CEN/TC 396/WG 6 - Hydraulic placement of mineral waste
Hydraulic placement of mineral waste
General Information
Frequently Asked Questions
CEN/TC 396/WG 6 is a Working Group within the European Committee for Standardization (CEN). It is named "Hydraulic placement of mineral waste". This committee has published 1 standards.
CEN/TC 396/WG 6 develops CEN standards in the area of Information technology. Currently, there are 1 published standards from this working group.
The European Committee for Standardization (CEN) is a public standards organization that brings together the national standardization bodies of 34 European countries. CEN provides a platform for developing European Standards (ENs) and other technical documents in relation to various products, materials, services, and processes, supporting the European Single Market.
A Working Group in CEN is a specialized group responsible for developing standards or technical work within a defined scope. These bodies bring together international experts to create consensus-based standards that support global trade, safety, and interoperability.
This European Standard gives general guidelines for the hydraulic placement of extractive wastes applicable, in particular, to the extractive industries.
The scope of this European Standard includes any dam, confining embankment or other structure serving to contain, retain, confine or otherwise support such wastes on surface in a terrestrial environment.
This standard therefore addresses the characterisation of the extractive waste for the purposes of hydraulic placement in the MWF both as part of the confining embankment and for safe storage, and in addition:
- specifies minimum requirements for the data to be acquired before the design and execution stage of a hydraulic fill project;
- provides guidelines for the selection of the type of confining embankment appropriate for the selected site;
- provides guidelines for the selection and characterisation of the construction materials;
- establishes general principles on how to design and execute the hydraulic fill project from pre deposition through operation to closure and rehabilitation;
- provides guidelines for monitoring and quality control of all stages of the hydraulic fill project to ensure long-term safety and stability.
- Standard98 pagesEnglish languagee-Library read for1 day