ISO/FDIS 20734
(Main)Building environment design — Daylighting design procedure for indoor visual environment
- Abstract
This document explores and references the different daylight metrics used globally that could have been specifically designed to address different situations (e.g. climates, seasonal specific sunlight availability, cultural values, and seasonal weather patterns). This document also provides quality views criteria for all regularly occupied areas within a building. Finally, the design process is outlined which lists necessary actions during design, construction, commissioning, post commissioning, post occupancy evaluations, and continual improvement.
- Status
- Not Published
- Technical Committee
- ISO/TC 205 - Building environment design
- Current Stage
- 5020 - Proof sent to secretariat or FDIS ballot initiated: 8 weeks - 50 Approval
- Start Date
- 12-Oct-2026
- Due Date
- 12-Oct-2026
- Completion Date
- 12-Oct-2026
Buy Documents
ISO/FDIS 20734 - Building environment design — Daylighting design procedure for indoor visual environment
REDLINE ISO/FDIS 20734 - Building environment design — Daylighting design procedure for indoor visual environment
ISO/FDIS 20734 is an ISO document on building environment design for the indoor visual environment. It specifies a daylighting design procedure that combines daylight sufficiency, control of daylight excessiveness, and quality views for use by design teams, owners, occupants, contractors, and other building stakeholders.
What does ISO/FDIS 20734 specify?
ISO/FDIS 20734 specifies a design procedure for daylighting in indoor spaces, including how to set goals, choose metrics, verify performance, and use post-occupancy feedback. It applies to new construction and retrofit projects, and it is intended for regularly occupied areas where daylight and views matter in daily use.
The document is organized into fundamentals, design elements, and a step-by-step design process, followed by two normative annexes with calculation metrics.
| Annex | What it covers |
|---|---|
| Annex A | Quality View Calculation Metrics |
| Annex B | Daylight and Sunlight Sufficiency and Excessiveness Design Metrics |
The body of the document covers scope, normative references, terms and definitions, fundamentals, project information, the framework for generation and verification, documentation at approval, design elements of daylight environment, and the design process from programming through continuous improvement.
What are the key requirements of ISO/FDIS 20734?
ISO/FDIS 20734 requires a documented, iterative daylighting process that connects programming goals to design decisions, measurement, and post-occupancy learning. In practice, the standard is not just about calculations - it asks the project team to define goals, test them, verify them, and improve the building after use.
Programming, project information, and goals
Clause 4.2 requires project information, constraints, codes, owner/client goals, and any assumptions to be documented. That matters because daylight and view decisions depend on site conditions, intended use, occupant needs, and the local regulatory context.
Clause 5.2.1 and 6.1 require the design team and owner/client representatives to set subjective and objective goals for quality views, daylight sufficiency, and mitigation of daylight excessiveness. The standard links those goals to Annex A and Annex B, so the project team has a clear way to choose metrics rather than relying on general intent.
Integrated design and verification
Clause 4.3 requires repetitive processing, verification, and validation at each design stage, with attention to the life-cycle effects of design decisions. The practical point is that daylighting is treated as a coordinated building-system issue, not as a last-minute facade check.
Clause 6.1.5 lists the people who should be connected through an ongoing integrated design process, including the architect, interior designer, lighting designer, structural engineer, mechanical engineer, sustainability consultant, owner/client representatives, occupant representatives, and commissioning provider. That matters because daylight performance is shaped by orientation, openings, interior finishes, furniture, controls, and ventilation or energy trade-offs.
Design-stage actions
The design process in Clause 6 moves through programming, conceptual design, schematic design, preliminary design, final design, and measurement and verification. Across those stages, the standard calls for setting goals, determining building orientation and room layout, sizing and locating daylight openings, refining glare-mitigation strategies, integrating electric lighting and controls, and checking whether the design meets the goals.
For practical use, this means the team should test daylight performance more than once - not only at final design. The document specifically points to yearly, daily, and seasonal modeling approaches, which helps teams align the model with the kind of daylight behavior they are trying to predict.
Objective and subjective evaluation
Clause 5.2.2 and 5.2.3 connect subjective POE questionnaire items with objective metrics. Subjective responses are collected on a 5-point Likert scale, and the standard ties common questions to objective references in Annex A and Annex B.
This is important in practice because the document asks whether occupants are satisfied, not only whether the model passes a threshold. The POE structure links design intent to actual occupant experience of views, daylight sufficiency, glare, and well-being.
Measurement, POE, and continuous improvement
Clause 6.6 requires testing of daylight controls, checking that daylight excessiveness controls are installed and functioning, and confirming that daylight sufficiency and quality views meet the programming goals. Clause 6.7 then requires POE after occupants have experienced one full year in the building.
Clause 6.9 requires a continuous improvement process based on POE results. If targets are met, POE is repeated at an interval set by the authority having jurisdiction or in three years, whichever is sooner; if targets are not met, POE is repeated in one year. In practice, the standard expects daylighting to be managed as a living performance topic, not a one-time design deliverable.
What terms does ISO/FDIS 20734 define?
ISO/FDIS 20734 defines the terms that anchor the document’s daylight and view criteria.
- Daylight - part of global solar radiation capable of causing a visual sensation, including scattered radiation when the sun is below the horizon.
- Daylight opening - a glazed or unglazed area that admits daylight into an interior.
- Regularly occupied space - an enclosed area where people normally spend more than one hour of continuous occupancy per person per day on average.
- Quality views - a visual connection to the outdoors that gives occupants a diverse, clear, and meaningful perspective and supports comfort and well-being.
- Daylight sufficiency - enough daylight illumination for occupants to complete visual tasks in a habitable room.
- Daylight excessiveness - daylight or sunlight that causes visual discomfort while occupants are doing visual tasks in a habitable room.
- Post Occupancy Evaluation (POE) - evaluation of a facility after completion and use to understand actual performance against requirements and capture lessons learned.
- Visual task - the visual elements of the work being done.
Who uses ISO/FDIS 20734?
ISO/FDIS 20734 is used by the design team and by building stakeholders who need to define, test, and review daylight and view performance. The introduction names architects, engineers, building owners, tenants, contractors, government officials, and academic staff as intended users.
In practice, it is used by:
- architects and interior designers to shape rooms, openings, and layouts
- lighting designers and engineers to coordinate daylight with electric lighting and controls
- sustainability consultants and commissioning providers to verify performance
- owners, owner representatives, and occupant representatives to set goals and review POE results
- facility and building teams to support continuous improvement after occupancy
Which standards are used with ISO/FDIS 20734?
ISO/FDIS 20734 relies on or points to several other standards and documents for terminology, process, and related methods.
- ISO 16813:2024 - provides the general principles for indoor environment design and the continuous improvement activities referenced in Clause 2 and Clause 6.9.
- IEC 60050-845 - supplies lighting vocabulary used in the terms and definitions.
- ISO 19454:2019 - supports daylight opening design and is referenced when locating and sizing apertures.
- ISO 16817:2017 - provides the indoor visual environment design process that the introduction and POE discussion build on.
- ISO 41014:2020 - supports facility management strategy and is cited for the POE definition.
- ISO 15686-10:2023 - is referenced for assessing functional performance timing in the measurement and verification process.
- EN 17037:2018+A1:2021 - informs several view metrics in Annex A.
- ANSI/IES LM-83-23:2023 - informs spatial daylight autonomy and annual sunlight exposure in Annex B.
- CIE PS 001:2024 and CIE S 026/E:2018 - support the circadian-lighting discussion in Annex B.
What does the ISO/FDIS 20734 document contain?
ISO/FDIS 20734 contains a full daylighting workflow for indoor visual environment design, from programming through post-occupancy improvement. It gives the project team a structure for defining goals, documenting assumptions, coordinating disciplines, and checking performance against occupant needs.
The document also contains two normative annexes with metric guidance. Annex A organizes quality-view metrics such as view outwards, view access, horizontal sight angle, distance to scene content, scene content layers, scene dynamism, and view clarity index, while Annex B groups daylight and sunlight metrics for fenestration geometry, static and dynamic daylight illumination, sunlight exposure, glare and contrast, and circadian-related daylight considerations.
In addition to the metric descriptions, the body of the document includes questionnaire items, design-stage actions, verification steps, and POE reporting guidance. That makes it useful for design documentation, simulation work, commissioning, occupant feedback collection, and later re-measurement when a building is adjusted or reoccupied.
Buy Documents
ISO/FDIS 20734 - Building environment design — Daylighting design procedure for indoor visual environment
REDLINE ISO/FDIS 20734 - Building environment design — Daylighting design procedure for indoor visual environment
Get Certified
Connect with accredited certification bodies for this standard

DIBt (Deutsches Institut für Bautechnik)
German Institute for Building Technology.
DIN CERTCO
DIN Group product certification.

Aboma Certification B.V.
Specialized in construction, metal, and transport sectors.
Sponsored listings
Frequently Asked Questions
ISO/FDIS 20734 is a draft published by the International Organization for Standardization (ISO). Its full title is "Building environment design — Daylighting design procedure for indoor visual environment". This standard covers: This document explores and references the different daylight metrics used globally that could have been specifically designed to address different situations (e.g. climates, seasonal specific sunlight availability, cultural values, and seasonal weather patterns). This document also provides quality views criteria for all regularly occupied areas within a building. Finally, the design process is outlined which lists necessary actions during design, construction, commissioning, post commissioning, post occupancy evaluations, and continual improvement.
This document explores and references the different daylight metrics used globally that could have been specifically designed to address different situations (e.g. climates, seasonal specific sunlight availability, cultural values, and seasonal weather patterns). This document also provides quality views criteria for all regularly occupied areas within a building. Finally, the design process is outlined which lists necessary actions during design, construction, commissioning, post commissioning, post occupancy evaluations, and continual improvement.
ISO/FDIS 20734 is classified under the following ICS (International Classification for Standards) categories: 91.160.10 - Interior lighting. The ICS classification helps identify the subject area and facilitates finding related standards.
