CLC/TC 112 - Power installations exceeding 1 kV AC (1.5 kV DC)
To prepare harmonized standards for high-voltage power installations (exceeding 1 kV AC or 1.5 kV DC) located indoor or outdoor, including earthing. The standards will specify the design requirements of the installations, and the selection and erection of electrical equipment in order to ensure the safety of persons and the proper operation of the installations. The standards will not be applicable to factory built and type tested equipment, but will be relevant to the installation of this equipment. The standards will not be applicable to overhead and underground lines between separate installations.
Power installations exceeding 1 kV AC (1.5 kV DC)
To prepare harmonized standards for high-voltage power installations (exceeding 1 kV AC or 1.5 kV DC) located indoor or outdoor, including earthing. The standards will specify the design requirements of the installations, and the selection and erection of electrical equipment in order to ensure the safety of persons and the proper operation of the installations. The standards will not be applicable to factory built and type tested equipment, but will be relevant to the installation of this equipment. The standards will not be applicable to overhead and underground lines between separate installations.
General Information
Frequently Asked Questions
CLC/TC 112 is a Technical Committee within CLC. It is named "Power installations exceeding 1 kV AC (1.5 kV DC)" and is responsible for: To prepare harmonized standards for high-voltage power installations (exceeding 1 kV AC or 1.5 kV DC) located indoor or outdoor, including earthing. The standards will specify the design requirements of the installations, and the selection and erection of electrical equipment in order to ensure the safety of persons and the proper operation of the installations. The standards will not be applicable to factory built and type tested equipment, but will be relevant to the installation of this equipment. The standards will not be applicable to overhead and underground lines between separate installations. This committee has published 0 standards.
CLC/TC 112 develops CLC standards in the area of Z99 - UNDETERMINED - Information technology. The scope of work includes: To prepare harmonized standards for high-voltage power installations (exceeding 1 kV AC or 1.5 kV DC) located indoor or outdoor, including earthing. The standards will specify the design requirements of the installations, and the selection and erection of electrical equipment in order to ensure the safety of persons and the proper operation of the installations. The standards will not be applicable to factory built and type tested equipment, but will be relevant to the installation of this equipment. The standards will not be applicable to overhead and underground lines between separate installations. Currently, there are 0 published standards from this technical committee.
CLC is a standardization organization that develops and publishes standards to support industry, commerce, and regulatory requirements.
A Technical Committee (TC) in CLC is a group of experts responsible for developing international standards in a specific technical area. TCs are composed of national member body delegates and work through consensus to create standards that meet global industry needs. Each TC may have subcommittees (SCs) and working groups (WGs) for specialized topics.