D163/C014: NO SNC approved by BT on 2019-06-12.
CMs to 59032

  • Amendment
    5 pages
    English language
    e-Library read for
    1 day

IEC 60364-8-2:2018 provides additional requirements, measures and recommendations for design, erection and verification of all types of low-voltage electrical installation according to IEC 60364-1:2005, Clause 11, including local production and/or storage of energy in order to ensure compatibility with the existing and future ways to deliver electrical energy to current-using equipment or to the public network by means of local sources. Such electrical installations are designated as prosumer’s electrical installations (PEIs). This document also provides requirements for proper behaviour and actions of PEIs in order to efficiently obtain sustainable and safe operations of these installations when integrated into smart grids. These requirements and recommendations apply, within the scope of IEC 60364 (all parts), for new installations and modification of existing installations.

  • Standardization document
    51 pages
    English language
    e-Library read for
    1 day

Frequently Asked Questions

CLC/TC 64/WG 30 is a Working Group within CLC. It is named "Low-voltage electrical installations - Part 8-2: Smart Low-Voltage Electrical Installations" and is responsible for: HD 60364-8-82 This committee has published 3 standards.

CLC/TC 64/WG 30 develops CLC standards in the area of Information technology. The scope of work includes: HD 60364-8-82 Currently, there are 3 published standards from this working group.

CLC is a standardization organization that develops and publishes standards to support industry, commerce, and regulatory requirements.

A Working Group in CLC is a specialized group responsible for developing standards or technical work within a defined scope. These bodies bring together international experts to create consensus-based standards that support global trade, safety, and interoperability.