ISO/FDIS 20734 is available in PDF format for immediate download after purchase. The document can be added to your cart and obtained through the secure checkout process. Digital delivery ensures instant access to the complete standard document.
Standards Content (Sample)
FINAL DRAFT
International
Standard
ISO/TC 205
Building environment design —
Secretariat: ANSI
Daylighting design procedure for
Voting begins on:
indoor visual environment
2026-10-12
Conception de l'environnement des bâtiments — Mode opératoire
Voting terminates on:
de conception de l'éclairage naturel pour l'environnement visuel
2026-12-07
intérieur
Member bodies are requested to consult relevant national interests in ISO/TC
274 before casting their ballot to the e-Balloting application.
RECIPIENTS OF THIS DRAFT ARE INVITED TO SUBMIT,
WITH THEIR COMMENTS, NOTIFICATION OF ANY
RELEVANT PATENT RIGHTS OF WHICH THEY ARE AWARE
AND TO PROVIDE SUPPOR TING DOCUMENTATION.
IN ADDITION TO THEIR EVALUATION AS
BEING ACCEPTABLE FOR INDUSTRIAL, TECHNO
LOGICAL, COMMERCIAL AND USER PURPOSES, DRAFT
INTERNATIONAL STANDARDS MAY ON OCCASION HAVE
TO BE CONSIDERED IN THE LIGHT OF THEIR POTENTIAL
TO BECOME STAN DARDS TO WHICH REFERENCE MAY BE
MADE IN NATIONAL REGULATIONS.
Reference number
FINAL DRAFT
International
Standard
ISO/TC 205
Building environment design —
Secretariat: ANSI
Daylighting design procedure for
Voting begins on:
indoor visual environment
Conception de l'environnement des bâtiments — Mode opératoire
Voting terminates on:
de conception de l'éclairage naturel pour l'environnement visuel
intérieur
© ISO 2026
Member bodies are requested to consult relevant national interests in ISO/TC
274 before casting their ballot to the e-Balloting application.
All rights reserved.
RECIPIENTS OF THIS DRAFT ARE INVITED TO SUBMIT,
WITH THEIR COMMENTS, NOTIFICATION OF ANY
This ISO publication is protected by copyright and is owned by ISO and/or its licensors.
RELEVANT PATENT RIGHTS OF WHICH THEY ARE AWARE
The content of this ISO publication is provided under licence, not sold. Use is subject to the applicable licence terms issued by ISO,
AND TO PROVIDE SUPPOR TING DOCUMENTATION.
an ISO member body, or an authorized third-party distributor.
IN ADDITION TO THEIR EVALUATION AS
BEING ACCEPTABLE FOR INDUSTRIAL, TECHNO
Except as required for implementation or expressly permitted by a separate licence, no part of this ISO publication may be
LOGICAL, COMMERCIAL AND USER PURPOSES, DRAFT
reproduced, distributed, modified, used, or made available in any form or by any means – electronic or mechanical, including
INTERNATIONAL STANDARDS MAY ON OCCASION HAVE
photocopying, scanning, recording, or posting on internal or external digital platforms. TO BE CONSIDERED IN THE LIGHT OF THEIR POTENTIAL
TO BECOME STAN DARDS TO WHICH REFERENCE MAY BE
Any use beyond the scope of the granted rights is prohibited and may result in legal action.
MADE IN NATIONAL REGULATIONS.
ISO copyright office
CP 401 • CH-1214 Vernier, Geneva
Phone: +41 22 749 01 11
Email: copyright@iso.org
Website: www.iso.org
Published in Switzerland
Reference number
ii
Contents Page
Foreword .iv
Introduction .v
1 Scope . 1
2 Normative references . 1
3 Terms and definitions . 1
4 Fundamentals . 2
4.1 General .2
4.2 Project information .3
4.3 Framework of generation and verification .3
4.4 Framework of documentation at approval .4
5 Design elements of daylight environment . 4
5.1 Design elements introduction .4
5.2 Quality daylighting and views design process: .4
6 Design process for the quality daylighting and views design procedure for indoor visual
environment . 5
Annex A (normative) Quality View Calculation Metrics .12
Annex B (normative) Daylight and Sunlight Sufficiency and Excessiveness Design Metrics .16
Bibliography .26
iii
Foreword
ISO (the International Organization for Standardization) is a worldwide federation of national standards
bodies (ISO member bodies). The work of preparing International Standards is normally carried out through
ISO technical committees. Each member body interested in a subject for which a technical committee
has been established has the right to be represented on that committee. International organizations,
governmental and non-governmental, in liaison with ISO, also take part in the work. ISO collaborates closely
with the International Electrotechnical Commission (IEC) on all matters of electrotechnical standardization.
The procedures used to develop this document and those intended for its further maintenance are described
in the ISO/IEC Directives, Part 1. In particular, the different approval criteria needed for the different types
of ISO document should be noted. This document was drafted in accordance with the editorial rules of the
ISO/IEC Directives, Part 2 (see www.iso.org/directives).
ISO draws attention to the possibility that the implementation of this document may involve the use of (a)
patent(s). ISO takes no position concerning the evidence, validity or applicability of any claimed patent
rights in respect thereof. As of the date of publication of this document, ISO had not received notice of (a)
patent(s) which may be required to implement this document. However, implementers are cautioned that
this may not represent the latest information, which may be obtained from the patent database available at
www.iso.org/patents. ISO shall not be held responsible for identifying any or all such patent rights.
Any trade name used in this document is information given for the convenience of users and does not
constitute an endorsement.
For an explanation of the voluntary nature of standards, the meaning of ISO specific terms and expressions
related to conformity assessment, as well as information about ISO's adherence to the World Trade
Organization (WTO) principles in the Technical Barriers to Trade (TBT), see www.iso.org/iso/foreword.html.
This document was prepared by Technical Committee ISO/TC 205, Building environment design, in
collaboration with ISO/TC 274, Light and lighting.
Any feedback or questions on this document should be directed to the user’s national standards body. A
complete listing of these bodies can be found at www.iso.org/members.html.
iv
Introduction
ISO TC 205 provides general principles for the design of building indoor environment. The principles defined
in ISO 16817 provide general design procedure for indoor visual environment based on the general design
process of ISO 16813.
The purpose of this document is to provide the design team members (architects and engineers), as well as
building owners, tenants, contractors, government officials, and academic staff, with design principles that
lead to high end user satisfaction, required visual comfort, health and well-being.
The end result provides for the indoor visual daylighted environment and quality views to the exterior
environment to aid provisions of required visual comfort, and positive physiological effects of daylight and
views.
v
FINAL DRAFT International Standard ISO/FDIS 20734:2026(en)
Building environment design — Daylighting design procedure
for indoor visual environment
1 Scope
This document explores the different daylight metrics used around the world that can be specifically designed
to address different climates, seasonal specific sunlight availability, altitude, latitude and longitude, cultural
values, and seasonal weather patterns. This document also provides quality views criteria for all regularly
occupied areas within a building. Finally, the design process is outlined which lists necessary actions during
design, construction, commissioning, post commissioning and post occupancy evaluations. It covers new
constructions as well as the retrofit of existing buildings and adaptation to changing needs.
2 Normative references
The following documents are referred to in the text in such a way that some or all of their content constitutes
requirements of this document. For dated references, only the edition cited applies. For undated references,
the latest edition of the referenced document (including any amendments) applies.
ISO 16813:2024, Building environment design — Indoor environment — General principles
IEC 60050-845, International Electrotechnical Vocabulary (IEV) — Part 845: Lighting
3 Terms and definitions
For the purposes of this document, the terms and definitions given in IEC 60050-845 and the following apply.
ISO and IEC maintain terminology databases for use in standardization at the following addresses:
— ISO Online browsing platform: available at https:// www .iso .org/ obp
— IEC Electropedia: available at https:// www .electropedia .org/
3.1
design team
group of people who are responsible for building design
Note 1 to entry: The design team can consist of an architect, an interior designer, a lighting designer, a landscape
designer, engineers in electrical engineering, illuminating engineering, HVAC systems, structural engineering and
construction management and other specialists.
[SOURCE: ISO 19454:2019, 3.5]
3.2
habitable room
room used or intended to be used for sleeping, cooking, living or eating purposes
Note 1 to entry: Enclosed spaces such as bath or toilet facilities service rooms, corridors, laundry, hallways, utility
rooms or similar spaces are excluded.
3.3
regularly occupied space
enclosed area where people normally spend time, defined as more than one hour of continuous occupancy
per person per day, on average
Note 1 to entry: See Reference [45].
3.4
rooflight
skylight
daylight opening on the roof or on a horizontal (or nearly horizontal) surface of a building
[SOURCE: IEC 60050-845:2020, 29-141, modified — the words "or nearly horizontal" are added]
3.5
roof window
skylight
opening in the plane of a pitched roof, which admits light and which can provide ventilation
[SOURCE: ISO 6707-1:2020, 3.3.3.14, modified — The words " construction for closing an" removed. Note 1 to
entry removed.]
3.6
post occupancy evaluation
POE
process of evaluating a facility after it has been completed and is in use to understand its actual performance
against that required and to capture lessons learned
[SOURCE: ISO 41014:2020, 3.1.4]
3.7
quality views
visual connection to the outdoor environment that provides occupants with a diverse, clear, and meaningful
perspective, contributing to comfort and well-being
Note 1 to entry: access to a quality view to the exterior may be facilitated by windows, and rooflights, roof windows,
or skylights. Criteria for a quality view will consider, at a minimum, Horizontal Sight Angle, Distance to the Scene
Content, and Scene Content Layers. Scene Content Dynamism has also been suggested as an additional important
criterion.
[SOURCE: EN 17037:2018+A1: 2021]
3.8
daylight sufficiency
provision of ample daylight illumination so that occupants can complete visual tasks in a habitable room
3.9
daylight excessiveness
provision of daylight or sunlight illumination that causes occupants to experience visual discomfort while
completing visual tasks in a habitable room
Note 1 to entry: Daylight excessiveness can include several phenomena including daylight glare, daylight discomfort
glare, daylight disability glare, and daylight veiling glare.
