SIST ETS 300 347-1:1997/A1:1998
(Amendment)V interfaces at the digital Local Exchange (LE); V5.2 interface for the support of Access Network (AN); Part 1: V5.2 interface specification
- Abstract
This amendment corrects errors which have been detected during and after the definition phase of TSS&TP for the V5.2 interface.
- Status
- Published
- Publication Date
- 30-Sep-1998
- Technical Committee
- SPS - Signalling protocols and switching
- Current Stage
- 6060 - National Implementation/Publication (Adopted Project)
- Start Date
- 01-Oct-1998
- Due Date
- 01-Oct-1998
- Completion Date
- 01-Oct-1998
SIST ETS 300 347-1:1997/A1:1998 is the Slovenian adoption of the ETSI amendment to the V5.2 interface specification for the digital Local Exchange (LE) and Access Network (AN). It corrects and clarifies the procedures, message coding, and SDL behavior used by V5.2 implementations at the LE and AN sides. The document is for telecom engineers, equipment suppliers, integrators, and test teams that need the amended V5.2 behavior.
What does SIST ETS 300 347-1:1997/A1:1998 specify?
SIST ETS 300 347-1:1997/A1:1998 specifies amendments to the V5.2 interface specification in ETS 300 347-1 (1994). It focuses on corrected protocol behavior, especially for system start-up, restart, port alignment, link failure handling, control messaging, protection protocol behavior, and SDL diagrams.
The amendment is organized as changes to clauses in the main specification and to several annexes. The annexes carry the detailed procedures, configuration example, SDL process descriptions, and message coding data that implementers use when building or testing V5.2 equipment.
| Annex | What it covers |
|---|---|
| Annex C | System start-up, restart, accelerated port alignment, timers, and related procedures |
| Annex E | Link failure rules and de-allocation behavior |
| Annex F | Example of AN and LE configuration |
| Annex L | SDL diagrams for startup, restart, port alignment, protection, and link control |
| Annex M | Message type and information element coding |
What are the key requirements of SIST ETS 300 347-1:1997/A1:1998?
The most important effect of this amendment is to make the V5.2 control, protection, and recovery behavior more precise so that AN and LE implementations react the same way in edge cases. In practice, this matters for interoperability, fault recovery, and conformance testing.
System start-up and restart
Annex C clarifies that during system start-up all user ports shall enter the blocked state, then all relevant ports go through the coordinated unblock procedure after start-up completes. The variant ID and interface ID are checked during start-up, and an unsuccessful check triggers notification to the maintenance entity and a repeated system-start-up process.
The restart procedure is also rewritten as a symmetrical procedure. It can be invoked by system management in the AN or LE, or by the OS, and it uses timers TR1 and TR2 and MDU-CTRL restart messages. In practice, this means both sides follow the same recovery logic and avoid deadlock when restart is needed from both ends.
Accelerated port alignment
The amendment adds an accelerated alignment procedure based on MDU-CTRL(UNBLOCK ALL RELEVANT PORTS REQUEST), ... ACCEPTED, ... COMPLETED, and ... REJECTED. This allows port states to be aligned without blocking and unblocking each port individually. Unsuitable ports are handled separately and generate MPH-BI indications.
For implementers, this is a faster recovery path after start-up or re-alignment, but it still requires coordination with the maintenance entity and the control protocol entity.
Flow control between LAPV5-DL and layer 3
A new subclause states that LAPV5-DL flow control mechanisms, such as RNR and RR frames, are also used to control the flow of V5 messages at layer 3. If the peer cannot receive layer 3 messages or is overloaded, layer 3 shall not start sending new V5 messages and retransmission timers shall not start until the overload clears.
This matters because the standard ties message handling at layer 3 to existing layer 2 signaling instead of treating overload as a separate mechanism.
Control protocol, link control, and message coding
Clause 15.4 keeps the control protocol aligned with ETS 300 324-1 while updating the control function element and control function ID coding. It also defines the accelerated alignment procedure at the control protocol level.
Clause 16 corrects the link control functional model and the LINK CONTROL message content. Clause 17 corrects BCC message handling, including reject causes, protocol error causes, connection incomplete coding, timer behavior, and the handling of optional information elements. Clause 18 corrects protection protocol messages, including reset SN and protocol error behavior.
