ISO/IEC JTC 1/SC 24/AG 1 - Study group on visualization for systems integration
The goals of the study group are summarized as follows: Examine the progress of JTC 1 SD 24 Systems Integration and coordinate with identified JTC 1 subgroups on topics related to the architecture and application of visualization standards to systems integration initiatives. Review and analyze JTC 1 SD 24 Systems Integration architectures and requirements in order to identify SC 24 technologies and standards necessary for the successful development of JTC 1 SD 24 initiatives. This includes existing standards within the SC 24 programme of work as well as the identification of potential new work items (within SC 24 or jointly-developed) to address gaps and new requirements. Propose and maintain a common architecture for use of visualization in Systems Integration initiatives, and in support of JTC 1 Systems Integration activities. Identify/propose new study groups and/or NWIPs based on required changes and/or new requirements generated from the work of the study group and within SC 24 scope.
Groupe d’étude sur la visualisation pour l’intégration de systèmes
The goals of the study group are summarized as follows: Examine the progress of JTC 1 SD 24 Systems Integration and coordinate with identified JTC 1 subgroups on topics related to the architecture and application of visualization standards to systems integration initiatives. Review and analyze JTC 1 SD 24 Systems Integration architectures and requirements in order to identify SC 24 technologies and standards necessary for the successful development of JTC 1 SD 24 initiatives. This includes existing standards within the SC 24 programme of work as well as the identification of potential new work items (within SC 24 or jointly-developed) to address gaps and new requirements. Propose and maintain a common architecture for use of visualization in Systems Integration initiatives, and in support of JTC 1 Systems Integration activities. Identify/propose new study groups and/or NWIPs based on required changes and/or new requirements generated from the work of the study group and within SC 24 scope.