PT 62600-202 - TC 114/PT 62600-202
TC 114/PT 62600-202
General Information
Frequently Asked Questions
PT 62600-202 is a Technical Committee within the International Electrotechnical Commission (IEC). It is named "TC 114/PT 62600-202". This committee has published 1 standards.
PT 62600-202 develops IEC standards in the area of Information technology. Currently, there are 1 published standards from this technical committee.
The International Electrotechnical Commission (IEC) is the world's leading organization for the preparation and publication of international standards for electrical, electronic, and related technologies. Founded in 1906, the IEC provides a global platform for companies, industries, and governments to meet, discuss, and develop the international standards they require.
A Technical Committee (TC) in IEC is a group of experts responsible for developing international standards in a specific technical area. TCs are composed of national member body delegates and work through consensus to create standards that meet global industry needs. Each TC may have subcommittees (SCs) and working groups (WGs) for specialized topics.
IEC TS 62600-202:2022 specifies the development stages of Tidal Energy Converters up to the pre-prototype scale (Stages 1 to 3). It includes the hydraulic laboratory test programs, where environmental conditions are controlled so they can be scheduled, and the first scaled system open-water trials, where combinations of tidal currents, wind and waves occur naturally and the programs are adjusted and flexible to accommodate these conditions. This document describes the minimum test programs that form the basis of a structured technology development schedule. For each testing campaign, the prerequisites, goals and minimum test plans are specified. This document addresses:
a: Planning an experimental program, including a design statement, technical drawings, selection of scale and facility based on physical laws, site data and other inputs; b: Device representation and characterization, including the physical device model, power-take-off components, foundation and mooring arrangements where appropriate; c: Energy resource and environment characterization, concerning either the tank testing facility or the open-water deployment site, depending on the stage of development; d: Specification of explicit test goals, including power conversion performance and device loads.
- Technical specification63 pagesEnglish languagesale 15% off