For readers, the practical point is that the amendment fixes the exact codes, states, and message contents that equipment must recognize and emit.
Link failure and resource de-allocation
Annex E clarifies what happens when a link failure or AN internal fault affects allocated resources. If the LE recognizes a link failure, it may block the link and the AN resource manager frees the related time slots internally. If the AN FAULT message contains enough information to identify the affected allocation, the LE does not need to send per-slot de-allocation commands.
This reduces unnecessary signaling during failure handling and gives a clear rule for when the LE must actively send DE-ALLOCATION messages.
What terms does SIST ETS 300 347-1:1997/A1:1998 define?
- Local Exchange (LE) - The exchange side of the V5.2 interface that connects to the AN and participates in signaling, control, and protection procedures.
- Access Network (AN) - The network side that provides access resources and manages ports, links, and bearer connections toward the LE.
- Finite State Machine (FSM) - The state-based control logic used for ports, links, and protocols when the standard describes transitions and recovery actions.
- Layer 3 (L3) - The signaling layer that carries V5 messages whose flow is controlled together with LAPV5-DL mechanisms.
- LAPV5-DL - The V5 data-link mechanism used for message transport and flow control, including RNR and RR handling.
- System management - The coordinating function that handles startup, restart, alignment, and notification actions across protocols.
- BCC - The bearer channel control protocol, used for allocation, de-allocation, audit, and fault-related signaling.
Who uses SIST ETS 300 347-1:1997/A1:1998?
Telecom equipment vendors use this amendment when implementing V5.2 interfaces in digital LE and AN products. Network engineers and system integrators use it when designing interoperability between exchange and access-network equipment.
Test and conformance teams use it to verify startup, restart, port alignment, link control, BCC, and protection behavior. Quality managers and buyers use it to check that a product follows the corrected V5.2 procedures and message codings expected by the interface specification.
What changed in SIST ETS 300 347-1:1997/A1:1998 from the previous edition?
This amendment modifies ETS 300 347-1 (1994) and corrects errors found during and after the TSS&TP definition phase for V5.2. The main changes include:
- clarified system start-up behavior, including variant/interface ID checking and repeated startup after failure
- a symmetrical PSTN restart procedure with TR1 and TR2 handling
- an accelerated port alignment procedure with UNBLOCK ALL RELEVANT PORTS messages and timers TU1 and TU2
- clearer link failure handling and de-allocation rules in Annex E
- updated flow control guidance using LAPV5-DL
- corrected message codes, information elements, table references, and SDL figures across the control, BCC, protection, and link control parts
Which standards are used with SIST ETS 300 347-1:1997/A1:1998?
- ETS 300 324-1 including amendment A1 - Provides the related V5.1 interface specification, and this amendment reuses and aligns several procedures and definitions with it.
- ETS 300 102-1 - Supplies the referenced code sets used where clause 13.5 points to the coding definitions.
- ETS 300 377-1 - Defines the LE configuration management standard that sets the V5InterfaceId.
- ETS 300 376-1 - The AN configuration management standard that refers to the V5InterfaceId defined for the interface configuration.
What does the SIST ETS 300 347-1:1997/A1:1998 document contain?
The document contains corrected clause text, updated subclauses, revised tables, and replacement SDL figures for the V5.2 interface specification. It also contains the detailed startup, restart, accelerated alignment, and link failure procedures that implementers use for design and interoperability work.
Several annexes provide the operational detail. Annex C gives the control flow for startup, restart, and port alignment; Annex E gives failure handling rules; Annex F provides a configuration example; Annex L shows the process diagrams; and Annex M gives the corrected coding for protocol messages and information elements.
Get Certified
Connect with accredited certification bodies for this standard

ANCE
Mexican certification and testing association.

Intertek Slovenia
Intertek testing, inspection, and certification services in Slovenia.
LNE (Laboratoire National de Métrologie et d'Essais)
French national laboratory for metrology and testing.
Sponsored listings
Frequently Asked Questions
SIST ETS 300 347-1:1997/A1:1998 is a amendment published by the Slovenian Institute for Standardization (SIST). Its full title is "V interfaces at the digital Local Exchange (LE); V5.2 interface for the support of Access Network (AN); Part 1: V5.2 interface specification". This standard covers: This amendment corrects errors which have been detected during and after the definition phase of TSS&TP for the V5.2 interface.