4 Fundamentals
4.1 General
General principles of indoor visual environment design allow the owners/clients and design team to provide
the desired quality of indoor visual environment in a building according to the fundamentals of the design
process. Exposure to daylight is an important criterion, especially for habitable rooms, because sufficient
exposure to daylight contributes to human health and a sense of well-being. However, it is also important to
mitigate daylight excessiveness. Therefore, proper inclusion of daylight may increase occupant satisfaction,
health, and well-being, especially compared to habitable rooms that exclude or severely limit daylight or
fail to adequately mitigate daylight excessiveness or overheating. The design team shall also consider the
site characteristics and possible sunshine duration on the building to satisfy the design team and owner/
client specified programming goals. Main concerns should be availability of daylight, mitigation of daylight
excessiveness including discomfort glare, and the visual relationship between the inside and outside of the
building.
Quality views to the exterior are a main concern as these, when included in indoor environments, can
have “positive effects on people’s emotional states and cognitive performance,” and have been shown to
[37]
increase individual creativity, productivity, and sense of well-being, as noted by Heschong. Therefore, the
inclusion of quality views indoors may increase occupant satisfaction as compared to habitable rooms that
[20]
exclude quality views. Quality views should be considered in the project information as they are integral
to occupants' visual comfort through daylight openings. Ideally daylight openings provide a view to the sky
and surrounding scenery. However, quality of view content is also determined by the site conditions, and is
further discussed in EN 17037:2018+A1: 2021 and in ISO 19454.
Post occupancy feedback and occupant satisfaction shall be conducted regularly in accordance with
subclauses 6.7 and 6.9.2 to determine design team and owner/client specified programming goals
verification.
Additionally, the nine general principles of sustainability (NGPS) should be considered as defined in
ISO 15392 throughout the design and continual improvement process. The NGPS include:
— continual improvement,
— equity,
— global thinking,
— holistic approach,
— involvement of interested parties,
— long-term consideration,
— precaution and risk,
— responsibility, and
— transparency.
4.2 Project information
The project information that influences the development of visual environment design concepts, together
with constraints, codes and owner/client goals, shall be documented. A description of the intended use
(and related requirements) of the building and occupant needs shall be included. When assumptions are
made in lieu of necessary information related to the standards or regulations applicable to quality visual
environment design, these assumptions shall be documented. The project information that influences the
programming, development and the design of building components shall also be documented in accordance
with ISO 16813. The design team is expected to work with owner/client representatives to set programming
goals relative to daylight and view criteria shall be documented with specific references to Annex A and
Annex B.
4.3 Framework of generation and verification
Architectural design/building system design are goal-driven activities for the satisfaction of all building
occupants. Hence, a repetitive processing, verification, and validation of the design decisions shall be
established at each stage of the design process, specifically focusing on occupant satisfaction. When a
decision is to be made, the design team shall make a review of the potential effects of that decision during
the life cycle of the building, including the potential effects on occupant satisfaction, health, and well-being.
The expected performance of the visual environment and the access to daylight and views shall be achieved
during these processes. If programming goals are not met, the design team shall determine acceptability
and act accordingly to improve design and outcomes to improve occupant satisfaction.
4.4 Framework of documentation at approval
The evaluation and approval processes shall be documented, with that documentation explicitly stating
what is to be provided by the project. The evaluation and approval process shall demonstrate that the
programming goals can be achieved, and every document provided shall describe the characteristics
planned and verify how they will be achieved. Transparent decision-making and communication processes
shall be established between owner/client and design team. Essential maintenance and replacement plans
of the building components shall be documented according to the expected service life of the building.
Owner/client approval should be obtained at each design stage. As a mechanism to ensure that occupant
satisfaction outcomes are understood and evaluated, and as a tool to guide continuous improvement to the
built environment and future design standards, verification of performance shall be documented through
[47]
Post Occupancy Evaluation (POE); see the WDBG POE Guidebook .
The documents issued during this design process shall cover the following questions:
— Is the stated definition of the project adequate and achieved?
— Is the environmental design for quality visual environment and access to views achieved?
— Are the building occupants satisfied with the provision of quality daylight and views?
— Is the building and interior design capable of providing the quality visual environment, performance,
and health and well-being benefits intended through use of daylight and access to views?
5 Design elements of daylight environment
5.1 Design elements introduction
The use of daylight to support indoor activities can produce spaces that are high-quality and healthy
environments for occupants. When daylight is used as a primary source of daytime illumination to
accommodate the visual tasks of occupants during occupied times, the space is often experienced as visually
comfortable, and can support occupant productivity, satisfaction, as well as their overall health and well-
being. Elements should be taken into consideration at each stage of the design process, including daylight
sufficiency and daylight excessiveness, as well as access to quality views to the exterior. Quality views
contribute to occupant visual and mental stimulation and often include illumination criteria (i.e. including
spectral power distribution, intensity, timing and duration of exposure) necessary to support circadian
rhythms, health and well-being, and occupant satisfaction, and therefore are an integral consideration for
the design team.
5.2 Quality daylighting and views design process:
5.2.1 Setting quality daylighting and view goals & defining POE process
Together the design team and owner/client representatives shall set subjective and objective goals during
project programming to guide the design process for quality views, daylight sufficiency, management
of daylight excessiveness, and to support health and well-being by making specific references to Annex A
and Annex B and in accordance with 5.2.2 and 5.2.3. These goals shall be developed so that all occupants
feel profoundly cared for. The design team shall work toward harmonization of architectural and building
system design for quality visual environment. As such, the objective is to harmonize the architectural,
building system, and interior design to provide access to daylight and quality views, while mitigating
daylight excessiveness, for all occupants.
5.2.2 Evaluating outcomes
Consider that outcomes will be evaluated by assessing occupant satisfaction based upon the following
categories using subjective measures to collect occupant feedback. All subjective measures shall be evaluated
on a 5-point Likert Scale from Strongly Agree to Strongly Disagree (5=Strongly Agree, 4=Agree, 3=Neither
Agree/Disagree, 2=Disagree, 1=Strongly Disagree). The design team and owner/client representatives shall
rd
together determine what organization will carry out the POE process. Use of an independent 3 party
organization is highly recommended. Properly anonymized granular results following EU General Data
Protection Regulations will be shared with both the design team and owner/client representatives as soon
as possible and within 3 months, summary results will be shared with occupant representatives within 6
[47]
months. Further guidance on implementing POEs is available in the WDBG POE Guidebook .
5.2.3 Subjective POE questionnaire Items (subjective measures) and objective daylight design metrics
(objective measures)
The owner/client and design team shall collaborate to establish goals and evaluation methods for quality
views, daylight sufficiency, management of daylight excessiveness, and to support health and well-being by
using the following outline. All subjective measures shall be evaluated by occupants on 5-point Likert Scale.
One or more objective measures shall be specifically referenced from the identified Annex.
a) Quality Views Outside
1) Simple Subjective Measure – “I am satisfied with the view through the windows in this space.”
2) Objective Measure – Reference Annex A, A.1.3.2 - Table A.1.
b) Daylight Sufficiency
1) Simple Subjective Measure – “I am satisfied with the amount of daylight in this space.”
2) Objective Measure – Reference Annex B, including the details as given in Subclauses B.1 to B.3.
c) Daylight Excessiveness (Including Discomfort Glare)
1) Simple Subjective Measure – “I do not experience glare or excessive brightness through windows/
skylight too frequently in the space.”
2) Objective Measure - Reference Annex B, including the details as given in B.4.3 and B.5.
d) Daylight & Well-being
1) Simple Subjective Measure — “When I am in this space, I feel well.”
2) Objective Measure — Reference Annex B, including the details as given in Subclauses B.4.2 and B.6.
e) Interior Design Visual Environment Integration
1) Simple Subjective Measure — “In my personal space, I have access to daylight and views.”
2) Open-ended Item (write-in response) — “Please describe your overall satisfaction with the visual
environment, and your ability to influence and control your access to daylight and views.”
6 Design process for the quality daylighting and views design procedure for indoor
visual environment
6.1 Programming - asking questions and defining goals
6.1.1 Project programming should include the following goals:
— Occupant needs are met
— Provisions for accessibility of daylight sufficiency, mitigation of daylight excessiveness (including
discomfort glare), and provision for quality views for all, setting specific goals referencing Annex A and
Annex B
— Equity of visual comfort for all
— Functional flexibility within the building
— Contribution to social equity and improvement for all
— Improvements on neighbouring outdoor environments
— Respect human values (see ISO 16817)
— Identification, characterization and involvement of the future occupants and their needs (see ISO 16817)
— Satisfaction of occupants and other affected parties (see ISO 16817)
— Circadian rhythm support for all occupants
Output: Develop a design programming document outlining the design team and owner/client specified
programming goals and how the design will meet the outlined goals, with consideration made related to the
[38]
IEC Gender Responsive Standards .
6.1.2 Daylighting programming
6.1.2.1 Prioritization of areas where occupants are located that need the most daylight and access to
quality views
6.1.2.2 Document areas where occupants have more choice/agency, where sunlight exposure may be more
desirable or acceptable
6.1.2.3 Provide plan on reducing daylight excessiveness and mitigating daylight excessiveness (including
discomfort glare) and excessive solar gain, specifically referencing Annex B
6.1.3 Outline design process for daylighting sufficiency, daylighting excessiveness (discomfort glare) and
quality views:
6.1.3.1 Calculation metrics inputs
6.1.3.1.1 Determine building location
6.1.3.1.2 Weather patterns
6.1.3.1.3 Seasonal effects
6.1.3.1.4 Occupant needs
6.1.3.2 Modelling techniques (physical, digital simulation, 3D climate based daylight simulation)
6.1.3.2.1 Yearly
6.1.3.2.2 Daily
6.1.3.2.3 Seasonal
6.1.4 Collect requirements
6.1.4.1 Owner/client project requirements/goals, including specified satisfaction targets for each POE
questionnaire item in accordance with subclause 5.2.3
iii. Example programming goal for occupant satisfaction – Quality Views Outside - Simple Subjective
Measure – “I am satisfied with the view through the windows in this space.”
