A.C. supplied electronic ballasts for tubular fluorescent lamps - Performance requirements

Specifies performance requirements for electronic ballasts for use on a.c. supplies up to 1 000 V at 50 Hz or 60 Hz with operating frequencies deviating from the supply frequency, associated with tubular fluorescent lamps as specified in IEC 60081 and 60901 and other tubular fluorescent lamps for high frequency operation. The contents of the corrigendum of June 1991 have been included in this copy.

Ballasts électroniques alimentés en courant alternatif pour lampes tubulaires à fluorescence - Prescriptions de performances

Spécifie les prescriptions de performances pour les ballasts électroniques alimentés en courant alternatif (jusqu'à 1 000 V) à 50 Hz ou 60 Hz, avec des fréquences de travail s'écartant de la fréquence d'alimentation, et utilisés en association avec des lampes tubulaires à fluorescence comme indiqué dans les CEI 60081 et 60901, ou avec d'autres types de lampes à fluorescence pour fonctionnement à haute fréquence. Le contenu du corrigendum de juin 1991 a été pris en considération dans cet exemplaire.

General Information

Status
Published
Publication Date
20-Dec-1990
Technical Committee
SC 34C - Auxiliaries for lamps
Current Stage
DELPUB - Deleted Publication
Start Date
22-Dec-2003
Completion Date
14-Feb-2026

Relations

Effective Date
05-Sep-2023

Buy Documents

Standard

IEC 60929:1990/COR1:1991 - Corrigendum 1 - A.C. supplied electronic ballasts for tubular fluorescent lamps - Performance requirements Released:6/1/1991

English and French language (1 pages)
sale 15% off
Preview
sale 15% off
Preview

Get Certified

Connect with accredited certification bodies for this standard

Intertek Testing Services NA Inc.

Intertek certification services in North America.

ANAB United States Verified

UL Solutions

Global safety science company with testing, inspection and certification.

ANAB United States Verified

ANCE

Mexican certification and testing association.

EMA Mexico Verified

Sponsored listings

Frequently Asked Questions

IEC 60929:1990 is a standard published by the International Electrotechnical Commission (IEC). Its full title is "A.C. supplied electronic ballasts for tubular fluorescent lamps - Performance requirements". This standard covers: Specifies performance requirements for electronic ballasts for use on a.c. supplies up to 1 000 V at 50 Hz or 60 Hz with operating frequencies deviating from the supply frequency, associated with tubular fluorescent lamps as specified in IEC 60081 and 60901 and other tubular fluorescent lamps for high frequency operation. The contents of the corrigendum of June 1991 have been included in this copy.

Specifies performance requirements for electronic ballasts for use on a.c. supplies up to 1 000 V at 50 Hz or 60 Hz with operating frequencies deviating from the supply frequency, associated with tubular fluorescent lamps as specified in IEC 60081 and 60901 and other tubular fluorescent lamps for high frequency operation. The contents of the corrigendum of June 1991 have been included in this copy.

IEC 60929:1990 is classified under the following ICS (International Classification for Standards) categories: 29.140.30 - Fluorescent lamps. Discharge lamps. The ICS classification helps identify the subject area and facilitates finding related standards.

IEC 60929:1990 has the following relationships with other standards: It is inter standard links to IEC 60929:2003. Understanding these relationships helps ensure you are using the most current and applicable version of the standard.

IEC 60929:1990 is available in PDF format for immediate download after purchase. The document can be added to your cart and obtained through the secure checkout process. Digital delivery ensures instant access to the complete standard document.

Standards Content (Sample)


IEC Publication 929
Publication 929 de la CEI
(First edition - 1990)
(Première édition - 1990)
Ballasts électroniques alimentés en A.C.-supplied electronic ballast for
tubular fluorescent lamps-
courant alternatif pour lampes tubulaires
à fluorescence - Performance requirements

Prescriptions de performances
C O R R I G E N D U M 1
Page 3
Page 2
CONTENTS
SOMMAIRE
Instead of: 7 Starting operations
Correction en anglais seulement.
Read: 7 Starting conditions
Page 13
Page 12
Subclause 4.3
Paragraphe 4.3
Au lieu de: Un seul échantillon est soumis à Instead of: One sample is submitted to all
tests.
tous les essais.
Read: One ballast is submitted to all tests.
Lire: Un seul ballast est soumis à tous les
essais.
Page 15
Page 14
Subclause 5.1b)
Paragraphe 5.1b)
Instead of: The symbol Z which indi
...

Questions, Comments and Discussion

Ask us and Technical Secretary will try to provide an answer. You can facilitate discussion about the standard in here.

Loading comments...