This amendment corrects errors which have been detected during and after the definition phase of TSS&TP for the V5.2 interface.
SIST ETS 300 347-1:1997/A1:1998 is classified under the following ICS (International Classification for Standards) categories: 33.040.30 - Switching and signalling systems. The ICS classification helps identify the subject area and facilitates finding related standards.
SIST ETS 300 347-1:1997/A1:1998 is available in PDF format for immediate download after purchase. The document can be added to your cart and obtained through the secure checkout process. Digital delivery ensures instant access to the complete standard document.
Standards Content (Sample)
SLOVENSKI STANDARD
01-oktober-1998
Signalizacijski protokoli in komutacija (SPS) - Vmesniki "V" pri digitalnih krajevnih
telefonskih centralah (LE) - Vmesnik V5.2 za podporo dostopovnega omrežja (AN) -
1. del: Specifikacija vmesnika V5.2
V interfaces at the digital Local Exchange (LE); V5.2 interface for the support of Access
Network (AN); Part 1: V5.2 interface specification
Ta slovenski standard je istoveten z: ETS 300 347-1/A1 Edition 1
ICS:
33.040.30 Komutacijski in signalizacijski Switching and signalling
sistem systems
2003-01.Slovenski inštitut za standardizacijo. Razmnoževanje celote ali delov tega standarda ni dovoljeno.
ETS 300 347-1
AMENDMENT A1
May 1997
Source: ETSI TC-SPS Reference: RE/SPS-03035-1
ICS: 33.020
Key words: V interface, V5 interface, LE, AN
This amendment A1 modifies
the European Telecommunication Standard ETS 300 347-1 (1994)
Signalling Protocols and Switching (SPS);
V interfaces at the digital Local Exchange (LE);
V5.2 interface for support of Access Network (AN);
Part 1: V5.2 interface specification
ETSI
European Telecommunications Standards Institute
ETSI Secretariat
Postal address: F-06921 Sophia Antipolis CEDEX - FRANCE
Office address: 650 Route des Lucioles - Sophia Antipolis - Valbonne - FRANCE
X.400: c=fr, a=atlas, p=etsi, s=secretariat - Internet: secretariat@etsi.fr
Tel.: +33 4 92 94 42 00 - Fax: +33 4 93 65 47 16
Copyright Notification: No part may be reproduced except as authorized by written permission. The copyright and the
foregoing restriction extend to reproduction in all media.
© European Telecommunications Standards Institute 1997. All rights reserved.
Page 2
ETS 300 347-1: September 1994/A1: May 1997
Whilst every care has been taken in the preparation and publication of this document, errors in content,
typographical or otherwise, may occur. If you have comments concerning its accuracy, please write to
"ETSI Editing and Committee Support Dept." at the address shown on the title page.
Page 3
ETS 300 347-1: September 1994/A1: May 1997
Foreword
This amendment to ETS 300 347-1 (1994) has been produced by the Signalling Protocols and Switching
(SPS) Technical Committee of the European Telecommunications Standards Institute (ETSI).
This amendment contains changes of clauses, subclauses and annexes of ETS 300 347-1 (1994) as
detailed below.
Transfer of V5.1 amendments (ETS 300 324-1/A1)
Annex C, item 5): According to annex C, item 5), the receiving entity of an unblock request
message is allowed to send no response back because it does not agree with
the unblock request. But then it is not possible for the sender of the unblock
request to distinguish between such a disagreement and a mismatch of the port
FSMs which has to be resolved by a block-unblock sequence.
Amendment: To avoid a situation where the FSMs stay undetected misaligned,
the receiver of a MPH-UBR shall respond to an unblock request within a certain
time limit.
Annex C, item 12): The text concerning re-provisioning verification is clarified.
Annex C, item 13): Initial state of the ISDN user port FSM, PSTN user port FSM and PSTN protocol
after system start up is not defined clearly.
Amendment: The system startup procedure is clarified. The SDL diagrams in
annex L are adapted accordingly.
It is stated that the interface and the variant ID shall be checked during system
startup. No procedure exists for the case of an unsuccessful check.
Amendment: The treatment of a unsuccessful system startup is be the same as
in the case of an unsuccessful restart (refer to annex C, item 14 b), last
paragraph).