1. Target response rate, 50 % of occupants respond
2. Target response value, 75 % of respondents provide a value of 3 or higher on the 5-point Likert
Scale, suggesting neutral or agreeable responses
6.1.4.2 Regulations such as codes, standards, “above-code” standards
6.1.4.3 Occupant needs and space functions
6.1.5 Establish relationships and communications platform among all design team members for an
ongoing and complete integrated design process including integrated design meetings beginning with the
Programming Design Phase through Post Occupancy Evaluations
6.1.5.1 Architect
6.1.5.2 Landscape Architect
6.1.5.3 Interior Designer
6.1.5.4 Lighting Designer
6.1.5.5 Structural Engineer
6.1.5.6 Mechanical Engineer
6.1.5.7 Sustainability Consultant
6.1.5.8 Owner/Client, Owner Representatives
6.1.5.9 Occupant Representatives
6.1.5.10 Commissioning Provider
6.1.5.11 Other design team members involved in the design of the site and building and who represent the
occupants
6.2 Conceptual design
6.2.1 Introduction statement about goals for quality daylight and views design procedure such that the
occupants will feel profoundly cared for
6.2.2 Coordinate with entire design team for an integrative design
6.2.3 Determine site, building orientation and spatial adjacencies
6.2.4 Determine interior volumes and space planning to support occupant tasks and activities within the
space
6.2.5 Develop concepts for access to quality views for all occupants to meet programming goals (in
accordance with Annex A, subclause A.1.3.2, Table A.1)
6.2.5.1 Determine level of quality views
6.2.5.2 Develop interior design concepts enabling quality views for all occupants
6.2.6 Develop concepts for access to daylight sufficiency for all occupants to meet programming goals (in
accordance with Annex B)
6.2.7 Provide concepts for mitigating daylight excessiveness (including discomfort glare) to meet
programming goals (in accordance with Annex B)
6.2.8 Provide analysis for circadian rhythms support (in accordance with Annex B, subclause B.6, see also
[10]
CIE Position Statement on Integrative Lighting )
6.2.9 Perform conceptual design exercises with methods outlined in Programming Phase
6.3 Schematic design — refining goals, exploring solutions
6.3.1 Introduction statement about goals for quality daylight and views design procedure such that the
occupants will feel profoundly cared for
6.3.2 Coordinate with entire design team for an integrative design
6.3.3 Determine room and area shapes and sizes to support occupant visual tasks and activities within
the space, while supporting adaptability and flexibility within the space
6.3.4 Determine daylighting aperture sizes and locations (see ISO 19454)
6.3.5 Perform quality daylighting sufficiency, access to views for all and daylight excessiveness calculations
to determine if design meets the programming goals (in accordance with Annex A and Annex B)
6.4 Preliminary design — design development
6.4.1 Introduction statement about goals for quality daylight and views design procedure such that the
occupants will feel profoundly cared for
6.4.2 Coordinate with entire design team for an integrative design
6.4.3 Refine room and area shapes and sizes to support occupant visual tasks and activities within the
space, while supporting adaptability and flexibility within the space
6.4.4 Refine daylighting aperture sizes and locations (see ISO 19454)
6.4.5 Refine daylight excessiveness (including discomfort glare) mitigation strategies including fixed
strategies and automated daylight management systems, including motorized blinds/shades, etc. (in
accordance with Annex A and Annex B practical considerations)
6.4.6 Integrate interior layouts including furniture, spatial interior organization, other items that could
block daylight and views
6.4.7 Integrate interior surface characteristics such as reflectance characteristics and interior glazing
6.4.8 Integrate electric lighting design and control strategies
6.4.9 Perform quality daylighting sufficiency, access to views for all and daylight excessiveness calculations
to determine if design meets the programming goals (in accordance with Annex A and Annex B)
6.5 Final design — construction documents
6.5.1 Introduction statement about goals for quality daylight and views design procedure such that the
occupants will feel profoundly cared for
6.5.2 Coordinate with entire design team for an integrative design
6.5.3 Finalize room and area shapes and sizes
6.5.4 Finalize daylighting aperture sizes and locations (see ISO 19454)
6.5.5 Finalize daylight excessiveness (including discomfort glare) mitigation strategies including fixed
strategies and automated daylight management systems
6.5.6 Finalize interior layouts including furniture, spatial interior organization, other items that could
block daylight and views
6.5.7 Finalize interior surface characteristics such as reflectance characteristics and interior glazing
6.5.8 Integrate electric lighting design and control strategies
6.5.9 Perform final quality daylighting sufficiency, access to views for all and daylight excessiveness
calculations to determine if design meets the programming goals (in accordance with Annex A and Annex B)
6.5.10 Finalize specifications
6.5.10.1 Glazing visible light transmission(VLT), solar heat gain coefficient (SHGC), shading coefficient
(SC), light to solar gain ratio, glazing color
6.5.10.2 Fixed daylight excessiveness (including discomfort glare) mitigation and automated daylight
management specifications
6.5.10.3 Develop Commissioning Specifications and Guidelines and Post Occupancy Evaluation plans
6.6 Measurement and verification - confirming the end results meet the programming goals
6.6.1 Introduction statement about goals for quality daylight and views design procedure such that the
occupants will feel profoundly cared for
6.6.2 Systematically testing of all daylight controls, including either or both management of electric
lighting with daylight sufficiency and automated mitigation of daylight excessiveness
6.6.3 Daylight excessiveness controls are installed correctly and functioning
6.6.4 Daylight sufficiency measurements met the programming goals
6.6.5 Quality views met the stated programming goals
6.6.6 Owner/client representatives and design team together identify what organization will conduct POE
and define schedule; (see ISO 16813:2024 and ISO 15686-10:2010, Subclause A.5, Annex C).
6.7 Post occupancy evaluations (POE)
6.7.1 Prepare to conduct POEs once occupants have experienced one full year in the building
6.7.2 Questionnaire items for subjective evaluations on satisfaction are available in subclause 5.2.3:
6.7.2.1 Quality views accessibility
6.7.2.2 Daylight sufficiency
6.7.2.3 Daylight excessiveness, including daylight discomfort glare
6.7.2.4 Daylight and well-being
6.7.2.5 Daylight and interior design visual environment integration
6.7.2.6 General occupant feedback and facility management complaint data may be collected as part of
POE process
6.7.3 Share POE feedback with owner/client representatives and design team
6.7.4 Owner/client representatives and design team together evaluate responses and decide how POE
feedback will be used to improve design and occupant satisfaction outcomes (see ISO 16817:2017, Annex A,
Annex B, goals from subclause 6.1.4)
6.7.5 Repeat POE (and design and construction improvements) until occupant satisfaction response
averages meet design team and owner/client specified programming goals (per subclause 6.1.4)
6.8 Re-measurement and re-verification - confirming results meet the programming goals
6.8.1 As necessary, implement design and construction improvements to increase occupant satisfaction
outcomes
6.8.2 After POE-guided design and construction improvements are complete, repeat measurement and
verification process in areas where adjustments were made (per subclause 6.6)
6.8.2.1 Re-commission and measurement and verification processes after improvements to:
6.8.2.1.1 Interior design and layout
6.8.2.1.2 New tenant or occupant functions
6.8.2.1.3 Other adjustments that affect quality daylighting and views for occupants
6.8.3 Update software on daylight control systems
6.8.4 Complete other alterations that affect the building operation, and occupant satisfaction
[40]
6.9 Continuous improvement (see ISO 16817, GSA-2019 )
6.9.1 After conducting POEs the organization conducting the POE shall set up a report based on:
6.9.1.1 Descriptive statistics from POE questionnaire.
— Recommend minimum response rate of 50 % regular occupants.
— Seek representative members of organization, diversity of occupants by building location,
employment status, job description type, age, gender, etc.
— List number of respondents to each questionnaire item (n=); if fewer than n=30 add note stating,
“Care must be taken when interpreting results, especially with a sample size below n=30 due to
possible non-normal distribution of data and limitations of correlational statistics.”; if fewer than 10
care for summary data is essential to preserve anonymity.
— Percent of respondents that rated 3 or higher (on 5-point Likert scale) for each questionnaire item.
— Average of responses for each questionnaire item.
— Standard deviation of responses for each questionnaire item.
6.9.1.2 Comparison of occupant satisfaction response averages relative to specified targets for each
questionnaire item (as defined in programming goals).
6.9.1.3 Narrative reflection on POE results and characterization relative to past and present experiences
and projects, lessons learned from the POE.
6.9.1.4 Planned and implemented improvements to the evaluated conditions to help meet specified
programming goals for each unmet item.
6.9.1.4.1 Leverage design team experience to propose improvements.
6.9.1.4.2 The POE Report shall propose improvements in accordance with Annex A and Annex B.
6.9.2 Implement selected improvements and develop a plan for continuous improvement (develop schedule
for re-evaluation per suggested example in subclauses 6.9.2.1 and 6.9.2.2). Continuous improvement
activities shall follow ISO 16813:2024, 4.9 and 4.10.
6.9.2.1 If all POE questionnaire items met specified programming goals, implement POE again according
to the duration required by authority having jurisdiction, or in three years, whichever is sooner.
6.9.2.2 If one or more POE questionnaire items specified programming goals were unmet, implement POE
again in one year.
Annex A
(normative)
Quality View Calculation Metrics
A.1 Metrics category: quality views
A.1.2 Practical considerations: View metrics typically document the view asset potential and typically do
not consider blind/shade use which may have a substantial impact on realized access to views by occupants.
View metrics do not often consider privacy demands. Automated blinds/shades are often controlled in a
uniform fashion based upon sunlight penetration depth and may limit access to views more than desired
by occupants. Research suggests that daylight glare is more tolerable when accompanied by quality views.
Available POE feedback suggests that most valued aspect of automated blinds/shades is to uniformly retract
blinds each morning preserving access to views with closure decisions made by occupants.
