ISO/TC 138/SC 8/WG 3 - Plastics piping systems for rehabilitation of underground water supply networks
Systèmes de canalisations en plastique pour la rénovation des réseaux enterrés d'alimentation en eau
General Information
Frequently Asked Questions
ISO/TC 138/SC 8/WG 3 is a Subcommittee within the International Organization for Standardization (ISO). It is named "Plastics piping systems for rehabilitation of underground water supply networks". This committee has published 4 standards.
ISO/TC 138/SC 8/WG 3 develops ISO standards in the area of Information technology. Currently, there are 4 published standards from this subcommittee.
The International Organization for Standardization (ISO) is an independent, non-governmental international organization that develops and publishes international standards. Founded in 1947 and headquartered in Geneva, Switzerland, ISO brings together experts from 170+ member countries to share knowledge and develop voluntary, consensus-based standards that support innovation and provide solutions to global challenges.
A Subcommittee (SC) in ISO operates under a Technical Committee and focuses on a specific subset of the TC's scope. Subcommittees develop standards and technical specifications in their specialized area, reporting to their parent Technical Committee. They may also have working groups for detailed technical work.
This document, in conjunction with ISO 11298‑1, specifies requirements and test methods for cured-in-place pipes and fittings used for the renovation of water supply networks, which transport water intended for human consumption, including raw water intake pipelines. It applies to independent (fully structural, class A) and interactive (semi structural, class B) pressure pipe liners, as defined in ISO 11295, which do not rely on adhesion to the existing pipeline. It applies to the use of various thermosetting resin systems, in combination with compatible fibrous carrier materials, reinforcement, and other process-related plastics components (see 5.1). It does not include requirements or test methods for resistance to cyclic loading or the pressure rating of CIPP liners where passing through bends, which are outside the scope of this document. It is applicable to cured-in-place pipe lining systems intended to be used at a service temperature of up to 25 °C. NOTE For applications operating at service temperatures greater than 25 °C, guidance on re-rating factors can be supplied by the system supplier.
- Standard39 pagesEnglish languagesale 15% off
- Standard42 pagesFrench languagesale 15% off
This document, in conjunction with ISO 11298‑1, specifies requirements and test methods for close-fit lining systems intended to be used for the renovation of water supply networks, which transport water intended for human consumption, including raw water intake pipelines. It applies to pipes and fittings, as manufactured, as well as to the installed lining system. It is applicable to polyethylene (PE) pipes of either solid wall single layer or co-extruded layer construction, which is reduced in the factory or on site to provide a close-fitting independent or interactive pressure pipe liner, as well as associated fittings and joints for the construction of the lining system. It is not applicable to PE coated pipes having a peelable, contiguous, thermoplastic additional layer on the outside of the pipe. It is applicable to PE pipes, fittings and assemblies intended to be used at an operating temperature of 20 °C as the reference temperature. NOTE For applications operating at constant temperatures greater than 20 °C and up to 40 °C, see ISO 4427‑1:2007, Annex A.
- Standard16 pagesEnglish languagesale 15% off
- Standard16 pagesFrench languagesale 15% off
ISO 11298-1:2018 specifies the requirements and test methods for plastics piping systems intended to be used for the renovation of underground water supply networks. It is applicable to pipes and fittings, as manufactured, as well as to the installed lining system. It is not applicable to the existing pipeline or any non-structural sprayed coatings or annular filler. ISO 11298-1:2018 gives the general requirements common to all relevant renovation techniques.
- Standard16 pagesEnglish languagesale 15% off
- Standard17 pagesFrench languagesale 15% off
ISO 11298-2:2018, read in conjunction with ISO 11298-1, specifies requirements and test methods for pipes and fittings which are part of plastics piping systems installed as continuous pipes in the renovation of underground water supply networks. It is applicable to PE pipes of three different types: - PE solid wall single layered pipes (nominal outside diameter, dn), including any identification stripes; - PE pipes with co-extruded layers on either or both the outside and inside of the pipe (total outside diameter, dn), as specified in Annex A, where all layers have the same MRS rating; - PE coated pipes (outside diameter, dn) having a peelable, contiguous, thermoplastics additional layer on the outside of the pipe ("coated pipe"); see Annex A. In addition, ISO 11298-2:2018 covers - jointing of pipe lengths by means of butt fusion, and - fabricated and injection-moulded fittings made of PE. ISO 11298-2:2018 is applicable to PE pipes, fittings and assemblies intended to be used at an operating temperature of 20 °C as the reference temperature. NOTE For applications operating at constant temperatures greater than 20 °C and up to 40 °C, see ISO 4427-1:2007, Annex A.
- Standard9 pagesEnglish languagesale 15% off
- Standard9 pagesFrench languagesale 15% off