Annex C, item 14): This item defines an asymmetrical PSTN restart procedure (master-slave
relationship). This leads to a lock-up situation if the restart is required from both
sides at the same point in time.
Amendment: The restart procedure is defined in a symmetrical way. The SDL
diagrams in annex L are adapted accordingly.
Annex C, item 17): If TC3 expires only on one side of the V5.1 interface, a mismatch of the PSTN
protocol FSMs after a re-establishment of the PSTN_DL can persist.
Amendment: The PSTN restart procedure is added in case of a re-
establishment of the PSTN_DL.
Annex C, table C.1: "Cause for start" of Timer TC2 is wrong.
Amendment: The cause for start is corrected.
Annex L, figure L.15.2: Figure L.15.2 is contradictory to annex C, item 13), which requires that the
variant and interface ID shall be checked during system start-up. Figure L.15.2
shows only a check of the interface ID.
Amendment: Update the figure by adding a decision for the correct variant.
Page 4
ETS 300 347-1: September 1994/A1: May 1997
Editorial
General: To be in line with existing definitions in the V5 standards, the "local manager"
and "system manager" are changed to "system management" in several places.
Clause 2: Update the normative reference to ETS 300 324-1 to include the amendment.
Subclause 13.5: Incorrect reference given where the code sets are defined. Change to the same
reference given by ETS 300 324-1.
Subclause 15.3.3.3.4: Correction of the state "Access Operational" that should be changed to
Operational to be in line with V5.1.
Subclause 15.3.3.3.4: In third paragraph, change the action to go from one state to another as "return
to" instead of "reset".
Clause 16, figure 11: The invisible text is reconstituted from an earlier version.
Subclause 16.2.4.5: A note is added about the sending of a notification to system management.
Subclause 16.3.1.1: Reconstitute the missing part of the table.
Subclause 16.3.2: The Link Control Function IE is defined differently in two separate places. The
value given in table M.2 (00110000) is correct.
Subclause 17.4.2.5: In table 42, the cause "V5 link unavailable (blocked)" missing. The cause with
diagnostic and length is added.
Subclause 17.4.2.6: An incorrect reference to subclause 17.5.8 is corrected.
Subclause 17.4.2.7: There are inconsistencies in the specification of the BCC protocol specification
element "Connection incomplete". The value in table 40 is correct and figure 24
is incorrect.
Subclause 17.5.5.2: Delete the duplicated word "entity".
Subclause 17.5.8: Subclause 17.5.8, third paragraph, states that a message with more than two
optional information elements shall be considered as too long, but in
subclause 17.3.8, up to three optional information elements are possible in the
AUDIT COMPLETE message in order to indicate an extent complete
connection.
Subclause 17.5.8.4: Split the subclause in two subclauses, one for mandatory and another (new) for
optional repeated information elements.
Subclause 17.6: There are inconsistencies between table 46 and table 47 in the BCC protocol.
Table 46 is changed to be consistent with table 47.
Subclause 17.7: In table 47 an unnecessary state is included for event MDU-BCC (Allocation
request) and state Bcc null (LEBcc0). Remove the "no state change" notation.
Subclause 18.3.2: In table 49, MDU "reset SN req" is not used in AN. It is mentioned in the ETS
only at this place and should therefore be deleted.
Subclause 18.3.2: PROTOCOL_ERROR PDU is missing in table 49.
Subclause 18.4.5: Table 56 contains a wrong reference for the IE Rejection Cause.
Subclause 18.4.6: Table 57 contains wrong references for the IE Logical C-channel identification,
Sequence number and Rejection Cause.
Page 5
ETS 300 347-1: September 1994/A1: May 1997
Subclause 18.6.2.3.1: An incorrect reference to subclause 18.6.2.2 is given.
Subclause 18.6.6.3: Change the subclause title by adding "mandatory" to be consistent with the text.
Subclause 18.8.2: Undefined protection protocol messages: (Wrong message name)
The message OS SWITCH-OVER REQ is defined in state SOLE0 and SOLE2
and can therefore be replaced by OS SWITCH-OVER COM.
Subclause 18.8.2: In table 66, the action in the protection protocol FSM contradicts
subclause 18.6.2.3.1 in state SOLE0 and event MDU-prot(OS-switch-over com).
