevertheless essential for the UHV transmission system. The UHV AC Transmission TC will consult and coordinate with the product TCs in all systems-related aspects of equipment standards.
General Information
Frequently Asked Questions
IEC/TC 122 is a Technical Committee within CLC. It is named "UHV AC transmission systems" and is responsible for: Standardization in the field of AC transmission technology for highest voltage of the system exceeding 800 kV, particularly the preparation of systems-oriented specifications such as those for planning, design, technical requirements, construction, commissioning, reliability, availability, operation and maintenance. Development of processes for specifying requirements and demonstrating whether the required performance of UHV systems is assured. Responsibility for equipment standards remains with product TCs, except for specific equipment which is not within the scope of an existing TC but is nevertheless essential for the UHV transmission system. The UHV AC Transmission TC will consult and coordinate with the product TCs in all systems-related aspects of equipment standards. This committee has published 1 standards.
IEC/TC 122 develops CLC standards in the area of Z99 - UNDETERMINED - Information technology. The scope of work includes: Standardization in the field of AC transmission technology for highest voltage of the system exceeding 800 kV, particularly the preparation of systems-oriented specifications such as those for planning, design, technical requirements, construction, commissioning, reliability, availability, operation and maintenance. Development of processes for specifying requirements and demonstrating whether the required performance of UHV systems is assured. Responsibility for equipment standards remains with product TCs, except for specific equipment which is not within the scope of an existing TC but is nevertheless essential for the UHV transmission system. The UHV AC Transmission TC will consult and coordinate with the product TCs in all systems-related aspects of equipment standards. Currently, there are 1 published standards from this technical committee.
CLC is a standardization organization that develops and publishes standards to support industry, commerce, and regulatory requirements.
A Technical Committee (TC) in CLC is a group of experts responsible for developing international standards in a specific technical area. TCs are composed of national member body delegates and work through consensus to create standards that meet global industry needs. Each TC may have subcommittees (SCs) and working groups (WGs) for specialized topics.
This part of IEC 63042-102 specifies the procedure to plan and design UHV transmission project and the items to be considered.
- Draft60 pagesEnglish languagee-Library read for1 day