A.1.3 Metric name: assessment of view outwards from a given position
A.1.3.1 Metric description:EN 17037:2018+A1: 2021 documents three recommended levels of access to
quality views to the outdoors from a given indoor position, comprising three discreet metrics, Horizontal
Sight Angle, Distance to the Scene Content, and Scene Content Layers.
A.1.3.2 Metric criteria:
Table A.1 — Assessment of the view outwards from a given position
Reproduced with permission from EN17037: 2018+ A1: 2021 ,Table A.5
a
Parameter
Number of layers to be seen
from at least 75 % of utilized
area:
Level of recom- Outside dis-
Horizontal sight
— sky
mendation for tance of the
angle
view out view
— landscape (urban and/or
nature)
— ground
At least landscape layer is includ-
Minimum ≥ 14° ≥ 6,0 m
ed
Landscape layer and one addition-
Medium ≥ 28° ≥ 20,0 m al layer is included in the same
view opening
all layers are included in the same
High ≥ 54° ≥ 50,0 m
view opening
a
For a space with room depth more than 4 m, it is recommended that the respective sum of the view
opening(s) dimensions is at least 1,0 m × 1,25 m (width × height).
A.1.3.3 Climate/time conditions: static, point in time
A.1.3.4 Countries using criteria: European, Chile
A.1.3.5 Practical considerations: These metrics do not address the amount of natural scene content or
scene content dynamism, both of which have been shown to support improved occupant satisfaction. See
also Annex A.
A.1.4 Metric name: view access
A.1.4.1 Metric description: Quantifies the proportion of habitable indoor space from which occupants
have a direct line of sight to the outdoors through windows or other transparent elements, representing the
availability of external views for building users.
A.1.4.2 Metric criteria: View Access is typically expressed as the percentage of the regularly occupied
floor area from which a seated or standing occupant can see the outdoors through a window; common
criteria include:
— A direct line of sight from 1,2 meters above the floor to the window.
— Minimum distance or horizontal sight angle of view may be specified.
— Example threshold: At least 75 % of regularly occupied floor area must have access to view; e.g. LEED v4
[44]
BD+C EQ Credit: Quality Views .
A.1.4.3 Climate/time conditions: static, point in time, it is assessed based on building geometry, window
placement, and interior layout at a single point in time. However, some advanced assessments may consider
dynamic factors if interior layouts or partitions are movable, or dynamic façade systems are included.
A.1.4.4 Countries using criteria:
— United States: Used in LEED v4 and WELL Building Standard projects.
— France: Window-to-floor area ratio requirements (e.g., 1:6 rule) indirectly support view access
— United Kingdom: Referenced in BREEAM and other green building programs.
— International: Referenced in EN 17037:2018+A1: 2021 Daylight in Buildings, adopted in several European
countries.
A.1.4.5 Practical considerations: View Access is widely used in sustainable building rating systems (Such
as LEED v4 and WELL) to promote occupant well-being and connection to the outdoors. Its main limitation
is that it does not assess the quality or content of the view—only the presence or absence of a view—so it is
often paired with other metrics for a more comprehensive evaluation. See also Subclause A.1.2.
A.1.5 Metric name: horizontal sight angle
A.1.5.1 Metric description: Defines views with three levels of recommendations based upon horizontal
sight angle to view via aperture from a given indoor position.
A.1.5.2 Metric criteria: Minimum - between 14 and 28 degrees; Medium - between 28 and 54 degrees;
High - greater than 54 degrees.
A.1.5.3 Climate/time conditions: static, point in time
A.1.5.4 Countries using criteria: European, Chile
— International: Referenced in EN 17037:2018+A1: 2021 Daylight in Buildings, adopted in several European
countries.
A.1.5.5 Practical considerations: See subclause A.1.2.
A.1.6 Metric name: distance to scene content
A.1.6.1 Metric description: Defines views with three levels of recommendations based upon distance
from window to scene content.
A.1.6.2 Metric criteria: Minimum - between 6 and 20 meters; Medium - between 20 and 50 meters; High -
greater than 50 meters.
A.1.6.3 Climate/time conditions: static, point in time
A.1.6.4 Countries using criteria: European, Chile
— International: Referenced in EN 17037:2018+A1: 2021 Daylight in Buildings, adopted in several European
countries.
A.
...
ISO/TC 205
Secretariat: ANSI
ISO/TC 205/JWG 12
Date: 2026-07-1009-25
Building environment design — Daylighting design procedure for
indoor visual environment
Member bodies are requested to consult relevant national interests in ISO/TC 274 before casting their
ballot to the e-Balloting application.
ISO #####-#:####(X)
© Conception de l'environnement des bâtiments — Mode opératoire de conception de l'éclairage naturel pour
l'environnement visuel intérieur
FDIS stage
Member bodies are requested to consult relevant national interests in ISO/TC 274 before casting their
ballot to the e-Balloting application.
2 © ISO #### – All rights reserved
All rights reserved. Unless otherwise specified,
This ISO publication is protected by copyright and is owned by ISO and/or its licensors.
The content of this ISO publication is provided under licence, not sold. Use is subject to the applicable licence terms issued
by ISO, an ISO member body, or an authorized third-party distributor.
Except as required in the context of its for implementation or expressly permitted by a separate licence, no part of this
ISO publication may be reproduced or utilized otherwise, distributed, modified, used, or made available in any form or
by any means, – electronic or mechanical, including photocopying, scanning, recording, or posting on internal or external
digital platforms.
Any use beyond the internet or an intranet, without prior written permission. Permission can be requested from either
ISO at the address below or ISO’s member body in the countryscope of the requestergranted rights is prohibited and may
result in legal action.
ISO copyright office
CP 401 • CH. de Blandonnet 8
CH-1214 Vernier, Geneva
Phone: + 41 22 749 01 11
Email: copyright@iso.org
Website: www.iso.org
Published in Switzerland
iii
Contents
Foreword . v
Introduction . vi
1 Scope . 1
2 Normative references . 1
3 Terms and definitions . 1
4 Fundamentals . 3
4.1 General. 3
4.2 Project information . 4
4.3 Framework of generation and verification . 5
4.4 Framework of documentation at approval . 5
5 Design elements of daylight environment . 5
5.1 Design elements introduction . 5
5.2 Quality daylighting and views design process: . 5
6 Design process for the quality daylighting and views design procedure for indoor visual
environment . 7
Annex A (normative) Quality View Calculation Metrics . 13
Annex B (normative) Daylight and Sunlight Sufficiency and Excessiveness Design Metrics. 18
Bibliography . 30
This template allows you to work with default MS Word functions and styles. You can use these
if you want to maintain the Table of Contents automatically and apply auto-numbering.
To update the Table of Contents please select it and press "F9".
iv
Foreword
ISO (the International Organization for Standardization) is a worldwide federation of national standards
bodies (ISO member bodies). The work of preparing International Standards is normally carried out through
ISO technical committees. Each member body interested in a subject for which a technical committee has been
established has the right to be represented on that committee. International organizations, governmental and
non-governmental, in liaison with ISO, also take part in the work. ISO collaborates closely with the
International Electrotechnical Commission (IEC) on all matters of electrotechnical standardization.
The procedures used to develop this document and those intended for its further maintenance are described
in the ISO/IEC Directives, Part 1. In particular, the different approval criteria needed for the different types of
ISO document should be noted. This document was drafted in accordance with the editorial rules of the
ISO/IEC Directives, Part 2 (see www.iso.org/directives).
ISO draws attention to the possibility that the implementation of this document may involve the use of (a)
patent(s). ISO takes no position concerning the evidence, validity or applicability of any claimed patent rights
in respect thereof. As of the date of publication of this document, ISO had not received notice of (a) patent(s)
which may be required to implement this document. However, implementers are cautioned that this may not
represent the latest information, which may be obtained from the patent database available at
www.iso.org/patents. ISO shall not be held responsible for identifying any or all such patent rights.
Any trade name used in this document is information given for the convenience of users and does not
constitute an endorsement.
For an explanation of the voluntary nature of standards, the meaning of ISO specific terms and expressions
related to conformity assessment, as well as information about ISO's adherence to the World Trade
Organization (WTO) principles in the Technical Barriers to Trade (TBT), see www.iso.org/iso/foreword.html.
This document was prepared by Technical Committee ISO/TC 205, Building environment design, in
collaboration with ISO/TC 274, Light and lighting.
Any feedback or questions on this document should be directed to the user’s national standards body. A
complete listing of these bodies can be found at www.iso.org/members.html.
v
Introduction
ISO TC 205 provides general principles for the design of building indoor environment. The principles defined
in ISO 16817 provide general design procedure for indoor visual environment based on the general design
process of ISO 16813.
The purpose of this document is to provide the design team members (architects and engineers), as well as
building owners, tenants, contractors, government officials, and academic staff, with design principles that
lead to high end user satisfaction, required visual comfort, health and well-being.
The end result provides for the indoor visual daylighted environment and quality views to the exterior
environment to aid provisions of required visual comfort, and positive physiological effects of daylight and
views.
vi
Building environment design — Daylighting design procedure for
indoor visual environment
1 Scope
This document explores the different daylight metrics used around the world that can be specifically designed
to address different climates, seasonal specific sunlight availability, altitude, latitude and longitude, cultural
values, and seasonal weather patterns. This document also provides quality views criteria for all regularly
occupied areas within a building. Finally, the design process is outlined which lists necessary actions during
design, construction, commissioning, post commissioning and post occupancy evaluations. It covers new
constructions as well as the retrofit of existing buildings and adaptation to changing needs.
2 Normative references
The following documents are referred to in the text in such a way that some or all of their content constitutes
requirements of this document. For dated references, only the edition cited applies. For undated references,
the latest edition of the referenced document (including any amendments) applies.
ISO 16813:2024, Building environment design — Indoor environment — General principles
Continuous improvement activities shall follow ISO 16813, Clauses 4.9 and 4.10.
IEC 60050-845, International Electrotechnical Vocabulary (IEV) — Part 845: Lighting
3 Terms and definitions
For the purposes of this document, the terms and definitions given in IEC 60050-845 and the following apply.