Replace "-" by "MDU-prot(reset SN error ind)".
Annex L, figure L.6: Some MDU-Protection primitives are missing for SR_PROTECT_SYSMGT:
reset SN com, reset SN ind, reset SN ack and Protocol error indication.
Annex L, figure L.29: Some MDU-Protection primitives are missing for SR_PROTECT_SYSMGT:
reset SN com, reset SN ind, reset SN ack, reset SN req and Protocol error
indication.
Annex L, figure L.33.2: In the bottom diagram, the symbol for the message LINK CONTROL ACK has
the wrong direction.
Annex L, figure L.36.4: The cause for start of timer TSO4 is misalignment of sequence numbers VP(S)
or VP(R) and repetition at the first timeout. Initialization of the sequence
numbers V(P) or V(P) is only done in the procedure for misaligned handling
according to figure L.14. This procedure is applied at the AN side and LE side.
When a misalignment is detected and TSO4 is running, there will be no further
protocol messages apart from RESET SN COM. Therefore, the sequence
numbers remain in their initialization values.
Amendment: Both figures L.13.4 and L.36.4 are corrected with a task symbol to
initialize VP(S) and V(P) before start of TSO4.
Annex L, figure L.36.5: A stop of timer TSO2 is missing in the bottom left branch.
Annex L, figure L.36.7: In the bottom diagram, the symbol for the message RESET SN ACK has the
wrong direction.
Annex M, table M.1: The following code points missing: RESET SN COM, RESET SN ACK and
PROTOCOL ERROR. Table M.1 is inconsistent with table 51.
Annex M, table M.2: The given values for EFaddr and V5DLaddr are not in line with table 1.
Technical
Annex C, item 14): This item defines the PSTN restart procedure in an asymmetrical way. This can
lead to a deadlock situation if the restart is requested from the AN and the LE at
the same time. Therefore a symmetrical restart procedure is proposed to cope
with this situation. For the V5.1 interface specification (ETS 300 324-1), the
necessary changes have been introduced via an amendment. This amendment
contains detailed text and SDL diagrams to provide the symmetrical PSTN
restart procedure for the V5.2 interface specification.
Amendment: The new text combines the two items 14 a) and 14 b) of annex C
into one. Because of the proposed symmetry, the PSTN restart procedure
becomes nearly independent of internal or external triggering. Internal triggering
describes the PSTN restart within system start-up or after PSTN-DL failure.
External triggering implies the PSTN restart after reception of a restart request
from the control protocol entity.
Page 6
ETS 300 347-1: September 1994/A1: May 1997
As far as the SDL diagrams are concerned, the restart procedure appears as
one of many other independent processes which make up the V5 system
management. There are no global states for the system management (like in the
V5.1 case). This independence of the triggering of the restart procedure makes
it easier to cope with the necessary changes and to produce a clean version of
the SDL diagrams.
Annex E, clause E.6: Link failure: In a number of exceptional cases where connections established in
the AN are unusable it is not specified how the AN time slot resource manager
behaves. In these cases, unnecessary messages used to de-allocate time slots
may aggravate the situation due to limited processing and transfer capacity. The
amendment intends to avoid different interpretation. It chooses the solution
which requires the least number of messages to clear a critical situation.
Amendment: In case of a link failure recognized by the LE, the LE may block the
link to make sure that the AN recognizes the situation. The AN's resource
manager shall than de-allocate all time slots concerned internally. The LE does
not need to send de-allocate commands for the individual time slots.
In case of AN internal fault reported by an AN FAULT message which contains
both the time slot and the port layer 3 address (and, in case of ISDN, the
B-channel), no de-allocate command is required to be sent by the LE. In case
that the AN is not able to indicate both ends of the allocation (the AN FAULT
message contains either only the time slot or the port's layer 3 address and, in
case of ISDN, the B-channel) the LE shall send a de-allocate message for the
allocation concerned to make sure that both ends are available for new
allocations.
Enhancement of port unblocking
Subclause 3.1: Technical (Port state alignment procedure after interface start up):
Add a new definition of the relevant user port due to the accelerated port
unblocking (refer to subclause 15.4).
Subclause 15.4: Technical (Port state alignment procedure after interface start up).
