PT PREPNW TS SYCSM-1 (temporary) - Key Performance Aspects for Smart Manufacturing (To be formally established after the approval of the NP)
- Abstract
To describe the definitions, models and calculation method for key performance aspects of intelligent manufacturing.
- Slovenian
Key Performance Aspects for Smart Manufacturing (To be formally established after the approval of the NP)
To describe the definitions, models and calculation method for key performance aspects of intelligent manufacturing.
There are no results that match your search criteria
Frequently Asked Questions
PT PREPNW TS SYCSM-1 (temporary) is a Technical Committee within the International Electrotechnical Commission (IEC). It is named "Key Performance Aspects for Smart Manufacturing (To be formally established after the approval of the NP)" and is responsible for: To describe the definitions, models and calculation method for key performance aspects of intelligent manufacturing. This committee has published 0 standards.
PT PREPNW TS SYCSM-1 (temporary) develops IEC standards in the area of Information technology. The scope of work includes: To describe the definitions, models and calculation method for key performance aspects of intelligent manufacturing. Currently, there are 0 published standards from this technical committee.
The International Electrotechnical Commission (IEC) is the world's leading organization for the preparation and publication of international standards for electrical, electronic, and related technologies. Founded in 1906, the IEC provides a global platform for companies, industries, and governments to meet, discuss, and develop the international standards they require.
A Technical Committee (TC) in IEC is a group of experts responsible for developing international standards in a specific technical area. TCs are composed of national member body delegates and work through consensus to create standards that meet global industry needs. Each TC may have subcommittees (SCs) and working groups (WGs) for specialized topics.