ISO and IEC maintain terminology databases for use in standardization at the following addresses:
— — ISO Online browsing platform: available at https://www.iso.org/obp
— — IEC Electropedia: available at https://www.electropedia.org/
3.1
daylight
part of global solar radiation capable of causing a visual sensation
Note 1 to entry: Daylight includes scattered radiation from the sun at times when it is below the horizon (e.g. twilight).
[SOURCE: IEC 60050-845:2020, 29-105]
3.2
daylight opening
area, glazed or unglazed, that is capable of admitting daylight to an interior
[SOURCE: IEC 60050-845:2020, 29-139]
3.1 3.3
design team
group of people who are responsible for building design
Note 1 to entry: The design team can consist of an architect, an interior designer, a lighting designer, a landscape
designer, engineers in electrical engineering, illuminating engineering, HVAC systems, structural engineering and
construction management and other specialists.
[SOURCE: ISO 19454:2019, 3.5]
3.2 3.4
habitable room
room used or intended to be used for sleeping, cooking, living or eating purposes.
Note 1 to entry: Enclosed spaces such as bath or toilet facilities service rooms, corridors, laundry, hallways, utility rooms
or similar spaces are excluded.
3.3 3.5
regularly occupied space
enclosed area where people normally spend time, defined as more than one hour of continuous occupancy per
[45]
person per day, on average
[45]
Note 1 to entry: See Reference 3.6
possible sunshine duration
sum of the time intervals within a given time period during which the sun is above the real horizon, which
may be obscured by mountains, buildings, trees, etc
[SOURCE: IEC 60050-845:2020, 29-119]
3.7.
3.4
rooflight
skylight
daylight opening on the roof or on a horizontal (or nearly horizontal) surface of a building
[SOURCE: IEC 60050-845:2020, 29-141, modified --— the words "or nearly horizontal" are added]
3.5 3.8
roof window
skylight
opening in the plane of a pitched roof, which admits light and which can provide ventilation
[SOURCE: ISO 6707-1:2014]2020, 3.3.3.14, modified — The words " construction for closing an" removed.
Note 1 to entry removed.]
3.9
sunlight
part of direct solar radiation capable of causing a visual sensation
[SOURCE: IEC 60050-845:2020, 29-103]
3.10
window
daylight opening on a vertical or nearly vertical area of a room envelope
[SOURCE: IEC 60050-845:2020 29-140]
3.6 3.11
post occupancy evaluation
POE
process of evaluating a facility after it has been completed and is in use to understand its actual performance
against that required and to capture lessons learned
[SOURCE: ISO 41014:2020, 3.1.4]
3.7 3.12
quality views
visual connection to the outdoor environment that provides occupants with a diverse, clear, and meaningful
perspective, contributing to comfort and well-being
Note 1 to entry: access to a quality view to the exterior may be facilitated by windows, and rooflights, roof windows, or
skylights. Criteria for a quality view will consider, at a minimum, Horizontal Sight Angle, Distance to the Scene Content,
and Scene Content Layers. Scene Content Dynamism has also been suggested as an additional important criterion.
[SOURCE: EN 17037:2018+A1:2021]
3.13
visual task
visual elements of the work being done
Note 1 to entry: The main visual elements are the size of the structure, its luminance, its contrast against the background,
its colour, and its duration.
[SOURCE: IEC 60050-845:2020, 22-084]
3.8 3.14
daylight sufficiency
provision of ample daylight illumination so that occupants can complete visual tasks in a habitable room
3.9 3.15
daylight excessiveness
provision of daylight or sunlight illumination that causes occupants to experience visual discomfort while
completing visual tasks in a habitable room
Note 1 to entry: Daylight excessiveness can include several phenomena including daylight glare, daylight discomfort
glare, daylight disability glare, and daylight veiling glare.
3.16
circadian rhythm
biological rhythm with a period of approximately 24 h
[SOURCE: IEC 60050-845:2020, 26-041]
4 Fundamentals
4.1 General
General principles of indoor visual environment design allow the owners/clients and design team to provide
the desired quality of indoor visual environment in a building according to the fundamentals of the design
process. Exposure to daylight is an important criterion, especially for habitable rooms, because sufficient
exposure to daylight contributes to human health and a sense of well-being. However, it is also important to
mitigate daylight excessiveness. Therefore, proper inclusion of daylight may increase occupant satisfaction,
health, and well-being, especially compared to habitable rooms that exclude or severely limit daylight or fail
to adequately mitigate daylight excessiveness or overheating. The design team shall also consider the site
characteristics and possible sunshine duration on the building to satisfy the design team and owner/client
specified programming goals. Main concerns should be availability of daylight, mitigation of daylight
excessiveness including discomfort glare, and the visual relationship between the inside and outside of the
building.
Quality views to the exterior are a main concern as these, when included in indoor environments, maycan have
“positive effects on people’s emotional states and cognitive performance,” and have been shown to increase
[37] [37]
individual creativity, productivity, and sense of well-being, as noted by Heschong . Therefore, the
inclusion of quality views indoors may increase occupant satisfaction as compared to habitable rooms that
[20] [20]
exclude quality views . Quality views should be considered in the project information as they are integral
to occupants' visual comfort through daylight openings. Ideally daylight openings provide a view to the sky
and surrounding scenery. However, quality of view content is also determined by the site conditions, and is
further discussed in EN 17037:2018+A1:2021 and in ISO 19454:2019.
Post occupancy feedback and occupant satisfaction shall be conducted regularly (in accordance with
subclauses 6.7Subclauses 6.7 and 6.9.26.9.2) to determine design team and owner/client specified
programming goals verification.
Additionally, the nine general principles of sustainability (NGPS) should be considered as defined in ISO 15392
throughout the design and continual improvement process. The NGPS include:
— — continual improvement,
— — equity,
— — global thinking,
— — holistic approach,
— — involvement of interested parties,
— — long-term consideration,
— — precaution and risk,
— — responsibility, and
— — transparency.
4.2 Project information
The project information that influences the development of visual environment design concepts, together with
constraints, codes and owner/client goals, shall be documented. A description of the intended use (and related
requirements) of the building and occupant needs shall be included. When assumptions are made in lieu of
necessary information related to the standards or regulations applicable to quality visual environment design,
these assumptions shall be documented. The project information that influences the programming,
development and the design of building components shall also be documented in accordance with ISO 16813.
The design team is expected to work with owner/client representatives to set programming goals relative to
daylight and view criteria shall be documented with specific references to Annex AAnnex A and
Annex BAnnex B.
4.3 Framework of generation and verification
Architectural design/building system design are goal-driven activities for the satisfaction of all building
occupants. Hence, a repetitive processing, verification, and validation of the design decisions shall be
established at each stage of the design process, specifically focusing on occupant satisfaction. When a decision
is to be made, the design team shall make a review of the potential effects of that decision during the life cycle
of the building, including the potential effects on occupant satisfaction, health, and well-being. The expected
performance of the visual environment and the access to daylight and views shall be achieved during thisthese
processes. If programming goals are not met, the design team shall determine acceptability and act accordingly
to improve design and outcomes to improve occupant satisfaction.
4.4 Framework of documentation at approval
The evaluation and approval processes shall be documented, with that documentation explicitly stating what
is to be provided by the project. The evaluation and approval process shall demonstrate that the programming
goals can be achieved, and every document provided shall describe the characteristics planned and verify how
they will be achieved. Transparent decision-making and communication processes shall be established
between owner/client and design team. Essential maintenance and replacement plans of the building
components shall be documented according to the expected service life of the building. Owner/client approval
should be obtained at each design stage. As a mechanism to ensure that occupant satisfaction outcomes are
understood and evaluated, and as a tool to guide continuous improvement to the built environment and future
design standards, verification of performance shall be documented through Post Occupancy Evaluation (POE);
[47][47]
see the WDBG POE Guidebook .
The documents issued during this design process shall cover the following questions:
— — Is the stated definition of the project adequate and achieved?
— — Is the environmental design for quality visual environment and access to views achieved?
— — Are the building occupants satisfied with the provision of quality daylight and views?
— — Is the building and interior design capable of providing the quality visual environment, performance,
and health and well-being benefits intended through use of daylight and access to views?
5 Design elements of daylight environment
5.1 Design elements introduction
The use of daylight to support indoor activities can produce spaces that are high-quality and healthy
environments for occupants. When daylight is used as a primary source of daytime illumination to
accommodate the visual tasks of occupants during occupied times, the space is often experienced as visually
comfortable, and can support occupant productivity, satisfaction, as well as their overall health and well-being.
Elements should be taken into consideration at each stage of the design process, including daylight sufficiency
and daylight excessiveness, as well as access to quality views to the exterior. Quality views contribute to
occupant visual and mental stimulation and often include illumination criteria (i.e. including spectral power
distribution, intensity, timing and duration of exposure) necessary to support circadian rhythms, health and
well-being, and occupant satisfaction, and therefore are an integral consideration for the design team.
5.2 Quality daylighting and views design process:
5.2.1 5.2.1 Setting quality daylighting and view goals & defining POE process
Together the design team and owner/client representatives shall set subjective and objective goals during
project programming to guide the design process for quality views, daylight sufficiency, management of
daylight excessiveness, and to support health and well-being by making specific references to Annex AAnnex A
and Annex BAnnex B and in accordance with 5.2.2Subclauses 5.2.2 and 5.2.35.2.3. These goals shall be
developed so that all occupants feel profoundly cared for. Note that The design team shall work toward
harmonization of architectural and building system design for quality visual environment. As such, the
objective is to harmonize the architectural, building system, and interior design to provide access to daylight
and quality views, while mitigating daylight excessiveness, for all occupants.