Transposition dates
Date of adoption of this amendment: 2 May 1997
Date of latest announcement of this amendment (doa): 31 August 1997
Date of latest publication or endorsement of this amendment (dop/e): 28 February 1998
Date of withdrawal of any conflicting National Standard (dow): 28 February 1998
Page 7
ETS 300 347-1: September 1994/A1: May 1997
Amendments
Page 16, clause 2
Replace normative reference [8] by:
[8] ETS 300 324-1 (1994) including amendment A1 (1996): "Signalling Protocols
and Switching (SPS); V interfaces at the digital Local Exchange (LE); V5.1
interface for the support of Access Network (AN); Part 1: V5.1 interface
specification".
Page 18, subclause 3.1
Insert the following definition:
"relevant user port: A user port for which a layer 3 address has been assigned to."
Page 30
Insert a new subclause 8.7.4:
"8.7.4 Flow control using LAPV5-DL mechanisms
LAPV5-DL provides flow control mechanisms. Details are defined in subclause 10.4.
NOTE: LAPV5-DL, as specified in clause 10, provides flow control mechanisms for the V5
data links using e.g. RNR or RR frames. These procedures shall also be used to
control the flow of V5 messages at layer 3. This means, if one side is not able to
receive V5 messages at layer 3 this should be indicated to the peer side via the
existing mechanisms at layer 2 (i.e. via RNR frames).
Furthermore, if the peer layer 2 entity indicates via existing mechanisms at layer 2 that
the peer side is currently in an overload situation, layer 3 shall not initiate sending of
new V5 messages, but wait until the overload situation has disappeared. This includes,
that re-transmission timers shall not be started until the overload situation has
disappeared.
The above mechanisms require co-ordination between layer 2 and layer 3 via system
management."
Page 35, subclause 13.5
Change the reference from ETS 300 324-1 [8] to ETS 300 102-1 [6].
Page 42, subclause 15.3.3.3.4, second paragraph
Replace the state name "Operational" (AN2.0) to "Access Operational" (AN2.0).
Page 42, subclause 15.3.3.3.4, fourth paragraph
Replace the first sentence of the fourth paragraph by:
"For AN and LE, when in "Remote unblock" (AN1.2x, LE1.2x) state and receiving FE204 or FE203
respectively, the port state FSM is returned back to "Blocked" (AN1.0, LE1.0), and a MPH-BI sent to
management."
Page 8
ETS 300 347-1: September 1994/A1: May 1997
Page 44, subclause 15.3.3.4, last paragraph
Change "local manager" to "system management".
Page 44, subclause 15.3.3.5, last paragraph
Change "local manager" to "system management".
Page 45, subclause 15.4 and table 9
Replace the complete text of subclause 15.4 by:
"15.4 Control protocol
15.4.1 Control protocol message definition and content
The contents of this subclause are identical to subclause 14.4.1 of ETS 300 324-1 [8].
15.4.2 General message format and information element coding
The contents of this subclause are identical to subclause 14.4.2 of ETS 300 324-1 [8] with the exception
of table 54 of ETS 300 324-1 [8] which is modified due to two additional Control function elements
required for the ISDN primary rate port, and with the exception of table 55 of ETS 300 324-1 [8] which is
modified due to five additional Control function Ids for the accelerated alignment procedure. Tables 9 and
9a show the modified tables 54 and 55 of ETS 300 324-1 [8], respectively.
Table 9: Coding of Control function element
Bits (octet 3)
7 6 5 4 3 2 1 Control function element
0 0 0 0 0 1 FE101 (activate access)
0 0 0 0 0 1 0 FE102 (activation initiated by user)
0 0 0 0 0
1 1 FE103 (DS activated)
0 0 0 0 1 0 0 FE104 (access activated)
0 0 0 0 1 0 1 FE105 (deactivate access)
0 0 0 1 1 0 FE106 (access deactivated)
0 0 1 0 0
0 1 FE201/202 (unblock)
0 0 1 0 0 1 1 FE203/204 (block)
0 0 1 0 1 0 1 FE205 (block request)
0 1 0 1 1 0 FE206 (performance grading)
0 0 1 0 1 1 1 FE207 (D-channel block)
0 0 1 1
0 0 0 FE208 (D-channel unblock)
0 0 1 1 0 0 1 FE209 (TE out of service)
0 0 1 1 0 1 0 FE210 (failure inside network)
NOTE: All other values are reserved.
