IEC 61116:2025 used as a guidance that applies to hydroelectric installations containing impulse or reaction turbines with unit power up to about 15 MW and reference diameter of about 3 m. These figures do not represent absolute limits.
This document deals only with the direct relations between the purchaser or the consulting engineer and the supplier. It does not deal with civil works, administrative conditions or commercial conditions. This document is intended to be used by all concerned in the installation of electromechanical equipment for small hydroelectric plants.
This document, based essentially on practical information, aims specifically at supplying the purchaser of the equipment with information which will assist him with the following:
preparation of the call for tenders;
- evaluation of the tenders;
- contact with the supplier during the design and manufacture of the equipment;
- quality control during the manufacture and shop-testing;
- follow-up of site erection;
- commissioning;
- acceptance tests;
- operation and maintenance.
The document comprises the following:
a) general requirements for the electromechanical equipment of small hydroelectric installations;
b) technical specifications for the electromechanical equipment, excluding its dimensioning and standardization;
c) requirements for acceptance, operation and maintenance
This second edition cancels and replaces the first edition published in 1992. This edition includes the following significant technical changes with respect to the previous edition:
a) harmonization of scope with IEC 62006;
b) introduction of new technical aspects;
c) overall editorial revision.

  • Standard
    53 pages
    English language
    sale 15% off
  • Standard
    54 pages
    French language
    sale 15% off
  • Standard
    107 pages
    English and French language
    sale 15% off

IEC 62006:2010 defines the test, the measuring methods and the contractual guarantee conditions for field acceptance tests of the generating machinery in small hydroelectric power installations. It applies to installations containing impulse or reaction turbines with unit power up to about 15 MW and reference diameter of about 3 m. The driven generator can be of synchronous or asynchronous type. This International Standard contains information about most of the tests required for acceptance of the hydraulic turbine such as safety approval tests, trial operating and reliability tests, as well for verification of cavitation, noise and vibration conditions, if required. This standard represents the typical methods used on smaller hydroelectric installations, and is divided into three classes as follows:
Class A: Default, normal test program (panel measurement), to determine the maximum output of the installation.
Class B: Recommended, extended test program, to determine the performance characteristics of the installation.
Class C: Optional, comprehensive test program, to determine the absolute efficiency of the installation.
All classes contain safety tests, trial operating tests, and reliability tests. This standard gives all necessary references for the contract in order to execute the test, evaluate, calculate and compare the result to the guarantee for all the classes A, B and C.