5.2.2 5.2.2 Evaluating outcomes
Consider that outcomes will be evaluated by assessing occupant satisfaction based upon the following
categories using subjective measures to collect occupant feedback. All subjective measures shall be evaluated
on a 5-point Likert Scale from Strongly Agree to Strongly Disagree (5=Strongly Agree, 4=Agree, 3=Neither
Agree/Disagree, 2=Disagree, 1=Strongly Disagree). The design team and owner/client representatives shall
rd
together determine what organization will carry out the POE process. Use of an independent 3 party
organization is highly recommended. Properly anonymized granular results following EU General Data
Protection Regulations will be shared with both the design team and owner/client representatives as soon as
possible and within 3 months, summary results will be shared with occupant representatives within 6 months.
[47][47]
Further guidance on implementing POEs is available in the WDBG POE Guidebook .
5.2.3 5.2.3 Subjective POE questionnaire Items (subjective measures) and objective daylight design
metrics (objective measures)
The owner/client and design team shall collaborate to establish goals and evaluation methods for quality
views, daylight sufficiency, management of daylight excessiveness, and to support health and well-being by
using the following outline. All subjective measures shall be evaluated by occupants on 5-point Likert Scale.
One or more objective measures shall be specifically referenced from the identified Annex.
a) a) Quality Views Outside
1) 1) Simple Subjective Measure – “I am satisfied with the view through the windows in this space.”
2) 2) Objective Measure – Reference Annex A, A.1.3.2 - Table A.1Annex A, Subclause A.1.3.2 -
Table A.1.
b) b) Daylight Sufficiency
1) 1) Simple Subjective Measure – “I am satisfied with the amount of daylight in this space.”
2) 2) Objective Measure – Reference Annex BAnnex B,, including the details as given in
Subclauses B.1Subclauses B.1 to B.3B.3.
c) c) Daylight Excessiveness (Including Discomfort Glare)
1) 1) Simple Subjective Measure – “I do not experience glare or excessive brightness through
windows/skylight too frequently in the space.”
2) 2) Objective Measure - Reference Annex BAnnex B,, including the details as given in
B.4.3Subclauses B.4.3 and B.5B.5.
d) d) Daylight & Well-being
1) 1) Simple Subjective Measure –— “When I am in this space, I feel well.”
2) 2) Objective Measure –— Reference Annex BAnnex B,, including the details as given in
Subclauses B.4.2Subclauses B.4.2 and B.6B.6.
e) e) Interior Design Visual Environment Integration
1) 1) Simple Subjective Measure –— “In my personal space, I have access to daylight and views.”
2) 2) Open-ended Item (write-in response) -— “Please describe your overall satisfaction with the
visual environment, and your ability to influence and control your access to daylight and views.”
6 Design process for the quality daylighting and views design procedure for indoor
visual environment
6.1 6.1 Programming - asking questions and defining goals
6.1.1 6.1.1 Project programming should include the following goals:
— — Occupant needs are met
— — Provisions for accessibility of daylight sufficiency, mitigation of daylight excessiveness (including
discomfort glare), and provision for quality views for all, setting specific goals referencing
Annex AAnnex A and Annex BAnnex B
— — Equity of visual comfort for all
— — Functional flexibility within the building
— — Contribution to social equity and improvement for all
— — Improvements on neighboringneighbouring outdoor environments
— — Respect human values [(see ISO 16817])
— — Identification, characterization and involvement of the future occupants and their needs [(see ISO
16817])
— — Satisfaction of occupants and other affected parties [(see ISO 16817])
— — Circadian rhythm support for all occupants
Output: Develop a design programming document outlining the design team and owner/client specified
programming goals and how the design will meet the outlined goals, with consideration made related to the
[38][38]
IEC Gender Responsive Standards .
6.1.2 6.1.2 Daylighting programming
6.1.2.1 6.1.2.1 Prioritization of areas where occupants are located that need the most daylight
and access to quality views
6.1.2.2 6.1.2.2 Document areas where occupants have more choice/agency, where sunlight
exposure may be more desirable or acceptable
6.1.2.3 6.1.2.3 Provide plan on reducing daylight excessiveness and mitigating daylight
excessiveness (including discomfort glare) and excessive solar gain, specifically referencing Annex BAnnex B
6.1.3 6.1.3 Outline design process for daylighting sufficiency, daylighting excessiveness (discomfort glare)
and quality views:
6.1.3.1 6.1.3.1 Calculation metrics inputs
6.1.3.1.1 6.1.3.1.1 Determine building location
6.1.3.1.2 6.1.3.1.2 Weather patterns
6.1.3.1.3 6.1.3.1.3 Seasonal effects
6.1.3.1.4 6.1.3.1.4 Occupant needs
6.1.3.2 6.1.3.2 Modelling techniques (physical, digital simulation, 3D climate based daylight
simulation)
6.1.3.2.1 6.1.3.2.1 Yearly
6.1.3.2.2 6.1.3.2.2 Daily
6.1.3.2.3 6.1.3.2.3 Seasonal
6.1.4 6.1.4 Collect requirements
6.1.4.1 6.1.4.1 Owner/client project requirements/goals, including specified satisfaction
targets for each POE questionnaire item in accordance with subclause 5.2.3Subclause 5.2.3
cxi) iii. Example programming goal for occupant satisfaction – Quality Views Outside - Simple
Subjective Measure – “I am satisfied with the view through the windows in this space.”
1) 1. Target response rate, 50 % of occupants respond
2) 2. Target response value, 75 % of respondents provide a value of 3 or higher on the 5-point Likert
Scale, suggesting neutral or agreeable responses
6.1.4.2 6.1.4.2 Regulations such as codes, standards, “above-code” standards
6.1.4.3 6.1.4.3 Occupant needs and space functions
6.1.5 6.1.5 Establish relationships and communications platform among all design team members for an
ongoing and complete integrated design process including integrated design meetings beginning with the
Programming Design Phase through Post Occupancy Evaluations
6.1.5.1 6.1.5.1 Architect
6.1.5.2 6.1.5.2 Landscape Architect
6.1.5.3 6.1.5.3 Interior Designer
6.1.5.4 6.1.5.4 Lighting Designer
6.1.5.5 6.1.5.5 Structural Engineer
6.1.5.6 6.1.5.6 Mechanical Engineer
6.1.5.7 6.1.5.7 Sustainability Consultant
6.1.5.8 6.1.5.8 Owner/Client, Owner Representatives
6.1.5.9 6.1.5.9 Occupant Representatives
6.1.5.10 6.1.5.10 Commissioning Provider
6.1.5.11 6.1.5.11 Other design team members involved in the design of the site and building and
who represent the occupants
6.2 6.2 Conceptual design
6.2.1 6.2.1 Introduction statement about goals for quality daylight and views design procedure such that
the occupants will feel profoundly cared for
6.2.2 6.2.2 Coordinate with entire design team for an integrative design
6.2.3 6.2.3 Determine site, building orientation and spatial adjacencies
6.2.4 6.2.4 Determine interior volumes and space planning to support occupant tasks and activities within
the space
6.2.5 6.2.5 Develop concepts for access to quality views for all occupants to meet programming goals (in
accordance with Annex A, subclause A.1.3.2, Table A.1Annex A Subclause A.1.3.2 - Table A.1 ))
6.2.5.1 6.2.5.1 Determine level of quality views
6.2.5.2 6.2.5.2 Develop interior design concepts enabling quality views for all occupants
6.2.6 6.2.6 Develop concepts for access to daylight sufficiency for all occupants to meet programming
goals (in accordance with Annex BAnnex B))
6.2.7 6.2.7 Provide concepts for mitigating daylight excessiveness (including discomfort glare) to meet
programming goals (in accordance with Annex BAnnex B))
6.2.8 6.2.8 Provide analysis for circadian rhythms support (in accordance with
Annex B, subclause B.6Annex B Subclauses B.6,, see also CIE Position Statement on Integrative
[10][10]
Lighting ))
6.2.9 6.2.9 Perform conceptual design exercises with methods outlined in Programming Phase
6.3 6.3 Schematic design -— refining goals, exploring solutions
6.3.1 6.3.1 Introduction statement about goals for quality daylight and views design procedure such that
the occupants will feel profoundly cared for
6.3.2 6.3.2 Coordinate with entire design team for an integrative design
6.3.3 6.3.3 Determine room and area shapes and sizes to support occupant visual tasks and activities
within the space, while supporting adaptability and flexibility within the space
6.3.4 6.3.4 Determine daylighting aperture sizes and locations (see ISO 19454:2019)
6.3.5 6.3.5 Perform quality daylighting sufficiency, access to views for all and daylight excessiveness
calculations to determine if design meets the programming goals (in accordance with Annex AAnnex A and
Annex BAnnex B))
6.4 6.4 Preliminary design -— design development
6.4.1 6.4.1 Introduction statement about goals for quality daylight and views design procedure such that
the occupants will feel profoundly cared for
6.4.2 6.4.2 Coordinate with entire design team for an integrative design
6.4.3 6.4.3 Refine room and area shapes and sizes to support occupant visual tasks and activities within
the space, while supporting adaptability and flexibility within the space
6.4.4 6.4.4 Refine daylighting aperture sizes and locations (see ISO 19454:2019)
6.4.5 6.4.5 Refine daylight excessiveness (including discomfort glare) mitigation strategies including fixed
strategies and automated daylight management systems, including motorized blinds/shades, etc. (in
accordance with Annex AAnnex A and Annex BAnnex B practical considerations)
6.4.6 6.4.6 Integrate interior layouts including furniture, spatial interior organization, other items that
could block daylight and views
6.4.7 6.4.7 Integrate interior surface characteristics such as reflectance characteristics and interior
glazing
6.4.8 6.4.8 Integrate electric lighting design and control strategies
6.4.9 6.4.9 Perform quality daylighting sufficiency, access to views for all and daylight excessiveness
calculations to determine if design meets the programming goals (in accordance with Annex AAnnex A and
Annex BAnnex B))
6.5 6.5 Final design -— construction documents
6.5.1 6.5.1 Introduction statement about goals for quality daylight and views design procedure such that
the occupants will feel profoundly cared for
6.5.2 6.5.2 Coordinate with entire design team for an integrative design
6.5.3 6.5.3 Finalize room and area shapes and sizes
6.5.4 6.5.4 Finalize daylighting aperture sizes and locations (see ISO 19454:2019)
6.5.5 6.5.5 Finalize daylight excessiveness (including discomfort glare) mitigation strategies including
fixed strategies and automated daylight management systems
6.5.6 6.5.6 Finalize interior layouts including furniture, spatial interior organization, other items that
could block daylight and views
6.5.7 6.5.7 Finalize interior surface characteristics such as reflectance characteristics and interior glazing
6.5.8 6.5.8 Integrate electric lighting design and control strategies
6.5.9 6.5.9 Perform final quality daylighting sufficiency, access to views for all and daylight excessiveness
calculations to determine if design meets the programming goals (in accordance with Annex AAnnex A and
Annex BAnnex B))
6.5.10 6.5.10 Finalize specifications
6.5.10.1 6.5.10.1 Glazing visible light transmission(VLT), solar heat gain coefficient (SHGC),
shading coefficient (SC), light to solar gain ratio, glazing color
6.5.10.2 6.5.10.2 Fixed daylight excessiveness (including discomfort glare) mitigation and
automated daylight management specifications
6.5.10.3 6.5.10.3 Develop Commissioning Specifications and Guidelines and Post Occupancy
Evaluation plans
6.6 6.6 Measurement and verification - confirming the end results meet the
programming goals
6.6.1 6.6.1 Introduction statement about goals for quality daylight and views design procedure such that
the occupants will feel profoundly cared for
6.6.2 6.6.2 Systematically testing of all daylight controls, including either or both management of electric
lighting with daylight sufficiency and automated mitigation of daylight excessiveness
6.6.3 6.6.3 Daylight excessiveness controls are installed correctly and functioning
6.6.4 6.6.4 Daylight sufficiency measurements met the programming goals
6.6.5 6.6.5 Quality views met the stated programming goals
6.6.6 6.6.6 Owner/client representatives and design team together identify what organization will
conduct POE and define schedule; (see ISO16813ISO 16813:2024 and ISO 15686--10:20232010,
Subclause A.5, Annex C).