Page 9
ETS 300 347-1: September 1994/A1: May 1997
Table 9a: Coding of Control function ID
Bits (octet 3) Optional information element
7 6 5 4 3 2 1 Control function ID considered mandatory
0 0 0 0 0 0 0 Verify re-provisioning Variant
0 0 0 0 0 0 1 Ready for reprovisioning Variant
0 0 0
0 0 1 0 Not ready for reprovisioning Variant, Rejection cause
0 0 0 0 0 1 1 Switch over to new variant Variant
0 0 0 0 1 0 0
Re-provisioning started Variant
0 0 0 0 1 0 1 Cannot re-provision Variant, Rejection cause
0 0 0 0 1 1 0 Request variant and interface ID -
0 0
0 0 1 1 1 Variant and Interface ID Variant, Interface ID
0 0 0 1 0 0 0 Blocking started -
0 0 1 0 0 0 0 Restart -
0 0 1 0 0 0 1 Restart acknowledge -
0 0
1 0 0 1 0 UNBLOCK ALL RELEVANT PORTS REQUEST -
0 0 1 0 0 1 1 UNBLOCK ALL RELEVANT PORTS ACCEPTED -
0 0 1 0 1 0
0 UNBLOCK ALL RELEVANT PORTS REJECTED -
0 0 1 0 1 0 1 UNBLOCK ALL RELEVANT PORTS COMPLETED -
NOTE: All other values are reserved.
15.4.3 State definition of the control protocol
The contents of this subclause are identical to subclause 14.4.3 of ETS 300 324-1 [8].
15.4.4 Control protocol procedures
The contents of this subclause are identical to subclause 14.4.4 of ETS 300 324-1 [8].
15.4.5 Accelerated alignment of the port related protocol entities and FSMs
Alternatively it is possible to align port states in AN and LE by the commands: "Unblock all relevant ports
request". This can be accepted or rejected. After acceptance by the other side, all relevant ports are
brought to the unblocked state on both sides except those considered unsuitable to be unblocked. After
completion, MPH-BI is issued for each port considered to be unsuitable for unblocked state. See annex C
for details."
Page 46, figure 11
Add the formerly "invisible" text to figure 11:
Link Control Link Control
V5.2 link
Layer 1
Layer 1
FSM
FSM
Link Link
MPH
FSM FSM MPH
Signals
System System
FE-IDx link link
Management FE-IDx Management
MDU MDU
Control Control
FE30x FE30x
Protocol L3 Protocol L3
Link control Link control
data link L2
data link L2
C-channel C-channel
Figure 11: Link control functional model
Page 10
ETS 300 347-1: September 1994/A1: May 1997
Page 53, subclause 16.2.4.1, fourth paragraph
Change "managers" to "system management".
Page 59, subclause 6.2.4.4, second paragraph, first sentence
Change "system manager" to "system management".
Page 60, table 17
Add the following note:
"NOTE 5: Notification to system management about L1 fault."
Apply note 5 to state LE0.1 for events MDU-LUBR, FE302 and FE305.
Page 60, subclause 16.2.4.5, second paragraph, first sentence
Change "system manager" to "system management".
Page 61, table 19
Complete table 19 as follows:
Table 19: LINK CONTROL message content
Message Type: LINK CONTROL
Direction: both
Information element Reference Direction Type Length
Protocol Discriminator 13.2.1 both M 1
Layer 3 Address 16.3.2.1 both M 2
Message Type 13.2.3 both M 1
Link Control Function 16.3.2.2 both M 3
Page 62, subclause 16.3.2, table 21 and figure 14
Change the link control function coding from "00100001" to "00110000".
Page 79, subclause 17.4.1, third paragraph, last sentence
Replace "renerating" by "generating".
Page 83, subclause 17.4.2.5, second paragraph
Add the following text to the end of the second paragraph:
"(This is not checked by the LE)"
Page 85, table 42
Add the following row to table 42:
Cause Diagnostic Length
V5 link unavailable (blocked) V5 time slot identification or Multi-slot map 4 or 11
information element
Page 11
ETS 300 347-1: September 1994/A1: May 1997
Insert the following paragraph below table 42:
"If the length of the diagnostics in the reject cause information element is not correct (i.e. does not comply
with a value given in table 42), the LE shall react according to subclause 17.5.8.7."