6.7 6.7 Post occupancy evaluations (POE)
6.7.1 6.7.1 Prepare to conduct POEs once occupants have experienced one full year in the building
6.7.2 6.7.2 Questionnaire items for subjective evaluations on satisfaction are available in
subclause 5.2.3Subclause 5.2.3::
6.7.2.1 6.7.2.1 Quality views accessibility
6.7.2.2 6.7.2.2 Daylight sufficiency
6.7.2.3 6.7.2.3 Daylight excessiveness, including daylight discomfort glare
6.7.2.4 6.7.2.4 Daylight and well-being
6.7.2.5 6.7.2.5 Daylight and interior design visual environment integration
6.7.2.6 6.7.2.6 General occupant feedback and facility management complaint data may be
collected as part of POE process
6.7.3 6.7.3 Share POE feedback with owner/client representatives and design team
6.7.4 6.7.4 Owner/client representatives and design team together evaluate responses and decide how
POE feedback will be used to improve design and occupant satisfaction outcomes (see ISO 16817:2017,
Annex A, Annex B, goals from subclause 6.1.4Subclause 6.1.4))
6.7.5 6.7.5 Repeat POE (and design and construction improvements) until occupant satisfaction response
averages meet design team and owner/client specified programming goals (per subclause 6.1.4Subclause
6.1.4))
6.8 6.8 Re-measurement and re-verification - confirming results meet the programming
goals
6.8.1 6.8.1 As necessary, implement design and construction improvements to increase occupant
satisfaction outcomes
6.8.2 6.8.2 After POE-guided design and construction improvements are complete, repeat measurement
and verification process in areas where adjustments were made (per subclause 6.6Subclause 6.6))
6.8.2.1 6.8.2.1 Re-commission and measurement and verification processes after
improvements to:
6.8.2.1.1 6.8.2.1.1 Interior design and layout
6.8.2.1.2 6.8.2.1.2 New tenant or occupant functions
6.8.2.1.3 6.8.2.1.3 Other adjustments that affect quality daylighting and views for occupants
6.8.3 6.8.3 Update software on daylight control systems
6.8.4 6.8.4 Complete other alterations that affect the building operation, and occupant satisfaction
[40] [40]
6.9 6.9 Continuous improvement [(see ISO 16817, GSA-2019 ])
6.9.1 6.9.1 After conducting POEs the organization conducting the POE shall set up a report based on:
6.9.1.1 6.9.1.1 Descriptive statistics from POE questionnaire.
— — Recommend minimum response rate of 50 % regular occupants.
— — Seek representative members of organization, diversity of occupants by building location,
employment status, job description type, age, gender, etc.
— — List number of respondents to each questionnaire item (n=); if fewer than n=30 add note
stating, “Care must be taken when interpreting results, especially with a sample size below n=30 due
to possible non-normal distribution of data and limitations of correlational statistics.”; if fewer than
10 care for summary data is essential to preserve anonymity.
— — Percent of respondents that rated 3 or higher (on 5-point Likert scale) for each questionnaire item.
— — Average of responses for each questionnaire item.
— — Standard deviation of responses for each questionnaire item.
6.9.1.2 6.9.1.2 Comparison of occupant satisfaction response averages relative to specified
targets for each questionnaire item (as defined in programming goals)).
6.9.1.3 6.9.1.3 Narrative reflection on POE results and characterization relative to past and
present experiences and projects, lessons learned from the POE.
6.9.1.4 6.9.1.4 Planned and implemented improvements to the evaluated conditions to help
meet specified programming goals for each unmet item.
6.9.1.4.1 6.9.1.4.1 Leverage design team experience to propose improvements.
6.9.1.4.2 6.9.1.4.2 The POE Report shall propose improvements in accordance with
Annex AAnnex A and Annex BAnnex B .
6.9.2 6.9.2 Implement selected improvements and develop a plan for continuous improvement (develop
schedule for re-evaluation per suggested example in subclauses 6.9.2.1 and 6.9.2.2Subclause 6.9.2.1 and
6.9.2.2)). Continuous improvement activities shall follow ISO 16813:2024, 4.9 and 4.10.
6.9.2.1 6.9.2.1 If all POE questionnaire items met specified programming goals, implement
POE again according to the duration required by authority having jurisdiction, or in three years, whichever is
sooner.
6.9.2.2 6.9.2.2 If one or more POE questionnaire items specified programming goals were
unmet, implement POE again in one year.
Annex A
(normative)
Quality View Calculation Metrics
A.1 A.1 Metrics category: quality views
A.1.1 A.1.2 Practical considerations: View metrics typically document the view asset potential and
typically do not consider blind/shade use which may have a substantial impact on realized access to views by
occupants. View metrics do not often consider privacy demands. Automated blinds/shades are often
controlled in a uniform fashion based upon sunlight penetration depth and may limit access to views more
than desired by occupants. Research suggests that daylight glare is more tolerable when accompanied by
quality views. Available POE feedback suggests that most valued aspect of automated blinds/shades is to
uniformly retract blinds each morning preserving access to views with closure decisions made by occupants.
A.1.2 A.1.3 Metric name: assessment of view outwards from a given position
A.1.2.1 A.1.3.1 Metric description:EN 17037:2018+A1:2021
documents three recommended levels of access to quality views to the
outdoors from a given indoor position, comprising three discreet metrics,
Horizontal Sight Angle, Distance to the Scene Content, and Scene Content
Layers.
A.1.2.2 A.1.3.2 Metric criteria:
Table A.1 — Assessment of the view outwards from a given position
Reproduced with permission from EN17037:2018+A1:2021, Table A.5 16
a
Parameter
Number of layers to be seen
from at least 75 % of utilized
area:
Level of Outside
Horizontal sight
— sky
recommendati distance of
angle
on for view out the view
— landscape (urban and/or
nature)
— ground
At least landscape layer is
Minimum ≥ 14° ≥ 6,0 m
included
Landscape layer and one
Medium ≥ 28° ≥ 20,0 m additional layer is included in the
same view opening
all layers are included in the
High ≥ 54° ≥ 50,0 m
same view opening
a For a space with room depth more than 4 m, it is recommended that the respective sum of the view
opening(s) dimensions is at least 1,0 m × 1,25 m (width × height).
A.1.2.3 A.1.3.3 Climate/time conditions: static, point in time
A.1.2.4 A.1.3.4 Countries using criteria: European, Chile
A.1.2.5 A.1.3.5 Practical considerations: These metrics do not
address the amount of natural scene content or scene content dynamism, both
of which have been shown to support improved occupant satisfaction. See also
Annex AAnnex A.
A.1.3 A.1.4 Metric name: view access
A.1.3.1 A.1.4.1 Metric description: Quantifies the proportion
of habitable indoor space from which occupants have a direct line of sight to
the outdoors through windows or other transparent elements, representing
the availability of external views for building users.
A.1.3.2 A.1.4.2 Metric criteria: View Access is typically
expressed as the percentage of the regularly occupied floor area from which a
seated or standing occupant can see the outdoors through a window; common
criteria include:
— — A direct line of sight from 1,2 meters above the floor to the window.
— — Minimum distance or horizontal sight angle of view may be specified.
— — Example threshold: At least 75 % of regularly occupied floor area must have access to view; e.g. LEED
[44][44]
v4 BD+C EQ Credit: Quality Views .
A.1.3.3 A.1.4.3 Climate/time conditions: static, point in time,
it is assessed based on building geometry, window placement, and interior
layout at a single point in time. However, some advanced assessments may
consider dynamic factors if interior layouts or partitions are movable, or
dynamic façade systems are included.
A.1.3.4 A.1.4.4 Countries using criteria:
— — United States: Used in LEED v4 and WELL Building Standard projects.
— — France: Window-to-floor area ratio requirements (e.g., 1:6 rule) indirectly support view access
— — United Kingdom: Referenced in BREEAM and other green building programs.
— — International: Referenced in EN 17037:2018+A1:2021 Daylight in Buildings, adopted in several
European countries.
A.1.3
...