Page 86, subclause 17.4.2.6, third paragraph
Replace "reject cause types" by "Protocol error cause types" twice.
Page 86, subclause 17.4.2.6, sixth paragraph
Replace the reference to "16.5.8" by "17.5.8".
Page 87, table 44
Insert the following paragraph below table 44:
"If the length of the diagnostics in the Protocol error cause information element is not correct (i.e. does not
comply with a value given in table 44), the LE shall react according to subclause 17.5.8.7."
Page 87, figure 24
Replace the information element identifier coding "11000001" by "01000110" and figure 24 as follows:
87654 321
01000 110 octet 1
Information element identifier
Length of the information element content octet 2
1 ext. Reason octet 3
(note)
NOTE: Bit 8 is marked "1 ext." as this is the last octet in the extension domain. Additional octets may
be defined later ("1 ext." will change to "0/1 ext.") and equipment shall be prepared to receive
such additional octets although the equipment need not be able to interpret or act upon the
content of these octets.
Figure 24: Connection incomplete information element
Page 91, subclause 17.5.5.2, first paragraph, first sentence
Delete the replication of "entity".
Page 93, subclause 17.5.8, third paragraph, first sentence
Change the first sentence to read: "If more than 3 optional information elements.".
Page 94, subclause 17.5.8.4, heading
Replace the heading of subclause 17.5.8.4 by:
"17.5.8.4 Repeated mandatory information element"
Page 95, top of page
Insert a new heading before "Whenever an optional information element (.)":
"17.5.8.4a Repeated optional information element"
Page 12
ETS 300 347-1: September 1994/A1: May 1997
Page 97, table 46, Timer number Tbcc3
Replace state "LE Bcc2" by "LE Bcc0".
Page 97, table 46, Timer number Tbcc4
Replace state "LE Bcc3" by "LE Bcc0".
Page 98, table 47, first row, first column
Delete the sign "-" (indicating "no state change") for event "MDU-BCC (Allocation request)", state "Bcc null
(LEBcc0)".
Page 106, table 49
Change "TSO2" to "TSO3", delete row "MDU-Protection (reset SN req)" and add a new row for
"PROTOCOL ERROR" as indicated below:
Name Direction Description
MDU-Protection PROTECT_AN --> SYS The Protection protocol entity indicates the expiry of
(switch-over error ind) timer TSO3 to the system management
MDU-Protection PROTECT_AN --> SYS The Protection protocol entity indicates to system
(reset SN req) management that reset of SN has been requested by
the peer entity
PROTOCOL ERROR PROTECT_AN --> PROTECT_LE Used by AN to indicate to the LE about protocol error
Page 110, table 56, last row
Replace the reference to "18.5.5" by "18.5.4".
Page 110, table 57
Replace the references to "17.5.1", "17.5.2" and "17.5.5" by "18.5.1", "18.5.2" and "18.5.5", respectively.
Page 117, subclause 18.6.2.3.1, sixth paragraph
Replace the reference to "17.6.2.2" by "18.6.2.2".
Page 123, subclause 18.6.6.3
Replace the heading of subclause 18.6.6.3 by:
"18.6.6.3 Repeated mandatory information element"
Page 13
ETS 300 347-1: September 1994/A1: May 1997
Page 127, table 66, second row
Modify event "MDU-Prot.(OS switch-over com)" as indicated below:
MDU-Prot. OS SWITCH-OVER COM; / OS SWITCH-OVER COM;
(OS switch-over com) start TSO2; SOLE1 start TSO2; SOLE1
(NOTE 1) MDU-Prot.(reset SN error ind);
-
Page 130, annex C, item(5)
Insert at the end of item 5):
"The remote side shall react on a MPH-UBR within a time limit of 5 min with MPH-BI or MPH-UBI."
Page 132, annex C, item(12), "Re-provisioning verification:"
Replace the second sentence "This procedure (.) re-provisioning" by:
"This procedure avoids a situation in which ports are operational while there is a mismatch of
variant ID or interface ID after re-provisioning."
Page 133, annex C, item(13)
Insert at the end of item 13):
"During the system startup procedure all
...



